BRINGING GREEN POWER TO LIFE

Similar documents
T Series (N6052T) Solar Battery Hybrid System. Installation Manual Version 1.1

3.3kWh Battery Pack Specification 3.3

DC Master 24/ A

Battery System User Manual for Panasonic LJ-SK56A BATTERY SYSTEM USER MANUAL FOR PANASONIC LJ-SK56A

Lithium-Ion Phosphate Battery US2000(Version B) Product Manual

Lithium-Ion Phosphate Battery Phantom-S Product Manual

WELDING INVERTER. PEGAS 160 E Smart PEGAS 200 E Smart OPERATING MANUAL. ALFA IN a.s. PEGAS E Smart Manual EN 04

PURE SINE WAVE DC TO AC POWER INVERTER

Lithium-Ion Phosphate Battery

MP V 8A Electronic Smart Charger. Instruction and Information Manual

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

c-go 12V/10A 12V/20A Power supply and battery charger Instruction manual

KeContact P20. User manual

Owner s Manual GLASSLINED PUMP TANK

c-go 24V/6A 24V/8A 24V/12A

MODEL A96 SERIES. 130Vdc Switchmode Utility Rectifier / Battery Charger. Used with LaMarche Power Cage ECN/DATE

Rescue Pac. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference

General Installation Manual 2007 Sanyo Electric Co., Ltd. All Rights Reserved 6/15/07

UGE-4K Off-Grid Controller OWNER S MANUAL

EV-2051-M Electric Motor. Operation and Maintenance Manual

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

POWER FOR TOMORROW. Motive Power. Network Power. Chargers. Bloc Batteries. Accessories. Service

NANOPAC-300 & 500 Power Supply. Instruction manual NANOPAC-300 & NANOPAC-500

Pro Booster 802Li. Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference.

High Frequency SineWave Guardian TM

User Manual. Solar Charge Controller 3KW


Intelligent Battery Charger

BYD Battery-Box HV User Manual Battery-Box H 5.1/6.4/7.7/9.0/10.2/11.5

User s Manual Lithium-ion Storage Battery Unit (Home-use, 9.89 kwh)

Rechargeable Li-ion Battery US3000 Product Manual

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

Sinewave Inverters. SWING 150VA and 300VA. User s manual

60V RECHARGEABLE LITHIUM-ION BATTERY

10 Year Limited Warranty

Installation Guidance

Installation manual wall-mounted distributor

Power. On Your Terms.

SCC-MPPT Solar Charge Controller

PowerPlex 40V MAX Standard Battery Pack/Charger

User Guide. Lubricus Lubrication System LUB-D1/LUB-D2/LUB-D3/LUB-D4 (24 VDC)

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

OPERATING INSTRUCTIONS

SOLAR PANELS SYSTEM MANUAL

C3 Operating Instructions

Owner s Manual. Contents GP-PWM-10-SQ

Battery Charger. Series EASY Charger. User s manual

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

60 Watt Industrial LED Low Bay Light

Mass Sine 24/10000 Mass Sine 24/15000

Installation Guide B-BOX Pro2.5 ~ 10.0

MASTERsine Inverter PXA Series Installation Guide

The Traveler Series: Adventurer

OWNER'S MANUAL WARNING DANGER. Propane cylinders sold separately. The propane cylinder must be disconnected when this firebowl is not use.

CPS Energy Balancer. Version: 1.0

LIGHTNING PROTECTION UNIT (LPU)

HOME CHARGER MODE 2. Series to /32A single phase CONTENTS. Manual IMPORTANT SAFETY INSTRUCTIONS 3 SAFETY INFORMATION 4 INSTALLATION 5

YSmart Technology Co., Ltd. User Manual. GTI Grid Series. GTI Series Inverters for Grid-connected PV system

Cordless Rechargeable Saw Instructions for Use

8 Step Fully Automatic Intelligent BATTERY CHARGER 12V 5A USER S MANUAL. Charges & Maintains. Flooded (WET), MF, VRLA, AGM, GEL & Calcium batteries

SPECTRA ENGINEERING PTY LTD. MXPS15 Series Technical Manual

Asymmetrical Installation Instructions. Components: i2cove Asymmetrical LED Light Fixtures. 12 [305mm] [918mm] 48.

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

DC TO AC POWER INVERTER PWRIC150012W INSTRUCTION MANUAL

SCC-MPPT Solar Charge Controller

Solar Charge Controller

Installation manual portable distributors

AC / 65 W M PLEASE READ BEFORE OPERATING THIS EQUIPMENT.

Owner s Manual. Contents GP-PWM-30-SQ GP-PWM-30-SQ

Duo Battery Charge Controller

SCC-MPPT Solar Charge Controller

Operating instructions. sonnenprotect for operators. KD-337 Part no Version X00.

Installing the Switch Chassis

Chargestar P24 / P32 Battery Charger Startmaster P300 Starter / Charger

MODEL A97 SERIES. Switchmode Utility Rectifier/Battery Charger ECN/DATE

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

User Manual Solar Charge Controller 3KW

INSTALLATION MANUAL.

HANGKAI GROUP HOYMILES MICRO-INVERTER MI-250

The Traveler Series TM : Adventurer

M T E C o r p o r a t i o n MATRIX FILTER. SERIES B Volts, 50HZ USER MANUAL PART NO. INSTR REL MTE Corporation

STONESTAR AUSTRALIA PTY LTD

Contents. VBHNxxxSJ40 series. VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT TM. VBHNxxxSJ40 series. VBHNxxxSJ25 series

WATERFLUX 3070 Quick Start

LiFePO4 Instruction Manual. LFP12V50A LFP12V100A LFP12V200A 50Ah 100Ah 200Ah

Contents. VBHNxxxSJ40 series VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT R. VBHNxxxSJ25 series VBHNxxxSJ40 series

BYD Battery-Box LV User Manual Battery-Box L 3.5/7.0/10.5/14.0

TABLE OF CONTENTS. 300 W Mobile Power Outlet SAVE THESE INSTRUCTIONS!

MULTI-FUNCTION JUMP STARTER

Installation and Operating Instructions. Solar System Controller ISC3030

Inverter / Charger Accessory for Steca Solarix PLI Phase / Parallel Kit. Installation and operating instructions Z01 17.

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

Power your day-to-day when others are power-less. Humless Sentinel User s Guide.

2017~ Honda NSX Emergency Response Guide

Lithium-Iron Phosphate Battery US2000B Product Manual

TROJAN BATTERY COMPANY WITH QUALITY SYSTEM CERTIFIED BY DNV = ISO

4 color Solar light. Model Due to continuing improvements, actual product may differ slightly from the product described herein.

Installation and Operating Instructions. Solar System Controller ISC3020

VSP SERIES Installation, Operation and Maintenance Manual

Transcription:

Version: GCLSI_ES_UM.V1 GCL GCL E-KwBe ENERGY STORAGE SYSTEM USER MANUAL BRINGING GREEN POWER TO LIFE Please read this manual carefully before installing the system and carry out the installation procedures as per the instructions

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 7.4: WARRANTY CLAIMS AND PERFORMANCE...27

GCL E-KwBe ENERGY STORAGE SYSTEM Preface CHAPTER 1: INTRODUCTION What is an E-KwBe system? E-KwBe is a new modular lithium-ion energy storage system which can help to optimize the use of in house solar energy systems, cut the electricity bills and reduce carbon footprint. The E-KwBe appearance is an aesthetically pleasing and modern design with a lifespan of more than 10 years. Its modular design allows multiple units to be connected together easily which can increase the capacity and reduce the use of fossil fuel progressively. Aluminum Chassis How does it work? Your solar PV system can produce energy during daylight hours that can be used to help power your home and other equipment. Surplus electricity generated from the solar panels during the day is stored in the E-KwBe for later use at night or during a power outage, The EKwBe stored energy is provided to your home by a Power Conversion System (PCS) unit which is sold separately. Off-peak electricity from the gird can be stored in the E-KwBe for Safety Switch re-sale to the gird via the PCS. ON/OFF Button SOC Indicator Mounting Plate How It Works Battery Terminals and Communication Ports Bottom Cover Optimized self-consumption will be achieved. Batteries are used to store the excess energy produced by the PV Systems. Batteries will power the AC load when the sun sets. Extra energy will be fed into the grid when batteries are fully charged and the system has already met its selfconsumption requirement. If the battery capacity is insufficient to meet self-consumption requirement, electricity will be obtained from the grid. Items Description On/off button Used as battery indicator and mode switching Bottom cover To hide and protect the power cables and terminals Battery terminals and communication ports Used to connect with PCS and operate the system Safety switch Used as the main circuit switch; Protect the circuit and avoid unexpected issues occuring Aluminum chassis Used for natural cooling Mounting plate Used for fixing the E-KwBe on the wall SOC Indicator The four indicator lights equate to 25% charge each from left to right. 01/02

GCL E-KwBe ENERGY STORAGE SYSTEM Preface CHAPTER 1: INTRODUCTION What is an E-KwBe system? E-KwBe is a new modular lithium-ion energy storage system which can help to optimize the use of in house solar energy systems, cut the electricity bills and reduce carbon footprint. The E-KwBe appearance is an aesthetically pleasing and modern design with a lifespan of more than 10 years. Its modular design allows multiple units to be connected together easily which can increase the capacity and reduce the use of fossil fuel progressively. Aluminum Chassis How does it work? Your solar PV system can produce energy during daylight hours that can be used to help power your home and other equipment. Surplus electricity generated from the solar panels during the day is stored in the E-KwBe for later use at night or during a power outage, The EKwBe stored energy is provided to your home by a Power Conversion System (PCS) unit which is sold separately. Off-peak electricity from the gird can be stored in the E-KwBe for Safety Switch re-sale to the gird via the PCS. ON/OFF Button SOC Indicator Mounting Plate How It Works Battery Terminals and Communication Ports Bottom Cover Optimized self-consumption will be achieved. Batteries are used to store the excess energy produced by the PV Systems. Batteries will power the AC load when the sun sets. Extra energy will be fed into the grid when batteries are fully charged and the system has already met its selfconsumption requirement. If the battery capacity is insufficient to meet self-consumption requirement, electricity will be obtained from the grid. Items Description On/off button Used as battery indicator and mode switching Bottom cover To hide and protect the power cables and terminals Battery terminals and communication ports Used to connect with PCS and operate the system Safety switch Used as the main circuit switch; Protect the circuit and avoid unexpected issues occuring Aluminum chassis Used for natural cooling Mounting plate Used for fixing the E-KwBe on the wall SOC Indicator The four indicator lights equate to 25% charge each from left to right. 01/02

The purpose of this document is to provide information for the owner and guidelines for the installer to help ensure that the GCL E-KwBe energy storage system is properly installed and operates to its designed potential. This document sets out key criteria that describe a quality system and key design and installation considerations that should be met in order to achieve this goal. This document deals with GCL E-KwBe energy storage system and is applicable for the following GCL energy storage system models: E-KwBe NC/S 2.5 kwh E-KwBe NC/S 5.6 kwh These systems should be installed by competent installers who have completed an Energy storage system installer training course. GCL has worked closely with distributors in each country to develop an energy storage system training course. All specifications and descriptions contained in this document are verified to be accurate at the time of printing. Continuous improvement is a goal at GCL and we reserve the right to make product modifications at any time. The images provided in this document are for demonstration purposes only. Depending on the product version and market region details may appear slightly different. Please visit our website http://www.gclsi.com to learn more about the E-KwBe energy storage system training and how to obtain installer certification. Thank you for choosing the GCL E-KwBe system, we are certain that with proper operation and maintenance our system will provide you with clean renewable solar electricity for many years. This manual does not list all precautions needed for safe work. Any energy storage system must comply with the Health and Safety Requirements and other relevant standards and Codes of Practice within the country of installation. This manual provides guidelines for installation but it does not guarantee the quality of installation work. Please complete all work in a responsible and professional manner. All electrical work should be performed by a qualified electrician. It is the qualified installers responsibility to ensure that the E-KwBe is suitable for your use and that the PCS is also certified for use by GCL to deliver the best outcomes.

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION1.1: SYMBOLS USED Symbols Description CAUTION! CAUTION represents hazardous situations which can cause light injuries if not avoided. NOTICE! NOTICE represents the situations which can cause damage to property if not avoided. INFORMATION INFORMATION provides tips that are valuable for optimum installation and operation of the product. Beware hot surface. The inverter can get hot during operation. Avoid contact in operation. Followtheguidelinesofallrelevantdocuments Do not dispose of the inverter with household wastes.for detailed disposal information, please refer to the installation manual provided. CE indication. The relevant equipment complies with the requirements in the EC guidelines. Number Symbol Description 1 Direct current 03/04

Number Symbol Description 2 Alternatingcurrent 3 Bothdirectandalternatingcurrent 4 3 Three-phasealternatingcurrent 5 3N Three-phasealternatingcurrent withneutralconductor 6 Earthterminal 7 Protectiveconductorterminal 8 Frame or chassis terminal 9 Refer to the operating instructions 10 ON (supply) 11 OFF(supply) 12 Equipment protected throughout by double insulation or reinforced insulation

GCL E-KwBe ENERGY STORAGE SYSTEM Number Symbol Description 13 Caution,riskofelectricshock 14 Cautionhotsurface 15 Caution,riskofdanger 16 Inpositionofapush button control 17 Outpositionofapushbutton control 18 Input terminal or rating 19 Output terminal or rating 20 Bidirectionalterminalrating 21 Caution,riskofelectricshock, Energystoragetimeddischarge 22 Caution,riskofhearingdamage. Wearhearingprotection 05/06

GCL E-KwBe ENERGY STORAGE SYSTEM CHAPTER 3: INSTALLATION CYCLE CHAPTER 2: PRECAUTIONS WARNING Failure to observe the precautions described in this section can cause serious injury to persons or damage to property. The scope of this document includes the installation of the E-KwBe to a wall or support structure, the connection of the D.C. wiring to the PCS, and provides information regarding the A.C. wiring required to connect the PCS into the building's electricity supply. A typical project cycle for a GCL energy storage system is shown below. It shows consideration of the E-KwBe system from the start of the project through the stages of installation, commissioning, and finishing with operation and maintenance considerations. Installation Cycle Observe the following precautions: Risks of explosion Do not subject the E-KwBe to strong impacts. Do not crush or puncture the E-KwBe. Do not dispose of the E-KwBe in a fire. 01 Check kit contents 02 Risks of fire Do not expose the E-KwBe to temperatures in excess of 50 C. Do not place the E-KwBe near a heat source such as a fireplace. Do not expose the E-KwBe to direct sunlight. Do not allow the battery connectors to touch conductive objects such as wires. Risks of electric shock Do not disassemble the E-KwBe. Do not touch the E-KwBe with wet hands. Do not expose the E-KwBe to moisture or liquids. Keep the E-KwBe away from children and animals. 08 Installation & Wiring E-KwBe Specialists 07 Installation space planning Risks of damage to the E-KwBe Do not allow the E-KwBe to come in contact with liquids. Do not subject the E-KwBe to high pressures. Do not place any objects on top of the E-KwBe. Read instruction manual 03 Check installation tools It is recommended to wear the following safety gear when connecting the E-KwBe with PCS. 06 04 Identify a suitable location for the E-KwBe Risk assessment/ Planning permission 05 Requirements for Wall or Support Insulated Gloves Safety Glasses Safety Shoes 07/08

GCL E-KwBe ENERGY STORAGE SYSTEM CHAPTER 3: INSTALLATION CYCLE CHAPTER 2: PRECAUTIONS WARNING Failure to observe the precautions described in this section can cause serious injury to persons or damage to property. The scope of this document includes the installation of the E-KwBe to a wall or support structure, the connection of the D.C. wiring to the PCS, and provides information regarding the A.C. wiring required to connect the PCS into the building's electricity supply. A typical project cycle for a GCL energy storage system is shown below. It shows consideration of the E-KwBe system from the start of the project through the stages of installation, commissioning, and finishing with operation and maintenance considerations. Installation Cycle Observe the following precautions: Risks of explosion Do not subject the E-KwBe to strong impacts. Do not crush or puncture the E-KwBe. Do not dispose of the E-KwBe in a fire. 01 Check kit contents 02 Risks of fire Do not expose the E-KwBe to temperatures in excess of 50 C. Do not place the E-KwBe near a heat source such as a fireplace. Do not expose the E-KwBe to direct sunlight. Do not allow the battery connectors to touch conductive objects such as wires. Risks of electric shock Do not disassemble the E-KwBe. Do not touch the E-KwBe with wet hands. Do not expose the E-KwBe to moisture or liquids. Keep the E-KwBe away from children and animals. 08 Installation & Wiring E-KwBe Specialists 07 Installation space planning Risks of damage to the E-KwBe Do not allow the E-KwBe to come in contact with liquids. Do not subject the E-KwBe to high pressures. Do not place any objects on top of the E-KwBe. Read instruction manual 03 Check installation tools It is recommended to wear the following safety gear when connecting the E-KwBe with PCS. 06 04 Identify a suitable location for the E-KwBe Risk assessment/ Planning permission 05 Requirements for Wall or Support Insulated Gloves Safety Glasses Safety Shoes 07/08

SECTION 3.1: CHECK KIT COMPONENTS Check kit contents against the included part list with component descriptions and quantities. Ensure all components and quantities are present before starting the installation project KITS PICTURES E-KwBe X1 Mounting Plate X1 Expansion screw (M10X80) X6 Screw (M8X10) X4 Ring terminal (M8) X4 Modular connector (8P8C) X2 Modular adapter (3 WAYS) X1 Modular adapter (1 WAY) X1 All of the instructions should be thoroughly read and understood before attempting to install, wire, operate and maintain the E-KwBe energy storage system. Contact with electrically active parts of the system such as terminals can result in burns, sparks, and lethal shock whether the module is connected or disconnected. The installation of the E-KwBe should only be performed by a qualified licensed professional, including, without limitation, licensed contractors and licensed electricians. Please keep this manual for reference.

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 3.3: CHECK INSTALLATION TOOLS TOOLS PICTURE DESCRIPTION Percussion drilling (M14) Drill the wall Screwdriver Connect the wire to the battery Torque wrench (M8) Fix the expansion screws Insulated rubber tape To prevent leakage and insulate wires Wire clamp Connect the wire to the battery terminals Multimeter Testing the connections Claw hammer Hit the screws Crimping Pliers Assemble the Ethernet cable with Modular connector to RJ45 (T568B) Utility knife Modify the wires Levelling instrument To conduct the levelling measurement 09/10

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 3.4: RISK ASSESSMENT/COMPLIANCE TO STANDARDS The E-KwBe energy storage system can power your home by combing with a PCS to store PV generated electricity to create a solution for residential and light commercial properties. Installation standards vary between countries and as such we recommend in all cases that you check with your local standards authority before you commit to installing our energy storage system. This document does not address health, safety, electrical or building regulations matters, a site assessment and works method statement should be completed prior to commencing the installation. SECTION 3.5: REQUIREMENTS FOR WALL OR SUPPORT WARNING The E-KwBe should be installed to a wall capable of supporting its weight, interior walls are preferred but where installation is on an exterior wall it should be protected from direct rain contact and sunlight. Local building regulations and standards should be observed to consider any fire ratings that may be applicable 11/12

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 3.4: RISK ASSESSMENT/COMPLIANCE TO STANDARDS The E-KwBe energy storage system can power your home by combing with a PCS to store PV generated electricity to create a solution for residential and light commercial properties. Installation standards vary between countries and as such we recommend in all cases that you check with your local standards authority before you commit to installing our energy storage system. This document does not address health, safety, electrical or building regulations matters, a site assessment and works method statement should be completed prior to commencing the installation. SECTION 3.5: REQUIREMENTS FOR WALL OR SUPPORT WARNING The E-KwBe should be installed to a wall capable of supporting its weight, interior walls are preferred but where installation is on an exterior wall it should be protected from direct rain contact and sunlight. Local building regulations and standards should be observed to consider any fire ratings that may be applicable 11/12

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 3.6: IDENTIFY A SUITABLE LOCATION FOR THE E-KWBE SECTION 3.7: INSTALLATION SPACE PLANNING Make sure the weight capacity of bracket location is greater than 60Kg Make sure the location is not easily accessible by children and in an area free from explosive or corrosive atmospheres. For residential installations the energy storage is typically located in a secure well ventilated location shielded from direct sunlight and rain. The E-KwBe must be mounted vertically on a wall or pole. Do not mount horizontally as adequate heat dissipation cannot be ensured. Make sure the E-KwBe is mounted in a location where the ambient temperature range is 0 to +45 C. The E-KwBe may shut down automatically if it excessive heat or cold temperatures. A space of at least 100mm to 300mm around the enclosure guarantees optimum ventilation. The 1000mm lower clearance is only recommended where children could access the E-KwBe and touch the heat sink/chassis. Unless walls are properly insulated, avoid mounting the E-KwBe on any wall that is directly exposed to the sun or a heat source such as a boiler room wall. Only work on the E-KwBe when it is fully disconnected and observe the heat sink temperature. Work should only be carried out by qualified person. SECTION 3.7.1: E-KwBe IN SERIES NOTE Currently there are no certified hybrid PCS to support series installations. The spacing indicated are those required for multi-e-kwbe installations. To minimize resistance and power loss, the customer should make sure to minimize the wire lengths among the E-KwBe, the PCS and the main utility service panel. Ensure the E-KwBe is mounted beside this cable entry to ensure successful connection to the PCS. Refer to the installation manual of the PCS manufacturer for further installation procedures and guidelines. 13/14

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 3.6: IDENTIFY A SUITABLE LOCATION FOR THE E-KWBE SECTION 3.7: INSTALLATION SPACE PLANNING Make sure the weight capacity of bracket location is greater than 60Kg Make sure the location is not easily accessible by children and in an area free from explosive or corrosive atmospheres. For residential installations the energy storage is typically located in a secure well ventilated location shielded from direct sunlight and rain. The E-KwBe must be mounted vertically on a wall or pole. Do not mount horizontally as adequate heat dissipation cannot be ensured. Make sure the E-KwBe is mounted in a location where the ambient temperature range is 0 to +45 C. The E-KwBe may shut down automatically if it excessive heat or cold temperatures. A space of at least 100mm to 300mm around the enclosure guarantees optimum ventilation. The 1000mm lower clearance is only recommended where children could access the E-KwBe and touch the heat sink/chassis. Unless walls are properly insulated, avoid mounting the E-KwBe on any wall that is directly exposed to the sun or a heat source such as a boiler room wall. Only work on the E-KwBe when it is fully disconnected and observe the heat sink temperature. Work should only be carried out by qualified person. SECTION 3.7.1: E-KwBe IN SERIES NOTE Currently there are no certified hybrid PCS to support series installations. The spacing indicated are those required for multi-e-kwbe installations. To minimize resistance and power loss, the customer should make sure to minimize the wire lengths among the E-KwBe, the PCS and the main utility service panel. Ensure the E-KwBe is mounted beside this cable entry to ensure successful connection to the PCS. Refer to the installation manual of the PCS manufacturer for further installation procedures and guidelines. 13/14

CHAPTER 4: INSTALLATION SECTION 4.1: INSTALLATION FOR MOUNTING PLATE 118mm 850mm 2 3 290mm 2 3 23mm 2 206.5mm 3 2 3 2 209.5mm 2 3 350mm 3 STEP Description Step 1 Draw lines positioning the holder plate with ruler on the wall Step 2 Drill the screw holes into the wall for 8cm-9cm Step 3 Drill the screw holes

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 4.2: INSTALLATION FOR E-KwBe WARNING E-KwBe is heavy and challenging to lift, two person lift is recommended. We recommend that following the schematic instruction to complete the installation. Repeat the same installation process if you have multiple series or parallel installations of the E-KwBe, until all the E-KwBe have been installed. Take out the E-KwBe from the box Hang the E-KwBe on the mounting plate, observe the schematic instruction 1 2 15/16

GCL E-KwBe ENERGY STORAGE SYSTEM CHAPTER 5: WIRING SECTION 5.1: WIRING IN SERIES NOTE The E-KwBe voltage between the positive and negative terminals should be measured with a multimeter before and after wiring (Ensure the E-KwBe is powered on,please check P23 for details). The initial voltage should register within 48-54V DC. If the reading is outside this range then please call your GCL authorized reseller for advice. It is recommended that the DC cable connection between the PCS and E-KwBe is kept to a minimum to minimize line losses. Interconnecting DC cables should also have variation lengths where possible. Multiple connection of the E-KwBe should follow the master and slaves setup on en.gclsi.com/site/productdetail3/68 before wiring. Currently there are no certified hybrid PCS to support series installations. The spacing indicated are those required for multi-e-kwbe installations. Cable Holes Make sure the safety switch is OFF, PCS is powered off and all the cables coming from PCS to the E-KwBe through the cable holes before continuing the following steps. Connect the ethernet cable (RJ45,T568B) to the communication port D1,(please visit en.gclsi.com/site/productdetail3/68 for the RJ45, T568B detail instruction) and then connect the communication cable coming from the PCS to the communication port through the cable hole. + + - + - - If the PCS has a ground wire, connect it to the ground screw through the cable hole. Connect the power cables to the terminal block through the cable hole. Connect the positive cable to the positive terminal B1 and the negative cable to the terminal C1. Switch on the safety switch, then replace the bottom cover plate. 17/18

GCL E-KwBe ENERGY STORAGE SYSTEM CHAPTER 5: WIRING SECTION 5.1: WIRING IN SERIES NOTE The E-KwBe voltage between the positive and negative terminals should be measured with a multimeter before and after wiring (Ensure the E-KwBe is powered on,please check P23 for details). The initial voltage should register within 48-54V DC. If the reading is outside this range then please call your GCL authorized reseller for advice. It is recommended that the DC cable connection between the PCS and E-KwBe is kept to a minimum to minimize line losses. Interconnecting DC cables should also have variation lengths where possible. Multiple connection of the E-KwBe should follow the master and slaves setup on en.gclsi.com/site/productdetail3/68 before wiring. Currently there are no certified hybrid PCS to support series installations. The spacing indicated are those required for multi-e-kwbe installations. Cable Holes Make sure the safety switch is OFF, PCS is powered off and all the cables coming from PCS to the E-KwBe through the cable holes before continuing the following steps. Connect the ethernet cable (RJ45,T568B) to the communication port D1,(please visit en.gclsi.com/site/productdetail3/68 for the RJ45, T568B detail instruction) and then connect the communication cable coming from the PCS to the communication port through the cable hole. + + - + - - If the PCS has a ground wire, connect it to the ground screw through the cable hole. Connect the power cables to the terminal block through the cable hole. Connect the positive cable to the positive terminal B1 and the negative cable to the terminal C1. Switch on the safety switch, then replace the bottom cover plate. 17/18

- SECTION 5.2: WIRING IN PARALLEL 25mm 2 + 25mm 2 25mm 2 25mm 2 35mm 2 35mm 2 25mm 2 NOTE Design specifications applicable for a maximum of 100 Amp charge/discharge PCS only. Cable sizes are a guide only and sizes should comply with local standards.

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 5.2: WIRING IN PARALLEL CONTINUED 35mm 2 25mm 2 35mm 2 DC Combiner Box 35mm 2 25mm 2 35mm 2 25mm 2 NOTE Design specifications applicable for a maximum of 100 Amp charge/discharge PCS only. Cable sizes are a guide only and sizes should comply with local standards. 19/20

SECTION 5.2: WIRING IN PARALLEL CONTINUED 35mm 2 25mm 2 25mm 2 Combiner Box DC 35mm 2 35mm 2 35mm 2 25mm 2 35mm 2 35mm 2 25mm 2 NOTE Design specifications applicable for a maximum of 100 Amp charge/discharge PCS only. Cable sizes are a guide only and sizes should comply with local standards.

GCL E-KwBe ENERGY STORAGE SYSTEM CHAPTER 6: COMMISSIONING, OPERATING, AND MAINTENANCE SECTION 6.1: COMMISSIONING STEP Description Step 1 Hold the on/off button of the E-KwBe for over 4 seconds until the button light is in a steady on state Ensure all the E-KwBe are powered on. Step 2 Power on the PCS, select the cell configuration interface (refer to PCS user manual). Step 3 Select GCL E-KwBe in the cell configuration interface. You also can input the specification of E-KwBe in the PCS cell configuration interrface.(please visit en.gclsi.com/site/product Detail3/68 for the detail instruction) Step 4 Complete other configuration options in the PCS installation manual. Step 5 Ensure the PCS and E-KwBe are connect successfully. Step 6 An error message will appear on the PCS screen if the connection failed. (refer to the troubleshooting section to solve the problem). Step 7 If the problem cannot be solved please contact the aftersales service of E-KwBe and PCS company (Aftersales service of E-KwBe: 86-512-6853-7399). 21/22

SECTION 6.2: OPERATING In the Process of using the E-KwBe please follow this manual for proper care and use of the product. There are three common modes: 1) Normal mode 2) Standby mode 3) Storage/transport mode NOTE Make sure to select the same mode for every E-KwBe in multiple connection. VOCATIONS: For battery protection it is recommended to keep the full system of PV, PCS and E-KwBe in operation. Extended periods of shutdown should be avoided. Mode Function Description Normal mode (Conditions of use: normal operation) Step 1 Step 2 Power on Shutdown Hold the on/off button of the E-KwBe over 4 seconds until the SOC Indicator is a steady state. Hold the on/off button of the E-KwBe over 6 seconds until the SOC indicator extinguishes. Standby mode (Conditions of use: Suspend the use of E-KwBe for less than one week) Step 1 Step 2 Auto standby Wake up The E-KwBe will enter auto standby mode automatically if no charge or discharge operation is carried out for more than 24 hours. Hold the on/off button of the E-KwBe over 4 seconds until the SOC Indicator is a steady state. Storage/Transport mode (Conditions of use: In the process of storage or transport the E-KwBe) Step 1 Step 2 Forced shutdown Wake up. Hold the on/off button of the E-KwBe over 6 seconds until the SOC Indicator extinguishes. Remove the bottom cover. Switch off the safety switch then disconnect all the wires and replace the bottom cover. Hold the on/off button of the E-KwBe over 4 seconds until the SOC Indicator is a steady state.

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 6.3: E-KWBE CARE Keep the top edge of E-KwBe clear of leaves and other debris to maintain optimal airflow. To clean E-KwBe use a soft lint-free cloth, the cloth can be dampened lighty with water only if required. To avoid possible injury do not subject the unit to high pressure water cleaning Caution: Do not use cleaning solvents to clean E-KwBe SECTION 6.4: MAINTENANCE E-KwBe is not user serviceable and must be repaired by a GCL Certified Installer who has been trained by GCL. If any problems arise refer to troubleshooting on page 29 before contacting the GCL Authorized Reseller who sold the E-KwBe unit. 23/24

CHAPTER 7: APPENDICES SECTION 7.1: TROUBLESHOOTING If E-KwBe is not working correctly perform the following steps. If the issue persists contact the GCL Authorized Reseller who originally sold the E-KwBe unit. Problem Solution E-KwBe refuses to operate check the temperature in the room and increase ventilation if needed The PCS and E-KwBe are both unresponsive switch off the breaker for the PCS, wait for at least one minute, and then turn it back on A brownout or blackout is experienced during backup supply Reduce the loads and check the breakers It is not possible to communicate with the PCS through its portal Check the PCS manual to learn about diagnosing E-KwBe Follow the troubleshooting steps outlined in the PCS manual SECTION 7.2: EMERGENCY SITUATION Wet If the E-KwBe is submerged in water do not let people access it and then contact your GCL authorized reseller for technical support. Damaged This product uses a special design with multiple layers of security to prevent leakage or fire events. Under strong external shock the E-Kwbe may emit smoke, in this case please stay away from E-KwBe until the smoke disappears, turn off the power supply of the E-Kwbe, and then return it to GCL authorized reseller. Damaged E-KwBe are dangerous and must be handled with the utmost care, they are not fit for use and may pose a danger to people or property. If the E-KwBe seems to be damaged, pack it in its original container and then return it to your GCL authorized reseller. In the unlikely case where smoke continues to be emitted by the E-Kwbe make sure that the following equipment is available near it: SCBA (self- contained breathing apparatus) and protective gear in compliance with the Directive on Personal Protective Equipment 89/686/EEC and either a Novec 1230, FM-200, or dioxide extinguisher. 25/26

GCL E-KwBe ENERGY STORAGE SYSTEM SECTION 7.3: SPECIFICATIONS Model E-KwBe NC/S 2.5kWh E-KwBe NC/S 5.6kWh Capacity Continuous current at 25 C 2.5 kwh 25A 5.6 kwh 50A Current for 1 hour at 25 C 30A 60A Current for 10 mins at 25 C 40A 80A DC Output Peak current at 25 C Maximum pulse current at 10s 50A <150A 100A <300A Maximum pulse current at 100ms <250A <500A Continuous current at 35 C 20A 40A Continuous current at 45 C 12.5A 25A Efficiency >97% >97% Voltage Nominal Voltage Maximum charging voltage Operating Condition Operating Temperature 45-61V DC 55.5V DC 63V DC Indoor or Outdoor From-20 C to 45 C Dimension (L*W*H) Weight 669*452*127 mm 25 kg 700*530*172 mm 47.5 kg Cooling Type Shell Material Color Installation Method IP Rating Maximum of Series-Parallel Series-Parallel Setting Warranty Life Span Communication Mode Protection Mode Battery Protection Natural cooling Aluminum (Chassis) + PolyCarbonate (Front cover) Blue, Red, Gold, Green, White, Gray Wall Mounted IP54 8 Auto Sensing 7 Years (daily cycle) >10 Years CAN Triple Hardware Protection Over-current, Over-voltage, Short circuit, Under-voltage, Over-temperature, Reverse polarity

SECTION 7.4: WARRANTY CLAIMS AND PERFORMANCE Warranty claim(s) will only be accepted when being put forward within the applicable warranty period. Without prejudice to the foregoing, warranty claim(s) shall be made within 21 days upon the Customer because aware or should have been aware of the under performance of the Products. If the Customer has a justified warranty claim covered by the Limited Warranty, an immediate notification shall be filed directly (i) to GCLSI, by mailing a registered letter in writing, or sending an email to GCLSI s email account listed hereunder; and (ii) to the vendor from whom the Customer purchased the Products. Together with the notification, the Customer shall provide: (i) the name and address of the Customer (and its distributor and installer, where applicable); (ii) evidence showing the Product has been under-performing; and (iii) other documents, evidence, or information as may be required by GCLSI or the agent appointed by GCLSI to deal with such warranty claim. GCLSI or approved agent of GCLSI will examine the evidences and documents provided by the Customer and may request the Customer to deliver the allegedly defective Products to be designated by GCLSI or GCLSI s approved agent for further examination, inspection and verification. After examination, inspection and verification of relevant evidences (and Product(s), where applicable): If GCLSI or approved agent of GCLSI determines that it has been substantiated that the Products are performing below the applicable Warranted Capacity, before GCLSI or approved agent of GCLSI would be obligated to perform relevant warranty obligations pursuant to the Limited Warranty, the Customer will be required to immediately furnish to GCLSI or approved agent of GCLSI the original invoice(s) issued to the Customer when the Customer purchased the Product(s) concerns. If GCLSI or approved agent of GCLSI determines that the result has indicated that the Product(s) has been performing in conformity with the applicable Warranted Capacity, the Customer shall be obligated to reimburse GCLSI and approved agent of GCLSI the costs and expenses incurred by them in relation to such testing, examination and verification. No warranty claim(s) will be honored if: The type or serial number of the Products have been altered, removed or been made illegible; or The Customer fails to provide to GCLSI the original copies of: a full set of invoices issued by the vendor to the Customer for the Customer s purchase of the Products involved in the warranty claim(s); the warranty certificate issued by GCLSI; and other evidence, information, document and datas that GCLSI might request the Customer to provide, to assess the actual performance of the Products; and a valid warranty claim is not submitted to GCLSI within 10 days after relevant applicable warranty period. 27/28

GCL E-KwBe ENERGY STORAGE SYSTEM

GCL website for Product Datasheet: http://en.gclsi.com/site/productdetail3/68 GCL website: http://en.gclsi.com/ GCL email: gclsisales@gclsi.com GCL address: GCL Energy Center, No. 28, Xinqing Road, Suzhou Industrial Park,Suzhou City, Jiangsu Province,China GCL telephone number: +86 0512-68537399