Railway Technology Avalanche

Similar documents
Gauge Face Wear Caused with Vehicle/Track Interaction

Dynamic characteristics of railway concrete sleepers using impact excitation techniques and model analysis

The evaluation of endurance running tests of the fuel cells and battery hybrid test railway train

A Study on the Measurement of Contact Force of Pantograph on High Speed Train

Test Facilities. (1) Vehicle Technologies

Development of the Evaluation Technology of the Braking Test for High-speed Brake Performance Tester

OCS Inspection System for High-Speed Railways

Lateral Resistance Characteristics of Sleepers in Railway Ballasted Tracks from Laboratory Model Tests

STUDY OF THE AERODYNAMIC NOISE CHARACTERISTICS OF BLUFF BODIES AS A PANTOGRAPH MEMBER

Railway Technology Avalanche Newsletter on the Latest Technologies Developed by RTRI No. 3

Improvements of Existing Overhead Lines for 180km/h operation of the Tilting Train

Special edition paper

Development of a High Efficiency Induction Motor and the Estimation of Energy Conservation Effect

Abstract In this paper, we developed a lateral damper to improve the running safety of railway vehicles

Current collecting characteristics of catenary with non-tension contact wires

Planetary Roller Type Traction Drive Unit for Printing Machine

INTERIOR NOISE OF A KOREAN HIGH-SPEED TRAIN IN TUNNELS

Research on Test Methods of Frame Torsional Rigidity Lu JIA1,2, Huanyun DAI1 and Ye SONG1

1064. Conversion and its deviation control of electric switch machine of high speed railway turnout

Multi Body Dynamic Analysis of Slider Crank Mechanism to Study the effect of Cylinder Offset

Steering Actuator for Autonomous Driving and Platooning *1

A STUDY ON THE PROPELLER SHAFT OF CAR USING CARBON COMPOSITE FIBER FOR LIGHT WEIGHT

Chapter 2 Dynamic Analysis of a Heavy Vehicle Using Lumped Parameter Model

Vehicle Turn Simulation Using FE Tire model

Rigid-Flexible Coupling Dynamics Simulation Analysis of Wheel/Rail Interaction in High-speed Turnout Zone

Development of Higher-voltage Direct Current Power Feeding System for ICT Equipment

Improvements for reduction of the brake squeal noise at Seoul metro rolling stock on tracks

Inductive Power Supply (IPS ) for the Transrapid

Development of Emission Control Technology to Reduce Levels of NO x and Fuel Consumption in Marine Diesel Engines

Interrelation between Wavelengths of Track Geometry Irregularities and Rail Vehicle Dynamic Properties

Analysis of Torsional Vibration in Elliptical Gears

Featured Articles Utilization of AI in the Railway Sector Case Study of Energy Efficiency in Railway Operations

All-SiC Module for Mega-Solar Power Conditioner

Riding Comfort relating to Maglev Guideway

Dynamic Behavior Analysis of Hydraulic Power Steering Systems

Special edition paper

Development of Variable Geometry Turbocharger Contributes to Improvement of Gasoline Engine Fuel Economy

Experimental Field Investigation of the Transfer of Lateral Wheel Loads on Concrete Crosstie Track

Prerequisites for Increasing the Axle Load on Railway Tracks in the Czech Republic M. Lidmila, L. Horníček, H. Krejčiříková, P.

Innovative Power Supply System for Regenerative Trains

Track test monitoring system using a multipurpose experimental train

Passive Vibration Reduction with Silicone Springs and Dynamic Absorber

Low-torque Deep-groove Ball Bearings for Transmissions

Extremely High Load Capacity Tapered Roller Bearings

Analysis on Steering Gain and Vehicle Handling Performance with Variable Gear-ratio Steering System(VGS)

Exploit of Shipping Auxiliary Swing Test Platform Jia WANG 1, a, Dao-hua LU 1 and Song-lian XIE 1

Development of Catenary and Batterypowered

Design of Damping Base and Dynamic Analysis of Whole Vehicle Transportation based on Filtered White-Noise GongXue Zhang1,a and Ning Chen2,b,*

Fig.1 Sky-hook damper

Development of Motor-Assisted Hybrid Traction System

High Capacity Tapered Roller Bearings

Study on System Dynamics of Long and Heavy-Haul Train

New Concept for Higher Speed on Existing Catenary System: Auxiliary Pantograph Operation

Railway Technology Avalanche

Extra-High-Voltage SF 6 Gas-Insulated Switchgear

Special edition paper

STRUCTURAL BEHAVIOUR OF 5000 kn DAMPER

NUMERICAL ANALYSIS OF LOAD DISTRIBUTION IN RAILWAY TRACK UNDER WHEELSET

Safe, fast HV circuit breaker testing with DualGround technology

Prototyping of Radial and Thrust Air Bearing for Micro Gas Turbine

Testing Of Fluid Viscous Damper

Historical study on designing Japanese rail profiles

POWER QUALITY IMPROVEMENT BASED UPQC FOR WIND POWER GENERATION

What is model validation? Overview about DynoTRAIN WP5. O. Polach Final Meeting Frankfurt am Main, September 27, 2013

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

Pantograph and catenary system with double pantographs for high-speed trains at 350 km/h or higher

FFU synthetic sleeper technology.com

Development of Pushrim-Activated Power-Assisted Wheelchair

Last date for sending comments : 30 November 2011

Railway Technology. Newsletter on the Latest Technologies Developed by RTRI. Recent Research and Development by RTRI

Experimental investigation on vibration characteristics and frequency domain of heavy haul locomotives

Vehicle Dynamic Simulation Using A Non-Linear Finite Element Simulation Program (LS-DYNA)

Design and Vibrational Analysis of Flexible Coupling (Pin-type)

Energy Management for Regenerative Brakes on a DC Feeding System

Special edition paper

Dynamic tests of SRIM fluid viscous dampers

Low Noise Gear Units Developed by Loading Test Rig in the Anechoic Chamber

Specifications and schedule of a fuel cell test railway vehicle. T. Yoneyama, K. Ogawa, T. Furuya, K. Kondo, T. Yamamoto

Multi-axial fatigue life assessment of high speed car body based on PDMR method

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

METHOD FOR TESTING STEERABILITY AND STABILITY OF MILITARY VEHICLES MOTION USING SR60E STEERING ROBOT

INFLUENCE OF CROSS FORCES AND BENDING MOMENTS ON REFERENCE TORQUE SENSORS FOR TORQUE WRENCH CALIBRATION

Erol Tutumluer, Yu Qian, Youssef Y.M.A. Hashash, and Jamshid Ghaboussi

Optimization of Total Operating Costs Using Electric Linear Drives

Technical Trends of Automotive Wheel Bearings

Train Group Control for Energy-Saving DC-Electric Railway Operation

A study on assessment of dropper life for conventional line speed-up

Is Low Friction Efficient?

A study of the train performance simulation for Korean next Generation high-speed train. high-speed train.

Quantification of Lateral Forces in Concrete Crosstie Fastening Systems

Tire Uniformity Machine, LIBROTA

Design of Piston Ring Surface Treatment for Reducing Lubricating Oil Consumption

Maneuvering Experiment of Personal Mobility Vehicle with CVT-Type Steering Mechanism

Improvement of Vehicle Dynamics by Right-and-Left Torque Vectoring System in Various Drivetrains x

Mike Hale CSX Transportation Director of Train Accident Prevention

Development of Assist Steering Bogie System for Reducing the Lateral Force

SOLUTIONS FOR SAFE HOT COIL EVACUATION AND COIL HANDLING IN CASE OF THICK AND HIGH STRENGTH STEEL

PASSING ABILITY OF SCC IMPROVED METHOD BASED ON THE P-RING

Non-contact Deflection Measurement at High Speed

Steering Dynamics of Tilting Narrow Track Vehicle with Passive Front Wheel Design

Transcription:

Newsletter on the Latest Technologies Developed by RTRI Railway Technical Research Institute -8-38 Hikari-cho, Kokubunji-shi Tokyo 185-85, JAPAN Copyright Railway Technical Research Institute. All rights reserved. Reproduction in whole or part without permission is prohibited. Printed in Japan. Railway Technology Avalanche GENERAL INFORMATION Foreword Isao OKAMOTO... 33 Wear Tester for Current Collecting Materials for High Speed Railway Shunichi KUBO... 3 ARTICLES Ladder Track Structure and Performance Kiyoshi ASANUMA... 35 Optimum Cross Sleeper Length and Ballast Tamping Area for Narrow Gauge Tracks Akira NAMURA... 36 Detecting High Resistance Grounding Faults in DC Electric Railways Using High Frequency Current Injection Akinobu OKUI... 37 A Measure to Reduce Contact Wire Wear in Shinkansen Overlap Sections Masatoshi SHIMIZU... 38 33 September 1, No. 6 International Activities of Railway Technical Research Institute Isao OKAMOTO Director, in charge of International Affairs I have been in charge of the Information & International Affairs Division of Railway Technical Research Institute since August of last year. This institute engages in the research and development of basic and applied railway technologies. It also emphasizes various international activities, including technical exchange and technical cooperation with railway operators, research institutes and other organizations around the world. For example, as a member of the UIC, the institute dispatches staff to the UIC to grasp current international railways trends. The institute takes part in joint research projects of the World Executive Council (WEC) and carries out research for the development of railway technology around the world. In addition, the institute has its experts actively attend major international conferences on railways, such as the World Congress on Railway Research (WCRR) and the Eurail Speed, to deliver lectures and present papers. Furthermore, the institute has carried out joint research with the French National Railways, the China Academy of Railway Sciences, the Korea Railroad Research Institute, and others. It participates in business conferences and specialist meetings sponsored by the Ministry of Land, Infrastructure and Transport to promote technical exchange with the United Kingdom, India, China, the United States and other countries. At the request of Japan Railway Technical Service (JARTS) and other agencies, the institute receives trainees in railway technology from overseas. Recently, at the request of JARTS in connection with the Taiwan Shinkansen, the institute is sending an increasing number of experts to Taiwan to promote technical support. Since the signing of an agreement with the Transportation Technology Center, Inc. (TTCI) of the United States for the use of its Pueblo experimental line, the institute has carried out various tests on this experimental line. The Railway Technical Research Institute intends to continue making contributions to the progress of the world's railway technology through various international activities. Mr. Isao OKAMOTO 1

3 Railway Technology Avalanche No. 6, September 1, Wear Tester for Current Collecting Materials for High Speed Railway Shunichi KUBO Senior Researcher, Laboratory Head, Frictional Materials, Materials Technology Division This tester consists of a revolving disk to which a ring made of copper plates (simulated contact wire) is fitted. With a pantograph contact strip pressed against the simulated contact wire, an electrical current is passed to them to turn the simulated contact wire, in order to measure the coefficient of friction, the rate of contact loss, wear of the contact strip and simulated contact wire, and the sliding surface conditions (Fig. 1 and Fig. ). This tester has made it possible to grasp the tribological characteristics of various current collecting materials under various sliding conditions. The tester was completed in December 3, replacing to the former wear tester introduced in the 197s. A pantograph contact strip slides on the contact wire at the train's running speed. A current as large as about 1 to 1, A passes to it. The contact strip must have enough strength as an important vehicle component, high electric conductivity as an electrical material, and high lubricating ability and wear resistance as a frictional material. The frequency of contact strip replacement depends on its wear resistance, and the contact wire life is significantly influenced by the contact strip's lubricating ability. Therefore, from the standpoint of railway management as well, improving the performance of the contact strip material is an important issue. On the other hand, with the increase in train speed and the decrease in the number of pantographs per train in recent years, the conditions under which the contact strip is used have become increasingly severe. This tester is used to develop high performance contact strip materials which can be reliably used even under the rigorous conditions of recent years. As a tester for current collecting materials, the apparatus boasts the highest performance in Japan, allowing for a m in diameter Revolving disk Contact strip test piece Contact strip holder Simulated contact wire (5 mm in width) Contact strip holder Contact strip test piece Driving motor Figure 1. Scheme of wear tester for current collecting material for high speed railway. maximum sliding speed of 5 km/h, hence can easily respond to future increases in train speeds. Fig. 3 shows the wear characteristics of various contact strip materials measured at sliding speeds of up to about 3 km/h. In the future, the apparatus will permit the wear characteristics of various contact strip materials at higher speeds to be grasped. The maximum current that the tester can pass to each contact strip is 5 A (DC/AC). The tester accepts not only actual contact strips but also small test pieces. This permits testing even of contact strip materials which are still in the prototype stage. Plates of pure copper are used for the simulated contact wire. However, a material other than pure copper can be substituted as long as it is in the form of a plate. The sliding conditions are either constant speed, constant current, or programmed conditions in which the speed and current are varied according to the actual train running conditions. The greatest factor causing contact strip wear is arc discharge, which occurs when the pantograph loses contact. It has been known that the rate of contact strip wear increases nearly in proportion to the rate of occurrence of arc discharge due to contact loss. The contact strip holder of the tester is provided with an vibrator, which is capable of forcing a contact loss to occur, making it possible to check the wear characteristics of a contact strip under conditions close to the actual pantograph conditions. The specifications of the tester are as follows. (1) Simulated contact wire: Pure copper ring ( m in diameter, 5 mm in width). () Contact strip test piece: Full-scale contact strip (7 mm in length, mm in width, 3 mm in thickness); smaller test piece (9 mm in length, 5 mm in width, 3 mm in thickness). (3) Maximum sliding speed: 5 km/h. () Maximum current: 5 A (1 V DC/AC; polarity reversing possible with DC). (5) Applied force: 9.8 to 196 N (1 to kgf). (6) Items that can be measured simultaneously during tester operation: friction coefficient (frictional force/applied force); current passed; contact loss rate (voltage drop and occurrence of arc between contact strip and simulated contact wire); contact strip temperature. (7) Items that can be measured with tester out of operation: shape of wear and surface condition of simulated contact wire; amount of wear of contact strip material. 1 Simulated contact wire Revolving disk m in diameter Contact strip test piece and contact strip holder Specific wear rate (mm 3 /Nm) 1 3 1 Iron-based sintered metal alloy Copper-based sintered metal alloy Copper alloy impregnated carbon Figure. Appearance of wear tester. 1 5 1 3 Sliding speed (km/h) Figure 3. Examples of measured wear characteristics of various contact strip materials.

Ladder Track Structure and Performance Railway Technology Avalanche No. 6, September 1, 35 Kiyoshi ASANUMA Senior Researcher, Structural Mechanics, Railway Dynamics Division 1. Introduction Sleepers, slabs and other rail supporting members play a vital role as the interface to connect rails with the track bed and structures. They are closely related to the issues of safety, economy, maintenance, and track-system environment. We have developed a "ladder sleeper," an innovative new interface that has remarkable advantages for the above issues. Using this new sleeper, we are proposing a ballasted ladder track and a floating ladder track.. Structure of the ladder sleeper The ladder sleeper, as shown in Fig. 1, is a mixed laddershaped structure composed of twin prestressed concrete longitudinal beams and transverse steel pipe connectors. The transverse steel pipe connector, which is made from a thick-walled pipe, is rigidly joined to the longitudinal beam by inserting it between indented prestressing strands, which are arranged close to the top and bottom surface of the longitudinal beam. Sufficient reinforcement is provided around the steel pipe and then high-strength concrete is cast to be monolithic. 3. Ladder track system Using the ladder sleeper, we have developed a ballasted ladder track and a floating ladder track. The fundamental structural concept of the ladder track is a "combined rail" composed of the steel rail and concrete longitudinal sleeper (see Fig. ). It features high rigidity and remarkable stability against track buckling.. Performance of ballasted ladder track The ballasted ladder track significantly reduces maintenance work compared with the crosstie track, owing to the reduction of dynamic load transferred to the ballast. In order to evaluate structural durability and the effect of reducing maintenance of the ballasted ladder track, we conducted an accelerated endurance test using a heavy-haul freight train, having a static wheel load of 175 kn, at the Transportation Technology Center, Inc. (TTCI) in Pueblo, Colorado, U.S.A. (see Fig. 3). By the end of the test, the passing tonnage reached 15 million. The longitudinal prestressed concrete beams bore without a single crack or any other damage, and all the steel pipe connectors remained sound. Then, we could confirm the appropriateness of the design of the ladder sleeper. In addition, we also confirmed the remarkable effectiveness of the ladder sleeper at reducing maintenance, because the ballasted ladder track required no maintenance throughout the endurance test, while the crosstie track has required thorough tamping five times (see Fig.). 5. Performance of floating ladder track The floating ladder track is a lightweight, vibration-proof track system that is floated from the concrete track-bed by supporting the ladder sleepers with low-stiffness springs at a constant interval. Owing to the vibration-isolation effect of low-stiffness springs, the floating ladder track can significantly reduce the structure-borne noise. In order to evaluate the effectiveness of the reduction, we measured the vertical vibration of the concrete track-bed under a floating ladder track and a non-ballasted crosstie track on a rigidframe viaduct (see Fig. 5). Fig. 6 illustrates the frequency analysis of the vertical vibration level of velocity, which has a close relation to structure-borne noise, and it shows that the floating ladder track can reduce the vibration level of velocity by approximately 13. db (all-pass filtered) over the nonballasted crosstie track. As a matter of fact, no structureborne noise was audible under the viaduct at the site. Circular resilient device Figure 1. Ladder sleeper. Figure 3. Ballasted ladder track in TTCI. Figure 5. An example of floating ladder track laid out for testing. Settlement standard deviation (mm) 16 Crosstie track tamped at MGT 79MGT 13MGT 1MGT 139MGT 1 1 1 8 6 Crosstie track Ballasted ladder track 6 8 1 1 1 16 Passing tonnage (MGT) Vibration level of velocity (db re 5nm/s) 1 75 5 5 1 1 Floating ladder track Non-ballasted crosstie track 1 1 3 1 1/3-octave frequency (Hz) 91.dB 78.dB All-pass filtered 13.dB Figure. "Combined rail" structural concept of ladder track. Figure. deviation. Settlement standard Figure 6. Comparison of track-bed vibration level of velocity. 3

36 Railway Technology Avalanche No. 6, September 1, Optimum Cross Sleeper Length and Ballast Tamping Area for Narrow Gauge Tracks Akira NAMURA Senior Researcher, Track Dynamics, Railway Dynamics Division Ballasted tracks are subject to differential settlement under repeated load during train operation. This differential settlement causes track irregularity. To correct track irregularity, ballast tamping, in which ballast is pushed underneath the sleepers, is performed (Fig. 1). Normally, however, the ballast under the central part of the sleeper is not tamped. Therefore, the density of the ballast there becomes lower than that of the ballast at either side. As train load is applied to ballast areas that differ in density, they are either compressed vertically or flowed laterally, resulting in further ballast settlement (initial settling process). In the subsequent process, in which the uneven density distribution is corrected to a certain degree and the settlement continues (gradual settling process), in the case where a conventional sleeper (length: m) is used, a void occurs between the sleeper and the ballast near each end of the sleeper, due to the dependence of ballast strength on its confining pressure. As this void widens, the settlement of the ballast increases. This paper describes the results of a cyclic loading test carried out on a full-scale track model to study the effects of sleeper length and ballast tamping area on ballast settlement properties (Fig. ). The amplitude of sleeper displacement after a repeated load was applied once and 1 6 cycles, respectively, is shown in Fig. 3. The changes in average amount of sleeper settlement and in degree of sleeper differential settlement are shown in Fig.. In the area of ballast tamping, "ordinary" means that the ballast in the area up to about mm on each side from the rail center was tamped, and "entire length" means that the ballast along the entire length of the sleeper was tamped. From Fig. 3(a), it can be seen that when repeated load is applied once, the longer the sleeper length, the smaller the sleeper displacement tends to become at each end, and that with a given sleeper length, the sleeper displacement at each end is smaller when the ballast is tamped along the entire length of the sleeper. In "ordinary" ballast tamping with sleeper length l =. m and l =.3 m, respectively, the sleeper displacement at each end is greater than that at the center. In the other cases, the sleeper displacement at each end is smaller than that at the center. From Fig. 3(b), it can be seen that after the repeated load is applied 1 6 cycles, the change in sleeper deformation in "entire length" ballast tamping with sleeper length l =.3 m and in "ordinary" ballast tamping with sleeper length l =.6 m, respectively, is smaller than the change in sleeper deformation after the repeated load is applied once. The implication is that "l =. m, ordinary" and "l =.3 m, entire length" increase the sleeper support at the center, whereas "l =.6 m, entire length" increases the sleeper support at each end. Fig. indicates that both the average amount of differential settlement and the degree of differential settlement are small when the sleeper displacement at the center is slightly larger than that at each end after the initial application of the repeated load, since the sleeper deformation does not change under repeated load. From the above facts, in order to reduce the ballast settlement effectively when the area of ballast tamping is "ordinary," it is necessary to increase the sleeper length to.6 m. The reason for this is that even when the sleeper length is extended, the ballast under the extended portion is not tamped sufficiently. However, by adopting "l =.3m, entire length," it should be possible to obtain a ballast settlement reducing effect comparable to that obtained by "l =.6 m, ordinary." 15 mm 15 mm 1.5 Figure 1. Ballast tamping area for narrow gauge track with cross sleepers (length:. m) when multiple tie tamper is used.. Amplitude of sleeper displacement (mm) 1.5 1..5.5 1. 1.5.5 1. Distance from sleeper center (m) (a) Number of cycles: 1 Amplitude of sleeper displacement (mm) 1.5 1..5.5 1. 1.5.5 1. 1.5. Distance from sleeper center (m) (b) Number of cycles: 1 6 l (m) Tamping. Ordinary.3 Ordinary.3 Entire length.6 Ordinary.6 Entire length Figure 3. Amplitude of sleeper displacement. 1 1 Degree of uneven sleeper settlement (mm) 8 5 5 1 Number of cycles ( 1 5 ) (a) Degree of differential settlement Average amount of sleeper settlement (mm) 8 5 5 1 Number of cycles ( 1 5 ) (b) Average amount of settlement l (m) Tamping. Ordinary.3 Ordinary.3 Entire length.6 Ordinary.6 Entire length Figure. model. Cyclic loading test on full-scale track Figure. Transition in amount of sleeper settlement.

Railway Technology Avalanche No. 6, September 1, 37 Detecting High Resistance Grounding Faults in DC Electric Railways Using High Frequency Current Injection Akinobu OKUI Senior Researcher, Power Supply Systems, Power Supply Technology Division It is difficult to distinguish the current that flows through the DC feeding circuit during a high-resistance grounding fault having a resistance of several ohms from the electric car current. Detecting it has long been a problem. Recently we developed a method of detecting a highresistance grounding fault. In this method, a high frequency current is injected into the DC feeding circuit to distinguish between the electric car current and the high-resistance grounding fault current. This paper describes the principle of detection and provides an outline of the detector. Principle of detection When a micro high-frequency voltage is applied to the DC feeding voltage at the substation, the impedance as viewed from the substation differs between the electric car current and the high-resistance grounding fault current. In principle, therefore, it is possible to distinguish between them (Fig. 1). In Fig. 1, assuming the impedance as viewed from the substation when frequency ƒ1 (angular frequency ω1) is injected as Z (ω1), the following equation holds true. The resistance of the feeding circuit is assumed to have a characteristic proportional to the frequency, and is expressed as ω1rf. Z (ω1) = ( jω1l F +ω1rf)l+(r+jω1l)......... (1) In the above equation, jω1lf+ω1rf denotes the impedance per unit length of the feeding circuit, and l denotes the distance from the substation to the electric car or highresistance grounding fault point. R+jω1L is the electric car impedance or the resistance of the high-resistance grounding fault. Observing the resistance component and reactance component of Z (ω1), the value of lω1rf in the resistance component, lω1rf+r, is larger than the value of R due to the skin effect (Fig. ) and hence it is difficult to distinguish between them. In order to detect R separately, we consider injecting an angular frequency, ω, which is relatively close to ω1. In this case, the impedance can be expressed by the following equation. Z (ω) = ( jωl F +ωrf)l+(r+jωl)......... () From the above equations (1) and (), R can be obtained as follows. ωz(ω1) ω1z(ω) R = ω ω1 Thus, by injecting two different frequencies, it is possible to reduce the error in calculation of R due to the skin effect on the feeding circuit. High-resistance grounding fault detector The high-resistance grounding fault detector, developed on the principle of detection mentioned above, consists of an inverter unit and an injection unit. It detects the impedance and R of the feeding circuit from the amplitudes and phases of the injected voltage and injected current (Fig. 3). Considering the influence of the detector on the track circuit (signal), we inserted a filter into the inverter unit and injection unit. In addition, we adopted a frequency of the harmonics generated by the rectifier ±1 Hz as the injection frequency, so that it does not affect the signal track circuit and is free from the influence of harmonics generated by the rectifier (Fig. ). According to the test results obtained by the detector, the frequency-dependent component of R during a highresistance grounding fault is eliminated, making it possible to detect the resistance component (Fig. 5). This result suggests the possibility to detect a high-resistance grounding fault. From the test results obtained by our high-resistance grounding fault detector, it was made clear that the detector is capable of detecting a high-resistance grounding fault without adversely affecting the track circuit. However, in order to put the detector into practical use, it is necessary to provide measures against the variation of R due to sudden changes in electric car load and verify a method of distinguishing between the electric car load and highresistance grounding fault when they occur at the same time. Feeder i(f) Feeder (Contact wire) Current probe C Injection unit v(f) Injection equipment rf Z(f) Rectifier LF CT L T Inv Rolling stock RG Rail Grounding fault Inverter unit Analyzer Rail Inverter Filter Tr V Voltage detector Figure 1. Principle of grounding fault detection. Figure 3. Configuration of high-resistance grounding fault detector. RDC = Resistance r F Approximate expression f 1 r F f f 1 Frequency f Resistance of feeding circuit Current Harmonics of rectifier i (f 1) i (f ) 1f f 36f 8f Frequency (f: Frequency of power source) Reactance component (Ω) Z (f 1) Z (f ) R Resistance component (Ω) Figure. Skin effect. Figure. Injection frequencies. Figure 5. Measurement result of R at high-resistance grounding fault. 5

38 Railway Technology Avalanche No. 6, September 1, A Measure to Reduce Contact Wire Wear in Shinkansen Overlap Sections Masatoshi SHIMIZU Senior Researcher, Contact Line Structures, Power Supply Technology Division The Shinkansen overlap section consists of four spans, in which the height of two contact wires are changed, up for one and down for the other, at their central supporting point. Compared with the contact wire in the ordinary section, the one in the overlap section tends to wear easily. This is a weak point in the overlap equipment (e.g., the contact wire needs to be replaced relatively frequently). It is possible to reduce the wear of the contact wire in an overlap section by setting the contact wire height and deviation properly. Fig. 1 shows an example of measured wear, height and deviation of contact wires in an overlap section. In the figure, wire A is the contact wire with which the pantograph makes contact before it passes through the overlap, and wire B is the contact wire with which the pantograph makes contact after it passes through the overlap. In the overlap, the wear of wire B is conspicuous. The wear of the wire portion enclosed with circle 1 has occurred within a relatively narrow range. It is due to an improper height of the wire (wire B is mm down at the intersecting point). On the other hand, the wire portion enclosed with flattened circle has worn uniformly in a wide range. This range coincides with the one in which the wire deviation is 15 mm or more. Thus, the wear is due to a large deviation of the wire. The deviation of 15 mm is the standard deviation set for the contact wire in the ordinary section. When the contact wire height in the overlap section is set improperly, the contact wire is subject to impact and vibration, which cause the contact force with the pantograph to increase. This in turn causes the wear of the contact wire to increase. Fig. shows the contact force characteristic obtained by a dynamic simulation of a catenary/pantograph system. It can be seen from the figure that the overlap configuration that permits the pantograph to move smoothly without being subject to impact is one in which wire B is set about mm higher than wire A. In the overlap section, the standard space between the right and left contact wires is 3 mm. Because of this, the contact wire deviation in the overlap section tends to become larger than that in the ordinary section (standard deviation: 15 mm). The contact wire used for the Shinkansen is made of copper alloy, and the slider is made of iron-based sintered metal which has lubricating ability. As the slider slides along the contact wire, the metal having lubricating ability and a low melting point melts and deposits on the sliding surface, thereby preventing the wear due to friction between the contact wire and the slider (Fig. 3). Fig. shows the relationship between the rate of contact wire wear relative to deviation and the rate of deposition of the metal having lubricating ability on the sliding surface. As the deviation exceeds 15 mm, the rate of metal deposition decreases and the rate of contact wire wear increases. Fig. 5 shows a thermograph of a pantograph in operation. It can be seen that the slider portion corresponding to the deviation of 15 mm or less has turned white, indicating that its temperature has risen. On the other hand, the temperature of the slider portion corresponding to deviations greater than 15 mm has remained the same. This accounts for the low rate of deposition of the metal having lubricating effect and the high rate of contact wire wear where the contact wire deviation is large. From the facts mentioned above, in order to reduce the wear of contact wire in the Shinkansen overlap section, it is effective to set wire B about mm higher than wire A and keep the contact wire deviation within about 15 mm. Supporting point 16 mm 15 1 Wear of wire B Left mm mm Right mm Height of wire A Direction of train motion 1 Deviation of wire B Deviation of wire A Height of wire B Wear of wire A 16mm 15 1 5 mm 8 m Maximum contact force (N) 3 km/h km/h 6 km/h 1 5 3 1 1 3 5 Difference in height (mm) Difference in height Figure 1. section. Example of measured contact wire wear in overlap Figure. Results of dynamic simulation of contact force. Contact wire (Cu) Slider Alloy of Fe (7% to 8%) containing metal of low-melting point (approx. 1%) (This metal melts and deposits on the sliding surface.) Figure 3. Mechanism that reduces frictional wear of Shinkansen contact wire. Deposition rate (%) 1 8 6 Deposition rate Wear rate 1 3 Deviation (mm).15.1.5 Figure. Correlation of contact wire deviation and wear rate and metal deposition rate. Wear rate (mm /1 pantograph passes) Pantograph head 1mm Figure 5. Thermograph of pantograph in operation. 6