LIFTMASTER MAGIC BUTTON FS10 & LPK5 FAST SLIDER

Similar documents
HIGH SPEED SLIDING GATE OPENER

TMT Boxer 24v slider motor installation notes from EasyGate

SL100DCx series Sliding gate system Installation guide

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

EC MACHINE DIRECTIVE COMPLIANCE DECLARATION

SKC400U SLIDING GATE OPENER OWNER S MANUAL

Electro-Mechanical Swing Operator. Table of Contents

Instruction Manual for the. E-SL 450 Series

Sliding Gate Operator User's Manual

LI-2B Installation Manual

DKC400Y AC Sliding Gate Installation Manual. Sliding Gate Opener. Model: DKC400Y. Installation Manual WARNING

contents OPERATOR Maintenance SHAFT-120 Installation and Operating Manual DoorHan, 2012

Sliding Gate Operator User's Manual

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC) WARNINGS FOR THE INSTALLER

Roll Up Door Operator

COOKSON OWNER'S MANUAL

OPERATOR SHAFT-120. Installation and Operating Manual CONTENTS GENERAL INFORMATION SAFETY INSTRUCTIONS OPERATOR UNIT OPERATOR INSTALLATION

Rolling Door Operator User s Manual

Automation Swing Gate Opener

Table of Contents. General Safety Preparation for Installation Parts List Optional Accessories Part List... 5

Typical Installation Schematic

Letron Auto Gates (Australia) Pty. Ltd. User s Installation Manual

PHASE CONVERTERS OPERATING & MAINTENANCE INSTRUCTIONS. MODEL NO: PC40 and PC60. PART Nos:

The 820/860 Slide Gate Operator: Installation Manual

GLM SERIES CONTROL Users Manual Rev:

SLIDE & OL USER'S AND INSTALLER'S MANUAL V1.0 REV. 06/2017

SLIDING GATE OPENER USER MANUAL

Installation and a Maintenancee Manual

D Vers. 03 ELECTROMECHANICAL AUTOMATION FOR SWING GATES

HÖRMANN DSA 100 DSA 100 L DSA 200 DSA 200L. page 1

DTS SECURITY P.O.BOX 3399 EDENVALE 1610 Base plate-mounting instructions TELEPHONE

HYDRAULIC PALLET TRUCK. MODEL No: PTE550 PART Nos OPERATION & MAINTENANCE INSTRUCTIONS

FORCE SPD 800/1500/2000

LKS300/LKS450 OPERATOR S MANUAL

ELEKTROMATEN ST Sliding-door-drive

EC DECLARATION OF CONFORMITY FOR MACHINES (DIRECTIVE 98/37/EC)

HYDRAULIC PALLET TRUCKS

C2 Wiring 2 YEAR WARRANTY NOT FOR RESIDENTIAL USE. Serial # Box. Installation Date. Wiring Type. See page 7 for other wiring configurations

Sliding Gate Operator. User's Manual WARNING THIS PRODUCT MUST BE INSTALLED BY A QUALIFIED ELECTRICIAN

OLYMPIAN MODEL 740 Operation and Service Manual

ALL POSITION VARIABLE SPEED TRAVEL CARRIAGE


contents Installation Maintenance DOOR OPERATOR SLIDING-1300/2100 Installation and Operating Manual DoorHan, 2012

FROG KIT. Installation Instructions for a Pair of gates... TECHNICAL HELPLINE THE FROG-P KIT CONSISTS OF:

Pro Series 600 Pro Series 800

Installing the gate post bracket with the cardboard arm template

The House of Gate Automation

DTS 412/512/624 SLIDING GATE MOTOR INSTALLATION MANUAL

Owner s Manual. For SOLAR BOOM GATE. Model: CA-5000 SOLAR

ROSTA Tensioning Motorbases Type MB. self-adjusting maintenance-free overload-proof non-slip dampen harmful vibrations extend belt drive

BOLT-ON AND WELD-ON FLUSH FLOOR SLIDEOUT SYSTEMS OPERATION AND SERVICE MANUAL

Technical Manual DICTAMAT 304 AZ. Door Drive Unit. for hinged lift landing doors. Technical Data

CHECKLIST & COMPONENTS

PW320/PW330 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR FOR RESIDENTIAL. Flashing Light. Push Button. Control box. Gate 2.

Installing the gate post bracket with the cardboard arm template

SWING GATE OPENERS 24V DC GEAR MOTOR

EC DECLARATION OF CONFORMITY FOR MACHINES WARNINGS FOR THE INSTALLER

ACC Series Power Conditioner OPERATION & INSTALLATION MANUAL

EC DECLARATION OF CONFORMITY

Series A Electric Linear Actuators

Gun 300 Handpiece INSTRUCTION MANUAL. Ph: (02) Refer to instruction book before use.

Installation, Operating, Maintenance and Safety Instructions for CW332 Pressurised water system for boats 24 volt d.c.

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

Electrical operating instructions

LMPLC COOKSON OWNER'S MANUAL FDO A & B SOLID STATE INDUSTRIAL DUTY FIRE DOOR OPERATOR. B2/C2 Wiring 2 YEAR WARRANTY FDO 1/2 HP FDO A & B

ROSTA Tensioning Motorbases Type MB. self-adjusting maintenance-free overload-proof non-slip dampen harmful vibrations extend belt drive

Technical Specification

PY600AC Sliding Gate Opener User Manual

IB INTERNATIONAL Pty Ltd OCMIS INSTRUCTION MANUAL AQUA SYSTEM 3

PW150/PW200 USER MANUAL SWING GATE OPENERS 24V DC GEAR MOTOR

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

Assembly instructions. Veranda sunblind VZ510. art.nr

F ERNI K I T THE FERNI-S KIT CONSISTS OF:

Reproduction or other use of this Manual, without the express written consent of Vulcan, is prohibited.

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual

Combine Cover Manual

Gate & Door Controller with LCD and Intelligent Technology

Installation and Maintenancee Manual

WWWAUTO-ROLLER.CO.ZA INSTALLATION MANUAL AUTO- ROLLER

Swing Gate Kits AUTOMATIC GATE KITS & ACCESSORIES SECURING GATES SINCE Control Cards. Accessories 2017 / Gate & Door Controls Catalogue

Self-Recovery Winch WARNING. General Safety Precautions

SWING GATE OPENERS 24V DC GEAR MOTOR

Pro Series 2120 COMMERCIAL ROLLER SHUTTER OPENER

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

is250/is250d/is250solar SWING GATE OPENER MANUAL

Marine Engineering Exam Resource Review of Couplings

Linear Actuator Swing Gate Operator Installation Manual Model # LA405-24

Hunter Automatics HA-8. Installation Manual

84-01 Jeep XJ Cherokee ZJ Grand Cherokee 3" Suspension Lift Installation Instructions

E-SL 450BD Series INSTRUCTION MANUAL WARNING USER DRIVEN MANUAL*

HYDRAULIC SWING GATE OPENER

MOUNTING AND CONNECTING INSTRUCTIONS 1. GATE ARRANGEMENT ENGLISH

LIPPERTCOMPONENTS, INC.

Roller Door Operator

WARNING. Electric Recovery Winch. General Safety Precautions

L /2012 rev 0 BISON 45 OTI UNIONE NAZIONALE COSTRUTTORI AUTOMATISMI PER CANCELLI, PORTE SERRANDE ED AFFINI

Tips & Technology For Bosch business partners

DynaCon Instruction Manual

2V POULTRY DOME DOMES IN OZ. 2 frequency Geodesic Dome Assembly Manual. Poultry version

Sectional and Tilting Door Opener

Transcription:

R MAGIC BUTTON FS0 & LPK5 FAST SLIDER OPERATORS MANUAL FEATURES High speed -800mm/second Corrosion resistant - Hot dip galvanised base with stainless steel cover Speed flexibility - Slow start / slow stop with fast open - slow close for additional safety Compact - Motor and controls all under the same key lockable cover Safety - An inbuilt clutch and isolation switch under the cover Emergency use - Simple motor disconnect for power fail situations Voltage - 240V supply WARNING This equipment requires installation by persons with appropriate electrical qualifications and training and must be wired in accordance to AS3000 wiring rules

TABLE OF CONTENTS. FS0 INSTALLATION............... page 3-4. Preliminary Checks 3.2 Installing the Operator 3.3 Fixing the Drive Rack 4 2. LPK5 INSTALLATION.................. 5-6 2. Preliminary Checks 5 2.2 Installing the Operator 5 2.3 Fixing the Drive Rack 6 3. ELECTRICAL.................. 7-9 3. Wiring Connections 7 3.2 Step Down Limit Configuration 8 3.3 Control Board Instructions 8 3.4 Photo Electric Wiring 8 3.5 Speed Inverter Instructions with Step Down Speed 9 4. Limits.................. 0 4. Limit Switch Function 0 4.2 Setting the Limits 0 5. GENERAL MAINTENANCE & SETUP.................. 5. Disengagement Lever 5.2 Slipping Clutch 5.3 Safety 5.4 Lubrication 6. TROUBLE SHOOTING.................. 2 6. Fault Finding Guide 2 7. PARTS EXPLOSION.................. 3-4 7. FS0 Parts List 3 7.2 LPK5 Parts List 4 8. F.A.Q.................. 5 8. Frequent Question 5 LIFTMASTER ELECTRONICS PTY LTD A.B.N. 58 000 266 035 PO BOX 54 ALEXANDRIA NSW 435 AUSTRALIA PH: 6 2 9699 9654 FX: 6 2 9699 8443 www.liftmaster.com.au As Liftmaster Electronics policy is one of constant improvement, we reserve the right to alter any part of these specifications without notice and without incurring any obligation.

X. FS0 INSTALLATION. Preliminary Checks To ensure trouble free operation, make sure that the gate (whether existing or to be installed) has the following specifications. Strong and rigid gate frame manufactured to appropriate engineered standards The gate moves freely and evenly over its entire travel and does not jam on start up from either direction - especially with cantilevered gates No sideways oscillation movement of the leaf Upper and lower sliding system in perfect condition with appropriate rated wheels and rollers Adequate mechanical gate stops which have been appropriately engineered are manditory The gate has sufficient extension for mounting the drive rack (Fig. ) If any welding or brazing is required on the gate, it should be done before installing the automation system. The condition of the structure directly affects the reliability and safety of the automation system.2 Installing the Operator LIFTMASTER. Lay the conduits and cables between operator, accessories and power supply. The flexible pipes must protrude approx. 2cm from the cable entry hole. To facilitate the electrical wiring on the electronic system, leave about 45cm of free cable out of the bore in the base plate. 2. Unpack the operator and check that all accessories are included in the parcel. 3. Open the cover of the operator by means of the key supplied. 4. Place the base plate in the position shown at Fig. (for left or right hand mounting). 5. Ensure surface is perfectly level and mark the bolt hole positions; These should be positioned in the slot at the further most point away from the gate (This is to allow the operator to be slid in and out of the drive rack). Remove operator and drill for bolting down with 4 x 2mm x 00mm Dyna bolts or equivalent. Before bolting down place 2mm shims, as a temporary measure, between the ground surface and the base plate. These are to be removed after the rack has been correctly attached to the gate (See.3). 6. Connect the cables to the electronic control unit (refer to section 3). Min. 200 X Min. 200 GATE POST TOP GUIDE 80 6.5 78.5 25 RACK 25 78.5 6.5 80 Cable Entry 70 OPEN OPEN 70 Cable Entry 2.5 00 20 320 65 550 Left Hand Opening 65 FS0 Fig. 65 65 550 Right Hand Opening 20 00 320 2.5 3

.3 Fixing the Drive Rack LIFTMASTER. Fit the rack by means of: - 2g tek screws for Nylon rack (not supplied). - the supplied screws for Steel rack. It is advisable to tighten the rack fixing screws at the centre of the slot. This allows the rack to be adjusted up and down if gate drop occurs. Steel Drive Rack 2. Release the operator as shown in Fig.3 3. Slide gate leaf open by hand. 4. Place the first section of the rack on the pinion, aligning it with the first spacer (tab on nylon rack). 5. Fix the rack section to the leaf by means of a clamp. 6. Slide the gate leaf by hand towards its closed position, until it is in line with the last spacer/tab on the rack and spot weld the spacer in position (Screw the tabs for the nylon rack). Fig. 2 7. For the steel drive rack, completely weld the three spacers to the gate. To fasten the other rack sections needed to reach the position of complete closing, proceed as follows. 8. Line up another drive rack length to the last one fixed on the gate. Use a section of rack of about 50mm long and clamp this section to the two lengths of drive rack to ensure that the teeth correctly mesh (Fig.4). 9. Slide the gate leaf by hand towards its closed position until the third spacer of the section to be fastened is aligned with the pinion (Fig. 4). Weld the three spacers to the gate. Repeat this process until all rack is installed. Ensure that all the rack sections are correctly centred on the pinion teeth (Fig. 3). If not, adjust the position of the operator. Do not weld the rack sections to the spacers or to each other. Nylon Drive Rack Fig. 3 355 295 FS0 STEEL RACK SHOWN DO NOT weld pieces together 2mm gate bottom rail min. 50mm A 2mm packing shim during installation to be removed after rack is installed 380 Rack Mounting Heights A Nylon Rack - 0mm Steel Rack - 50mm This measurement is from the ground to the centre of the rack mounts. Fig. 4 0. Manually check whether the gate can open completely and the movement of the leaf is smooth and even, over its entire travel. The slack between the pinion and the rack must be 2mm (Fig. 3 & 4). If the gate is new, check the slack a few months after installation. Do not apply grease or other lubricants to the pinion or rack.. Check all fixing screws are secure and tight. 4

2. LPK5 INSTALLATION 2. Preliminary Checks To ensure trouble free operation, make sure that the gate (whether existing or to be installed) has the following specifications. Strong and rigid gate frame manufactured to appropriate engineered standards The gate moves freely and evenly over its entire travel and does not jam on start up from either direction - especially with cantilevered gates No sideways oscillation movement of the leaf Upper and lower sliding system in perfect condition with appropriate rated wheels and rollers Adequate mechanical gate stops which have been appropriately engineered are manditory The gate has sufficient extension for mounting the drive rack (Fig. 5) If any welding or brazing is required on the gate, it should be done before installing the automation system. The condition of the structure directly affects the reliability and safety of the automation system 2.2 Installing the Operator. Lay the conduits and cables between operator, accessories and power supply. The flexible pipes must protrude approx. 2cm from the cable entry hole. To facilitate the electrical wiring on the electronic system, leave about 45cm of free cable out of the bore in the base plate. 2. Unpack the operator and check that all accessories are included in the parcel. 3. Open the cover of the operator by means of the key supplied. 4. Place the base plate in the position shown at Fig. 5 (for left or right hand mounting). 5. Ensure surface is perfectly level and mark the bolt hole positions; These should be positioned in the slot at the further most point away from the gate (This is to allow the operator to be slid in and out of the drive rack). Remove operator and drill for bolting down with 4 x 2mm x 00mm Dyna bolts or equivalent. Before bolting down place 2mm shims, as a temporary measure, between the ground surface and the base plate. These are to be removed after the rack has been correctly attached to the gate (See 2.3). 6. Connect the cables to the electronic control unit (refer to section 3). Min. 450 X X Min. 250 GATE POST TOP GUIDE 30 73 5 Cable Entry 470 50 570 RACK OPEN OPEN LPK5 Cable Entry 00 0 00 6 Left hand Opening Fig. 5 Right hand Opening 5

2.3 Fixing the Drive Rack LIFTMASTER. Fit the rack by means of: - 2g tek screws for Nylon rack (not supplied). - the supplied screws for Steel rack. It is advisable to tighten the rack fixing screws at the centre of the slot. This allows the rack to be adjusted up and down if gate drop occurs. Steel Drive Rack 2. Release the operator as shown in Fig.3 3. Slide gate leaf open by hand. 4. Place the first section of the rack on the pinion, aligning it with the first spacer (tab on nylon rack). 5. Fix the rack section to the leaf by means of a clamp. 6. Slide the gate leaf by hand towards its closed position, until it is in line with the last spacer/tab on the rack and spot weld the spacer in position (Screw the tabs for the nylon rack). Fig. 6 7. For the steel drive rack, completely weld the three spacers to the gate. To fasten the other rack sections needed to reach the position of complete closing, proceed as follows. 8. Line up another drive rack length to the last one fixed on the gate. Use a section of rack of about 50mm long and clamp this section to the two lengths of drive rack to ensure that the teeth correctly mesh (Fig.8). 9. Slide the gate leaf by hand towards its closed position until the third spacer of the section to be fastened is aligned with the pinion (Fig. 8). Weld the three spacers to the gate. Repeat this process until all rack is installed. Ensure that all the rack sections are correctly centred on the pinion teeth (Fig. 7). If not, adjust the position of the operator. Do not weld the rack sections to the spacers or to each other. Nylon Drive Rack Fig. 7 95 45 LPK5 STEEL RACK SHOWN DO NOT weld pieces together 2mm 540 Rack Mounting Heights Gate Bottom Rail. Min 50mm 00 A A Nylon Rack - 30mm Steel Rack - 65mm This measurement is from the ground to the centre of the rack mounts. Fig. 8 0. Manually check whether the gate can open completely and the movement of the leaf is smooth and even, over its entire travel. The slack between the pinion and the rack must be 2mm (Fig. 7 & 8). If the gate is new, check the slack a few months after installation. Do not apply grease or other lubricants to the pinion or rack.. Check all fixing screws are secure and tight. 6

5 3. ELECTRICAL 3. Wiring Connections LIFTMASTER MB06 WIRING INSTRUCTIONS USING TAIAN E2-20-HF INVERTER LCD Display NEXT UP DOWN SET 3 PHASE MOTOR Motor Overload Transformer 240/2V 0.5 Amp Open Relay Micro Controller 2 OFF OFF 9 7 8 6 0 2 4 ON ON 3 6 5A Fuse 5x20mm WARNING 240VAC RFI Filter Active Neutral COM OPEN CLOSE Motor Capacitor 2 3 4 5 6 7 Close Relay P.E. Fuse AUX RELAY A Fuse 5x20mm 2 3 4 5 JP3 MB06 REV 0 LINK 3 2 3 L L2 Link 2 & 3 (for invertor) OPT0 L3 OPT02 L4 L5 COM OPEN CLOSE +2V 0V COM PE NC COM PB PED L6 L7 ANT GND 8 9 0 23456789 2 3 4 Receiver JP2 L8 L9 Black Blue White White 5 4 3 6 T - U T2 - V Inverter 2/COM REV/OPEN T3 - W FWD/CLOSE SP 240V 50Hz SUPPLY E A N BLUE RED ISOLATING SWITCH ON / OFF RED BLUE Motor Limits BLACK BLUE WHITE 2 5 4 NC C C NO C NO Connect to main Earth L N WIRING DIAGRAM FOR STEP DOWN SPEED CONTROL WHITE (FROM JP3) Inverter Terminals 3 FWD (Close) BLUE (FROM JP3) 4 REV (Open) Yellow 2nd Open Limit Blue N.O C 9 7 White 3 N.O C White 6 SPI 40Hz Closing Speed Red 2nd Close Limit 7 RST 20Hz Speed Yellow Black (from JP3) 5 +2 COM Fig. 9 7

3.2 Step Down Limit Configuration Opening: the step down open limit (yellow) is set 0 degrees before the final open limit (green). The nd yellow limit will start the 2 speed and the gate will move at 20Hz speed for small distance then the gate will stop on the green open limit. Closing: the step down limit (red) is set 0 degrees before the final close limit (black). The red limit will nd start the 2 speed and the gate will move at 20Hz speed for small distance then the gate will stop on the black limit. RED, Close step down limit YELLOW, Open step down limit BLACK, Close stop limit GREEN, Open stop limit For details on adjusting the limits, refer to section 4 3.3 Control Board Instructions For detailed control board information, please refer to the control board instruction manual. 3.4 Photo Electric Wiring 2.4. All photo electrics used with the Magic Button FS0 or LPK5 MUST have an Earth wire connected between 0V supply terminal and the photo electric steel case or any other metal plate next to the photo electric (E.g. Gate jamb, post, track etc) 3.4.2. RIB Photo Electric Wiring (5002) 3.4.3. Mini Photo Electric Wiring (50022) A+ A- 8 0 2 3 4 2 4 3 Earth to casing on receiver only Note: JP jumper should be ON for both PE s) 2 4 3 Earth to casing on receiver only Note: For other brands of photo electrics, refer to the manufacturers instructions 8

3.5 Speed Inverter Instructions with Step Down Speed 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 TAIAN INVERTER PROGRAMMING SETTING DISPLAY COMMENT Turn Power ON 5.0 Running Frequency till 60 DSP FUN till DATA ENT till DATA ENT till 2 DATA ENT till 0.5 DATA ENT till F05 60 F00 F0 05.0 F0 F02 5.0 F02 F05 Set Running Frequency to 60Hz Acceleration time function Acceleration time set to Deceleration time function Deceleration time set to DATA ENT till 2 2 DATA ENT F05 till F08 DATA ENT till 40 DATA ENT till F09 F08 0 40 F08 F09 Closing frequency set to 40Hz Step down speed DATA ENT 6.0 till 20 20 DATA ENT F09 till F0 DATA ENT till DATA ENT F0 000 F0 Operating Mode till F3 3 Torque compensation gain DATA ENT 000 till 5 5 DATA ENT F3 till F20 F20 DATA ENT 05 till 00 DATA ENT F20 DSP FUN 60 End Programming Note: These are settings for the running frequency, acceleration time and deceleration time. Refer to the inverter booklet for other functions. 9

4. LIMITS 4. Limit Switch Function NOTE: Care should be taken to ensure the limit switch roller does not over travel the limit cam (See Fig. 0). A high speed and long slow down time will cause the motor to over run the limits allowing the gate to continue its travel in the same direction causing damage to the gate and motor. MAXIMUM TRAVEL Fig. 0 TRAVEL OVER RUN 4.2 Setting the limits To adjust the limits, remove the limit cover (refer to Fig. 4). The coarse adjustment of the limit switches can be done by inserting a rod or screw driver into one of the adjustment holes of the cam wheels and moving in the direction required. Fine adjustment can be done two ways - () by increasing or decreasing the speed on the inverter, or (2) by screwing the adjustment screw (refer Fig. 2) against the cam shaft thread inside each cam wheel. The adjustment screw is supplied inside each limit switch box. The screw must be changed from one adjustment hole to the other for turning the cam wheel in the opposite direction. Adjustment Screw Fig. Lock Nut Note: Before starting adjustment of the limit switches, loosen or tighten (if necessary) the lock nut in order to obtain a convenient ADJUSTMENT TIGHTNESS of the cam wheels. After finishing the adjustments, make sure that the lock nut is sufficiently tight to retain the cam wheels during operation (refer Fig. ) Coarse Adjustment Fine Adjustment Fig. 2 0

M a nual LIFTMASTER 5. GENERAL MAINTENANCE & SETUP 5. Disengagement lever In power failure or emergency situations the disengagement lever is provided to allow the gate to be opened manually. By turning the disengagement lever the gear unit can be disconnected from electric operation in order to permit manual operation of the gate. Before disengagement, isolate the power. NOTE: When changing the disengagement lever back to electric operation, the gate itself must be moved manually, slightly in either direction in order for the clutch to get perfectly engaged. Disengagement Lever Fig. 3 5.2 Slipping Clutch The torque transmitted by the drive unit must always be adjusted in due consideration of the safety requirements of the gate operation. The limitation of the torque is done by adjusting the slipping clutch. When supplied from Liftmaster, the slipping clutch is left loose so that no torque can be transmitted from the electric motor. Adjustment: (Refer Fig. 4). Loosen the lock nut at the end of the worm shaft. Limit Cover Worm Shaft Clutch Lock Nut Clutch Adjustment Screw Rating Plate of the Gear Box Slipping Clutch Lining Fig. 4 2. Hold the worm shaft with a spanner. 3. Start turning the adjustment screw inwards (clockwise) until the required torque has been obtained. The torque should be adjusted so that it is just high enough to move the gate over its complete travel and low enough to permit the clutch to slip as soon as the gate is obstructed in its movement. A direct safety risk is produced if the torque is set to a considerably higher level than required for the gate operation. IMPORTANT: Before starting to adjust the slipping clutch, check and make sure that the gate can easily be moved manually in every part of its travel. 5.3 Safety The installation of appropriate safety devices applicable for the situation is mandatory. Possible safety accessories include warning signs, photo electrics, vehicle detectors, safety edge profile, emergency stop controls, flashing lights, and traffic lights. 5.4 Lubrication Correct lubrication is of primary importance for the function of the worm gear. The oil grade of the initial filling is shown on the rating plate of the gear box (refer Fig. 4). In normal operating conditions oil changes are not necessary. The oil quantity, however, should be checked at the time of the installation as well as periodically in connection with normal maintenance and adjustments in the gate function. The red oil plug of the gearbox shows the required oil level. The normal oil (Mobil Gear Oil 627 or equivalent) is applicable for an environment with temperature variations from -5 C to +45 C. For lubrication in especially low or high operating temperatures we recommend consulting with Liftmaster for appropriate oil.

6. TROUBLE SHOOTING 6. FAULT FINDING GUIDE Turn the release clutch to manual use Can the gate be moved easily manually? NO Remove obstructions and obstacles preventing gate movement YES Check the thermal relay in the control box NO FUNCTION In half open position observe relays while pressing push buttons FUNCTIONS IN BOTH DIRECTIONS The motor runs? YES YES Is the gear shaft turning? NO Adjust or replace the slipping clutch NO Gear teeth or release clutch broken Check drive shaft keyway Replace gear unit NO Check gate rollers NO Measure the phase currents OK YES Check fuses Check whether the motor is overheating Check micro switches in motor & limit switch box Check closed limit switch circuit Check safety circuits Check open limit switch circuit Fault in the control box logic circuits FUNCTIONS ONLY IN THE OPEN DIRECTION FUNCTIONS ONLY IN THE CLOSED DIRECTION Release the slipping clutch NO Mechanical fault in the motor YES NO Check the release clutch function NO Fix / adjust the release clutch ONE PHASE MISSING Phase broken in the motor winding YES Replace the motor Right voltage in every phase? NO Main circuit faulty Fig. 5 2

7. PARTS EXPLOSION 7. FS0 PARTS LIST No. ITEM Gear Box & Limit Assembly 2 Motor 0.55kw 3 Mounting Plate 4 Cover No. ITEM 5 6 7 8 Lock Inverter Isolation Switch Magic Button Control Board No. 9 0 2 ITEM PVC Control Box Base Plate Sprocket - Z25 Shaft 4 5 Left Hand 3 Right Hand 3a 6 2 7 0 Left Hand 0a Right Hand 9 8 2 TITLE: MBFS0 PARTS EXPLOSION DATE: SCALE: LIFTMASTER 08/08/06 NTS DRAWN BY: DRAWING No: CF spare_parts CHECKED BY: RH 3

7.2 LPK5 PARTS LIST No. ITEM Gear Box & Limit Assembly 2 Motor 0.55kw 3 Base Plate 4 Cover 5 Isolation Switch 6 Control Box - PVC 7 Magic Button Control Board 8 Inverter 9 Shaft 0 Sprocket - Z25 Mounting Plate (optional) 4 5 M8 Socket Screw 6 3 2 7 8 0 9 LIFTMASTER ELECTRONICS P/L TITLE: OVITOR LPK5 EXPLOSION DATE: SCALE: 25/2/04 NTS DRAWN BY: DRAWING No: DS CHECKED BY: ovi-lpk5exp.304.ds 4

8. F.A.Q. 8. FREQUENT QUESTION: What size and weight gate can this operator handle and how fast does it close/open? ANSWER: Gate weight is often used as a criteria for gate motor selection. The first issue of gate motor selection is whether the gate is well engineered, manufactured and installed and can be moved by a force of 400 kiloponds (approximately what one man can move by hand) These requirements are fundamental to every gate installation. The start torque of the FS0 at 50Hz is 44 kg with the 36:2 gearbox or 96 kg with the 29: gearbox, and as such the FS0 has a start torque that far exceeds 400 kiloponds. Gate weight becomes of concern when safety needs are examined, as any fast moving gate, regardless of weight, needs to have sufficient safety devices to provide a prudent operation. Any risk assessment of gate speed involves the potential need of how to stop the gate mass, if required, before it meets the end limits and the mandatory, suitably engineered to suit, open and close gate stops. As the gate motor speed is achieved by an inverter there will ALWAYS be approximately one () second of slow down before the gate motor will be without power and the motor brake engages. A risk assessment of the distance the gate will travel in one second is dependent upon the selected inverter frequency selection and must be taken into account.. The heavier the gate, the more the gate speed should be lowered to achieve an acceptable stopping distance for the application, in the event of an emergency stop. The speed can be altered by lowering the frequency, at 80Hz the gate speed with a 36:2 gearbox is 800mm TECHNICAL DATA / sec., and at this speed the mass of Power Supply Required any size gate will be hard to stop in 240V AC an emergency. Over travel before Absorbed Power (Watts) 550 W stopping will be significant, while the slower the speed the less the over travel. This contingency has to be taken into account in any installation, as also the possibility of programming separate speeds for open and close cycles. Current Drawn (Amps) Electric Motor Standard Reduction Ratio Max Speed with 36:2 Start-up Torque with 36:2 4 Amp 4 Poles - 370 RPM 36 : 2 800mm/sec 44 kg The 36:2 gearbox is standard, while the 29: gearbox is available on special order. Gate travel of over ten (0) metres will require four (4) external limits to be installed. If in any doubt with regard to any issue consult a qualified engineer. Nominal Torque with 36:2 Locking Torque with 36:2 Optional Reduction Ratio Max Speed with 29: Start-up Torque with 29: Nominal Torque with 29: Locking Torque with 29: Pinion Size Rack Type of Oil Temperature Range Weight of Operator 9 kg 80 kg 29 : 480mm/sec 96 kg 24 kg 326 kg Z25 (0mm diam.) Module 4 Mobil Gear 627 (or equivalent) -5 C to +45 C 42 kg 5

NOTES DISTRIBUTED BY: LIFTMASTER ELECTRONICS PTY LTD A.B.N. 58 000 266 035 PO BOX 54 ALEXANDRIA NSW 435 AUSTRALIA PH: 6 2 9699 9654 FX: 6 2 9699 8443 www.liftmaster.com.au As Liftmaster Electronics policy is one of constant improvement, we reserve the right to alter any part of these specifications without notice and without incurring any obligation. 6