RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Similar documents
PASADENA WATER AND POWER

ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION EQUIPMENT PURSUANT TO REGULATION 23.

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

JEA Distributed Generation Policy Effective April 1, 2018

Overview of S.L Competitive Energy Solutions for North Carolina

Michigan Renewable Energy Case Study

TO: CITY COUNCIL DATE: December 1 3,201 0

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

S T A F F R E P O R T

Merger of the generator interconnection processes of Valley Electric and the ISO;

Interconnection and Net Metering Service in Ohio

EASTERN ILLINI ELECTRIC COOPERATIVE REGULATION NO. 26A

City of San Juan Capistrano Agenda Report

City of San Juan Capistrano Agenda Repo_rt

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Los Angeles. June 17, The Honorable City Council c/o Office of the City Clerk Room 395, City Hall Mail Stop 160

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Decision on Merced Irrigation District Transition Agreement

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

To: Honorable Public Utilities Board Submitted by: /s/ Barry Leska AGM Energy Resource Planning. From: Alan Hanger Approved by: /s/

Renewable Net Metering Program Appendix ESD APX 001 1

CITY COUNCIL OF THE CITY OF NOVATO ORDINANCE NO. 1620

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

The Commonwealth of Massachusetts

Net Metering Policy Framework. July 2015

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Legal Considerations Related to Distributed Energy Resources

MENARD ELECTRIC COOPERATIVE POLICY MANUAL. SECTION IV Operating Rules for Cooperative Members

Douglas Electric Cooperative Roseburg, Oregon

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Georgia Power Renewable Update. October 31, 2016 Marc Vinson

THE CONNECTICUT LIGHT AND POWER COMPANY dba EVERSOURCE ENERGY AND THE UNITED ILLUMINATING COMPANY

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

Senate Substitute for HOUSE BILL No. 2101

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

The Realities of Consumer-Owned Wind Power For Rural Electric Co-operatives

Heber Light & Power Electric Service Rule No. 14 NET METERING SERVICE

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

THE COUNCIL OF STATE GOVERNMENTS RESOLUTION SUPPORTING ELECTRIC POWER GRID MODERNIZATION TO ACHIEVE ENERGY EFFICIENCY AND DEMAND REDUCTION BENEFITS

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

Wind Energy and Utility Providers

EAU CLAIRE ENERGY COOPERATIVE FALL CREEK, WI Issue Date: 05/28/2014 Subject: New Distributed Generation Post May 28, 2014

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Smart Grid Technology: Measuring Residential Energy Use

County of Sonoma Agenda Item Summary Report

Statewide Joint IOU Study of Permanent Load Shifting Workshop #2: Expanding the Availability of Permanent Load Shifting in California

Considerations for Interconnecting with Renewable Generators

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

Ketchum Energy Advisory Committee Annual Update and Recommendation for Electric Vehicle Charging Station

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Kansas Legislator Briefing Book 2009

ERIC S. CASHER, CITY ATTORNEY WINSTON RHODES, AICP, PLANNING MANAGER

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Per Meter, Per Month. Effective July 1, 2018 Customer Charge Flat Charge $8.86

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

The Gambia National Forum on

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

City of Palo Alto (ID # 6416) City Council Staff Report

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE CALIFORNIA A RESOLUTION AMENDING WATER RATES AND CHARGES FOR FISCAL YEARS THROUGH

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

Impact of Energy Efficiency and Demand Response on Electricity Demand

Department of Legislative Services

Docket No EI Date: May 22, 2014

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Cost Reflective Tariffs

Smart Grid Update Supplier Conference. Kevin Dasso Senior Director Technology & Information Strategy. October 27, 2011

White River Electric Association, Inc. Net Metering Information & Service Requirements

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

24. SOLAR INCENTIVE PROGRAM II

Interdepartmental Memorandum

Illinois and Renewable Energy

City Power Johannesburg: Response to Potential Load Shedding. Presented by : Stuart Webb General Manager : PCM October 2014

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

Rate Schedules. Effective 1/1/2019

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

Zero Emission Bus Impact on Infrastructure

WHEREAS, LADWP seeks to enable the continued growth of customer generation, including solar-powered generation; and

Net Metering and Solar Incentive Proposed Framework

NET METER REQUEST FORM

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 3rd Revised CPUC Sheet No. 137 Canceling 2nd Revised CPUC Sheet No.

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

West Virginia Energy Plan and Becoming an Electric Generator

ORDINANCE NO. WHEREAS, The City of Georgetown established its current electric rates in 2007;

NERSA CONSULTATION PAPER PROCESS. Moefi Moroeng Specialist: Wholesale Electricity Trading

Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Electric Purchased Power Costs BACKGROUND AND CURRENT STATUS OF THE CITY S ELECTRIC FUND

Transcription:

DATE: July 16,2007 TO: FROM: SUBJECT: CITY COUNCIL CITY MANAGER CONSIDERATION OF ADOPTION OF NEW FEDERAL STANDARDS RELATING TO ELECTRIC UTILITIES UNDER THE PUBLIC UTILITIES REGULATORY POLICIES ACT AND THE ENERGY POLICY ACT OF 2005 FOR THE WATER AND POWER DEPARTMENT. RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which: 1. Finds that Pasadena Water and Power Department existing rates and policies are in compliance with four of the five new federal standards added by the Energy Policy Act of 2005 amendments to the Public Utility Regulatory Policies Act of 1978; and 2. Determines not to adopt certain aspects of the Smart Metering standard and directs staff to evaluate the cost effectiveness of offering additional Time of Use pricing schedules and Smart Metering technology in the future. BACKGROUND: The Energy Policy Act of 2005 ("EPACT 2005) was signed into law on August 8, 2005. EPACT 2005 amended the Public Utility Regulatory Policies Act of 1978 ("PURPA") to require certain utilities to consider, among other things, whether to adopt the federal standards for (1) Net Metering, (2) Fuel Sources Plan, (3) Fossil Fuel Generation Efficiency, (4) Smart Metering, and (5) Interconnection ("Standards"). These Standards, which are described further below, must be considered by all publicly owned electric utilities with total annual retail sales greater than 500 million kwh. Pasadena Water and Power Department ("PWP"), which has annual retail sales of 1,200 million kwh is subject to the requirement. MEETING OF 07/16/2007 AGENDA ITEM NO. 6.A. 7:30-p*M.

Page 2 EPACT 2005 states that the utility must consider each of these Standards and make a determination concerning whether or not it is appropriate to implement the Standards. Utilities are not required to adopt the Standards, only consider them. However, if a determination is made that a particular Standard is not appropriate to implement and is declined, the utility must state in writing the reason for the decision in a public document. These Standards are defined by the Federal government and do not give the City discretion to adopt a different standard. Therefore, the City Council, in the context of a public hearing, shall make the determination concerning whether or not it is appropriate to implement the Standards provided by EPACT 2005. EPACT 2005 triggered the following deadlines to begin consideration and make a determination concerning whether or not it is appropriate to implement federal Standards. For Smart Metering and Interconnection Standards, consideration must commence by August 8,2006 and a determination be made by August 8, 2007. For Net Metering, Fuel Sources Plan, and Fossil Fuel Generation Efficiency, the dates are August 8, 2007 to begin consideration and August 8, 2008 to make a determination. In all cases, enforcement actions may be initiated starting August 8, 2008. PWP began consideration of the Standards shortly after the American Public Power Authority published its "Reference Manual and Procedures for Implementation Of the 'PURPA Standards' in the Energy Policy Act of 2005" in March 2006. In staff's consideration, it was determined that a consultant was needed to assist in the evaluation and analysis of PWP's current standards to those required under EPACT 2005. In March 2007, EES Consulting was retained by PWP to conduct an analysis on each of the five Standards, evaluate PWP's current status with each Standard, and recommend any required actions needed to comply with the Standards. The final report from EES is included herein as Attachment 1 and is also available on PWP's website at www.pwpweb.com. Staff has reviewed and considered the consultant's recommendations in developing the following assessment of current status and the proposed recommendations: 1. Net Metering - This Standard requires an electric utility to make net metering service available to any electric customer, upon request. Net metering means service to an electric consumer under which electric energy generated by that electric consumer from an eligible on-site generating facility and delivered to the local distribution facilities may be used to offset electric energy provided by the electric utility to the electric consumer during the applicable billing period. PWP's current status: PWP meets the Net Metering Standard by offering net metering service to all PWP customers with cogeneration or self-

Page 3 generation through rate schedule SG: Self-Generation Service, as referenced in the Pasadena Municipal Code 13.04.178 - Section B. Staff Recommendation: The City Council finds that PWP meets the Net Metering Standard. 2. Fuel Sources Plan - This Standard requires an electric utility to develop a plan to minimize dependence on one fuel source and to ensure that the electric energy it sells to customers is generated using a diverse range of fuels and technologies, including renewable technologies. PWP's current status: PWP fulfills this Standard through several approved plans. PWP incorporates geographic and fuel diversity as a goal in its resource planning process. In November of 20Q1, the City Council adopted the 2001 Strategic Resource Plan (SRP) which calls for both geographic and fuel diversity of PWP's fuel sources to reduce risk from market price and outages. The City's Renewable Portfolio Standard (RPS), adopted by the City Council in October of 2003, requires that renewable resources be used to meet at least 20% of PWP's retail load by 201 7. Staff Recommendation: The City Council finds that PWP meets the Fuel Sources Plan Standard. 3. Fossil Fuel Generation Efticiencv - This Standard requires an electric utility to develop and implement a ten-year plan to increase the efficiency of its fossil-fueled generation facilities, such as natural gas or coal-fired power plants. PWP's current status: PWP's existing planning process includes consideration of the need to increase efficiency of Pasadena's fossil fuel generation facilities. The 2001 SRP laid out a 10-12 year plan to replace PWP's aging local generation infrastructure and initiated the replacement and retrofit of 135 MW of Pasadena's generation to achieve higher efficiency and reduce emissions. Additionally, the lntermountain Power Authority has upgraded the lntermountain Power Project steam turbines to increase energy output and efficiency in recent years. Staff Recommendation: The City Council finds that PWP meets the Fossil Fuel Generation Efficiency planning Standard. 4. Smart Metering - This Standard requires each electric utility to offer each of its customer classes, and provide individual customers upon customer request, a time-based rate schedule under which the rate charged by the electric utility varies during different time periods and reflects the variance,

Public Hearing on PACT2005 and PURPA Standards Page 4 if any, in the utility's costs of generating and purchasing electricity at the wholesale level. The time-based rate schedule shall enable the electric consumer to manage energy use and cost through advanced metering and communications technology. Each State regulatory authority shall conduct an investigation and issue a decision whether or not it is appropriate for electric utilities to provide and install time-based meters ("Smart Meters") and communications devices for each of their customers which enable such customers to participate in time-based pricing rate schedules and other demand response programs. PWP's current status: PWP partially meets the Smart Metering Standard through its time-based current rates. PWP requires a Time of Use (TOU) rate schedule for some customers and offers TOU rates to all customers, subject to TOU meters availability and installation at the customer's expense. As defined, TOU rates means the electric rate varies with the time of day, day of week andlor month or season. PWP offers Load Management Credits under "Curtailable Service" for medium and large commercial/industriai customers through the Light and Power Rate Ordinance (Pasadena Municipal Code 13.04). However, PWP does not currently use smart meters or offer the Critical Peak Pricing ("CPP), which has very high energy and demand charges for peak load hours, and Real Time Pricing ("RTP") rates, which charge customers rates that vary continuously according to market prices, included in the Smart Metering Standard. Evaluation: Full adoption of this Standard to include the other time-based rates and the offering of smart meters to all customers would require additional evaluation of customer class structure, billing system compliance and rate standards. An initial feasibility study to evaluate this Standard is expected to cost approximately $1 50,000. While a detailed cost-benefit study has not been completed, full implementation of the Smart Metering Standard rates is not expected to be cost effective at this time. The EES report indicated that Smart Metering implementation costs far exceed the benefits for small and medium sized utilities such as PWP, and that studies for large utilities indicate minimal net benefit to warrant up front investment associated with these programs. The estimated cost for PWP to purchase and install new smart meters to replace the current Automatic Meter Read (AMR) electric meter system and to upgrade billing systems is $39 million, and though not quantified, far exceeds the benefit received. PWP believes at this time such funds would have more impact if directed towards cost effective energy efficiency, demand response, and renewable resource procurement.

Page 5 The California Public Utilities Commission has authorized the state's investor-owned utilities to make substantial investments in Smart Metering programs. PWP will monitor the programs for additional information and insight into their potential appropriateness for Pasadena. Also, PWP plans to evaluate the additional TOU pricing schedules such as CPP and RTP as part of its electric cost of service study during the next 24 months. Staff Recommendation: The City Council finds that PWP partially meets the Smart Metering Standard by offering a TOU based rate schedule and TOU meters to all of its customers. The cost effectiveness of offering additional TOU pricing schedules such as CPP and RTP and the implementation of smart metering technology shall be evaluated for future consideration, but not adopted at this time. 5. lnterconnection - This Standard requires each electric utility to make available, upon request, interconnection service to any electric customer that the electric utility serves. lnterconnection service allows an electric consumer to connect a generating facility on the consumer's premises to be connected with the utility's local distribution facilities. lnterconnection services shall be offered based upon the standards developed by the Institute of Electrical and Electronics Engineers: IEEE Standard 1547 for Interconnecting Distributed Resources with Electric Power Systems, as they may be amended from time to time. In addition, agreements and procedures shall be established whereby the services offered shall promote current best practices of interconnection for distributed generation, including but not limited to practices stipulated in model codes adopted by associations of state regulatory agencies. All such agreements and procedures shall be just and reasonable, and not unduly discriminatory or preferential. PWP's current status: PWP currently offers interconnection service through its Distributed Generation lnterconnection Requirements - Regulation 23, adopted by the City Council in Resolution #8304 on October 13, 2003. Regulation 23 meets or exceeds the interconnection regulations required under the IEEE 1547 standard as stated in the EPACT 2005. Staff Recommendation: The City Council finds that PWP currently implements the lnterconnection Standard.

Page 6 In summary, PWP currently has in place provisions and policies that meet or exceed four of the five federal Standard requirements under the EPACT 2005 amendments to the PURPA. While PWP's current rates and infrastructure partially meets the Smart Metering Standard contemplated under EPACT 2005, full adoption and implementation of the Smart Metering Standard is not recommended at this time. FISCAL IMPACT: Adoption of the attached resolution will not have any fiscal impact upon the City nor the electric rates at this time. Further evaluation to adopt and implement the Smart Metering Standard, including the offering of Critical Peak Pricing (CPP) and Real Time Pricing (RTP), as well as the offering of Smart Meters to each PWP customer per EPACT 2005 will require additional staff time and additional expenses to evaluate implementing these federal guidelines. Consulting expenses, which will be authorized separately, to support further evaluation, are expected to be approximately $150,000. Respectfully submitted, Cynthia J. Kurt Prepared by: d Fred Lyn Legislative & Regulatory Affairs Manager Water and Power Department Approved by: phyllis E. Currie General Manager Water and Power Department