OIL AND GAS DOCKET NO. 8A

Similar documents
OIL AND GAS DOCKET NO

EXAMINERS' REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

EXAMINER'S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

RE: PETITION OF DENBURY RESOURCES INC. FILED FOR REGUK

application of Robert Mosbacher asking that he be authorized to complete and produce the well hereinafter described in the Smackover

BEFORE THE STATE OIL AND GAS BOARD OF MISSISSIPPI DOCKET NO ORDER NO FINAL ORDER

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

JTC ENERGY GROUP, LLC. Jarmon #1D

Mini-Waterflood: A New Cost Effective Approach to Extend the Economic Life of Small, Mature Oil Reservoirs

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION

: : : : : : : Commonwealth Edison Company ( ComEd ), pursuant to Section of the Public

Wyoming EORI 2nd Annual Wyoming CO2 Conference 5/29/08

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH NOTICE TO CUSTOMERS DOCKET NO. E-34, SUB 46 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

STATE OF MINNESOTA ENVIRONMENTAL QUALITY BOARD MEQB DOCKET NO. MP-HVTL-EA-1-99

TECHNICAL RESPONSE FOR M

Large Scale CO 2 Flood Begins Along Texas Gulf Coast (Technical Challenges in Re-Activating an Old Oil Field)

Section 5. Crude Oil and Natural Gas Resource Development

FISCHER, FRANKLIN & FORD Attorneys and Counsellors GUARDIAN BUILDING, SUITE GRISWOLD STREET DETROIT, MICHIGAN

Umatilla Electric Cooperative Net Metering Rules

Tyson W. Voyles vs. Safety

First Revision of Sheet No P.S.C.U. No. 50 Canceling Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO.

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

Filed with the Iowa Utilities Board on September 17, 2018, RMU STATE OF IOWA DEPARTMENT OF COMMERCE IOWA UTILITIES BOARD

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Minnesota Public Utilities Commission Staff Briefing Papers

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

History. Wyoming CO2 Pipeline Network

LEGAL DESCRIPTION REZONE PARCEL

April 18, Mr. David Schmit, County Manager Arapahoe County 5334 S. Prince Street Littleton, CO Conoco Phillips Section 6 Swan Well

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

BEFORE THE NEW MEXICO PUBLIC REGULATION

Docket No EI Date: May 22, 2014

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

HOUSE BILL No Koch

COMMERCIAL SCHEME Approval No

STATE OF MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS FOR THE PUBLIC UTILITIES COMMISSION PUC DOCKET NO. E002/TL OAH DOCKET NO.

For personal use only

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

DEPARTMENT OF TRANSPORTATION

THE PUBLIC SERVICE COMMISSION OF MARYLAND

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

Municipal District of Taber Synchronized With The Alberta Township System

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

P.S.C.U. No. 50 Original Sheet No ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 136 STATE OF UTAH

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C ) ) ) ) ) ) ) ) ) ) REPLY COMMENTS OF CTIA THE WIRELESS ASSOCIATION

Interconnection and Net Metering Service in Ohio

CHAPTER 7: EMISSION FACTORS/MOVES MODEL

TITLE: FIELD DEMONSTRATION OF CARBON DIOXIDE MISCIBLE FLOODING IN THE LANSING-KANSAS CITY FORMATION, CENTRAL KANSAS

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

Follow this and additional works at:

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Contact Person for questions and approval letters: Alain Blunier

Large General Service Time-of-Use Storage Program

BEFORE THE GUAM PUBLIC UTILITIES COMMISSION ) ) ) ) ) ) ) ) ORDER INTRODUCTION

P UBLIC S ERVICE C OMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

Transportation & Traffic Engineering

FUEL ADJUSTMENT CLAUSE

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia.

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

TITLE: FIELD DEMONSTRATION OF CARBON DIOXIDE MISCIBLE FLOODING IN THE LANSING-KANSAS CITY FORMATION, CENTRAL KANSAS

LONG RANGE PERFORMANCE REPORT. Study Objectives: 1. To determine annually an index of statewide turkey populations and production success in Georgia.

Mar. 11, 2010 PL Ontario Municipal Board Commission des affaires municipales de l Ontario

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

Vermont Public Power Supply Authority 2018 Tier 3 Annual Plan

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

PROPOSED RULEMAKING BOARD OF COAL MINE SAFETY 25 PA CODE CHAPTER 208 PREAMBLE

IN THE SUPERIOR COURT OF FULTON COUNTY STATE OF GEORGIA

Dulles Corridor Air Rights Study Investigation

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON AR 515

/ Planning and Zoning Staff Report Lonestar Land, LLC. - Rezone, RZ

Coalspur Mines (Operations) Ltd.

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

MEETING GOVERNMENT MANDATES TO REDUCE FLEET SIZE

California s Interconnection Rule 21 Smart Inverter & the Smart Inverter Working Group

ORDINANCE NO O-015 ORDINANCE AMENDING ARTICLE V OF CHAPTER 21 OF THE CODE OF ORDINANCES OF THE CITY OF PONTIAC, LIVINGSTON COUNTY, ILLINOIS

October 29, !.?., E 7 ip, i.j CASE NO MC-FC PRESTON SANITATION, INC.

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Please Refer to Attached Sample Form

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

STATE OF NEW HAMPSHIRE Inter-Department Communication

Village of Schiller Park Automated Red Light Enforcement Program

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

East Avenue and Queen City Substation Improvement Project

126m strike length vein averaging 42.37g/t gold

UNITIL ENERGY SYSTEMS. INC. CALCULATION OF THE EXTERNAL DELIVERY CHARGE

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

RE: PRESSURE MAINTENANCE WATERFLOOD ORDER AMENDMENT #8 EAGLE WEST FIELD - BELLQY A POOL

Transcription:

OIL AND GAS DOCKET NO. 8A-0277586 THE APPLICATION OF HUNT OIL COMPANY TO CONSOLIDATE VARIOUS STRAWN FIELDS AND TO ADOPT FIELD RULES FOR THE PROPOSED ANNE TANDY (STRAWN) FIELD, KING COUNTY, TEXAS HEARD BY: Richard D. Atkins, P.E. - Technical Examiner Randall Collins - Legal Examiner DATE OF HEARING: September 6, 2012 APPEARANCES: REPRESENTING: APPLICANT: Brian R. Sullivan Lloyd E. Hoelscher James Travis Michael H. Carter Hunt Oil Company EXAMINERS REPORT AND RECOMMENDATION STATEMENT OF THE CASE Hunt Oil Company ( Hunt ) requests that various Strawn Fields be consolidated into a new field to be known as the Anne Tandy (Strawn) Field (ID No. 03025 400). The fields proposed for consolidation are as follows: FIELD NAME FIELD NUMBER Anne Tandy (Strawn 5400) 03025 600 Anne Tandy, NW. (Strawn 5400) 03026 600 Anne Tandy (Strawn, Lo.) 03025 500 Anne Tandy, S. (Strawn Lo.) 03027 500 Big -B- (Strawn, Lo) 07732 500 Big -N- (Strawn 5250) 08002 333 Big -N- (Twin Peaks) 08002 750 Big -S- (Strawn) 08016 500 Big -S- (Strawn Reef) 08016 550 Big -S- (Strawn 5400) 08016 600 FIELD NAME FIELD NUMBER Big -S-, E. (Strawn 5400) 08016 604

OIL AND GAS DOCKET NO. 8A-0277586 PAGE 2 Big -S-, North (Strawn 5400) 08017 600 Burnett -A- (Strawn 5080) 13676 600 GG (Strawn 5400) 33453 750 GG (Twin Peaks) 33453 800 GG, East (Strawn 5400) 33454 500 Twin Peaks (Strawn 5400) 92060 600 Twin Peaks (Strawn, Up) 92060 500 YA (Twin Peaks) 99160 400 YA (Twin Peaks, South) 99160 500 YA (Twin Peaks, East) 99160 450 field: Hunt also requests that the following Field Rules be adopted for the consolidated 1. Designated interval from 5,106 feet to 5,700 feet as shown on the log of the Hunt Oil Company - S. B. Burnett Lease, Well No. Y 18A (API No. 42-269- 30253); 2. 150'-0' well spacing; 3. 80 acre oil units with optional 40 acre density; 4. Allocation based on 75% acres and 25% per well with a 1965 Yardstick Allowable of 171 barrels of oil per day. Hunt also requests that proration unit plats not be required for individual wells, but that Form P-15 be filed to designate the number of acres to be assigned to each well. The application was unprotested and the examiners recommend approval of the field consolidation and Field Rules, as requested by Hunt. DISCUSSION OF THE EVIDENCE The subject Strawn Fields were discovered beginning in March 1970. There are 68 producing oil wells and 46 injection wells carried on the proration schedules. Most of the fields operate under Field Rules that provide for 660'-1,320' well spacing and 80 acre oil units. The remaining fields operate under Statewide Rules. Hunt operates all but one well in the fields. The fields are geographically intermingled and there are no other fields contained within the proposed correlative interval. Many of the wells have produced from several different fields. Cumulative production from the fields through July 2012 is 78.6 MMBO and 8.8 BCFG. Hunt proposes that the correlative interval from 5,106 feet to 5,700 feet as shown on the log of the Hunt Oil Company - S. B. Burnett Lease, Well No. Y 18A (API No. 42-269-30253), Section 11, Block X, R. M. Thompson Survey, A-649, King County, Texas, be considered a single field known as the Anne Tandy (Strawn) Field. This interval includes

OIL AND GAS DOCKET NO. 8A-0277586 PAGE 3 the entire Strawn formation. Waterflooding was initiated in the most of the fields in 1990 and several units were approved in the fields. The Strawn sands that are being waterflooded are in the late stage of secondary recovery. The reservoir and fluid properties in all the sands are similar. Hunt plans to initiate a CO 2 injection project in all of the subject fields similar to the CO 2 flood in the nearby Katz (Strawn) Field that is located to the southeast. Consolidation of the fields is necessary to efficiently flood the entire Strawn interval simultaneously. It would not be economically feasible to conduct separate CO 2 floods in each field. The mineral ownership in the proposed project area is the same. To date, the Commission has already approved 21 exceptions to Statewide Rule 10 to allow downhole commingling in the various Strawn fields. Hunt is proposing the same spacing and density rules that exist in the nearby Katz (Strawn) Field. Hunt requests 150'-0' well spacing and 80 acre oil units with optional 40 acre density. This spacing will allow for optimum use of existing wellbores to perform the proposed CO 2 flood in all sands within the consolidated field. Hunt plans to drill some new wells to fill in the pattern of the CO 2 flood. Hunt estimates that the production in the project area can be increased from 300 BOPD up to 1,800 BOPD. Because the consolidated interval for the field includes multiple sands, a two factor allocation formula is required by statute. Hunt requests that allocation be based on 75% acres and 25% per well. Hunt also requests that proration unit plats not be required for individual wells, but that Form P-15 be filed to designate the number of acres to be assigned to each well. FINDINGS OF FACT 1. Notice of this hearing was sent to all persons legally entitled to notice at least ten days prior to the date of hearing. 2. The subject Strawn Fields were discovered beginning in March 1970. a. There are 68 producing oil wells and 46 injection wells carried on the proration schedules. b. Most of the fields operate under Field Rules that provide for 660'- 1,320' well spacing and 80 acre oil units. The remaining fields operate under Statewide Rules. c. Hunt Oil Company ( Hunt ) operates all but one well in the fields. d. The fields are geographically intermingled and there are no other fields contained within the proposed correlative interval. Many of the wells have produced from several different fields.

OIL AND GAS DOCKET NO. 8A-0277586 PAGE 4 3. The Anne Tandy (Strawn) Field should be designated as the correlative interval from 5,106 feet to 5,700 feet as shown on the log of the Hunt Oil Company - S. B. Burnett Lease, Well No. Y 18A (API No. 42-269-30253), Section 11, Block X, R. M. Thompson Survey, A-649, King County, Texas. a. The interval includes the entire Strawn formation. b. The Strawn sands that are being waterflooded are in the late stage of secondary recovery. c. The reservoir and fluid properties in all the sands are similar. 4. Hunt plans to initiate a CO 2 injection project in all of the subject fields similar to the CO 2 flood in the nearby Katz (Strawn) Field that is located to the southeast. a. Consolidation of the fields is necessary to efficiently flood the entire Strawn interval simultaneously. b. It would not be economically feasible to conduct separate CO 2 floods in each field. c. The mineral ownership in the proposed project area is the same. d. To date, the Commission has already approved 21 exceptions to Statewide Rule 10 to allow downhole commingling in various Strawn fields. 5. Hunt is proposing the same spacing and density rules that exist in the nearby Katz (Strawn) Field. a. Hunt requests 150'-0' well spacing and 80 acre oil units with optional 40 acre density. b. This spacing will allow for optimum use of existing wellbores to perform the proposed CO 2 flood in all sands within the consolidated field. c. Hunt plans to drill some new wells to fill in the pattern of the CO 2 flood. d. Hunt estimates that the production in the project area can be increased from 300 BOPD up to 1,800 BOPD.

OIL AND GAS DOCKET NO. 8A-0277586 PAGE 5 6. Allocation based on 75% acres and 25% per well and a top allowable based on the 1965 Yardstick Allowable of 171 barrels of oil per day is a reasonable formula which will protect correlative rights and meet statutory requirements. 7. The filing of Form P-15 to designate the number of acres to be assigned to each well for proration purposes with no proration unit plats will eliminate unnecessary paperwork. CONCLUSIONS OF LAW 1. Proper notice of this hearing was given to all persons legally entitled to notice. 2. All things have occurred or been accomplished to give the Railroad Commission jurisdiction in this matter. 3. Consolidation of the subject Strawn Fields is necessary to prevent waste and protect correlative rights. 4. Adopting the proposed Field Rules for the Anne Tandy (Strawn) Field will prevent waste, protect correlative rights and promote development of the field. EXAMINERS RECOMMENDATION Based on the above findings of fact and conclusions of law, the examiners recommend that the Commission approve the field consolidation and adopt Field Rules for the Anne Tandy (Strawn) Field, as requested by Hunt Oil Company. Respectfully submitted, Richard D. Atkins, P.E. Technical Examiner Randall Collins Legal Examiner