Verizon NEBS TM Compliance: FiOS Battery NEBS Testing Verizon Technical Purchasing Requirements VZ.TPR.9508 Issue 1, June 2011

Similar documents
MHR VRLA batteries are manufactured in compliance with TL, NEBS, GR, SR, IEC, BS, UL, ISO, OSHAS and CE quality and performance standards.

Reliability & Qualification Report for MEMS Based Variable Optical Attenuators

PERFORMANCE SPECIFICATION SHEET BATTERY, STORAGE, AIRCRAFT, MAINTENANCE-FREE, 24-VOLT, 1.5-AMPERE-HOUR

n For use in telecommunication circuit applications requiring low current protection with high surge tolerance

PERFORMANCE SPECIFICATION SHEET BATTERY, RECHARGEABLE, NICKEL CADMIUM, VENTED, 1.2-VOLT, 13 AMPERE- HOUR, BB-475/A CELL

PURE LEAD PLUS UPS APPLICATIONS. Valve Regulated Lead Acid Battery Designed for UPS Standby Power Applications Watts per Cell

Page 2 of 23 UNT150420C11

NetSure. 211 Series DC Power System

Central Florida Regional Transportation Authority d.b.a.

PURE LEAD PLUS UPS APPLICATIONS Valve Regulated Lead Acid Battery Designed for UPS Standby Power Applications Watts per Cell

2O3D3-19A REVB MOUNTING

TOTALFLOW Technical Bulletin 59 Lead Acid Battery Inspection and Maintenance Procedures

Table of Contents. 1 Introduction. 2 Power System Requirements. Preface... xi

Contents. 1 Introduction. 2 General Product Information. 3 General Test Requirements

BOOST POWER 1212 Product Description

UZB GENERAL DESCRIPTION 2. SHORT-FORM DATA 3. ORDER NUMBERS 4. MARKINGS BATTERY REPLACEMENT BATTERY REPLACEMENT 12V, 12AH 1/6.

Defender Mini Online Emergency Central Lighting Inverter (CLI) Technical Specifications

Modular Max Range BATTERY SOLUTIONS. NEBS qualified. Reliable capacities. EverExceed power your applications

3. MAJOR SYSTEM COMPONENTS Emergency Lighting Power System shall consist of the following major subsystems:

IEC 62133:2012 (2nd Edition) Understanding IEC Safety Requirements for Rechargeable Cells & Batteries used in Portable Devices

FAST-SC Connector. Any questions should be directed to AFL Telecommunications.

Cisco Nexus 7700 Switches Environment

VERTIV XTE 401 SERIES. Ordering Guide

TEST REPORT. Test Report for Mating Cycle Validation of Mini Circuits QBL Series Quick-Lock Test Cables.

Uninterruptible Power Supply

Cobra 3 Stand-By Emergency Central Lighting Inverter (CLI) Technical Specifications

Performance of Batteries in Grid Connected Energy Storage Systems. June 2018

VIA Platform Environmental Qualification Testing Standards

GENCORE 5 FUEL CELL SYSTEM System Fundamentals

31-SDMS-02 REV. 01 SPECIFICATIONS FOR

Power Lynx 3 Uninterruptible Power System (UPS) Technical Specifications

SOLAR LIGHTING SYSTEM

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

CTC Battery, Inc. Lithium Iron Phosphate Battery Specification

TEMPORARY REVISION NUMBER

Municipality Generator Interconnection Application Single Meter Application Part I

12-SDMS-02 REV. 05 ( )

SECTION

TEMPORARY REVISION NUMBER

COMMENT RESPONSE DOCUMENT

Investigation into UK socket-outlets incorporating USB charging points

Uninterruptible power supply Supply MEg101.4

CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM OFF-ROAD COMPRESSION-IGNITION (CI) APPLICATION

Special Specification 6058 Battery Back-Up System for Signal Cabinets

UL AND CODE COMPLIANCE

PRODUCT SPECIFICATION

IDEAL INDUSTRIES INC. TECHNICAL MANUAL - SUPPLEMENT MODEL

REFERENCE REV CP_TSSPEC_016 1 TITLE SPECIFICATION FOR DATE: NOVEMBER 2010 LIGHTING TABLE OF CONTENTS Page FOREWORD INTRODUCTION

3M CP2 Press-Fit Headers and Sockets, 2 mm

NterpriseIP Solution Adaptive, high-availability power system for IP Telephony. Business-Critical Continuity for Communications

FEATURES & benefits. Constant Power Discharge Ratings - Watts per 77 F (25 F) Operating Time (in minutes) to 1.

Verification/Report Number(s): HEARTWAY MEDICAL PRODUCTS Co., Ltd. Applicant Name/Address:

Principle Decision by the Central Experience Exchange Circle of the Notified Bodies and the GS Bodies according to the Product Safety Act ZEK

SECTION DC POWER SUPPLY/BATTERY CHARGER

TEST REPORT CONCERNING THE COMPLIANCE OF A VOTING MACHINE FOR USE AT ELECTIONS IN IRELAND, BRAND NEDAP, MODEL P.R.U

34-SDMS-02 SPECIFICATIONS FOR

An Urgent Bulletin from CSA Group

TEST REPORT. The following merchandise was submitted and identified by the vendor as:

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

UniStar III Series. Full Three Year Warranty. On-line, Single-phase UPS System. 1, 2, & 3kVA Tower Model

BALT5-800 LOW-PROFILE FLUORESCENT EMERGENCY BALLAST

BAL1400 FLUORESCENT EMERGENCY BALLAST Specification-grade One or two-lamp emergency illumination

HIGH SPEED MEZZANINE PRODUCT SPECIFICATION

SECTION A Division of Exide Technologies

National Board Update

THERMOSTAT PROBE PACKAGES: FAST RESPONSE, TINY STAT TM

Fortress 1 Outdoor Emergency Central Lighting Inverter (CLI) Technical Specifications

SGS North America, Inc.: Grant of Expansion of Recognition. AGENCY: Occupational Safety and Health Administration (OSHA), Labor.

Section V DC Nickel Cadmium Alkaline BATTERY

34-SDMS-01 SPECIFICATIONS FOR

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Southern California Edison Rule 21 Storage Charging Interconnection Load Process Guide. Version 1.1

Korea Eco-label Standards EL764 Revised 19. JUL Ministry of Environment Batteries EL764:2012

PERFORMANCE SPECIFICATION ACTUATOR, LINEAR, ELECTROMECHANICAL

NATIONAL TECHNICAL SYSTEMS

Physical Properties of Window Films

Jun 20,2014 Rev A

Umatilla Electric Cooperative Net Metering Rules

TYPE 400, SINGLE-POSITION, GENERAL-PURPOSE O3D3-RT REVB MOUNTING

TEMPORARY REVISION NUMBER

SPICES BOARD (Ministry of Commerce & Industry, Govt. of India) Palarivattom.P.O. N H By Pass Kochi

Lead Acid Batteries Modeling and Performance Analysis of BESS in Distributed Generation

and other -48VDC Power Systems. 19 or 23 Wide (Nominal) Relay Rack (part of system).

AUGUST 28, 2008 TEST REPORT # REV.1.1 MIXED FLOWING GAS TESTING CONNECTOR SERIES CLP S-D-A FTSH S-DV-A SAMTEC, INC.

Wireless Seat Occupancy Sensor

AUGUST 28, 2008 TEST REPORT # REV.1.1 MIXED FLOWING GAS TESTING CONNECTOR SERIES SEM H-D-WT TEM H-D-WT SAMTEC, INC.

Singlemode Fused Coupler LGX Module (832 Series)

TECHNICAL SPECIFICATIONS for. Telecommunication Battery Backup Systems (TBS)

SEM.Test Compliance Service Co., Ltd

Proposal for amendments to Regulations Nos. 19, 48 and 98.

Wireless Vehicle Sensor

Australian/New Zealand Standard

MN/DOT Specification Light Emitting Diode (LED) Luminaire 03/20/2012

SPECIFICATION AND PERFORMANCE TABLE OF CONTENT. 1. Scope Reference Documents Material and Components... 2

Dimensions WxHxD [mm] Weight [kg]

Centerwide System Level Procedure

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SCHEDULE 6 RESIDENTIAL SERVICE ON-SITE GENERATION

Transcription:

Verizon NEBS TM Compliance: FiOS Battery NEBS Testing Verizon Technical Purchasing Requirements VZ.TPR.9508 Issue 1, June 2011

CHANGE CONTROL RECORD: Version Date Action* Reason for Revision 1 6/1/2011 New New Document * New, Add, Delete, Change, Reissue Trademark Acknowledgement NEBS is a trademark of Telcordia Technologies, Inc. VZ.TPR.9503 Page - 2

PREPARED BY: Name, Title, Organization Todd Talbot DMTS, NEBS, Fiber and Energy Efficiency Verizon Technology Organization Systems Integration and Testing 320 St. Paul Place, Floor 14 Baltimore, MD 21202 Phone: 410-736-5945; Fax: 410-736-5144 E-mail: todd.f.talbot@verizon.com Date 6/1/11 APPROVED BY: Name, Title, Organization Howard Davis Manager, NEBS, Fiber and Energy Efficiency Verizon Technology Organization Systems Integration and Testing 320 St. Paul Place, Floor 14 Baltimore, MD 21202 Phone: 410-736-5904; Fax: 410-736-5144 E-mail: howard.davis@verizon.com Date 6/1/11 VZ.TPR.9503 Page - 3

Table of Contents 1.0 PURPOSE... 5 2.0 SCOPE... 5 3.0 REFERENCES... 5 4.0 ACRONYMS... 5 5.0 GENERAL REQUIREMENTS... 6 6.0 TEST REQUIREMENTS... 6 7.0 BATTERY RESERVE TESTING... 7 VZ.TPR.9503 Page - 4

1.0 PURPOSE The purpose of this Verizon Technical Purchasing Requirement document is to define the minimum required NEBS and battery reserve testing for VRLA Batteries supporting FiOS services. 2.0 SCOPE This Technical Purchasing Requirement document is intended to summarize Verizon s environmental and battery reserve time testing for VRLA FiOS batteries, which may be deployed in Verizon s network in conjunction with a UPS. For this TPR, a UPS is defined as the BBU for single family dwellings or the FMPS for multi-family dwellings. The tests contained herein shall be used by equipment suppliers and the Verizon-approved Independent Test Laboratory as the baseline of tests to create the NEBS test plan. In all instances of test planning and test execution, the most recent and accepted versions of the GR standards shall be used. 3.0 REFERENCES GR-63-CORE NEBS TM Requirements: Physical Protection 4.0 ACRONYMS BBU EUT FiOS FMPS ITL NEBS OPSU UPS VRLA Battery Back-up Unit Equipment Under Test Fiber Optic Service FTTP Multi-Purpose Power Supply Independent Testing Laboratory Network Equipment Building Systems Optical Power Supply Unit Valve Regulated Lead Acid VZ.TPR.9503 Page - 5

5.0 GENERAL REQUIREMENTS Verizon requires that manufacturers submit their EUT and associated documentation to a Verizon approved ITL for testing and verification of conformance to the qualification test requirements in this document. For a list of Verizon approved laboratories and locations, consult the Verizon web page at http://www.verizonnebs.com/tcppage.html. In addition to the NEBS requirements, products used at a customer s premises must meet applicable UL safety standards. 6.0 TEST REQUIREMENTS Standard Section Required Notes GR-63-CORE Sec. 4.1.1 Transportation and Storage Environmental Criteria The batteries must execute a charge / discharge cycle following each test GR-63-CORE Sec. 4.1.2 Operating Temperature Criteria The batteries must execute a charge / discharge cycle during each temperature extreme as well as towards the end of the of the humidity cycle GR-63-CORE Sec. 4.1.3 Altitude The batteries must execute a charge / discharge cycle at each dwell point during altitude testing GR-63-CORE Sec. 4.2 Fire Resistance GR-63-CORE Sec. 4.3 Equipment Handling Packaged Drop GR-63-CORE Sec. 4.3 Equipment Handling Unpackaged Drop GR-63-CORE Sec. 4.4.1 Earthquake Environment and Criteria GR-63-CORE GR-63-CORE Sec. 4.4.4 Office Vibration Environment and Criteria Sec. 4.4.5 Transportation Vibration Criteria The batteries must execute a charge / discharge cycle following the test. The batteries must be tested in their final shipping container. The batteries must execute a charge / discharge cycle following the test. The Batteries shall be mounted directly to the test fixture. The batteries must execute a charge / discharge cycle following the test. The Batteries shall be mounted directly to the test fixture. The batteries must execute charge / discharge cycles continuously during the test. The batteries must execute a charge / discharge cycle following the test. VZ.TPR.9503 Page - 6

7.0 BATTERY RESERVE TESTING The testing shall be performed with new batteries that has not been previously used for testing as defined in section 6 above and has not been recharged since shipping from the battery vendor. Testing shall be conducted on a minimum of 5 batteries. Testing will be performed with a 7 watt load to simulate the load from an OPSU and BBU. The battery voltage, current, case temperature and time to discharge shall be monitored and recorded during the testing. 7.2aH batteries or equivalent must meet the Verizon required 4 hours battery reserve time at -20 C. Alternate size batteries shall be prorated accordingly. Testing shall be conducted as follows: 1. Arrange the FiOS batteries in an environmental chamber with the support equipment located outside the chamber. 2. At a temperature of 25 C, charge the batteries to their maximum level and allow the batteries to stabilize for a minimum of 2 hours. 3. Connect the load circuit to the batteries and measure and record the voltage, current, case temperature and time for the battery to discharge to a voltage of 10.5 Vdc. 4. Repeat steps 2 and 3 for a second cycle at 25ºC. Two hour stabilization is not required for the second cycle. 5. Recharge batteries to their maximum level. 6. Ramp the environmental chamber to -20ºC and allow the batteries to stabilize for a minimum of 2 hours. 7. Connect the load circuit to the batteries and measure and record the voltage, current, case temperature and time for the battery to discharge to a voltage of 10.5 Vdc. 8. Recharge the batteries while maintaining the -20ºC environmental set point. 9. Repeat steps 7 and 8 to complete 2 discharge cycles at -20ºC. 10. Recharge the batteries while maintaining the -20ºC environmental set point. 11. Once recharging has completed, increase the temperature in the environmental chamber to 25ºC and allow the batteries to stabilize for a minimum of 2 hours. 12. Connect the load circuit to the batteries and measure and record the voltage, current, case temperature and time for the battery to discharge to a voltage of 10.5 Vdc. 13. Recharge the batteries while maintaining the 25ºC environmental set point. 14. Repeat step 12 15. Testing complete. VZ.TPR.9503 Page - 7