SINGLE SIDED SAFETY BARRIER ON GROUND H2-W4-A (3n35975)

Similar documents
End Terminals Installation and Repair Manual SMAT2 SMAT4

Certificate of constancy of performance

Installation and Maintenance Manual. End Terminals

Service manual. English. F5 Corpus

Illustrated Parts: Model 712 GX8

Illustrated Parts: Model 712 GX5

The GK units differ from the LK units in that the springs of the GK units have a spring eye at the front.

Comparison of IG Testing Standard. IGMA Summer Meeting August 8, 2004

DNV-GL HH CE RoHS-II conform

Data sheet CFBUS.PVC PVC - e-chain - Bus cable for medium load requirements (class 4.3.2): shielded, oil-resistant as well as flame-retardant.

Midwest Roadside Safety Facility

Bus system Profibus Ethernet (CAT 5e / GigE / PoE) ASinterface Part. No. CF CF CF & CF mm

14 HH EAC/CTP CE RoHS-II conform

ENGINE REMOVAL & INSTALLATION

Midwest Roadside Safety Facility

01 09 Installation guidelines Air suspension units GL70 GL70HD GL70L GN Air suspension units GL70 GL70HD GL70L

LAKE CITY POLICE DEPARTMENT GENERAL ORDERS MANUAL

TEST METHOD Booster Seats. May 2012R January 1, Revised: Issued: (Ce document est aussi disponible en français)


QBMATE UPPER BODY.

VULCAN BARRIER TL-3 GENERAL SPECIFICATIONS

Exchange of rollers from the XTS-Mover

CF11.LC / CF11.LC.D CF14.CAT5

GUIDANCE NOTES. Solar Collectors. On-Roof Installation (First Fix) Please leave these instructions with the User. Baxi Heating UK Ltd 2012

CF270.UL.D.

Infant Restraint Systems

Midi Traffic Light installation manual TRAFFIC CONTROL ACCESSORIES

Art.-Nr. CF220.UL.H1xx.XX.XX CF220.UL.H2xx.XX.XX

Data sheet chainflex CF5

PISTON ACCUMULATOR. Installation and operation manual Revision

Pressure switch hex 27

July 17, In Reply Refer To: HSSD/B-176A

Health, Safety, Security and Environment

2800 VIBRO-TILL FIELD CULTIVATOR ASSEMBLY INSTRUCTIONS Series. Kongskilde

TRAM Fall Protection Systems Catalog Fall 2010

Data sheet chainflex CF240

Conductor: Fine-wire strand consisting of bare copper wires (following DIN EN 60228). Mechanically high-quality TPE mixture. (see colour code table)

CFRIP - tear strip for faster stripping

Occupant Restraint Systems in Frontal Impact

Data sheet chainflex CF9

ArmorGuard Barrier Portable Longitudinal Barrier

Art.-Nr. CF280.UL.H1xx.XX.XX.D CF280.UL.H2xx.XX.XX.D

CAN-Bus cable. CAN-Bus cable Can-Bus / Field-Bus cable for medium to maximum load requirements. chainflex cable. Overview. igus e-chainsystems

SECTION 602 PORTLAND CEMENT CONCRETE PAVEMENT SMOOTHNESS

INSTALLATION INSTRUCTIONS

COMPLIANCE TABLE FOR PALLET DOLLEY

STANDARD PNEUMATIC RAM TEST METHOD AND EQUIPMENT USED IN EVALUATING THE PERFORMANCE CHARACTERISTICS OF PROTECTIVE HEADGEAR AND FACE GUARDS

TRAILER PASSPORT. instruction manual maintenance warranty

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

panelclaw.com Polar Bear III for 10 Degree

Universal TAU-IIR Redirective, Non-Gating, Crash Cushion

Multipole Conductor Rail MultiLine Program 0831

one filter having K between 1.5 and 2.5 m -1

Automotive Transmissions

HYDRONIC LIFT SOLUTION FOR A3 AMENDMENT

Data sheet chainflex CF6

NSF 2014 NSF/ANSI

THE UNITED KINGDOM TYPE APPROVAL AUTHORITY

Date No ST Suspensions is a brand of KW automotive North America, Inc. - KW automotive North America, Inc.

TL INSTALLATION MANUAL FOR TELMA AF50-90 with ROTARY FOOT SWITCH DESIGN 2 FORD F550 CAB CHASSIS FROM MODEL YEAR 2011

Safety Valve HM-SV Installation, maintenance and startup guide

Conductor: Fine-wire strand consisting of bare copper wires (following DIN EN 60228). Mechanically high-quality TPE mixture. (see colour code table)

Installation Instructions. PowerFlex 700 Drive - Frame 8 Components Replacement

CHAPTER 71: TRAFFIC REGULATIONS

IMPORTANT SAFETY NOTICE

WP5 - Computational Mechanics B5 - Temporary Vertical Concrete Safety Barrier MAIN REPORT Volume 1 of 1

June 27, In Reply Refer To: HSSD/B-176

INSTRUCTION MANUAL ALL TERRAIN PALLET TRUCK HAND PALLET TRUCK

Coaxial Joining (6-axis) FUS

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection

Sections. Price Extras Pounds Sterling Effective on all deliveries from 01 April 2016 PRICE LIST

Speeding. Standard Operating Procedure

Assembly of the Multi Applicational Safety System

INSTALLATION GUIDE. KTM 950/990 LC8 Engine Manual Revision:

SERVICE LETTER No.: 0007/2012/R1

User Guide Rail Scooter

Data sheet chainflex CF130.UL

Please follow the procedure marked with this symbol precisely. Non-compliance may lead to damage of the product.

3.2 Spring diameter to height ratios are designed to ensure that spring will never buckle even when fully loaded.

DYNAMIC PILE TESTING 10/26/ General.

Data sheet chainflex CF8821

10 Pressure/temperature measurement SCPT analogue

Spa USE AND MAINTENANCE CULTIVATOR MODEL BL300 / BL350

SERVICE MANUAL SEDEO PRO+ VERSION

ALWAYS follow all Webasto installation and repair instructions and observe all warnings.

Data sheet chainflex CFSOFT1

Instructions for changing bearings on all B&C Technologies SP and HP models

1 Product Description Check of the supplied Parts Notes Intended Use Current Collector... 3

ETATRACK active DIY

Following symbols can be found next to text outlining important information.

ArmorGuard Barrier Portable Longitudinal Barrier

Operating Instructions Flexdip CYA112

- CONSTRUCTIONS 300 SECTIONAL VIEW DRAWING 300 SECTIONAL VIEW TABLE 301 QUANTITY FOR MODEL 302 MECHANICAL SEAL 303 BEARINGS 304 FITTINGS 305

WP5 - Computational Mechanics B1 (ESP-N2) Barrier Steel N2 MAIN REPORT Volume 2 of 2

Type Pneumatic Control Unit. Operating Instructions

Type Pneumatic Control Unit. Operating Instructions

URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail

2.0 TEST PROCEDURES AND RESULTS Vibration Test TEST EQUIPMENT AND INSTRUMENTATION QUALITY ASSURANCE PROGRAM 7 ATTACHMENTS

Min. bending radius for fixed installation 7,5 x d 6,8 x d 4,0 x d 6,8 x d Torsion (at 1 m cable length) --- ±45 ±90 ±45

No.1. Side approach mechanism Precise lateral contacting. Catalogue 1.1. Test Probes Test Fixtures

Transcription:

SINGLE SIDED SAFETY BARRIER ON GROUND H2-W4-A (3n397) Performance Containment level Acceleration Severity Index ASI Working width Extreme lateral position of the vehicle Dynamic deflection H2 A W4 (1.30 m) 1.70 m 1.20 m Characteristics Height out of ground Transversal overall dimensions Centre to centre between posts Tested minimum length 900 mm 38 mm 100 mm 67 m Supply and installation of a 3-wave safety barrier, thickness 2, mm, C100x0x2x4,0 mm H= 1700 mm, fixed to ground every 100 mm; spacers 407x201x.9 mm L=80 mm, assembled with nuts and bolts and provided with reflectors. S23JR-S27JR-S3JR steel quality according to EN 1002 EN 1002 Hot dip galvanization according to UNI EN ISO 1461 Nuts and bolts according to UNI EN ISO 898-1, UNI EN 20898-2 The safety barrier has successfully passed the tests required by EN 1317, part 1 and 2. Certificate CE n. 187/2131/CPD/2011 1

Elevation Section 1 C post 100x0x2x4,0mm; H= 1700 mm 2 3n Beam c/c 400 mm th. 2, mm 3 Spacers 407x201x.9 mm L=80 mm 4 Plate 100x4x mm Torque value M10 x 30 M16 x 30 M16 x 4 30 Nm Revision 1 of 17/11/2011 2

SINGLE SIDED SAFETY BARRIER ON GROUND H2-W4-A (3n397) Special Special 1 C post 100x0x2x4,0mm; H= 1700 mm 2 3n Beam c/c 400 mm th. 2, mm 3 Spacers 407x201x.9 mm L=80 mm 4 Plate 100x4x mm Torque value M10 x 30 30 Nm M16 x 30 M16 x 4 3

INSTALLATION CRITERIA FOR BARRIER H2-W4-A 3n397 Along with the general assembly instructions specified in the introduction chapter, please observe the following guidelines to install barrier 3n397. Preliminary operations Where installation is to be carried out in traffic, all necessary road signs must be set up in order to direct traffic and protect workers from vehicles, in accordance with safety regulations. The parts making up the road barrier can be unloaded from the transport vehicles by means of a crane fitted to the vehicle, or forklift truck, in accordance with current safety regulations. Workers must be supplied with all required equipment, including safety shoes, gloves and goggles and - where necessary - helmets, safety harnesses and all else specifically needed for the site and required by current safety regulations. Installation sequence The assembly diagram provides instructions for correct barrier installation. Fully and completely follow these instructions. Main steps: 1. Trace out a full line of reference on the ground, which will serve to align poles and beams. 2. Place the beams (2) along the traced line taking into account the direction of traffic 3. Poles C 100x0x2x4.0 mm h=1700 mm (1) are to be lifted vertically and planted in the ground 1000 mm deep at the holes in the tap and spaced 100 mm apart. A mechanical pile-driver is generally used. During this phase, please check: alignment and level of poles, distance between poles, that they are vertical, and distance from the embankment, all in accordance with the measurements and tolerances specified in the applicable drawing of reference. 4. Assemble the spacers (3) to the uprights (1) using the Special bolts M16x40 mm ();. Assemble the beams (2) that have been laid on the ground, attaching them to the spacers (3) and themselves, by means of the bolts supplied and the set plates. 6. Use the calibrated pneumatic screwdrivers to fasten all nuts and bolts into place, checking levels and alignments. 7. Apply the identification product labels 8. Installation must always take place under the surveillance of a specialist technician, and in full compliance with the final drawing and current safety regulations. Revision 1 of 17/11/2011 4

Inspection of installation conformity The technician responsible for the installation shall, at the very least, control conformity of the following, prior to beginning assembly, during work and upon conclusion, by using all measurement instruments necessary and in his possession: 1. Full compliance of the installation with the final drawings of reference. 2. Pole spacing and height of upper beam and current edge in accordance with that specified on the final drawings of the barrier, dilation joints and ends. 3. Length and alignment of the installation on the basis of the final drawings and the road layout and altimetry. 4. Final coupling bolt torque according to that set in the assembly diagram.. Apply the identification product labels 6. Compliance with all applicable safety regulations.