USER MANUAL MPS 1-5KW SERIES

Similar documents
USER MANUAL. IPS home inverters with UPS function. IPS home inverter manual

On Line UPS. LUC 1000E / LUC 2000E / LUC 3000E User Manual

USER MANUAL. Blazer Vista 1000/1400/2000. Uninterruptible Power System

MPPT Solar Integrated Inverters (500VA~2500VA) User Manual THE SOLAR TECH CO.,LTD. Solar Integrated Inverter Series 500VA~2500VA 13.

BRAVER UPS. (Uninterruptible Power System) User s Manual

NB NB 1511 NB NB 4031 TRUE ON-LINE DOUBLE CONVERSION UPS

Thank you for choosing EATON products. Safety information and operating instructions are included in this manual. Do not attempt to operate the UPS

UPS USER MANUAL F-11 LINE INTERACTIVE UPS GENERAL PURPOSE UPS 650VA/1200VA/2200VA

User Manual. NetGuard IMPORTANT. PSD 650/1200/1600 Line Interactive UPS Uninterruptible Power Supply System. UPS Monitoring Software

User Manual V1.1 OptiFlex 1100 / OptiFlex 2000

USER MANUAL. PowerMust 1400/2000 LCD. Uninterruptible Power System

CENTAURI ENERGY SERVER TECHNICAL DATA kw POWER

USER MANUAL. Uninterruptible power supply MODEL: 53965,

USER S MANUAL CONTENTS. Uninterruptible Power Supply 1. INTRODUCTION SAFTY INSTRUCTION SYSTEM DESCRIPTION... 4

Solar Inverter Manual

DC AC POWER INVERTER. LIV 10 / LIV 20 / LIV 30 User Manual

General Precautions. Personnel Precautions

General safety and installation information.

Installation and Operation Back-UPS BX550CI-CN

User Manual Back-UPS BX650CI-MS 230 Vac with AVR

LIFT 1500 VA UNINTERRUPTIBLE POWER SUPPLY UPS USER MANUAL

Installation and Operation Manual Back-UPS BX1100CI-CN

CONTENTS 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION SYSTEM DESCRIPTION INVERTER OPERATION...

USER MANUAL ONLINE UPS 6000L(XL)/10000L(XL) Uninterruptible Power Supply

USER MANUAL. Power GUARD UPS. Uninterruptible Power System

100 Watt Power Inverter + USB INSTRUCTION MANUAL HT8710-AUOXY

POWER TROLLEY 8 INSTRUCTION MANUAL POWER TROLLEY 8. Model: SINE Instruction Manual for: Self-Contained Sinewave Mobile Power Backup System

Pure sine wave charger inverter Product Manual

Back-UPS 650 VA 230 V with AVR (BX650CI-ZA)

Don't let the shadows of yesterday hide the sunshine of tomorrow Nandina Morris

1. Important Safety Warning

Elite Pure Sine. DC To AC Power Inverters Convert 12V DC electricity into clean household-like power.

User Manual 1.5KVA-3KVA INVERTER / CHARGER. Version: 1.1

Foreword. Manual instruction

User Manual Digital Energy Uninterruptible Power Supply ML Series UPS VA GE Digital Energy Power Quality

PURE SINE WAVE DC TO AC POWER INVERTER

X600. Technical Sheet

User Manual Easy UPS BV Series 500VA, 650VA, 800VA, 1000VA Safety and General Information

K50. Technical Sheet

K10. Technical Sheet

Low Frequency Pure Sine Wave Inverter. Operatinal Manual

User Manual. Digital Energy Uninterruptible Power Supply ML Series UPS VA. GE Digital Energy Power Quality. GE imagination at work

USER MANUAL. GS Series Hybrid Inverter

User Manual 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER

Installation and Operation Manual Back-UPS BR1000-CH

Installation and Operation Manual Back-UPS BX800CI-ZA/BX1100CI-ZA

X400. Technical Sheet

1000 Watt Power Inverter INSTRUCTION MANUAL HT87112-AUOXY

DC TO AC POWER INVERTER

User Manual 1.5KVA-3KVA INVERTER / CHARGER

YSmart Technology Co., Ltd. User Manual. GTI Grid Series. GTI Series Inverters for Grid-connected PV system

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

User Manual 5KVA/5KW INVERTER / CHARGER. Version: 1.3

Match 19" GE Digital Energy. Uninterruptible Power Supply VA. Technology for the Digital World. Match 19" UPS.

User Manual Back-UPS BC500-RS, BC650-RS 650 VA 230 V

Solar Inverter 3kW-8kW Inverter (off-grid)

1. INTRODUCTION SYSTEM DESCRIPTION Front Panel CONNECTION AND OPERATION TROUBLESHOOTING...8

Solar Hybrid Inverter SP Brilliant Series

Users Manual. Defender 1 8.0KW to 14.0KW Online Emergency Lighting Inverter. Technical Manual # Revision B

Mission 1K Single Phase UPS

Users Manual. Cobra Plus Stand-By Emergency Lighting Inverter. Technical Manual # Revision B

SCC-MPPT Solar Charge Controller

Battery Power Inverters

1KVA/ 2KVA/ 3KVA/ 4KVA/ 5KVA MS, LV MPPT INVERTER / CHARGER. User Manual. Version: 2.3

User Manual 3KVA-5KVA INVERTER / CHARGER. Version: 1.1

User Manual 1KVA-5KVA (PF1) INVERTER / CHARGER. Version: 1.0

USER S MANUAL SOLAR POWER INVERTER KW-6KW

Outdoor UPS. User Manual. Contents. Please read carefully this manual before installing and using this product. 1 Introduction Safety...

User Manual 1KVA-5KVA INVERTER / CHARGER. Version: 2.1

USER S MANUAL CONTENTS. Uninterruptible Power Supply 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION... 4

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

User Manual SOLARMAX 1KVA/ 2KVA/ 3KVA INVERTER / CHARGER

Uninterruptible Power System

SCC-MPPT Solar Charge Controller

Solar Charge Controller

User Manual 1KVA-5KVA INVERTER / CHARGER

User Manual 1KVA-5KVA INVERTER / CHARGER

User Manual 4KVA/ 5KVA INVERTER / CHARGER. With MPPT Controller

SCC-MPPT Solar Charge Controller

AUTOMOTIVE POWER INVERTERS INSTRUCTIONS. Item #31463, #31464, #31465

SmartOnline SUT Series 3-Phase 208/120V 220/127V 30kVA 30kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

Steca Solarix PLI. Inverter / Charger with Solar Charge Controller. Installation and operating instructions. Download manual at

Steca Solarix PLI. Inverter / Charger with Solar Charge Controller. Installation and operating instructions. Download manual at

OASIS-UM-01. User Manual. Inverter/Charger Oasis 6000 Rev 1.0. Oasis 6000 Series MAY 2012 ISSUE 01

HYBRID 5048E. Hybrid Inverter INSTALLATION AND OPERATION MANUAL. Version 2.0E

Centurion 1000/1500/2000/3000 Tower/Rackmount On Line UPS User s manual

CONTENTS 1. INTRODUCTION SAFTY INSTRUCTION CABLE CONNECTION SYSTEM DESCRIPTION OPERATION... 9

Solar Hybrid Inverter SP Efecto Series

USER MANUAL. PW Series Inverter / Charger

User Manual. PF0.9 1K/2K/3K Online UPS. Uninterruptible Power Supply System. Version: 1.3

12 VOLT 30 AMP DIGITAL SOLAR CHARGE CONTROLLER

HQST 500W (12V) HQST 1000W (12V) Modified Sine Wave Inverter. User Manual

Solar Hybrid Inverter SP Efecto Series

User manual. Solar Hybrid 1-5KVA. Uninterruptible Power Supply / Charger

400 Watt Backup Power System Owner s Manual

SmartOnline SUT Series 3-Phase 208/120V 220/127V 20kVA 20kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

POWERSOURCEPURE INSTRUCTIONS. Pure Sine Wave Inverter. RINV1200P REINV1200P RINV2200P REINV2200P

User Manual Rittal PMC UPS 6kVA

ULTIMA W SERIES. 1K/2K/3K Online UPS USER MANUAL

5 IN 1 JUMP START OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: JS5IN1 PART NO: LS0810

Transcription:

USER MANUAL MPS 1-5KW SERIES Low Series Frequency Solar and Wind Power Charging Inverter CONTENTS 1 WWW.NEXTGENNRG.COM

1. Introduction... 3 2. Profile Structure 4 2.1. Working Principle 4 2.2.Product Features..5 3. Security.5 3.1. Security Notice 5 3.2. Battery..6 4. Back View.7 5. Installation..8 5.1. Environment 8 5.2. Space Size..8 5.3. External Protection Device.8 5.4. Bypass Switch 11 5.5. Display Panel Appearance.12 6. Equipment Operation...13 6.1. Keyboard Functions 13 6.2. Preliminary Operation Control 14 6.3. Launch Steps 14 6.4. Shutdown Steps.15 7. Transportation and Storage 15 8. Maintenance.15 8.1 Clean Processing.15 9. Troubleshooting.16 10. Technical Specification Table..17 1. INTRODUCTION This manual contains the installation, operation and application instructions of the inverter. Please read this user s manual in detail before installation. 2

In order to ensure the right operation of the equipment, the inverter should be operated by a professional. Please refer to the manual as a reference when needed. Symbol and Logo Danger It indicates that if the operation violates the normal rules, it would not only endanger personal safety, but will also reduce of the equipment and affect the performance. Attention It indicates additional data and information. Schedule The power of this inverter is 5000W/3000W/1000W, the detailed installation and connection refers to the following table: Rated Capacity Input Wiring Diagram Output Wiring Diagram 5000W Input wiring diagram 1 Input wiring diagram 2 Input wiring diagram 3 Output wiring diagram Wiring Connector Wiring Connector 3000W Input wiring diagram 1 Input wiring diagram 2 Input wiring diagram 3 Output wiring diagram Wiring Connector 1000W Input wiring diagram 1 Input wiring diagram 2 Input wiring diagram 3 Output wiring diagram Wiring Connector 2. PROFILE STRUCTURE 2.1. Working Principle 3

The working principle of the low frequency solar and wind power charging inverter is: when the solar energy and the wind power are normal, photovoltaic controller and wind power controller charge the inverter and the batteries at the same time; then the inverter will transform input DC into the pure sinusoidal alternating current (AC) output. You can set the time that the generator can charge the battery every day by setting the generator charging time (set parameter 4 and 5). When the solar and wind power input are abnormal, the battery will provide the power to the inverter. When battery boxes discharge to get the setting voltage point (set parameter 6), the system will give out the signal of the low voltage of the battery and the working mode will be changed to mains. When the DC voltages of the solar and wind power or the battery recover the setting voltage point, the system will give out the signal of the normal DC output and the working mode will be changed to inverter. When the inverter system is off or has a failure, it can be changed to the generator if attached by the bypass maintenance switch. 4

2.2. Product Features Industrial-grade intelligent design Pure sine wave output,suitable for TV, refrigerator, induction cooker, electric fan, microwave oven, air conditioning etc. LCD liquid crystal display,easy to query various technical parameters. Has power generation computing function, and can view real-time power generation. Has overcharge, over-discharge, overload, short-circuit, low voltage and high temperature protective functions. 3. SECURITY Correct way of use: This equipment adopts an uninterrupted way to supply the load. This equipment can meet the demands and the all the safety requirements; and it is applicable for office, home, and emergency response, etc. Warning: 3.1. Security Notice: Our company takes personal safety very seriously, thus the user or the operator must read the manual carefully and should strictly abide by the instructions. When the switch is disconnected, the high voltage risk still exists inside the device. Any movement or operation or opening the protection board must only be done by authorized technical people. In order to ensure safe use, please observe the following items: Please read the manual in detail before use, please do not use the system over the rated load. When the MPS Unit has any failure, quickly cut off the power supply, and contact the seller. If the building around the equipment catches fire, use a dry powder fire extinguisher. Liquid fire extinguisher will potentially lead the danger of an electric shock. The MPS Unit will need to have a suitable isolating switch selected, and installed before starting so it is possible to shut down the power in any emergency. The MPS can also be wired with a socket outlet to the generator to enable easy disconnection in case of an emergency. Never place any liquid containers on the equipment. 5

The equipment should be installed by a qualified electrical contractor or an authorized MPS installer to assure that earthing complies with AS/NZS. Emergency Danger Before connecting the equipment, all load switches should be shut down. Current Leakage Before switching on, please ensure the ground wiring is connected. Radio Interference This MPS series has a Low level of radio interference, and it is best to be as far away from any sensitive electromagnetic equipment (such as transmitters, receivers, radars, and metal detectors etc.) 3.2. Battery Battery maintenance must be carried out by authorized professionals. The battery contains electrolytes, whether they are installed inside or outside the batteries must be kept dry. If the battery is damaged, the electrolyte may leak out, and the electrolyte can cause injuries to eyes and skin. In the event of any body contact, wash with plenty of water and then seek medical advice. The voltage existing in the monomer battery terminal is not dangerous, but it will form a dangerous voltage after a certain amount of batteries are installed in series. When battery terminals short circuit or over-discharge, it is easy to damage cells and may cause a fire. The battery type used is a sealed battery. If the battery is stored or not used for more than 6 months, it will need to be recharged (even if the batteries are fully charged before). Otherwise the batteries may fail. If you do not, the batteries cannot be guaranteed to operate normally. We recommend that you should recharge the batteries every four months. After the first charge, the capacity of a new battery usually will not get to 100%. To be fully charged, the batteries must undergo several charging and discharging cycles. To avoid environmental pollution, you must observe the rules and regulations on how to dispose of the used batteries. Battery temperature Sensor is not included. For battery temperature sensor, we recommend THERMOCOUPLE TYPE. 6

4. BACK VIEW 5. INSTALLATION Warning The installation must be done by a qualified technical person referencing local safety standards. 5.1. Environment The MPS Unit must be installed in horizontal vertical racks or on the ground and the temperature and humidity must be suitable. Do not place any objects on the device. 5.2. Space Size The placement of the MPS Unit: To keep the air intake and exhaust open, a space of about 2.5cm above and around it must be allowed. 7

Avoid direct sunlight Avoid overheating Avoid damp and contact with liquids Avoid dust 5.3. External Protection Device The external devices must use the appropriate circuit breaker or fuse products. Notice When connecting to an external battery box, it must make an external battery box near the equipment, and configure the appropriate circuit breaker or fuse. 8

Input Wiring Diagram 1 Input Wiring Diagram 2 Input Wiring Diagram 3 9

Output Wiring Diagram 10

Wiring Connector Notice Please connect batteries, solar input, wind input, genset input, make sure if battery positive and battery negative, solar positive and solar negative are correct. 5.4. Bypass Switch 11

5.5. Display Panel Appearance 1. Energy Saving Mode 2. Generator Input 3. Solar Panel 4. Wind Turbine 5. Battery Capacity 6. Power Generation/Parameter Display 7. Charging LED 8. Inverter LED 9. Fault LED 10. Load Indication 11. Date/Time Setting Indication 12. Setting Indication 13. PC Connection Indication 14. Mute Indication 15. Warning Indication 16. K1 17. K2 18. K3 19. K4 12

6. EQUIPMENT OPERATION 6.1. Keyboard Functions K1 ON/OFF/MOVE/ENTER Press K1 for seconds to start the inverter, when it does not enter the setting mode, press K1 for seconds to shut down the machine. K2 DOWN (parameters positive) K3 UP (parameters negative) K4 Settings/NEXT/ESC After start-up: long press K4 button to enter setting mode, long press again to exit setting mode (if 30 seconds without pressing, it will exit the settings automatically). After entering the setting mode, a short press K4 can switch to another parameter setting mode (see table). Short press K1 can move the flashing position, press K2 / K3 which can change the flashing number and long press K1 can save the current settings. This inverter is already set to Australian Standard Configuration. NO. PARAMETERS FUNCTION DESCRIPTION 1 2015 Year Setting 2 0112 Month/Date Setting 3 0706 Hour/Minute Setting 4 0709 Generator Charging Time Setting Starting Time for Mains Charging (Hour/Minute) 5 0710 Mains Charging Time Setting Ending time for Mains Charging (Hour/Minute) 6 0444 Switch to Mains Low Voltage Point of the Battery 7 0548 Battery Voltage to Recover to Inverter Status (charging another an hour) 13

6.2. Preliminary Operation Control Before starting the equipment and loading any power supply, the following rules must be complied with: Ensure that the ventilation is good Ensure that the ground wire is good Ensure that all the connections on back of the panel are correct Danger After the equipment is connected to the mains, the output port is in a charged state; even if the front switch of the equipment is not turned on. Do not connect any equipment that may overload the devices or (such as hair dryer, vacuum cleaner, etc.). DC load Notice The MPS Unit must be installed by a qualified electrical contractor or an authorized MPS installer to assure that the installation complies with AS/NZS. If the instructions are not fully complied with, the process of powering up with the MPS Unit may be a problem. 6.3. Launch Steps Put external battery box switch at ON position; Long press equipment front panel ON/OFF key to boot (longer than 2 seconds), turn off the device Put the mains input switch ON position Wait for at least 30 seconds until the output voltage is stable In turn to connect the external load Danger If overloaded, the device will sound an alarm. Please drop some load, and restart. 6.4. Shutdown Steps 14

Notice Carrying out the program should shut off the load. Disconnect all load switch After a long press ON/OFF button (longer than 2 seconds), turn off the device Set the user input switch to OFF position Set the external battery box switch to OFF position Make sure all the switches and the circuit breaker of the device are disconnected 7. TRANSPORTATION AND STORAGE Transport When receiving the goods; please check whether the packing is good condition or damaged. If there is any damage or items missing, you must be within 7 days to give notice to the sellers with a complete report and photographs of the condition & damage. Unpacking To avoid damage to the equipment, you should be very careful while moving the device, check whether all the packaging material is good condition. Storage After receiving the equipment, if it will not be used within 7 days, be sure to store in a clean and dry environment. Carrying Equipment must be kept upright and carefully carried; otherwise damage may be caused to the equipment. 8. MAINTENANCE Cleaning Process Long press ON/OFF switch to shut down the device and disconnect the mains input. Use dry or slightly damp cloth to wipe the surface of the equipment. Danger Do not use detergents or corrosive solvents to clean the equipment. Do not let any liquids flow onto or into the machine. Ensure the vents of the equipment are not blocked. 9. TROUBLESHOOTING 15

If the equipment is not functioning normally, please check the following items prior to contact the customer service representative: Whether the external battery connection of the equipment is normal, whether the battery is damaged or not The device whether has a genset input, and whether the mains voltage frequency is consistent with requirements Whether the input fuse is damaged or circuit breaker is damaged If you contact the customer service representative please provide the following situations: Equipment information: type, order number, serial number (marked on the back board); A detailed description of the problem (load type, the occasional problem, often occurs or panel lights and alarm, etc.). 10. SERVICE Notice If the equipment needs to be repaired, please complete the following steps: For general questions, please refer to the Troubleshooting (above) section for maintenance issues. If the problem still exists, please call the seller. Recording the equipment model, serial number, and the date of purchase, and the troubleshooting methods that you get by telephone when consulting a technical person. During the warranty period, faults will be repaired free of charge, except for any man-made problems. Otherwise, the charge is not free. When sending back equipment to the seller, please ensure the equipment is properly packed, to avoid any damage in transit. Notice Do not use polystyrene foam pad beads as packaging material. Any damage in transport will not be covered under the warranty (we advise to insure for the shipping of all goods being returned). 16

11. TECHNICAL SPECIFICATION TABLE Model MPS5KW-NRG MPS3KW-NRG MPS1KW-NRG Power 5000A 3000A 1000A System voltage (VDC) 48VDC 48VDC 48VDC Solar energy input range (VDC) 60-84VDC 60-84VDC 60-84VDC Maximum input current of solar energy (A) 60A 40A 20A Wind turbine voltage grade 48V 48V 48V Maximum output current of Wind turbine 25A (1000W) 25A (1000W) 12A (1000W) Maximum allowed voltage connecting to PV 150V 150V 84VDC Maximum allowed charging current to PV 60A 60A 30A Maximum allowed power to Wind turbine 1000W 1000W 500W Maximum allowed charging to current Wind turbine 20A 20A 10A Generator pure sine wave input range 240VAC±20% 240VAC±20% 240VAC±20% Input frequency range 50Hz±5% 50Hz±5% 50Hz±5% Generator charging current 35A (MAX) 35A (MAX) 15A (MAX) Inverter output voltage 240VAC±3% 240VAC±3% 240VAC±3% Inverter output frequency 50Hz±5% 50Hz±5% 50Hz±5% Inverter output wave form Pure sine wave Pure sine wave Pure sine wave Generator voltage stabilizing function No No No Transfer time 10ms 10ms 5ms Inverter output Waveform distortion /THD 5% 5% 5% Transfer efficiency (Linear load) 83% (100%load) 83% (100%load) 83% (100%load) Crest factor 3: 1 (Max) 3: 1 (Max) 3: 1 (Max) Low voltage protective point 44VDC 44VDC 44VDC Recovering voltage point 50.4VDC 50.4VDC 30.2VDC Overload capacity 120% 30s ; 150% 2s ; 200% protect immediately. Protective functions Input overvoltage, low voltage protection, overload protection, over temperature protection, short circuit protection, output over voltage, low voltage protection, wind turbine protection. Noise (>1m) 55db Working temperature 0 C 40 C Storage temperature -20 C-55 C Relative humidity 0 90% No condensation Altitude 1500m, Higher than 1500m, de-rating usage Dimension (L*W*H) mm 499mmx483mmx271mm (net height 266mm) Battery compatible type Lead-acid Gel Battery Battery voltage 192V (2V battery 96pcs in series or 12 battery 16pcs in series) Battery capacity According to requirements Battery low voltage protection >168V Please consult with our company if the manual could not be understood or detailed explanations are needed during application. We would be more than happy to serve you. This manual is subject to any changes without prior notice. CONTACT Site: www.nextgennrg.com Ph: 07 5568 0029 or 1300 02 (1300 02 7283) Email: admin@nextgennrg.com 17