HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

Similar documents
HELIOMOTION QUICK ASSEMBLY GUIDE PV-1300

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

HELIOMOTION QUICK ASSEMBLY GUIDE PV-3

Installation, Operation and Maintenance Manual

Sunwize Power Ready Express Quick Start

Sunwize Water Pumping Kit Quick Start

The Solar Power Kit includes the following components. Please be sure you have all listed components before beginning. 5/16" x 2" Carriage Bolt

Oberbauer/ITEX Solar Power Systems

Nanometrics Solar Power System

Solar Dolly. Assembly Manual

My Reserve 500 Install Guide

Photovoltaic Module User Manual

ChargePoint Gateway Installation Instructions

Owner s Manual. Expansion Kits: GP-RV-80E GP-RV-95E GP-RV-160E

MULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

Battery Cables. Wire & Cable

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

ETATRACK active. Installation of Controller and Motor. 1 Function of the ETATRACK active Controller

Solar Photovoltaic Power. Overarching Objectives. How many questions? 9/16/2012. From plan review to Final Inspection

User Manual. SUN FLUX II Hot Water Controller. Model SEI 02. Off Grid/Hybrid PV Solar Hot Water Controller -1-

A B C D E F. Tools Required (supplied by others)

Installation Instructions Table of Contents

Installation instruction do88 Intercooler for SAAB 9-3SS/SC 2,8 V6 Turbo

Assembly Manual. Assembly Instructions Read Carefully 2.1. Parts included: Tools suggested: Electric Drill

The Traveler Series: Wanderer

CEGOLD-2000 Electronic Grease Level Detector

NOVO LIGHTED MIRROR. Installation Instructions

EZ-MOUNT WEATHER STATION

GENERAL SAFETY... 3 PARTS LIST...

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

Automatic Roof Hatch Opener

Photovoltaic Modules Installation Manual for Australia

2015 Ford F150 Rear Bumper w/ LED

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

The Traveler Series: Wanderer

Do It Yourself Solar Photovoltaic (PV) Workshop. Jack Barnett Blair Buselli

Dry Contact Closure Interface

HYBRID 6 INSTALLATION MANUAL. The installer is solely responsible for complying with all applicable building and electrical codes.

Installation instruction do88 Intercooler for SAAB 9-3 1,9 TTiD

F I R S T! Assembly* 4 Battery systems pull toward you, or 8 battery systems Lift up, both sides with a. Fig. B. *performed by licensed electrician

SGL2 Solar LED landscape Lamp. Instruction manual

INSTALLATION INSTRUCTIONS

Solar PV General Introduction Guide for Electricians

MAKING MODERN LIVING POSSIBLE. UniLynx Indoor Installation Manual. ULX 1800i ULX 3000i ULX 3600i ULX 5400i SOLAR INVERTERS

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

General Installation Manual 2007 Sanyo Electric Co., Ltd. All Rights Reserved 6/15/07

Duo Battery Charge Controller

The Traveler Series TM : Adventurer

igen2500 and ipro2500 IGNITION COIL RETROFIT GUIDE

Off Grid Solar Inverter. LVS 50M User Manual

Owner s Manual. Solar Controller GP-PWM-30

SOLAR CHARGE CONTROLLER

AUO Photovoltaic Module Installation Manual. Version 2.0

INSTRUCTIONS. Power Panel. Installation Instructions

The Traveler Series: Adventurer

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

ASSEMBLY INSTRUCTIONS FOR SUNLINK PV MODULE ROOF MOUNT SYSTEM

2015 Ford F150 Front Bumper w/ LED

Solar Charging Kit SRV A SRV A

Top-of-Pole Mount for 6 Modules (TPM6) For Module Types A, B, & C ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Installation instruction do88 Intercooler for SAAB 9-3SS/SC 4-cyl Turbo

Top-of-Pole Mount for 4 Modules (TPM4) For Module Types D, E, F, & G

Belt Drive Battery Backup Garage Door Opener Models HD920EV WD962KEV WD962KPEV

Temperature Transmitters

Micro3 Grid Tied Residential Package

1-3/8 Designer Metals Telescoping Traversing Rod Installation Instructions

PHOTOVOLTAIC SYSTEM CONTROLLERS SUNSAVER MODELS INCLUDED IN THIS MANUAL SS-6 / SS-6L SS-10 / SS-10L SS-10-24V / SS-10L-24V SS-20L SS-20L-24V

INSTALLATION GUIDE. Guide for your AZ-125 Dual-Axis, Azimuth Drive Solar Tracker

Billboard LED Solar System STOP! THIS IS IMPORTANT

User and Fitting Manual June 2008

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

Owner s Manual. Contents GP-PWM-10-SQ

SOLAR LIGHTING CONTROLLER SUNLIGHT MODELS INCLUDED IN THIS MANUAL SL-10 SL-10-24V SL-20 SL-20-24V

Solar Power Installation Application

Spiral. Installation Manual. [Revision: December 22, 2005, , Rytec Corporation 2001]

PVM 220 Installation Guide

Automated Wardrobe Lift Installation Instructions Standard

ThermoLite 110W-330W Solar Panel Installation Instructions

GET GROUNDED. Renewable Energy System Grounding Basics

AEV30308AA Last Updated: 05/31/18. 4 DUALSPORT sc SUSPENSION system for RAM 1500 air ride standard and rebel INSTALLATION GUIDE

Fabric Studio Custom Roll Shades Installation Instructions

TOYOTA tc HANDS FREE BLU LOGIC Preparation

Rooftop Solar PV System Designers and Installers. Training Curriculum. APEC Secretariat

Midnite Kid Basic Solar Charging Kit

Removing and installing trim panel

C FORD F250 / F L POWERSTROKE DIESEL WITH AUTOMATIC TRANSMISSIONS ONLY

Top-of-Pole Mount for 6 Modules (TPM6) For Module Type D

DC 12V 8GPM Fuel Transfer Pump Kit User s Manual

Tusk Pannier Racks. Instructions and information KLR

INSTALLATION GUIDE. Guide for your AZ-225 Dual-Axis, Azimuth Drive Solar Tracker

INTELLIQUILTER INSTALLATION ON INNOVA VERSION

Raritan PX. Power Cord Installation Guide. Safety Guidelines. Safety Instructions

Lighting a Billion Lives

panelclaw.com Polar Bear III for 10 Degree

PVM 220 Installation Guide

Sun Tie Inverter. Installation and Operator s Manual. ST1000, ST1500, ST2000 and ST Trace Engineering. P/N Rev.

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Owner s Manual. Contents GP-PWM-30-SQ GP-PWM-30-SQ

Sentinel Field Satellite Controller

Sure Grip Left Foot Gas Pedals A202. with

Transcription:

HELIOMOTION QUICK ASSEMBLY GUIDE PV-650

PART I - FOUNDATION M16 M16 8x 2

PLACEMENT 1m Area around flange must be clear of obstacles in a 1 meter radius. Place the unit in a location that receives sunlight throughout the day. CONFIGURATION A) NEAR A WALL B) FREE STANDING 0.4-0.7m MAX 1.5m Wall support is required if column height exceeds 1.5 meters 3

1 Make a hole for the concrete at your chosen location. Refer to the user manual for recommended volume. 2 Fill the hole with concrete up to a few centimeters below ground level. 3 Push the rod unit into center of the concrete and let the flange rest on top of it. Use a spirit level to align the flange horizontally. Rod unit Allow the concrete at least 1 week to set before assemling the remainder of the power plant. Cover the concrete with soil after it has cured for 4 weeks. 4

Extension column 8x 1. Adjust bottom nuts to vertically align the column. 2. Tighten top stop nuts to secure the column. 3. Mount any additional columns in the same way. 5

Wall support 1 2 3 1. Fasten the wall support to the column, as high as the wall allows. 2. Adjust the length of the wall support as needed and fasten it to the wall. If the wall is thin then first reinforce it by bolting a plank horizontally to the inner or outer side of the wall. 3. Drill a 8mm hole through the inner telescopic rectangular tubes. Fasten bolts through the holes to secure the wall support. 6

PART II - TRACKER M10x120 M16x70 M16 M16 8x 7

1 8x 2 A Leave bolts loose A B C INDOORS 1. Pull the 4-wire cable through the column using the hole below the balk. A pull wire simplifies this task. 2. Leave 20 cm of cable sticking out of the hole. Put a cable tie around the balk and the cable to relieve strain from the cable hanging inside the column. 3. Remove the outer insulation from 10 cm of the cable and then remove the top 7 mm of inner insulation from each of the four wires. 4. Make holes for each of the four wires in the outdoor junction box (A) using a screwdriver at the illustrated locations. Carefully push the wires into the junction box through the elastic membrane. 5. Connect the wires to the ±24V terminal and one of the ±TE terminals. Make a note of which wire color is connected to which terminal and polarity. 6. Wire the underground cable to the house and then bury it below ground. To provide access to the burried cable in the future it is advisable to run the underground part of the cable through a flexible conduit. 7. Mount the indoor junction box (B) on a wall inside using two screws and pull the cable inside the box. 8. Connect the four wires to the terminal block inside the indoor junction box (B). 9. Fasten the power adapter (C) near the indoor junction box. Connect the power adapter's wires to the ±24V wires in the indoor junction box. The red wire from the adapter is +24V. 8

3 F The tracker needs to be turned to face true south in the northern hemisphere or true north in the southern hemisphere. To do so follow these steps. Alternative 1: 1. Power on the tracker by plugging in the power adapter. 2. The tracker will move to its initial position, calibrate itself using GPS, and then proceed to the sun's calculated position. 3. Temporarily fasten an M10 bolt to the flange on top of the tracker in one of the holes next to the forward marker (F). 4. When the tracker has reached the sun's calculated position, rotate the tracker so that the shadow from the bolt aligns with the hole behind it. This step requires sunshine. 5. Remove the temporary bolt and unplug the power adapter. 6. Tighten the bolts holding the tracker to the foundation column. Alternative 2: 1. Use a smart phone with a GPS compensated compass. 2. Place the phone below the balk and align it to true south (or north) according to the compass. Make sure the compass is not distorted by being too close to any metal objects. 3. Turn the tracker so that the edge of the balk aligns with the edge of the phone. 4. Tighten the bolts holding the tracker to the foundation column. 9

PART III - PANEL M6 M6 8x 8x 8x 8x 10

1 8x 8x 2 1 8x 2 Positive 8x 1. Attach PV cables to the back of the frame using supplied clip anchors and cable ties. 2. Attach positive connector on bottom panel to negative connector on top panel. Negative 3 11 3. Leave remaining two plugs unconnected.

PART IV - FORK M10 M10 M6 M6 M10 12

1 Align fork with forward marker 2 13

3 1 2 4 Connect the PV cable to the remaining TE screw terminal in the outdoor junction box. 14

Grid-tied inverter D C A B P The panels and inverter must be connected by a certified electrician. However, the preparation work may be done by a layman as long as local code requirements are followed. Please read the inverter's user manual for additional information on how to install it. 1. Mount the inverter (A) on a wall, preferably at face level near a wall outlet. 2. Wire a 2.5mm cable to the indoor junction box (B). Connect the wires to the PV screw terminals. Mount a pair of PV (MC4) connectors on the other end of the cable, according to your notes regarding the cable colors. Seal one of the two pairs of PV input terminals on the inverter using the supplied sealing plugs. 3. Mount the AC connector on the power cord (P) and connect it to the inverter's AC terminal. Do not connect it to the wall socket. 4. Plug in the power adapter (C) to start the solar tracker. Contact a certified electrician and have them inspect the installation and carry out the remaining tasks. 5. Connect the PV cable (D) to the solar panels. 6. Check that the polarity is correct and plug the inverter into a wall socket. 7. Mount the black external DC load-break switch at the bottom of the inverter to enable the PV panel connection. 8. Inspect the inverter's display and status lights to make sure the system is operational. 15

Solar station - Part 1 W S D E R C B P T The panels and solar station must be connected by a certified electrician. However, the preparation work may be done by a layman as long as local code requirements are followed. Please read the solar station's user manual for additional information on how to install and configure the station. 1. Put up the PV breaker (P) for the solar panels on the wall and make sure the breaker is switched to its off position. Install a 2.5mm² cable from the breaker to the indoor junction box (B) and connect it to the PV wires terminal block according to your cable color notes. 2. Connect the batteries (T) together to get the required voltage for your solar station. To connect 12V batteries to a 24V solar station you need to connect two batteries in parallel and two in series, resulting in 24V and twice the ampere hour capacity. Be very careful to avoid short circuiting the batteries. Use a voltage meter to confirm you have wired the batteries correctly. 3. Put up the battery breaker (R) on the wall and make sure it is switched off. Connect the positive terminal from the 24V battery array to the breaker using the red 16mm² cable. 4. Mount the solar station (S) on the wall where you want it, preferably at face level. Use a small screwdriver to remove the service panel at the bottom of the station to access its terminals. 5. Install a 2.5mm² cable from the PV breaker (P) to the solar station's PV input terminal. 6. Wire the black 16mm² cable from the negative terminal on the battery array to the solar station's negative battery input terminal. Wire the red 16mm² cable from the battery breaker to the solar station's positive battery input terminal. 7. Plug in the power adapter (C) to start the solar tracker. 16

Solar station - Part 2 W S D E R C B P T Contact a certified electrician and have them inspect the installation and carry out the remaining tasks. 8. Install the wall outlet (W) next to the solar station. Wire a 3x1.5mm² cable from the AC output terminal of the solar station to the wall outlet (W) and connect it. 9. Connect the PV cable (D) to the solar panels and check that the polarity is correct in the indoor junction box. 10. If the building has a grid connection install a power cord (E) from the AC input terminal of the solar station. 11. Reattach the service panel to the bottom of the station. 12. Confirm the polarity for the battery connections and then switch on the battery breaker (R) to enable the solar station. The station will beep for a few seconds. 13. Plug the solar station into a wall socket if grid power is available. Be sure not to plug the station into its own wall outlet (W). 14. Switch on the PV breaker (P) to enable solar charging. 15. Turn on the solar station's inverter using the power switch found at the bottom right of the device. 16. Test the station's wall outlet (W) to see that it has power. 17. Configure the solar station as needed using the manual for the station. 17