Vikingegaarden A/S Tinnetvej 70 DK-7173 Vonge. Vikingegaarden EcoMove Banke MM Media Mannov

Similar documents
CleanCharge Solutions ApS

Final report. 1.1 Project details. 1.2 Short description of project objective and results. 1.3 Executive summary. 1.4 Project objectives

ENTIFFIC EV Self-powered cabin heater

Final report. 1.1 Project details. 1.2 Short description of project objective and results. 1.3 Executive summary. 1.4 Project objectives

eco-fev: efficient Cooperative infrastructure for Fully Electric Vehicle Y. KOBAYASHI, M. LENARDI, Hitachi Europe, VIENNA, 06.February.

Measuring the Smartness of the Electricity Grid

ELECTRIC MOBILITY DISRUPTION

How to provide a better charging performance while saving costs with Ensto Advanced Load Management

1. Thank you for the opportunity to comment on the Low Emissions Economy Issues Paper ( Issues Paper ).

Offshore Application of the Flywheel Energy Storage. Final report

Scientific Support for The Transition To A Low Carbon Economy - Drivers for Low Carbon Economy

Status Review on Smart Metering

PRODUCT PORTFOLIO. Electric Vehicle Infrastructure ABB Ability Connected Services

The role of the DSO in the emobility first results of Green emotion project

DESTA - Demonstration of 1 st European SOFC Truck APU Jürgen Rechberger AVL List GmbH

Efficiency Challenges for the European Utilities A view from Enel

Energy Management Through Peak Shaving and Demand Response: New Opportunities for Energy Savings at Manufacturing and Distribution Facilities

EV - Smart Grid Integration. March 14, 2012

Urban Mobility Systems - Regulation Across Modes

Renewables in Transport (RETRANS)

SMART GRIDS, THE FUTURE OF DISTRIBUTION POWER NETWORK

Smart Grid Research in a Danish Perspective

Assessment of Smart Grid Applications for the City of Palo Alto. City of Alameda Public Utilities Board September 19, 2011

IBM SmartGrid Vision and Projects

Slide 1. ABB September 9, 2015

Energy Demand-Aware Open Services for Smart Grid Intelligent Automation. SmartHG. EU FP7 Project #317761

e-harbours WP 3.5 Application of Smart Energy Networks Technical and Economic Analysis Summary results of showcase Zaanstad, case study REloadIT

Integrated System Models Graph Trace Analysis Distributed Engineering Workstation

THE REAL-WORLD SMART CHARGING TRIAL WHAT WE VE LEARNT SO FAR

Smart Cities Industry, Technology and Citizens. December 2017 Dr. Fritz Rettberg

European Green Vehicles Initiative Contractual PPP. Lucie Beaumel 26 th October 2017, Brussels

Hydrogen Transport in European Cities HyTEC Contract number: Programme Review Days 2015 Brussels, Nov. 2015

EcoGrid EU A Prototype for European Smart Grids Demonstrated at Bornholm Island, Denmark

Presentation of the European Electricity Grid Initiative

Informal Meeting of European Union Competitiveness Ministers. Chairman and CEO Ignacio S. Galán

Residential Smart-Grid Distributed Resources

Electric Vehicles: Updates and Industry Momentum. CPES Meeting Watson Collins March 17, 2014

DC-GRIDS FOR ENABLING SMART GRIDS WITH DISTRIBUTED RESOURCES, DEMAND RESPONSE AND STORAGE FOR ELECTRICITY

Standards for Smart Grids Progress and Trends

Vision of long-term transition to e- mobility

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

Technological Pathways to Lower Carbon Transportation

Operational Profile 1.1 What are the main activities of your organization? Biodiversity protection, conservation and sustainable use of natural resour

The Swedish Government Inquiry on Smart Grids

ELIPTIC. Planning a charging infrastructure for electric vehicles using Barcelona s rail network Eliptic Project. April EBERSWALDE LONDRES

Challenges Facing the City of Cape Town in Meeting Renewable Energy Targets

STRATÉGIES D ACTIONS POUR LA FILIÈRE H2-DAY Rodez 11 May 2017

Innovation Takes Off

Smart Mobile Energy: Electric Vehicles and the Energy System

Power Consump-on Management and Control for Peak Load Reduc-on in Smart Grids Using UPFC

INTERREG IVA 2 Mers Seas Zeeën Cross-border Cooperation Programme

Japan core market for any strategy in Renewable Energy and E-Mobility

GREENER CLEANER PLANET FOR A. TekMindz develops a Cloud based platform for managing charge network stations. INDZ TEK

BERNSTEIN STRATEGIC DECISIONS CONFERENCE 2018

Making Energy Saving Simple

Low Carbon Green Growth Roadmap for Asia and the Pacific FACT SHEET

E-Mobility in Planning and Operation of future Distribution Grids. Michael Schneider I Head of Siemens PTI

Smart Grid Demonstration Projects Update

WashTec AG Baader Bank Investment Conference Karoline Kalb WashTec AG

#AEC2018. Theodoros Theodoropoulos, ICCS

CONNECTING ELECTRIC VEHICLES. Driving the way to a more sustainable future

COMPASS Competitive Auxiliary Power Units for vehicles based on metal supported stack technology

Accelerating Electric Recharging Infrastructure Deployment in Europe

European Integrated Research Programme on Smart Grids

Brussels, 14 September ACEA position and recommendations for the standardization of the charging of electrically chargeable vehicles

Electric Alliances the entrepreneurial view Healthy competition

The Automotive Industry

Roadmaps, Projects And Future Plans of the European Green Cars Initiative PPP. Dr. Beate Müller VDI VDE Innovation + Technik GmbH Berlin, Germany

Charge up at Work! Intelligent E-Mobility Solutions for Companies

Project description Environmental issues Beneficiaries Administrative data

DISTRIBUTED ENERGY RESOURCE MANAGEMENT SYSTEM. ABB Ability DERMS Operational confidence.

Virtual Power Plants Realising the value of distributed storage systems through and aggregation and integration

A Guide to the medium General Service. BC Hydro Last Updated: February 24, 2012

Power Networks. Professor Graeme Burt Institute for Energy & Environment, University of Strathclyde

@SOLAXEUROPE /SOLAXEUROPE /SOLAXPOWER

Comet Group: The growth story accelerates

DNV GL Energy Transition Outlook 2018 and our services related to electric mobility

Energy Institute Hrvoje Požar on Smart Grid: Past activities and future directions

CONNECTED SERVICEs TACHOGRAPH SOLUTIONS

Microgrids in the EU TP SmartGrids Context

Cenex. State of Play on Demand Side Measures. Transform Project Meeting Rotterdam 3 rd December Cenex. Robert Evans CEO

Luxury Liverpool Developments

Topsil Semiconductor. LD SmallCap Seminar 7 October 2010

Global Perspectives of ITS

Energinet.dk project no KK-Electronics, Denmark A/S, now KK Wind Solutions A/S, Bøgildvej 3, 7439 Ikast

Opening Address By. Programme Director: Mr Chris Yellend, Dr. Fereidoon Sioshansi, Menlo Energy Economics, USA

NAVISTAR ANNOUNCES WIDE-RANGING STRATEGIC ALLIANCE WITH VOLKSWAGEN TRUCK & BUS

Plug-in Electric Vehicles

Patrick Lee and Chuck Wells

County of Sonoma Agenda Item Summary Report

Kepler Cheuvreux Field Trip. Ingolstadt, November 20, 2018

NORDAC 2014 Topic and no NORDAC

Development of Smart Grids in Europe

Optimal Decentralized Protocol for Electrical Vehicle Charging. Presented by: Ran Zhang Supervisor: Prof. Sherman(Xuemin) Shen, Prof.

SEEV4-City. Smart, clean Energy and Electric Vehicles 4 the City

Table of contents. Financial statement 2013 Report of the EVS Board Statement of assets and liabilities Notes to the annual account 2013

Issue 23 draft for Nuvve

2nd Implementing Agreement Day Belgium, 29 May 2012, Brussels Carlo Mol Contents

Corporate Partners Committee Smart Meter Data Access Use Case. June 21, 2011

COTEVOS: Concepts, Capaci3es and Methods for Tes3ng EV Systems and their InterOperability within the Smartgrid

Transcription:

Final report 1.1 Project details Project title EVergreen Quick Charger Project identification (program abbrev. and file) Name of the programme which has funded the project Project managing company/institution (name and address) Project partners 64012-0229 EUDP Vikingegaarden A/S Tinnetvej 70 DK-7173 Vonge Vikingegaarden EcoMove Banke MM Media Mannov CVR (central business register) 30089375 Date for submission 24/11-2015 1.2 Short description of project objective and results Formålet med projektet har været at udvikle en Quick Charge ladestander til elbiler for dermed at få komplet EVergreen (EVG) produktprogram. Ladestanderen er baseret på Combo protokollen, som supporterer alle de nyeste europæiske elbiler, og som forventes at blive godkendt som EU-standard. EVG quick charger er baseret på åben adgang for 3 parts integration. Alle ladestandere i Evergreen serien kan styres ud fra CO2-prognoser og reguleres trinløst med store CO2-besparelser til følge. Quick chargeren er udviklet i samarbejde med EcoMove og Banke. EcoMove har integreret Combo stikket og protokol i deres elbil, Q-Beak, Banke har lavet en løsning med onboard opladning, som EVergreen systemet supporterer. Der er dermed udviklet en løsning, der muliggør flere typer opladning til industrien. The objective of the project was to develop a Quick Charge charging station for electric cars in order to get complete the EVergreen (EVG) product range. The charging station is based on the Combo protocol, which supports all the newest European electric cars, and is expected to be approved as EU standard. The EVG quick charger is based on open access for partner integration. All charging stations in the EVergreen series can be controlled according to CO2 forecasts and adjusted steplessly resulting in large CO2 savings. The quick charger is developed in collaboration with ECOmove and Banke. ECOmove has integrated the Combo socket and protocol in their electric car, Q-Beak. Banke has created a 1

solution with onboard charging supported by the Evergreen system. Thus the system is applicable for various charging needs. 1.3 Executive summary The EVergreen Quick Charger project has resulted in a complete quick charger including backend system, load balancing, integration into vehicle and on-board charging of batteryhydraulic drives for garbage trucks. The quick charger A complete quick charger has been built using the design from the AC chargers in the EVergreen product range. Modifications have been made to accommodate the combo outlet as well as power transformers. The combo protocol was chosen due to the fact that this is expected to be approved as EU standard. Backend system 2

The Evergreen backend system has been further developed to handle and manage the quick chargers. Form the backend system owners of the chargers have complete overview of the chargers. The Evergreen system is intelligent in terms of using electricity when the CO2 emissions are lowest. The system downloads the forecasts form Energinet.dk on a daily basis. Vikingegaarden has further developed a web service which allows owners to adjust the power thus providing load balance in order to avoid grid overload. I other words the Evergreen chargers are a smart grid solution. EcoMove s Q-Beak e-car EcoMove has developed an e-car called Q-Beak. During this project they have implemented the combo protocol and build in the combo connector in the car. This will reduce the charging time significantly which was of great importance to EcoMove s customers. EcoMove resigned in the middle of the project and has stalled the further development of the e-car. Banke garbage trucks Banke develops garbage trucks with battery-hydraulic drives. Banke and Vikingegaarden have developed a solution with on-board charging. The garbage trucks are usually charged during night time, and with the intelligent system Banke s customers will accomplish great savings on CO2 this is crucial to Banke s customers. 1.4 Project objectives The project has devolved as foreseen but with delays delays were due to the supply market not being as mature as expected. Purchasing components for the charger was more time consuming than expected and delivery time was very long. EcoMove resigned in the middle of the project as an important partner. The e-car market has not developed as expected, thus the market for the quick charger is still uncertain. The outcome of the project has met the expectations, and the solution proves strong. The risk is if the market is ready for a quick charger and smartgrid. However, the backend system, the webservice and Banke s solutions are requested by customers, so in total the project has great value. Especial for further integration in the Sønderborg H2020 SmartCity project and other partners. 3

1.5 Project results and dissemination of results The project has succeeded in realising the objective a complete quick charger system has been developed and tested. The technical solution based on an open protocol has proven to have great commercial potential. The solution has enabled Vikingegaarden to collaborate with the following companies: Atea: Atea has developed an app where users can start and stop a charge, and they can pay for the electricity using the app. The app is integrated with the Evergreen charger using the web service solution. Insero: For Insero s live lab Vikingegaarden delivered 19 chargers as well as a web service, which enabled Insero to regulate on the charges. The load balancing resulted in savings of 17 % C02. The conclusion was that the system has great potential and that it is possible to reduce the peak load on the power grid by controlling the charging of EVs without reducing the users comfort. Imtech: Imtech produces street equipment and has decided to build the Evergreen core parts into a street light post. This is expected to have great potential worldwide. 4

1.6 Utilization of project results The project participants have the flowing expectations regarding utilization of results: Vikingegaarden: has a full product range ready to be sold. The system consists of chargers, backend system and webservice. The system is flexible and based on an open protocol enabling integration with other systems. Vikingegaarden has already done projects with other companies (see 1.5), and expect more projects to come of this sort. Vikingegaarden business plan is newly updated and Evergreen is an important part of our future cloud strategy along with our other telemetry products. Sales will only be done through integrators. Vikingegaarden also expects the outcome of the project to grov fast as Evergreen is now part of the Sønderborg H2020 SmartCity project. EcoMove: has stalled their development of the e-car. Banke: Enabling intelligent charging and load balancing has the potential to save significantly on CO2 for Banke s customers. Banke expects this to be a selling point as we can do savings for their customers as well as on CO2. The project has great potential to realize energy policy objectives. The system downloads the CO2 forecasts from Energinet.dk, and performs intelligent charging based on this. Also the system allows a stepless voltage regulation via the webservice, which again results in savings on CO2, plus helps avoid grid overload. 1.7 Project conclusion and perspective The project has resulted in an intelligent quick charger that completes the series of EVergreen chargers. The backend system is unique and forms the basis for a wide range of applications. The open architecture enables integration and partnerships like the above mentioned (Atea, Insero, Imtech) potential partnerships are in the pipeline. The system s intelligence ensures that charging will take place at the time with lowest CO2 emission thus contributing to the governments visions of smart grid solutions. 5

Evergreen development and progress will proceed and as well prepare to join the SmartCity project H2020 project in Sønderborg. Evergreen will be implemented as an important part of the smargrid and to balance between windmill production and consumption. The plan is to mount 30 Evergreen chargers. The backend system will be used in another application to control the chargers remotely. 6

IMTECH will be an important partner for us and Evergreen. Over the next year there 3 integration steps are specified and this is about how to integrate chargers into IMTECH backend and how to use chargers along with IMTECH products. The first order is already placed. Annex Project website: www.evergreen.dk Chargers website: www.tipcharge.com Nyhedsbreve: http://www.evergreen.dk/show/1470 Insero case: http://www.vikingegaarden.com/content/reference/showreferencearticle/id/450061 Atea case: http://www.vikingegaarden.com/content/reference/showreferencearticle/id/450065 Vikingegaarden bliver en del af Smart City-projekt i Sønderborg: http://www.vikingegaarden.com/content/news/shownewsarticle/id/450071 7