SHIVVERS ROTATION DETECTOR. fshiwersf ROTATION DETECTOR 676A-001A

Similar documents
INSTRUCTIONS FOR A

INSTALLATION INSTRUCTIONS 8" CONTINUOUS FLOW/TRANSFER AUGER QUICK RELEASE POWERHEAD 702B-001A AND 702E-001A

A DANGER. jshivvers/ location, it will need to be relocated, possibly into another enclosure. CELL CONDUIT LOCK NUT REMOVE KNOCK-OUT PLUG CORD GRIP

Combine Cover Manual

SHIVVERS INSTALLATION INSTRUCTIONS 8" CONTINUOUS FLOW AND AUXILIARY TRANSFER AUGERS FOR

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

SHIVVERS INSTALLATION INSTRUCTIONS. 8" DRI-FLO Sweep High Torque Dri-Fio Horizontal Unload

ASSA ABLOY Series Power Operator Installation and Instruction ASSA Manual ABLOY ASSA ABLOY

Combine Cover Manual

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

MODEL CMS INSTALLATION INSTRUCTIONS A. INTRODUCTION 1. USAGE 2 2. HOW IT OPERATES 2 B. SPECIFICATIONS 1. ELECTRICAL 3 2.

PH3 AIR INTAKE EMERGENCY SHUT-OFF VALVE WITH POWERGUARD SMART OVERSPEED LIMITER. Generic PH3 Truck Shut-Off Valve Kit.

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Product Instruction. Door Control Board: Board 1Ø4 for PM/SSC (R3)

MODEL ELC-12/40-CVM-D BATTERY CHARGER

ECU. Speed Switch Manual. Contents. ECU is a registered trademark of Engineering Concepts Unlimited Inc.

Auxiliary Status Switch Kit

R & D SPECIALTIES ROTROL I USER'S MANUAL

SYMBOL LEGEND DANGER WARNING NOTE THIS INDICATES DANGER TO THE LIFE AND HEALTH OF THE USER IS APPROPRIATE PRECAUTIONS ARE NOT TAKEN

Senior Swing Control Box. Table of Contents

I. Introduction - basic information 3 II. Installation into a vehicle 3. III. Attachments 9

Application Engineering

INSTALLATION MANUAL for SHIVVERS HIGH TORQUE DRIVE SYSTEM

Owner's/Installation Manual

INSTALLATION & OWNER S MANUAL

Automatic Roof Hatch Opener

Electro-Mechanical Swing Operator. Table of Contents

McDonalds Installation Guide

SW10 (Full Power) & SW19 (Low Energy)

Sensors W2 and E2 are optional. Installation guide, 'Pickle Fork' Back-and-Forth Model Train Controller

KEANE MONROE a member of the record group

SHIFNOID WIRING DIAGRAM FOR a B&M PRO RATCHET with SN5070 SOLENOID KIT

Installation Instructions Capacity 10,000 lbs. (100 Series Lift)

Installation Instructions - D-Series Warming Cabinet Instruction Door for Hinge UseReversal (Glass and Stainless Steel Doors)

MULTI 9 System Catalog IEC Rated C60N/H/L Circuit Breakers

C50254A PH3 AIR INTAKE SHUT-OFF VALVE DODGE 6.7L CUMMINS WITH POWERGUARD SMART OVERSPEED LIMITER

Process switches and PLC circuits

TRAC-Station BT Installation Instructions

WARNING. Murphy W-Series Engine Panels General Installation Instructions. Installation Accessories

WARNING. Murphy W-Series Engine Panels General Installation Instructions. Installation Accessories

Installation Manual. E-design A Transfer Switches A

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Components for EEx e Panels

AUTOMATIC DUST COLLECTION FOR SMALL SHOPS INSTRUCTIONS GG500C MOTOR CONTACTOR WITH THERMAL PROTECTION 220VAC COIL

AgriWheel Single Gate Kit Low Voltage & Solar. Installation & Operating Instructions

OFFICE PARTITIONS. Data Port Openings. Use cable tie bracket to dress data cables under panels. STEP 1

SPACESAVER EC-300 A ELECTRICS

3ATS & 3NTS J-design 600 A 3ADTS & 3NDTS A Transfer Switches. Installation Manual. Installation A DANGER. Table of Contents WARNING

Technical Installation and Service Manual RollSeal 1733 County Road 68 Bremen, Alabama 35033

Installation Manual. For. Trident Boat Lifts

Application Engineering

ES52 Auto Start Engine Controller Installation and User Manual for the ES52 Auto Start Engine Controller.

AUTOMATIC DUST COLLECTION FOR SMALL SHOPS INSTRUCTIONS GG500B MOTOR CONTACTOR WITH THERMAL PROTECTION 115VAC COIL

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

SHIFNOID WIRING DIAGRAM FOR a B&M PRO RATCHET with SN5070 SOLENOID KIT

IMI vibration switch USER MANUAL INSTALLATION - OPERATION - MAINTENANCE

ITCEMS950 Idle Timer Controller - Engine Monitor Shutdown Isuzu NPR 6.0L Gasoline Engine

Instruction Manual for the. E-SL 450 Series

Installation Manual. For. Alumavator / Platinum Boathouse Lifts

User s Manual. ACS550-PC/PD Packaged Drive with Disconnect Supplement to ACS550-01/U1 User s Manual

5600 Series Power Operator Installation and Instruction Manual

ATA 49 AUXILIARY POWER UNIT

MAXIGARD A2000 SPEED SWITCH. Introduction

Series BFM Bulk Flow Monitor 1A FUSE RED LED RELAY. Part Number BFM-1 BFM-2 BFM-3 BFS-1

IL 33-DRC-1 Retrofit System for Westinghouse and Cutler-Hammer DS Power Circuit Breakers. Table of Contents

IDS ILLINOIS, LLC. 2000/2500 DEVICE & OPERATOR

Self-Adjusting Hall Effect Gear Tooth Sensor IC CYGTS9802 with Complementary Output

CLOUDBOX Quick Start Guide

ChargePoint Gateway Installation Instructions

INSTALLATION GUIDE For Surface Mounted Applications (Purchased after 08/01/2018)

SERIES 3.0 OPERATING & INSTALLATION INSTRUCTIONS PARTS LISTS

FLOAT BATTERY CHARGER

Florham Park, NJ USA Call (ASCO) for sales or service

Door Operator Conversion Package: Type M to PM/SSC or HPM/SSC with Board 1Ø4

Package Contents. Mounting Hardware

HYDRUS INSTALLATION INSTRUCTION P/N: 3801-EOP AUTO REVERSE / AUTO STOP OPTION KIT FOR HYDRUS 2000 MAIN PANEL

Technical Manual. DLM Module. This manual should remain with the unit.

ONE TOUCH CONTROL BOX

Visit our web site at AMR LS-3000, LS-3010 & LS-3020 BELT SLIP/SEQUENCE CONTROL INSTALLATION AND SETUP INSTRUCTIONS

Installation Instructions

Elegance Electrician s Installation Guide

Operator s Manual Series ADTS Automatic Delayed Transition Transfer Switches, amps

Turn OFF all power to the Automatic Door if a Safety System is not working.

Electrical Options Booklet. Table of Contents

Idle Timer Controller - ITC Freightliner MT45 Contact InterMotive for additional vehicle applications

Safeguarding Applications and Wiring Diagrams Cat 1 Stop with Guardlocking Interlock and Proximity Sensors TLSZR-GD2, 872C, GLP, PowerFlex 45

Control Panel Interface Upgrade Installation Guide For Model 200i and 250i Motorcycle Dynamometers Serial Number 202xxxx.

Demand Switch NEFA20 Plus. Installation Guide. Please read this entire guide before beginning the installation!

Installation, Operation and Maintenance Manual

COMMERICAL SPLIT SYSTEM KITS AND ACCESSORIES /2014 Supersedes 8/2012

Installation Instructions

GENSET CONTROL MODULE A121A / A241A

Kits 25415, INSTALLATION GUIDE. Magnetic Height Sensor

Basic steps for installing the AmeriGlide Express Dumbwaiter

Micro Autonomations LLC

A1500, A1500NF SPEED SWITCH SINGLE SET POINT - SELF CONTAINED. Introduction

Model 579 Curtain Machine Manual. General Information. Unpacking:

ARCHITECTURAL CONTROL SYSTEMS, INCORPORATED ST. LOUIS, MISSOURI

FM200 FLOW/NO-FLOW MONITOR INSTALLATION AND TECHNICAL MANUAL 120 VAC MODEL 6/1/2017

Quick Start Guide TS 910

Transcription:

SHIVVERS ROTATION DETECTOR 676A-1A INSTALLATION & OPERATING INSTRUCTIONS fshiwersf ROTATION DETECTOR 676A-1A INDICATOR LIGHT Solid Red = Rotation Is OK Slow Flash (1 sec. on; 1 sec. off)= Rotation Detector shut system down. It Is running OK now. (Flashes for 5 minutes then goes to Solid Red.) Fast Flash (1/4 sec. on; 1/4 sec. off)= Rotation Is NOT OK. Shutdown relay is energized. (Shut down bypassed.) P-1226 SHIWERS MANUFACTURING INC. CORYDON, IOWA USA PH. (641) 872-15 ** FAX (641) 872-1593 www.shivvers.com P-12264 9/12/14

TABLE OF CONTENTS INTRODUCTION 1 SAFETY 2 SENSOR AND MAGNET ORIENTATION 2 PREPARING FOR INSTALLATION 3 PAGE INSTALLING WITH 676B-1A 4-5 SHIVVERS HORIZONTAL UNLOAD W/ ENCLOSED BELT SHIELD INSTALLING WITH 676C-1A 6-7 SHIVVERS HORIZONTAL UNLOAD W/ OPEN BACK BELT SHIELD INSTALLING WITH 676D-1A 8-9 SHIVVERS CONTINUOUS FLOW OR AUXILIARY AUGER, 6 INCH INSTALLING WITH 676F-1A 1 SHIVVERS CONTINUOUS FLOW OR AUXILIARY AUGER, 4 INCH INSTALLING WITH 676G-1A 11-12 SHIVVERS DRI-FLO HORIZ. UNLOAD OR TRANSFER AUGER, 8 INCH INSTALLING WITH 6761-1A 13 SHIWERS DRI-FLO HORIZ. UNLOAD OR TRANSFER AUGER, QRPH MOUNTING THE MAGNET 14 WIRING ROTATION DETECTOR 15 WIRING ROTATION DETECTOR TO COMPUDRY COMMAND CENTER-- 16 SPEED AND SHUTDOWN DELAY CONFIGURATION,------- 17 TESTPROCEDUR~------------------------------ 18

INTRODUCTION The 676A-1A Rotation Detector will monitor any rotating shaft or pulley and will activate a relay if the rotation speed is outside the pre-programmed limits. It is normally installed and wired to start monitoring when a motor is started. If the sensor does not pick up a signal from a magnet mounted on the equipment, a relay will be activated which will shut the motor down. A 1 or 2 second selectable time delay is used to prevent nuisance shutdowns. The motor must be wired so that it will not restart when the Rotation Detector relay re-closes. It is very easy to install the Rotation Detector with a Compudry Command Center. A unique feature of the Shivvers Rotation Detector is that it will flash the indicator light for 5 minutes if the Rotation Detector shut the equipment off. This saves valuable time when troubleshooting why the system was shut down. Mounting bracket kits are available for common Shivvers auger configurations. Many times one of these kits can be modified for use in other applications. If enough requests are received, other mounting configurations may be made available in the future. Contact your dealer or the Shivvers factory for more information. 676B-1A 676C-1A Mounting Kit for Shivvers Horizontal Unload with enclosed belt shield, 6 or 8 inch. Mounting Kit for Shivvers Horizontal Unload with open back belt shield, 6 or 8 inch. 676D-1A Mounting Kit for Shivvers Continuous Flow or Auxiliary Auger, 6 inch. 676E-1A Latching Relay Kit for Systems using a control box without start/stop switches, such as a Shivvers Deluxe Circutrol. 676F-1A Mounting Kit for Shivvers Continuous Flow or Auxiliary Auger, 4 inch. 676G-1A Mounting Kit for Dri-Fio Horizontal Unload and 8" Transfer Auger Power Head. 1

SAFETY The installer of this equipment must assume the responsibility for his own safety, and that of those working around him. He must also make sure that the equipment is installed as shown in this manual. If any items covered in this manual are not completely understood, or there is a concern with the safety of this product, contact Shivvers at the address shown on the front page. TAKE NOTE ANYTIME THIS SYMBOL APPEARS. YOUR SAFETY, AND THAT OF PERSONS AROUND YOU, IS AT STAKE. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN COMPLIANCE WITH THE LATEST EDITION OF TME ANSI/NFPA STANDARD 7, NATIONAL ELECTRICAL CODE, AS A MINIMUM REQUIREMENT, AND IN COMPLIANCE WITH LOCAL WIRING CODES AS APPLICABLE. WIRING MUST BE DONE BY A COMPETENT ELECTRICIAN. A LICENSED ELECTRICIAN IS RECOMMENDED, AND MUST BE USED WHEN REQUIRED BY LOCAL OR STATE STATUTES. SENSOR AND MAGNET ORIENTATION The magnetic sensor must be mounted so the supplied south pole facing magnet passes across the face of the sensor as shown below. South Pole Facing Magnet E-6427 ~ Magnetic~ Sensor Cable Assembly 676-1A ~ ~Ys-%" 2

PREPARING FOR INSTALLATION Step 1. Step 2. Remove 676-1A magnetic sensor cable assembly from 676A-1A box and the sensor bracket from the mounting kit provided for your application. Using (2) #4-4 X 5/16 screws (F-1631) and (2) #4-4 nyloc nuts (F-1713) from hardware sack 676-1A found in the 676A-1A box, attach the magnetic sensor cable assembly to the sensor bracket, as shown below. OR Horizontal Unload Mounting Bracket #4-4 X 5/16 (676-9P) Screw F-1631 Magnetic Sensor Cable Assembly Continuous Flow Mounting Bracket (676-2P) Wire Tie Holes Sensor Bracket Dri-Fio Power Head & 8" Transfer Auger M~unting Bracket (676-13P) Magnetic Sensor Cable Assembly ~-- Sensor Bracket Magnetic Sensor Cable Assembly ~---- Sensor Bracket #4-4 X 5/16 Screw ~ ~t F-1631 ""'- _,_ ~ F-1713 Step 3.., "'--- #4-4 Nyloc Nut (2) Black wire ties (E-6428), from the hardware sack labeled 676-1A, can be used to hold the magnetic sensor cable snug against the bracket, for the top two configurations. 3

INSTALLING WITH 676B-1A SHIVVERS HORIZONTAL UNLOAD WITH ENCLOSED BELT SHIELD (Go to the next section for other mountings.) A DANGER Step 1. Remove belt shield cover. Mark a hole 1/2 11 from the top of the belt shield side and 1 11 from the edge. See Figure 1 for hole placement. Step 2. Locate the rotation detector box assembly, and (4) #8-32 machine screws and ( 4) #8-32 nyloc nuts from the rotation detector kit. Use hardware to mount the rotation detector box to the box mounting bracket. See Figure 2. Step 3. Using (2) #12 X 1 11 self drilling screws (F-1121) from the mounting kit box, mount the box mounting bracket. (Note: Box mounting bracket should be flush with the top of the belt shield side.) Make sure belt shield cover will open completely without hitting bracket. Step 4. Locate the sensor bracket with magnetic sensor cable attached and (2) #12 X 1 II self drilling screws from m~unting kit. Attach the sensor bracket 1/2 11 from the bend in the belt shield and as close to the pulley as - possible. See Figure 3 for correct placement. The magnetic sensor needs to be about 7/16" away from the pulley spokes. MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. FIGURE 1 Box Mounting Bracket 676-8P FIGURE 2 Rot. Det. Box Assy. --..._ #8-32 X~" Mach. 1\ Screw F-167 FIGURE 3 Sensor bracket with magnetic sensor cable attached. Pulley #8-32 Nyloc Nut F-149 4

There are (3) spacer brackets included in the mounting kit to space the sensor bracket, as necessary. FIGURE 4 1/4-2 Nyloc Nut ~15-1 Sensor Bracket 676-9P Skip to page 13 for mounting the magnet. Spacer bracket 676-4P (use as required) 1/4 Flat 1/4-2 Screw F-1 15-2 (5/8" L) or F-115-5 (1" L) 5

INSTALLING WITH 676C-1A SHIVVERS HORIZONTAL UNLOAD WITH OPEN BACK BELT SHIELD (Go to the next section for other mountings.) A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. NOTE: The belt shield may need to be removed to install this bracket. It is not shown for illustration purposes. Step 1. Locate the open belt shield bracket, and (2) 1/2" nyloc nuts in the mounting kit. Step 2. Attach the open belt shield bracket to (2) bolts from the transition head. See Figure 1. Step 3. Locate the rotation detector box assembly, and (4) #8-32 machine screws and (4) #8-32 nyloc nuts from the rotation detector kit. Use hardware to mount the rotation detector box to the open belt shield bracket. See Figure 2. Step 4. Locate the sensor bracket with magnetic sensor cable attached and (2) 1/4-2 screws (F-115-2 or F-1 15-5), (2) 1/4" flat washers (F-1 9-1 ), and (2) 1/4-2 nyloc nuts (F-1 5-1) from the mounting kit. Two different length screws are provided. The length used will depend on the amount of spacer brackets used. Attach the sensor bracket. See Figure 3 for correct placement. The magnetic sensor needs to be about 7/16" away from the pulley spokes. FIGURE 1 1/2" Nyloc Nut F-1378 Open Belt Shield/ Bracket 676-5P FIGURE 2 #8-32 Nyloc Nut_/ F-149 FIGURE 3 Transition Bolt Rot. Det. Box Assy. #8-32 X~" Mach. Screw F-167 6

There are (3) spacer brackets included in the mounting kit to space the sensor bracket, as necessary. Skip to page 13 for mounting the magnet. FIGURE4 1/4-2 Nyloc Nut ~15-1 Spacer bracket 676-4P (use as required) /Sensor / Bracket, 676-9P ~- 1/4-2 Screw F-1 15-2 (5/8" L) Washer or F-115-5 (1" L) F-1 9-1 7

INSTALLING WITH 676D-1A SHIVVERS CONTINUOUS FLOW OR AUXILIARY AUGER, 6 INCH (Go to next section for other mountings.) A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. NOTE: Belt shield may need to be removed to install this bracket. It is not shown for illustration purposes only. Step 1. Locate the control box mount, (4) 3/8-16 x 7/8" bolts (F-1558), and (4) 3/8-16 nyloc nuts (F-1239) from the mounting kit. FIGURE 1 - ---1 - --1 Control Box Mount 676-7P Step 2. Remove (2) nuts and (2) bolts from the front motor mount plate, as shown in Figure 1, and replace with (2) 3/8-16 nyloc nuts and (2) 3/8-16 X 7/8 bolts. For added support, it may be necessary to drill the other two holes out through the control mount box. Hardware is supplied for this option. Remove (2) existing nuts and bolts. replace with 3/8-16 x 7/8 bolts and 3/8-16 nyloc nuts. FIGURE 2 Mount can be placed on either side of auger. Step 3. Locate the rotation detector box assembly, and (4) #8-32 machine screws (F-167) and (4) #8-32 nyloc nuts (F-149) from the rotation detector kit. Use hardware to mount the rotation detector box to the box mounting bracket. See Figure 2. Step 4. Locate the sensor bracket with magnetic sensor cable attached and (2) 1/4-2 screws (F-115-2), (2) 1/4" flat washers (F-1 9-1 ), and (2) 1/4-2 nyloc nuts (F-15-1) from the mounting kit. tj #8-32 X~" Mach. Screw (F-167) Rot. Det. Box Assy. 8

Attach the sensor bracket. See Figure 3 for correct placement. The magnetic sensor needs to be about 7/16" away from the pulley spokes. Skip to page 13 for mounting the magnet. FIGURE 3 l Rot. Det.J BoxAssy. 1/4-2 Nyloc Nut F-15-1 J 1/4" Flat Washer F-1 9-1 1/4-2 X 5/8 Screw F-115-2 Sensor bracket with magnetic sensor attached. 9

INSTALLING WITH 676F-1A SHIVVERS CONTINUOUS FLOW OR AUXILIARY AUGER, 4 INCH A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. NOTE: Belt shield may need to be removed to install this bracket. It is not shown for illustration purposes only. Step 1. Locate the control box mount, (2) 3/8-16 x 7/8" bolts (F-1558), and (2) 3/8-16 nyloc nuts (F-1239) from the mounting kit. FIGURE 1 Control Box Mount Step 2. Drill the two holes out through the control mount box for mounting, as shown in Figure 1, and install with (2) 3/8-16 nyloc nuts and (2) 3/8-16 X 7/8 bolts. Step 3. Locate the rotation detector box assembly, and (4) #8-32 machine screws (F-167) and (4) #8-32 nyloc nuts (F-149) from the rotation detector kit. Use hardware to mount the rotation detector box to the box mounting bracket. See Figure 2. Step 4. Locate the sensor bracket with magnetic sensor cable attached and (2) 1/4-2 screws (F-115-2), (2) 1/4" flat washers (F-19-1), and (2) 1/4-2 nyloc nuts (F-1 5-1) from the mounting kit. Attach the sensor bracket. See Figure 3 for correct placement. The magnetic sensor needs to be about 7/16" away from the pulley spokes. Skip to page 13 for mounting the magnet. Drill out two holes for mounting and use 3/8-16 x 7/8 bolts and 3/8-16 nyloc nuts~ FIGURE 2 :;::/ #8-32 Nyloc j Nut F-149 1/4-2 _/ Nyloc Nut 1/4" Flat F-1 5-1 Washer F-1 9-1 1 Mount can be placed on either side of auger. #8-32 X~" Mach. Screw (F-167) Sensor bracket with magnetic sensor attached.

INSTALLING WITH 676G-1A SHIVVERS DRI-FLO HORIZONTAL UNLOAD OR TRANSFER AUGER, 8 INCH A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. NOTE: Belt shield cover may need to be removed to install this bracket. It is not shown for illustration purposes only. FOR USE WITH 8" DRI-FLO HORIZONTAL UNLOAD (See next page for 8" Transfer Auger or Jumpster with a Shivvers Power Head.) Step 1. Locate the rotation detector box assembly, and (4) #8-32 machine screws (F-167) from the rotation detector kit. (NOTE: #8-32 nyloc nuts (F-149) will not be used). Use hardware to mount the rotation detector box to the horizontal unload transition. See Figure 1. Step 2. Locate the sensor bracket with magnetic sensor cable attached and (2) 1/4-2 screws (F-115-2), (4) 1/4" flat washers (F-1 9-1 ), and (2) 1/4-2 nyloc nuts (F-15-1) from the mounting kit. Attach the sensor bracket to the belt shield back. See Figure 2 for correct placement. The magnetic sensor needs to be about 7/16" away from the pulley spokes. Step 3. The safety side shield has a knock-out slot to allow the sensor cable to pass through to the outside of the belt shield back. Use as needed. See Figure 3. Skip to page 13 for mounting the magnet. FIGURE 1 FIGURE2 I ~I Uf 1/4-2 X 5/8 Screw F-115-2 I II I 1/4" Flat - #8-32 X~" Mach. Screw F-167 1/4-2 Nyloc Nut ----.-.41111. F-15-1 FIGURE 3 11 Transition Rot. Det. Box Assy.

INSTALLING WITH 676G-1A SHIVVERS DRI-FLO HORIZONTAL UNLOAD OR TRANSFER AUGER, 8 INCH A DANGER NOTE: Belt shield cover may need to be FIGURE 1 removed to install this bracket. It is not shown for illustration purposes only. FOR USE WITH 8" TRANSFER AUGER OR JUMPSTER. MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. Step 1. Locate the rotation detector box assembly, and (4) #8-32 machine screws (F-1 67) from the rotation detector kit. (NOTE: #8-32 nyloc nuts (F-149) will not be used). Use hardware to mount the rotation detector box to the Power Head. See Figure 1. Step 2. Locate the sensor bracket with magnetic sensor cable attached and (2) 1/4-2 screws (F-1 15-2), (4) 1/4" flat washers (F-1 9-1 ), and (2) 1/4-2 nyloc nuts (F-1 5-1) from the mounting kit. Attach the sensor bracket to the belt shield back. See Figure 2 for correct placement. (NOTE: Pulley not shown for clarity of mounting.) The magnetic sensor needs to be about 7/16" away from the pulley spokes. Rot. Det. BoxAssy. FIGURE 2 1/4" Flat Washer F-19-1 #8"'32 X~" Mach. Screw F-167 1/4-2 X 5/8 Screw F-115-2 Sensor bracket with magnetic 1 sensor attached. Belt Shield Back --~ 12

INSTALLING WITH 6761-1A SHIWERS DRI-FLO HORIZONTAL UNLOAD, OR TRANSFER AUGER, WITH QUICK RELEASE POWERHEAD A DANGER NOTE: Belt shield cover should not need to be removed to install this bracket. It is not shown for illustration purposes only. MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. FOR USE WITH 8" TRANSFER AUGER OR JUMPSTER. a Step 1. Locate the rotation detector box assembly, and (4) #8-32 machine screws (F-1 67) from the rotation detector kit. (NOTE: #8-32 nyloc nuts (F-149) will not be used). Use hardware to mount the rotation detector box to the bracket. Fasten bracket to motor mount using (3 or 4) #12 x 1" Sheet metal Screws (F-1121) See Figure 1. #12 X 1" Sht. Metal. Screw F-1121 Rot. Det. BoxAssy. Machine Screw F-167 Step 2. Locate the sensor bracket with magnetic sensor cable attached and (4) 1/4-2 screws (F-115-2), (4) 1/4" flat washers (F-19-1), and (4) 1/4-2 nyloc nuts (F-1 5-1) from the mounting kit. Attach the sensor bracket to the belt shield back. See Figure 2 for correct placement. (NOTE: Pulley not shown for clarity of mounting.) The magnetic sensor needs to be about 7/16" away from the pulley spokes. FIGURE 2 Two Brackets, 76~18P 676-19P Alternate placement for Sensor Bracket fastened on side of bearing plate or frame channel. Use 676-17P. 14 Washer F-19-1 1/4-2 Nyloc Nut F-1 5-1 13

MOUNTING THE MAGNET A DANGER Step 1. Locate 676-11A, magnet hardware sack in the rotation detector kit. MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. ) MARK AND DRILL HOLE Step 2. To determine the location to mount the magnet, slowly rotate the pulley until one of the spokes passes over the magnetic sensor. Mark one edge of the pulley spoke where the center of the magnetic sensor hits. Rotate to the other edge of the same pulley spoke and mark where the center of the magnetic sensor hits. Draw an arc from one mark to the other and drill a hole at the midpoint of the arc. See Figure 1. Drill the hole using a #29 (.136) or 9/64 (.14) drill bit. Tap the hole using 8-32 tap. Lubricate hole before tapping, especially on aluminum pulleys. \ FIGURE 2 #8 WASHERS (IF REQUIRED) "-' F-1144 ~ Step 3. Screw the magnet along with a #8 lock washer into the tapped hole. (4) #8 flat washers are provided as spacers to achieve a gap no less than 1/8" and no more than 3/8" between the magnet and the magnetic sensor. FIGURE 3 (Side View) If the pulley spoke is thicker than the tap will reach, a counterbore will need to be drilled before tapping to allow full reach to the other side. \LV \LV \LV #8 LOCK WASHER F-148 NOTE: Lubricate hole before tapping, especially with aluminum pulleys. 14

WIRING ROTATION DETECTOR A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. Rotation Detector Terminal Strip for 12 VAC Input 12 VAC input when motor is running. COM N.C. N.O. Shutdown Relay Usually connect to COM and N.C. Blue Pulse (Normally I Black Red I Closed). DC GND + 5V. I To Sensor Step 1. Route conduit from the magnetic sensor bracket to the Rotation Detector control box, using wire ties to keep conduit away from moving parts. Step 2. Wire the black, blue, and red wires from the sensor bracket to terminals 8, 9, and 1, respectively. (See wiring diagram above.) Step 3. Wire as shown in the drawing above for 12 VAC input when the motor is running. When wiring for 22 VAC input, wire as shown below. Rotation Detector Terminal Strip for 22 VAC Input 22 VAC input when motor is running. COM N.C. N.O. Shutdown Relay Usually connect to COM and N.C. Blue Pulse (Normally I Black Red I Closed). DC GND + SV. I To Sensor Usually a connection is made between the COM (terminal #5) and N.C. (normally closed) (terminal #6) terminals to shut the motor down if rotation is not within range. The optional 676E-1A Latching Relay Kit may be required for some control panels. See next section for wiring to CompuDry Command Center. 15

WIRING ROTATION DETECTOR TO COMPUDRY COMMAND CENTER A DANGER MAKE SURE ALL POWER IS DISCONNECTED AND LOCKED OFF. Pull 4 wires through the conduit from the Command Center to the Rotation Detector Box. For whichever 5 pole magnetic starter plug that controls the motor the Rotation Detector box is connected to: To Magnetic Starter 1 2 ------------------~----------- 3 ------------------~~--------- 4 5 5 Pole Starter Plug J6-J1 Rotation Detector Terminal Strip 1 2 3 4 5 6 7 8 9 1 LtJ Step 1. Wire from terminal #1 of the 5 pole plug to terminal #1 of the Rotation Detector terminal strip. Step 2. Wire a white wire from terminal #3 of the 5 pole plug to terminal #4 of the Rotation Detector terminal strip. Step 3. Take the wire out of terminal #5 of the 5 pole plug. Wire nut this wire to a wire going to terminal #5 of the Rotation Detector terminal strip. Step 4. Wire from terminal #5 of the 5 pole plug to terminal #6 of the Rotation Detector terminal strip. 16

SPEED CONFIGURATION SPEED AND SHUTDOWN DELAY CONFIGURATION As shipped the Rotation Detector will monitor speeds between approximately 9 RPM to 72 RPM. Higher RPMs are not recommended because the pulse width gets too narrow for reliable detection. For lower RPMs, either multiple magnets may be attached to the shaft or pulley being monitored, or the J4 jumper may be cut, allowing the rotation detector to monitor speeds between approximately 4 RPM to 18 RPM. SHUTDOWN CONFIGURATION As shipped, the Rotation Detector will determine the number of pulses received in one second and if outside the allowable range, it will sample for another second before shutting down. If the J3 jumper is cut, the Rotation Detector won't try the second time, so it will shut down within one (1) second if the number of pulses received is outside the allowable range. Make sure the device being monitored will normally come up to speed within one (1) second before cutting J3. FRONT VIEW oa~@ U1 C2 ~ + D'S-~ D :: J3 J4 4 @ ~ @ J3 J4 MIN RPM MAX RPM J4 SHUTDOWN TIME INTACT INTACT 9 75 2 SEC INTACT CUT 4 2 2 SEC CUT INTACT 12 72 1 SEC CUT CUT 65 18 1 SEC Allow at least 2% variation in above RPMs due to manufacturing tolerances and temperature extremes. 17

TEST PROCEDURE Testing the Rotation Detector will depend on how it is wired. It may be as easy as shutting off the circuit breaker to the motor being monitored, then trying to turn the motor on. The Rotation Detector will not detect any pulses and will shut the control circuit off. Other ways to test the Rotation Detector include: removing the belts; unwiring the blue pulse wire from terminal #9 of the Rotation Detector; or moving the sensor/magnet so the Rotation Detector doesn't receive pulses. 18