Kraftsystemer Norge Referanser utland Revb Norge 2004-05-11 / 1
Revb Norge - 2004-05-11 / 2 Belas, Angola Empresa Nacional de Electricidade Empresa Nacional de Electricidade (ENE) needed a new substation to reduce the load from the main substation in the city of Luanda Four 15 kv outgoing lines should provide electricity to a continously growing area To supply a 20 MVA, 60/15 kv transformer, 4 outgoing lays and necessary switchgear The erection and commissioning to be performed by ABB and the civil work to be sub-contracted to a local company Long experience working in Africa secured the turnkey delivery to the clients satisfaction Improved quality of the distributed electricity providing a stable voltage level to the end users and reducing the powercuts to a minimum Officially opened by the Minister of Energy in Angola, April 26 th, 1997
Birkapili (1x66MW), Turkey ERE Hidroelektrik Revb Norge - 2004-05-11 / 3 ERE Hidroelektrik needed a reliable partner for a cost effective Hydro Power Plant ABB delivers Control, Protection, Electrical Balance of Plant and Substation ABB in Norway and Turkey in cooperation with GE Hydro forms a strong team A plain, functional solution offered Local presence and knowledge of market requirements for cost effectiveness ERE Hidroelektrik obtains a Hydro Power Plant at fair market pricing, with well known ABB products and a professional contractor able to meet technical and logistic challenges
Yixing (4x250MW), China Jiangsu Pumped Storage Power Co. Ltd/GE New pumped storage plant to strengthen the supply of electricity in part of Eastern China Technically advanced power products and systems to secure high reliability In partnership with GE ABB provides Control, Protection and Electrical Balance of Plant Revb Norge - 2004-05-11 / 4 Considerable experience in the Power Systems business and knowledge of China provides high reliability and availability The delivery will strengthen the power supply in an area which suffers from severe power shortages due to growing demand
Rio General (2x20MW) Hidroenergía del General/SARET Costa Rica Revb Norge - 2004-05-11 / 5 Hidroenergía del General needed a reliable partner for a cost effective Hydro Power Plant for the development of infrastructure in Costa Rica In partnership with GE ABB provides Control, Protection, Electrical Balance of Plant 13,8/138 kv Plant Substation Extension of Leesville Substation Hidroenergía del General obtains a Hydro Power Plant at fair market pricing, with well known ABB products and a professional contractor able to meet technical and logistic challenges. The delivery will contribute to increased economic development in Costa Rica
Revb Norge - 2004-05-11 / 6 Bor 3, 110/5,25 kv substation - 3 x 40 MVA Serbia 2001-2002 Customer: EPS Elektroistok Contract value: 4,5 MUSD Financing: Norwegian MFA Short delivery time: < 9 months History EPS Elektroistok Substation bombed by NATO airattacks in May 1999 Local community suffering from lack of power and unsecure supply to important metal industry ABB scope System design and responsibilty 110kV GIS New buildings and rehabilitation of transformers and overhead line 5,25kV switchgear with powerblock/vd4 Power cable, OPGW and telecommunication Control and protection system Local contractors in Serbia Civil works, erection and cable delivered by Energoproject Oprema 5,25kV switchgear built by Minel Fepo Rehabilitation of transformers by Elektroistok
Central and Southern Region Network Development, Lesotho Lesotho Electricity Corporation (LEC) Rural Electrification for the Central and Southern part of the Country 11kV, 33kV, 132kV overhead lines Consortium between ABB Norway and ABB Sweden with soft finance from SIDA and NORAD The erection and commissioning to be performed by ABB and the civil work to be subcontracted to a local company Revb Norge - 2004-05-11 / 7 Improved quality of the distributed electricity providing a stable voltage level to the end users and reducing the power cuts to a minimum Electric power to local industry projects 1992-2000
9 Towns Bangladesh Power Development Board Revb Norge - 2004-05-11 / 8 Improve the reliability, reduce the system losses and connect new customers to the electric system Renewal and extension of 5 substations Supply of 33/11 kv transformers and switchgear Improved quality of the distributed electricity Increased capacity to open for new customers 31 engineers invited for training at ABB universities 2003 2004
Ampara Substation, Sri Lanka Ceylon Electricity Board (CEB) New substation to improve power supply quality in the eastern region New 132 kv substation 20 km 132 kv overhead transmission line Soft-financing Turnkey responsibility with local partner Revb Norge - 2004-05-11 / 9 Improved power supply quality in the region Reduced losses Improved flexibility
Revb Norge - 2004-05-11 / 10 Vavunia Substation, Sri Lanka Ceylon Electricity Board (CEB) New substation to solve voltage problems created by very long supply lines To cover the growth of demand in the area as a consequence of the peace process New 132kV substation Transfer of 2x10 MVA surplus transformers from existing substation Soft-financing Turnkey responsibility with local partner Improved power supply quality in the region Reduced losses Increased flexibility
Revb Norge - 2004-05-11 / 11 Anuradhapura substation, Sri Lanka Ceylon Electricity Board (CEB) New substation to reduce losses and increase power supply quality for the central/northern regions of Sri Lanka Supply of a new 220kV/132kV/33kV substation Extension of existing 220kV substation in feeding end Soft-financing Turnkey responsibility with local partner Standardized solutions for 220kV substations in the country Improved power supply quality in the region
Mutundwe and Lugogo, Uganda UEB Contract Value: 1,8 MUSD Financing: NORAD, UEB New 132 and 11 kv feeders (2 x 20 MVA) Revb Norge - 2004-05-11 / 12 2002-2003 Control, protection and preparation for remote operation Rehabilitation and extension of 2 substations on turn-key basis 132 kv transformers, relocation and new installations
Masaya 230/138 kv substation - 2 x 75 MVA Nicaragua ENEL Revb Norge - 2004-05-11 / 13 1998-2000 Complete Substation on Turn-key basis 1 1/2 breaker system Part of the Central American Interconnection System, with connection to Honduras and Costa Rica Local Contractors Erection executed by the Maintenance Department of ENEL Civil Works