Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

Similar documents
HIGHWAY 28 FUNCTIONAL DESIGN

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

STH 60 Northern Reliever Route Feasibility Study Report

METRO Orange Line BRT American Boulevard Station Options

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

5 VAUGHAN METROPOLITAN CENTRE AND SURROUNDING AREAS TRANSPORTATION STUDY PROGRESS

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

Harlem Avenue between 63 rd and 65 th

ANDERSON PROPERTY SITE ANALYSIS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

TRANSPORTATION REVIEW

Maryland Gets to Work

Harlem Avenue between 63 rd and 65 th

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

DISTRICT OF LAKE COUNTRY TRANSPORTATION PLAN

The Eastern Connector Study November, 2007 planning for the future

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

TRAFFIC IMPACT STUDY. USD #497 Warehouse and Bus Site

Trans-Canada Highway and McCallum Road Interchange Upgrade

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

King County Metro. Columbia Street Transit Priority Improvements Alternative Analysis. Downtown Southend Transit Study. May 2014.

V. DEVELOPMENT OF CONCEPTS

GASOLINE SERVICE STATION 1618, 1622 ROGER STEVENS DRIVE OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for:

APPENDIX E. Traffic Analysis Report

Transit City Etobicoke - Finch West LRT

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

2.0 Development Driveways. Movin Out June 2017

Welcome. Green Line in Your Community

1 Downtown LRT Connector: Draft Concept

IMPROVEMENT CONCEPTS

PROJECT BACKGROUND 3

MERIVALE PRIORITY SQUARE 2852 MERIVALE ROAD CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: ONT Inc. 25 Winding Way Nepean, Ontario K2C 3H1

Technical Feasibility Report

New Jersey Turnpike Authority Interchange 6 to 9 Widening Program

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Pedestrians, Cars, Buses and Trains? Considerations for Rapid Transit Service at Western University

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Mississauga Bus Rapid Transit Preliminary Design Project

TRAFFIC PARKING ANALYSIS

Clean Harbors Canada, Inc.

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

DEVELOPMENT PROPERTY 1627 MAXIME STREET CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Subhas Bhargava. July 9, Overview_1.

Environmental Assessment Derry Road and Argentia Road Intersection

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

Mountainland Association of Governments SPRINGVILLE-SPANISH FORK AREA TRANSPORTATION STUDY APRIL 2012

FREQUENTLY ASKED QUESTIONS

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

June 8, Prepared by Urban Systems Ltd.

Traffic Impact Study Proposed Residential Development (Watson Parkway North - Starwood Drive Node, City of Guelph)

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

VIADUCT LOCATION STUDY. October 19, 2009

Letter EL652 City of Mercer Island. Page 1. No comments n/a

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

What We Heard Report - Metro Line NW LRT

FREQUENTLY ASKED QUESTIONS

Section 5.0 Traffic Information

Baddow Road Bus Gate Frequently Asked Questions May 2018

NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis

Vanier Parkway and Presland Road Residential Development Transportation Impact Study

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

Traffic Impact Study Speedway Gas Station Redevelopment

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

TRAVEL DEMAND FORECASTS

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

Craig Scheffler, P.E., PTOE HNTB North Carolina, P.C. HNTB Project File: Subject

Summary of the Alcoa Highway Redevelopment Project

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

welcome to the BC Hydro community open house

King Soopers #116 Thornton, Colorado

Sherman Oaks Community Traffic Plan

I-405 Corridor Master Plan

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Draft Results and Recommendations

Scarborough Transit Planning

RTID Travel Demand Modeling: Assumptions and Method of Analysis

THOMPSON-NICOLA DISTRICT HIGHWAY 5A SAFETY REVIEW

FAIRWINDS TRANSPORTATION OVERVIEW

Committee Report. Transportation Committee. Business Item No

GTA West Corridor Planning and EA Study Stage 1

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

Central Loop Bus Rapid Transit

Introduction and Background Study Purpose

King Street & Wyman Road Transportation Impact Study & Transportation Demand Management. Paradigm Transportation Solutions Limited

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Central Park Drives Traffic Management Overview

Green Line LRT: Beltline Segment Update April 19, 2017

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

This letter summarizes our observations, anticipated traffic changes, and conclusions.

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Transcription:

Welcome Thank you for attending this Community Engagement on improvements to the Boucherie Road and Westlake Road intersections on Highway 97 in the Central Okanagan. Public Open House Schedule Location Date/Time Venue West Kelowna Westbank First Nation Wednesday, March 2, 2016 4:00 p.m. 8:00 p.m. Thursday, March 3, 2016 4:00 p.m. 8:00 p.m. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna Sensisyusten Multi-Purpose Facility 1920 Quail Lane, Westbank

Community Engagement March 2 20, 2016 You re invited to provide input on conceptual layouts being considered for the intersection improvements at Boucherie Road and Westlake Road. We want to hear from you! Provide us with your feedback by: Please submit your comments by March 20, 2016. P Completing the feedback form and leaving it with our team P Reading the Discussion Guide and completing the Feedback Form P Filling out our online Feedback Form P Sending an email to: boucherie.westlake@gov.bc.ca by March 20, 2016 WE ARE HERE Stages of Planning and Engagement 1 Current Conditions Analysis 2 Future Needs Defined 3 Conceptual Planning Development and Evaluation of Options 4 Community Engagement (March 2 20, 2016) Public input regarding the conceptual layouts under consideration How Input Will be Considered Input will be considered, along with technical information, costs and benefits, and further input from local governments, as preliminary designs for the intersection improvements are developed. There will be additional opportunities to provide input regarding the Boucherie Road and Westlake Road intersection improvements as the project proceeds. 5 Revise Conceptual Layouts Considering Public Input 6 Initiate Preliminary Design

Planning for the Future: B.C. on the Move In March 2015, the government of B.C. released B.C. on the Move: A 10-Year Transportation Plan. As part of developing this plan, province-wide engagement was held to seek comments from British Columbians about transportation priorities over the next 10 years. B.C. on the Move: Okanagan Central Okanagan Planning Study In recent years, the regional transportation network in the Okanagan has undergone significant improvements for all modes of travel. Some of the highway improvements for the Okanagan region in B.C. on the Move: A 10-Year Transportation Plan include: P Continue planning for the second crossing of Okanagan Lake P Construct new passing lanes and four-laning on highways throughout the Okanagan, including six-laning through Kelowna P Intersection improvements, new interchanges, and safety improvements on highways and roads throughout the Okanagan Valley B.C. on the Move A 10-Year Transportation Plan Okanagan Lake Second Crossing Project Central Okanagan Planning Study Future Conditions Assessment Consultation Companion Open House Fall 2015 gov.bc.ca/transportationplan rtat ationplan The Central Okanagan Planning Study (COPS) will determine transportation needs of the area, and will look at route options including potential locations for a future additional lake crossing and potential timing for future projects. Although not part of COPS, the Boucherie Road and Westlake Road intersection improvements will be considered together with the recommendations resulting from COPS. The study area for COPS extends from Greata Ranch, south of Peachland, north to Clerke Road/College Way south of Vernon, and encompasses the communities of Peachland, West Kelowna, Lake Country, the Westbank First Nation and Okanagan Indian Band. You can read the full plan at engage.gov.bc.ca/transportationplan To learn more about the Central Okanagan Planning Study, visit engage.gov.bc.ca/okanagansecondcrossing.

Highway 97: Intersection Improvements at Boucherie Road and Westlake Road With the completion of the William R. Bennett Bridge and Westside Road Interchange projects, Boucherie Road to Westlake Road was identified as the next section of Highway 97 most in need of safety and mobility improvements. In addition to the Central Okanagan Planning Study launched in 2014, which looks at the transportation needs for the broader area, the Ministry of Transportation and Infrastructure (MoTI) initiated conceptual planning for these intersections as a result of the safety and mobility improvements needed in the near term. In 2014, MoTI began planning for improvements to the Boucherie Road and Westlake Road intersections, to increase safety and mobility along the Highway 97 corridor. These intersections create significant highway and cross street delays, and experience higher collision rates compared to other locations throughout the province. Highway 97: A Vital Transportation Corridor Highway 97 is the primary north-south roadway through the Okanagan Valley, serving as the major connection between the communities of Osoyoos, Oliver, Penticton, the City of West Kelowna, Kelowna, Vernon and Kamloops, and connecting the U.S. in the south to the Trans-Canada Highway (Highway 1) in the north. Hwy 97 to Vernon The Boucherie Road and Westlake Road intersection improvements will help traffic continue to move safely and meet future traffic needs resulting from the projected population and economic growth in the area. Highway 97 Lake Country Kelowna Hwy 97C to Kamloops and the Trans-Canada Highway (Hwy 1) West Kelowna Hwy 33 Okanagan Lake Hwy 97 to Penticton, Oliver, Osoyoos and the Canada/U.S. Border Highway 97 approaching the existing Boucherie Road intersection Highway 97 at the existing Westlake Road intersection

Working with local government MoTI has worked with the City of West Kelowna and Westbank First Nation to consider their goals for transportation infrastructure improvements, including: Planning and discussions with the City of West Kelowna and Westbank First Nation over the past year have resulted in conceptual layouts for intersection improvements at Westlake Road and Boucherie Road. Extensive technical consultation has been carried out with the City of West Kelowna and Westbank First Nation staff throughout the planning process. Local government has provided input related to land use impacts, future growth and traffic forecasts, and future local transportation infrastructure plans as well as improvement option evaluation. The Ministry appreciates both parties involvement in the planning process. Guiding Principles Improvements to Highway 97 Intersections Planning for improvements to the Boucherie Road and Westlake Road intersections include the following principles to guide the decisionmaking process: P Improve safety and traffic flow on the highway. P Improve access and connectivity with the local road network. P Support and enhance adjacent land uses and consider local community character, aesthetics and image. P Minimize impacts to residents and businesses and maximize development potential. P Support active transportation.

Boucherie Road and Westlake Road Intersections: Current Conditions The population of the Okanagan is growing rapidly, and is predicted to continue to grow. From 1996 to 2011, the Central Okanagan population grew by 32%, a much higher rate than the provincial average of 18%. To meet this growing demand, capacity improvements are needed to address safety, queuing and delays and help improve travel times along Highway 97. Traffic Collisions An analysis of current operations and collisions, completed as part of the conceptual planning process, shows the Boucherie Road and Westlake Road intersections are considered collision prone locations experiencing higher than average collisions and accident severity, based on comparable locations in the province. On Highway 97, between Westlake Road and Westside Road, over 115 collisions have been reported in a five year period (2010 2014), with the majority occurring at the Boucherie Road and Westlake Road intersections. Westlake Road and Boucherie Road are currently ranked the most collision prone locations along Highway 97 south of the William R. Bennett Bridge. The Ministry s planned improvements will increase safety at these two intersections. Highway 97 Westlake Road to Westside Road 5 Year Collision History (2010 2014) NUMBER OF COLLISIONS: 2010 2014 Westlake Road Intersection 40 35 30 25 20 15 10 5 Boucherie Road Intersection Westside Road Intersections HIGHWAY 97 FROM WESTLAKE ROAD TO WESTSIDE ROAD INTERCHANGE Since 2013, the average yearly number of crashes at the Westside Road interchange has decreased by 75%

Boucherie Road and Westlake Road Intersections: Current Conditions Current Traffic Congestion Highway 97 experiences significant delays and queuing, particularly northbound traffic during the morning peak hour, and southbound traffic during the afternoon peak hour. The following locations are particularly congested: The right turn from Boucherie Road onto Highway 97 (northbound) during the morning and afternoon peak hours The left turn from Highway 97 (southbound) onto Boucherie Road during the afternoon peak hour Eastbound Westlake Road/Hudson Road, including the left turn from Westlake Road/Hudson Road onto Highway 97 northbound during the morning and afternoon peak hours Within the Boucherie Road and Westlake Road study area, traffic volumes on the highway during morning peak hours are around 3,500 vehicles-per-hour (VPH) and in the afternoon are around 4,200 VPH. Traffic does not flow efficiently through the signalized intersections at Boucherie Road and Westlake Road as a result of existing traffic and land use patterns. For example, residential development is on the west side of Okanagan Lake and employment centres are on the east. Congestion on Highway 97 has resulted in vehicles diverting to Sneena Road Extension, causing additional congestion on local roads. Traffic Volume During the Morning Peak Hour Boucherie Road Intersection (Summer 2015) Traffic Volume During the Morning Peak Hour Westlake Road Intersection (Summer 2015) Future Traffic Conditions 1,451 DRIVE HORIZON 59 45 37 38 HWY 97 2,208 501 TRAFFIC VOLUME MORNING PEAK 1,302 200 91 WESTLAKE ROAD 93 206 Anticipated development in the area (identified by the City of West Kelowna and Westbank First Nation) could contribute up to an additional 2,300 vehicles-per-hour (VPH) during the morning BOUCHERIE ROAD 163 Number of vehicles travelling through the Boucherie Road intersection on Hwy 97 Number of vehicles turning on to Hwy 97 from Boucherie Road or Horizon Drive Number of vehicles turning off Hwy 97 on to Boucherie Road or Horizon Drive 61 104 HUDSON ROAD 278 HWY 97 1,872 TRAFFIC VOLUME MORNING PEAK Number of vehicles travelling through the Westlake Road intersection on Hwy 97 Number of vehicles turning on to Hwy 97 from Westlake Road or Hudson Road peak hour and 3,600 VPH during the afternoon peak hour over a 25-year time frame. This would increase daily traffic in the area by about 70%. Number of vehicles turning off Hwy 97 on to Westlake Road or Hudson Road

Boucherie Road and Westlake Road Intersections: Current Conditions Current Traffic Congestion There are many activity centres concentrated on the Highway 97 corridor, and few alternative routes. The greatest traffic congestion is around these activity destinations. Population and economic growth has resulted in congestion, particularly in the summer when the largest amount of tourist traffic is added to local and commercial traffic. Traffic counts at the south end of William R. Bennett Bridge show that the average weekday daily traffic over the year 2014 is 56,000 vehicles per day, ranging from 47,000 in winter to 64,000 in summer. Highway 97 and the side-streets at the Boucherie Road and Westlake Road intersections experience significant traffic congestion and traffic queues during the morning and afternoon peak hours, particularly in the summer months when traffic volumes increase by about 15%. Highway 97 Average Annual Daily Traffic (2014) LEGEND Average Annual Daily Traffic 0-10,000 10,000-20,000 20,000-30,000 30,000-40,000 40,000-50,000 50,000+ District of Lake Country Traffic Backups on Highway 97 During the Morning and Afternoon Peak Hours (Summer 2013) Westlake Road/Hwy 97 AM BACKUP PM BACKUP During the PM rush, traffic backs up 1.7km southbound almost all the way to Boucherie Road NORTHBOUND 405m 350m WESTBOUND 100m 65m EASTBOUND 500m 485m SOUTHBOUND 180m 1.7km Boucherie Road/Hwy 97 AM BACKUP PM BACKUP During the PM rush, traffic backs up 3km southbound and could extend onto the Bridge NORTHBOUND 685m 315m EASTBOUND 105m 50m WESTBOUND 40m 30m SOUTHBOUND 125m 3km To William R. Bennett Bridge District of Peachland City of West Kelowna IR #10 IR #9 City of Kelowna

Boucherie Road Intersection Improvements: Conceptual Layout BOUCHERIE ROAD INTERSECTION WEST FRONTAGE RD SB ON-RAMP HORIZON DRIVE HIGHWAY 97 UNDERPASS SB OFF-RAMP SNEENA RD EXTENSION NB OFF-RAMP NB ON-RAMP TOMAT AVE BOUCHERIE RD HAYMAN RD The Boucherie Road intersection conceptual layout will increase safety and capacity, and improve traffic flow.

Boucherie Road Intersection Improvements: Conceptual Layout This conceptual layout provides on/off ramps to and from the highway. An underpass at the current intersection of Highway 97 and Boucherie Road would connect the two sides of the highway. The three-lane underpass would be a continuation of Boucherie Road to the west side of the highway using a new roundabout intersection with Horizon Drive. On the east side, Boucherie Road would tie into a new roundabout with northbound on/off ramps. The Hayman Road intersection would be relocated to intersect with the extension of Sneena Road. This conceptual layout reduces congestion and improves movement to and from the highway. Boucherie Road Intersection: Conceptual Layout Planning and Conceptual Layout Project planning identifies the transportation issues for the project to solve, defines the scope of the project and recommends a solution to move forward into the design stage. A conceptual layout illustrates the recommended design during the planning phase of a project. The next step is preliminary design.

Boucherie Road Intersection Improvements: Conceptual Layout Safety and Mobility Benefits Achieved with the Boucherie Road Interchange Conceptual Layout: Reduces potential for high speed collisions on highway Removes traffic signal from the highway Improves traffic flow Improves access and connectivity with the local road network Enables pedestrians and cyclists to cross underneath the highway Supports the efficient movement of goods OTHER BENEFITS: Supports and enhances adjacent land uses Minimizes effects to residents and businesses and provides opportunities for development

Westlake Road Intersection Improvements: Conceptual Layout INDUSTRIAL RD STEVENS RD WESTLAKE ROAD INTERSECTION WESTLAKE RD HIGHWAY 97 HUDSON RD UNDERPASS CONCORD RD HUDSON RD / STEVENS RD CONNECTOR THOMAS RD HUDSON RD COLLEEN RD The Westlake Road intersection conceptual layout will increase safety and capacity, and improve traffic flow.

Westlake Road Intersection Improvements: Conceptual Layout This conceptual layout provides right in/right out movements to and from the highway, with an underpass north of the current Highway 97/Westlake intersection. This underpass would connect Hudson Road with Stevens Road. A section of Concord Road would be removed and a new road would extend from Hudson Road and connect back to Concord Road. The exact alignment would be confirmed in the next phase of preliminary design. This conceptual layout provides better movements to and from the highway. Westlake Road Intersection: Conceptual Layout Roundabouts Benefits: Roundabouts are growing in popularity across Canada and the U.S. Roundabouts reduce vehicle speeds through an intersection, improving safety for all users. Roundabouts reduce the potential for serious crashes, such as t-bone or head on-collisions. Roundabouts reduce GHG emissions by reducing delay and encouraging free flow of traffic.

Westlake Road Intersection Improvements - Conceptual Layout Safety and Mobility Benefits Achieved with the Westlake Road Interchange Conceptual Layout: Reduces potential for high speed collisions on highway Removes traffic signal from the highway Improves traffic flow Improves access and connectivity with the local road network Supports the efficient movement of goods Maintains and improves business access Includes rapid bus facility Enables pedestrians and cyclists to cross underneath the highway OTHER BENEFITS: Supports and enhances adjacent land uses Minimizes effects to residents and provides opportunities for development

Other Concepts Assessed Multiple concepts were considered through the planning process to address safety and mobility concerns along the Highway 97 corridor between Westlake Road and the Westside Road interchange. How does the Ministry Select a Conceptual Layout? The Ministry s transportation planning analysis looks at many factors when examining conceptual layouts for solving a transportation related issue. Our teams consider technical information, along with environmental and land impacts, and community interests by using a multiple accounts evaluation (MAE). The content of the MAE is developed by our planning teams and includes input from local governments, First Nations and stakeholders. An MAE allows us to directly compare the benefits and impacts of each concept and assists our engineers in recommending a preferred layout. Evaluation Process: The Boucherie Road and Westlake Road intersection concepts were evaluated by assessing the following criteria: Economic Account Convenient access Highway exposure (to businesses) Land consumption Socio-Community Account Cross-highway connectivity Impacts to residences Impacts to businesses Multi-modal (pedestrian, bicycle, transit) Financial Account Maintenance cost Construction costs Property cost Customer Service Account Safety Travel time savings Highway operations Ramp operations Network road operations Constructability Local Government Input Westbank First Nation City of West Kelowna

Other Concepts Assessed: Boucherie Road Intersection Improvements Signalized Diamond Interchange (Highway 97 Underpass) Boucherie Road Flyover (Highway 97 Underpass) Highway 97 Overpass (Horizon Drive Tube) Boucherie Road Intersection Boucherie Road Intersection Boucherie Road Intersection DRAFT OPTION ASSESSED DRAFT OPTION ASSESSED DRAFT OPTION ASSESSED Boucherie Road would pass over the highway, connecting the local roads on either side of the highway. Direct ramps would be provided to/from the highway northbound, while southbound a direct off-ramp and loop on-ramp from Horizon Drive (in the northwest quadrant of the interchange) would be provided. Boucherie Road would pass over the highway, providing access to lands on either side of the highway. Access to/from the highway would be provided by right-in/right-out ramps. An underpass would be provided south of the existing highway intersection to access lands on either side of the highway. Right-in/right-out ramps would provide access to/from the highway. Reasons why this concept was not selected: Property impacts to adjacent lands Short intersection spacing affects traffic operations High fill slope or retaining wall on west side Highest construction costs Reasons why this concept was not selected: Increased circuitousness of local road network Property impacts to adjacent lands Reconstruction of Boucherie Road High fill slope or retaining wall on west side Reasons why this concept was not selected: Increased circuitousness of local road network Pedestrian and cyclist connectivity between east and west sides less desirable Rapid bus stop placement challenging New intersection on Boucherie Road at an 8% grade

Other Concepts Assessed: Westlake Road Intersection Improvements Oval Roundabout (Stevens Road) Westlake Road Intersection Westlake/Hudson Road Overpass (Oval Roundabout, NB; Right-in/Right-out, SB) Westlake Road Intersection Westlake Diamond Interchange All movements to/from highway would be provided by an oval roundabout connecting Stevens Road across the highway and connecting to Boucherie Road. Reasons why this concept was not selected: Property and access impacts to adjacent lands (i.e. residences, ALR and Business Park) Grade differential between Boucherie Road east of highway and Stevens Road west of highway Significantly higher construction costs Includes unfamiliar traffic manoeuvres for drivers DRAFT OPTION ASSESSED Westlake/Hudson Road overpass would connect local roads on either side of the highway. Access to/from highway northbound would be provided by an oval roundabout, while right-in/right-out ramps would be provided southbound. Reasons why this concept was not selected: Property and access impacts to adjacent lands (i.e. residences, ALR and Business Park) Traffic management during construction would be challenging Includes unfamiliar traffic manoeuvres for drivers DRAFT OPTION ASSESSED All movements to/from highway would be provided by a diamond interchange just north of the current Westlake intersection. Westlake Road would pass over the highway, connecting the local roads on either side of the highway. Reasons why this concept was not selected: Property and access impacts to adjacent lands (i.e. residences, ALR and Business Park) Grade differential between Boucherie Road east of highway and Stevens Road west of highway Potential environmental impact on west side of highway Significantly higher construction costs

Boucherie Road and Westlake Road Intersection Improvements Next Steps Review comments and prepare Engagement Report. Revise conceptual layouts considering public input. Finalize planning report and initiate preliminary design. We want to hear from you! Provide us with your feedback by: Please submit your comments by March 20, 2016. P Completing the feedback form and leaving it with our team P Reading the Discussion Guide and completing the Feedback Form P Filling out our online Feedback Form P Sending an email to: boucherie.westlake@gov.bc.ca by March 20, 2016 Project information will be available at Thank you for coming