Details of concern person for future communication/clarification. Mobile No. Address

Similar documents
Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

NESCO UTILITY. Januganj, Balasore TARIFF NOTIFICATION The 23 rd March, 2015 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2015

MPSEZ Utilities Private Limited Truing up for FY and Determination of Tariff for FY

Final Written Examination.

ANNEXURE: TARIFF SCHEDULE

Need Assessment Document (NAD) DDUGJY

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

CII National Conference Capital Goods Industry: Emerging Opportunities Attached to Power Sector. Date , New Delhi

DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

THE PUBLIC SERVICE COMMISSION OF WYOMING

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

Western Electricity Supply Company of Orissa Ltd., Burla, Sambalpur , Orissa

Level 7 Post Graduate Diploma in Engineering Power System Economics and Planning

The Electric Power System

ANNEXURE: TARIFF SCHEDULE

ANNEXURE: TARIFF SCHEDULE TARIFF FOR SUPPLY OF ELECTRICITY AT LOW TENSION, HIGH TENSION, AND EXTRA HIGH TENSION Effective from 1 st April, 2016

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

JEA Distributed Generation Policy Effective April 1, 2018

N.H.P.U.C. No ELECTRICITY GRANITE STATE ELECTRIC COMPANY DBA LIBERTY UTILITIES. SUPERSEDING N.H.P.U.C. No. 17 TEMPORARY RATES

UTTARAKHAND POWER CORPORATION LIMITED

CASE NOS. 79, 80, 81 & 82 of 2017/363 Date

ECONOMIC SURVEY STATISTICAL APPENDIX

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

TARIFF SCHEDULES FOR HIGH TENSION CONSUMERS. Table of Contents

PRESS RELEASE ON 19March, 2018

Page Number Schedule Rate Class Description 1 R

Chapter 3.1: Electrical System

Scale of Inspection Fees of Electrical Inspectorate Schedule. I. Fees for Initial Inspections:

CITY OF BOWLING GREEN, OHIO MUNICIPAL UTILITIES ELECTRIC RATE SCHEDULES

BEFORE THE NEW MEXICO PUBLIC REGULATION

ADB Knowledge Partnership Week. Hirokazu Yamaguchi May, 2015

CITY OF GRAND ISLAND UTILITIES DEPARTMENT ELECTRIC RATE SCHEDULE Effective October 1, Ordinance No. 9133

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

JACKSON ELECTRIC COOPERATIVE POLICY NO. 305

Street Address. City-Village-Township

Rural areas of Southgate have private wells and private sewage systems.

Uttar Gujarat Vij Company Limited APR for FY & ARR for FY TARIFF SCHEDULE

Fixing Ontario s Electricity System

Street Address. City-Village-Township

RESOLUTION NO

Tamilnadu Trade Promotion Organisation, Chennai-89

John Holland, President, International Copper Association. Copper Demand in Asia Growth Trends and Drivers for New Applications

PRIVATELYOWNED POWER POLES AND POWERLINES

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

Rate No , 17 Residential Service Rate

FUNDAMENTALS OF POWER DISTRIBUTION SAIEE-1337-V : 2 CPD credits : Category 1

is attached to and becomes a part of a agreement dated, 20

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

JAMMU AND KASHMIR STATE POWER DEVELOPMENT CORPORATION LIMITED PUBLIC NOTICE

The Electric Power System

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

I. Meter Hire/Rental Charges

is attached to and becomes a part of a agreement dated, 20,

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Tariff Circular & Tariff Schedules

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

M.P.S.C. No. 2 Electric Third Revised Sheet No. 65 (Rate Case) Cancels Second Revised Sheet No. 65

Case/Order Reference(s): Approved at the February 26, 2014 Admin. Mtg.

Pioneer Electric Rates and Tariffs

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

Line using HTLS Conductors to increase

Methodology of Cost Allocation

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Laboratory worker at Goedgevonden Coal Mine

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Guidelines for Solar Grid Power Projects

Connecting your business diesel generation

ELECTRIC WATER SEWER STORMWATER 3 Industrial Loop Drive PO Box 1589 Hannibal, MO (573)

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B;

Diesel Power Generating Plants. Introduction

MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 16 th May, Amended by notification S.O.1002(E), dated 4 th May, 2010)

BTE2413: Electrical Power System

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

BUREAU OF Statistics Yukon Energy Facts

HARYANA POWER GENERATION CORPORATION LIMITED Regd. Office C-7, Urja Bhawan, Sector-6, Panchkula Corporate Identity Number: U45207HR1997SGC033517

MINUTES OF THE 47 th SLCF MEETING HELD ON

2018 Customer generation rates

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Bharat Heavy Electricals Limited, Electronics Division, Bangalore, India.

17. INDIAN RAILWAY. The Government Railways are classified by Zones as mentioned below: (i) Central, (ii) Eastern,

MANUFACTURING OF PUMP SETS FOR AGRICULTURAL (SUBMERSIBLE)

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

Electricity industry structure and key players

MANHARI SOLAR. (Your own renewable energy management experts)

Electricity Safety (Electrical Installations) Regulation 2005

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Micro Embedded generation

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Regional Meeting on Sustainable Energy for Asia -Pacific Least Developed Countries Kathmandu, Nepal. Surendra Rajbhandari

Before the. Case No. 106 of 2009

Noble County Rural Electric Membership Corporation

ENMAX POWER CORPORATION ( EPC ) DISTRIBUTION TARIFF RATE SCHEDULE

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS

Akinwole Omoboriowo II Chief Executive Officer(CEO) Genesis Electricity Limited(GEL) Africa

EUCL AMI Project Experience Share

:Tamil Nadu Generation and Distribution Corporation Limited: Delegation of powers of sanction to officers (TNEB Volume-II) - revised Communicated Reg

Transcription:

114 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] GENERATION OF ELECTRICITY FORMAT-1 PERIODICITY-ANNUAL DATA OF YEAR 20 20. Submission by 30th June NAME AND ADDRESS OF UTILITY: Sl. No. (A) Name of Power Station Owned by the Utility 1 Station-1 2 Station-2 3 Station-3 4 Station-4 Type of Primemover* Installed Capacity of Power Station as at year end Nos. of Units Unit Size in MW Stn. Capacity in MW Gross Electricity Generation in MkWh Electricity Consumption in Unit & Stn. Auxiliaries in MkWh (B) Jointly Owned by the Utility (in respect of its share) 1 Station-1 2 Station-2 *Hydro turbine, Steam turbine (Coal), Steam turbine (Lignite), Steam turbine (Multifuel), Gas turbine, Diesel engine, Wind turbine, etc. Details of concern person for future communication/clarification S.No. Name of the officer Design ation 1. 2. Mobile No. Email Address Fax No. Official Phone No. Signature of Aurhorised Person Seal

115 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4] FORMAT-2 PERIODICITY- ANNUAL DATA OF YEAR: 20 20. SUBMISSION-BY 30 th JUNE TRANSMISSION OF ELECTRICITY Name & Address of State Transmission Utility/SEB/ED: Figs. in MkWh 1. Electrical Energy imported from : (a) Within the State/UT/System (i) State/Pvt/Jt. Power Stations (ii) Captive Power Plants ( CPPs) (b) Central Generating Stations (Station-wise) (c) Outside the State/UT/System (i) Utilities State/Pvt.(Name-wise) Jt.(Name-wise) (d) Outside the country 2. Total Electrical Energy Imported (1a+1b+1c+1d) 3. Electrical Energy exported to : (a) Licensees within the State/UT/System: (furnish break-up licensee wise) (b) Other State Electricity Boards/Electricity Departments (Outside the State/System but within the country)-give breakup entity wise (c) (d) Outside the country Any other entity within the State/UT/System- give break-up entity wise ` 4. Total electrical energy exported (3a+3b+3c+3d)

116 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-3 PERIODICITY- ANNUAL DATA OF YEAR : 20 20 SUBMISSION-BY 30 TH JUNE DISTRIBUTION OF ELECTRICITY Name & Address of the DISCOM/SEB/ED/Licensee : 1. Electrical Energy imported from : (a) Within the State/UT/System (b) Captive power plants( from within or outside the State/UT/System) (c) Central generating stations (Station-wise) (d) Outside the State/UT/System(from within the country) (e) Outside the country 2. Total Electrical Energy Imported (1a+1b+1c+1d+1e) 3. Electrical Energy sold to : (a) Directly to consumers within the State/UT/System(Area of operation) (b) Licensees within the State/UT/system- furnish break-up licensee wise (c) Any other entity within the State/UT/System-furnish break-up entity wise 4. Total electrical energy sold (3a+3b+3c) Figs. in MkWh

117 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-4 PERIODICITY- ANNUAL DATA OF YEAR 20. 20. SUBMISSION-BY 30 TH JUNE TRADING OF ELECTRICITY Name & Address of the TRADING COMPANY Category of Licence: Figs. in MkWh 1. Electrical Energy purchased from : (a) State/Private./Joint Utility Power Stations (Station name-wise) (b) Captive power plants (Name-wise) (c) Central Generating Stations (Name-wise) (d) Outside the country (Name-wise) 2. Total electrical energy purchased (1a+1b+1c+1d) 3. Electrical Energy sold to : (a) Licensees (Licensee name-wise) (b) Outside the country (Name-wise) (c) Any other entity (Entity name-wise) 4. Total electrical energy sold (3a+3b+3c+) Note: Please furnish break-up of each of above for round the clock, off peak, peak and as & when required trading.

118 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] DETAILS OF ACTUAL SALE AND PURCHASE OF GROSS ELECTRICAL ENERGY FORMAT-5 Data of year 20-- 20--- Submission by -30 th June Name of Utility/Licensee: Figures in MkWh Name of Utility/Non- SALES PURCHASES REMARKS, IF ANY Utility/Entity (To whom (MkWh) (MkWh) Sold /from whom purchased) Note:- (i) Gross energy sale/purchase may be indicated utility/non-utility name-wise clearly & separately in this table. (ii) Purchase of energy from captive power plant if any, may also be indicated. (iii) Details of energy sold to licensees may be indicated Licensee-name wise. (iv) Wheeling of energy should not be included in the above data. (v) Energy imported/exported from /to Central Generating Stations may be given separately for each Power House.

119 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] Name and address of the Utility: INSTALLED ELECTRICITY GENERATING CAPACITY FORMAT-6 Submission by 30 th June Figs. in MW Sl. No. Type of AS AT THE BEGINNING New Change in Capacity Prime mover OF THE YEAR Capacity capacity Retired AT THE END OF THE YEAR (Fuel base) Installed Re-rated added during the during the Installed Re-rated Remarks Capacity Capacity (I.C) year due to year Capacity Capacity if any Re-ration* 1. Hydro Turbine 2. Steam Turbine Coal - Lignite Gas/ Multifuel 3. Diesel Engine 4. Gas Turbine 5. Nuclear 6. Wind Turbine 7. Solar 8. Others, if any I.C = Installed Capacity * Use (+) if due to up ration or (-) if due to deration.

120 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] DETAILS OF ELECTRICITY GENERATING CAPACITY ADDED FORMAT-7 Data of year 20---- 20--- Submission by -30 th June Name and address of the GENCO/Utility: Sl. Name of Power Unit size Type of MAKE Date of No. House in MW Prime mover Boiler Turbine Generator Commissioning (Fuel base) Note: - The details of each unit are to be furnished in this format. Indicate primary fuel within brackets along with type of prime-mover.

121 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-8 Submission by- 30 th June DETAILS OF ELECTRICITY GENERATING SETS RETIRED FROM SERVICE Name and address of the GENCO/Utility: Sl. Name of the Unit size Type of Date of Date of Reason(s) for No. Power House in MW Prime mover Commissioning Retirement Retirement

122 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-9 Submission by 30 th June DETAILS OF DERATIONS OF ELECTRICITY GENERATING SETS Name and address of the GENCO/Utility : Sl.. Name of the Unit No. Date Type of Rated Derated Date Reason(s) No. Power House of Prime mover Capacity (I.C) capacity of for Commissioning (MW) (MW) Deration Deration I.C. = Installed Capacity

123 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] Name of the GENCO/Utility: DETAILS OF FUEL CONSUMPTION FORMAT-10 Submission by -30 th June Sl.. Name of Fuel F U E L C O N S U M E D Kilo calories Overall No. Power House Name Qty. used Average Calorific value in per unit Thermal mt /kl / kilo calories per kg./litre generated Efficiency MMSCM Note :- - Fuel consumption details regarding Gas/Diesel stations are to be shown separately. -Give details of all primary & secondary fuels consumed during the year. - mt = Metric Tonne -kl = Kilo Litre -MMSCM = Million Metric Standard Cubic Metre

124 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] Name of the Utility/Entity : DETAILS OF STEP-UP TRANSFORMERS IN SERVICE AT THE POWER STATIONS AND VARIOUS SUB-STATIONS AS ON 31-03-20.. FORMAT-11 Submission by -30 th June Sl.. Name of Voltage Voltage Different No(s). in Aggregate No. Power House No. of Class* in use Ratio in use Capacity in use each capacity capacity or Transformers (kva) size (kva) Sub-station TOTAL * State if voltage class is 400 kv,220kv,132kv,110kv,78kv,66kv,33kv,22kv,13.2kv,11kv,6.6kv,4.4kv,3.3kv and other voltage if any. Note: - Power House/Sub-stations to be designated by the highest voltage that exists in the station. Please ensure that only details of step-up transformers are indicated in this proforma. Please indicate aggregate capacity along with total no. of transformers.

125 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-12 Submission by 30 th June DETAILS OF STEP-DOWN TRANSFORMERS * IN SERVICE AS ON 31-03-20.. Name of the Undertaking Sl.. Voltage S T E P D O W N T R A N S F O R M E R S Aggregate No. Class Total No. of Different Different Capacities No. in each Total No. of Transformers capacity Sub-stations Voltage - in use (kva) capacity-size (kva) ratio in use 1. 400 kv 2. 220 kv 3. 132/110 kv 4. 78/66 kv 5. 44/33 kv 6. 22 kv 7. 13.2 kv 8. 11 kv 9. 6.6 kv 10. 4.4 kv 11. 3.3 kv 12. Any other (specify) (*) Secondary voltage above 500 volts. TOTAL

126 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-13 Submission by -30 th June DETAILS OF DISTRIBUTION TRANSFORMERS * IN SERVICE AS ON 31-03-20.. Name of the Utility/Non-Utility/Entity: Sl.. Voltage Class Voltage Ratio Total No. Different capacities No. in each Aggregate No. of transformers in use (kva) capacity size capacity (kva) * Secondary voltage below 500 Volts. Total :

127 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-14 Submission by -30 th June DETAILS OF TRANSMISSION AND DISTRIBUTION LINES AS ON 31-03-20--- Name and address of the Utility/Non-Utility/Entity: Length of line in km at the Length of line added during the year Total Length of line in Ckt km Remarks Sl. No Nominal Voltage Single Ckt beginning of the year Double Ckt in km at the beginning Multi Ckt* Single Ckt Double Ckt 1. EHV Lines: above 500kV 2. 500 kv DC lines 3. 400 kv 4. 230 kv 5. 220kV 6. 132 kv 7. 110 kv 8. 78 kv 9. 66 kv 10. 33 kv 11. 22 kv 12. 11 kv 13. 6.6 kv 14. 4.4 kv 15. 3.3 kv 16. 2.2 kv 17. 440/230 V, 3 phase, single phase if available 18 * Direct current lines (volts) 19 Any other (specify). Note: Give break-up for U.G. (Underground) & O.H. (Overhead). Indicate voltage of operation. * Mention no. of Ckts. at the end of the year Multi Ckt* Single Ckt Double Ckt Multi Ckt*

128 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-15 Submission by -30 th June DETAILS OF ELECTRICITY CONSUMERS, CONNECTED LOAD AND CONSUMPTION Name of the Utility Sl.. Consumer N U M B E R O F C O N S U M E R S C O N N E C T E D L O A D (kw) Energy Remarks No. Category At the beginning Added during At the end At the beginning Added during At the end Consumption of the year the year of the year of the year the year of the year (kwh) R U R U R U R U R U R U R U 1. Domestic 2. Commercial 3. Industrial a. Low & Medium Voltage b. High Voltage with demand less than 1 MW c. HV/EHV with demand of 1MW & above 4.. Railways 5. Irrigation 6. Public Lighting 7. Public Water works & Sewage disposal 8.. Any other category 9. Pvt. Licensees* (Licensee wise) 10. Entities within State/U.T (Entity wise) 11. Entities outside State/U.T (Entity wise) 12. Total Note :- Energy consumed through unmetered connection should be estimated and indicated clearly. * Dealing in purchase and further sale of energy. Give separate break-up for LT & HT supply for Item 7 to 11. Give break-up for Rural (R) & Urban (U) areas separately

129 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] Name of Utility: DETAILS OF MANPOWER FORMAT-16 (page 1 of 2) Submission by -30 th June Class of employment (A) Regular (i.e. monthly paid) N U M B E R OF E M P L O Y E E S Training provided Type of Training As on As on No. of Personnel/Tech/Adm/Others Induction/Refresher/ 1. Managerial and higher executives 31-03-20.(Yr.Start) 31-03-20.(Yr.end) Management/Others (Rank of Chief Engineer and above) 2. Technical & Scientific Officers 3. Non-technical: Executive, clerical, accounting, revenue collection, meter reading staff & officers, etc. 4. Technical Supervisory staff in (a) Generation (b) Transmission (c) Distribution (d) Trading (e) Others 5. Technicians and Operating Staff in (a) Generation (b) Transmission (c) Distribution (d) Trading (e) Others TOTAL REGULAR (1) to (5) = (A) (B) Non-Regular (a) Technical : Trainees & Apprentices (b) Work Charged Staff (Monthly paid basis) i. Skilled ii. Unskilled Total ( b ) = (i)+(ii) (c ) Casual (daily paid basis) i. Skilled ii. Unskilled Total ( c ) = (i)+(ii) (i.e.=c) Sub-Total (a)+(b)+(c) = (B) Grand Total (A)+(B)

130 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-16 (Contd.) Page 2 of 2 General Guidelines for filling form for manpower in the electricity supply industry. 1. Managerial and higher executives: All engineering posts of the rank of Chief Engineer and above is to be included. 2. Technical and scientific officers: All engineering posts above the rank of supervisor/junior Engineer/ Scientific Officer may be included. 3. Non-Technical : All regular non-technical employees i.e. Executive, clerical, accounting, revenue collection, meter reading staff and officers may be included. 4. Technical supervisory staff : a) Generation: All technical staff of the rank of supervisor/section officer/junior engineer/ Assistant Controller engaged at generating stations and those associated with planning of generation may be included. b) & c) Similar staff mentioned above engaged in transmission & distribution system. d) & e) Similar staff mentioned above engaged in trading & other activities. 5. a) Technicians and operation staff : All the technical staff below the rank of supervisor/junior engineer engaged at generating stations. b) & c)similar staff mentioned above engaged in Transmission and Distribution system. d) & e)similar staff mentioned above engaged in other activities.

131 THE GAZETTE OF INDIA : EXTRAORDINARY Training Facilities / Training Capacity in the Power Sector (Man-Days of Year) Name of Utility/Organisation Data of the Financial year 20--- 20--- Format-17 Submission by -30th June. Name of Institute Field of Training (Thermal/Hydro/Transmission/ Distribution/ Management) Induction Level Training (Man Days) Management Training (Man Days) Refresher Training (Man Days) Total training (Man Days) Total Training Capacity (Man Days) Utilization of Training Capacity =Col. 10/11*100(%) 1 2 3 4 5 6 7 8 9 10 11 12 Technical Non-Technical Engineers Sup./Operators Technicians Executive Non-Executive

132 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] FORMAT-18 Submission by -30 th June DETAILS OF THEFT OF ELECTRICITY Name and Address of Discom/Licensee/SEB/Electricity Deptt. = i) No. of cases where inspection was carried out: ii) No. of cases where theft of electricity was detected: iii) Estimated quantity of electrical energy considered as theft in above cases for the period: iv) Estimated cost of such energy: v) No. of cases where penalties were imposed:

133 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] S T A T I S T I C S O N E L E C T R I C A L A C C I D E N T S FORMAT-19 Periodicity Annual Submission by -30 th June.. Name of Utility/Non-Utility/Entity: Sl.. INSTALLATIONS H U M A N A N I M A L S No. ------------------------------------------ ------------------------------------ FATAL NON-FATAL FATAL NON-FATAL 1. Installations of suppliers of electricity including SEBs/Licensees/Generating Companies: (a) (b) (c) Generating Station Transmission System (Lines, sub-stations, towers, etc.) Distribution system (Lines, sub-stations, poles, transformers, etc.) 2. Installations of industrial consumers: (a) (b) Owned by Govt./Semi -Govt. bodies/local authorities. Owned by private companies 3. Installations of consumers other than industrial consumers e.g. domestic/agriculture/commercial consumers, etc.: (a) (b) (c) Owned by Govt./Semi Govt. bodies/ local authorities. Owned by private companies. Persons(s) TOTAL (excluding suicides) N.B. :- Indicate the number of human/animal affected. Also show the corresponding number of accidents within brackets.

134 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III SEC.4] R E A S O N S F O R E L E C T R I C A L A C C I D E N T S FORMAT-20 Submission by -30 th June Name of Undertaking: Sl. R E A S O N S H U M A N A N I M A L S TOTAL No. --------------------------------------- ------------------------------------------- FATAL NON-FATAL FATAL NON-FATAL (i) SNAPPING OF CONDUCTORS (ii) ACCIDENTAL CONTACT WITH LIVE ELECTRIC WIRE / EQUIPMENT (iii) VIOLATION / NEGLECT OF SAFETY MEASURES / LACK OF SUPERVISION (iv) DEFECTIVE APPLIANCES/ APPARATUS / TOOLS (v) INADEQUATE / LACK OF MAINTENANCE (vi) UNAUTHORISED WORK (vii) ANY OTHER REASONS TOTAL N.B. : Main reasons for accidents mentioned at Sl.No.(vii) are :- (Please specify)