Special Applications PB 1

Similar documents
Special Applications Pick Up Box Removal PB 1

UI BULLETIN # 28b. REAR BUMPER REMOVAL Information is also provided for modifiers who intend only to remove the rear bumper from the All New C/K.

Special Applications PB 1

Special Applications Pick Up Box Removal PB 1

PICKUP BOX REMOVAL PROGRAM...PB

PICKUP BOX REMOVAL/ALTERATIONS DESIGN RECOMMENDATIONS

Incomplete Vehicle Document 2014 Model Year NOTE:

Specs F 250/ F 350/ F 450 Super Duty Pickups. 8/20/ F-250/F-350/F-450 SD Pickups - Specs

AFFIX FEDERAL OR CANADA INCOMPLETE VEHICLE CERTIFICATION LABEL HERE

INCOMPLETE VEHICLE DOCUMENT NOTE: YOU CAN PRODUCE YOUR OWN LEGITIMATE INCOMPLETE VEHICLE DOCUMENT

VEHICLE NOISE REGULATIONS / EMISSION CONTROL MODIFICATIONS

Special Applications - Full Size (K) Pick-Ups (4x4) SP 0 Contents

Chapter 2 GOVERNMENT REGULATIONS 1. SAFETY STANDARDS 2. VEHICLE NOISE REGULATIONS INFORMATION 3. EMISSION CONTROL REGULATIONS KK-US109

2013 Ram Federal/Canada Safety Standards

2014 Ram Federal/Canada Safety Standards

2015 Chassis Cab Design Recommendations/Cautionary Notes. For Dump Body Installation Requirements click here: CAUTIONARY NOTES

2008 Chassis Cab Federal/Canada Safety Standards

INTRODUCTION SECTION I. 08/01/ Federal/Canada Safety Standards Ram C/V

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

Ram 2005 Federal/Canada Safety Standards

SVE BULLETIN. Slow Fuel Fill

Petition for Rulemaking; 49 CFR Part 571 Federal Motor Vehicle Safety Standards; Rear Impact Guards; Rear Impact Protection

Body Builders Layout Book

Body Builders Layout Book

Fuel System Integrity


Importing Motor Vehicles into the United States

Configurations F 250/ F 350/ F 450 Super Duty Pickups. Specs > Configurations. Regular Cab: 141.6" WB 4x2/141.6" WB 4x4

C/K TRUCK (CURRENT) BODY BUILDERS INSTRUCTIONS. Section 0 General Instructions. Section 1 Body PAGE

Electrolyte Spillage and Electrical Shock Protection

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration

#15067: F/CMVSS Noncompliance - Goodyear P255/65R18 109S Fortera HL Tires - (Mar 11, 2015)

Pupil Transportation Safety

Special Applications - Full Size K Series (4x4) SP 0 Contents

PART 665 BUS TESTING. Subpart A General. 49 CFR Ch. VI ( Edition)

Model Legislation for Excessively Raised Vehicles. Section 1. Short Title. This Act may be cited as the Excessively Raised Motor Vehicle Safety Act.

WHAT CONSUMERS NEED TO KNOW: Changes in Fuel System Components and Yamaha s New Fuel System Connectors

Type I School Bus means a school bus with a Gross Vehicle Weight Rating of more than 10,000 pounds. (IVC Section )

SVE BULLETIN F-Series Super Duty with Aftermarket Auxiliary AC System Control

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

FMVSS 111 Rear Visibility Full Compliance Requirements: How Commercial Vehicles Are Affected

Agency Information Collection Activity Under OMB Review. AGENCY: National Highway Traffic Safety Administration (NHTSA),

2016 ProMaster Design Recommendations SYSTEM DESIGN RECOMMENDATIONS FUEL SYSTEMS

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

Windshield Mounting. TECHNICAL STANDARDS DOCUMENT No. 212, Revision 0R

PERFORMANCE SUSPENSION PARTS

Air Lift. Kit Honda Civic (8th GEN) PERFORMANCE INSTALLATION GUIDE. Front Application

Have your Vehicle Converted to Compressed Natural Gas - SAFELY

SPECIAL APPLICATIONS TRUCK-CAMPER LOADING... TC 1

Click Here for Printable PDF File. CHAPTER 3 - BASIC INFORMATION for PERFORMING HYDRAULIC SYSTEM MAINTENANCE

Executive Order G F

DOCUMENT FOR INCOMPLETE VEHICLE APPLICABLE TO THE 2016 MODEL YEAR FULL SIZE VAN (G-VAN)

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

Federal Motor Vehicle Safety Standards

TOYOTA MOTOR SALES, U.S.A., INC. TOYOTA PRIUS MODEL YEAR 2006 QUALIFIED HYBRID MOTOR VEHICLE CREDIT MANUFACTURER CERTIFICATION

REPORT NUMBER: 305-MGA

PERFORMANCE SUSPENSION PARTS

Air Lift. Kit Ford Mustang SN95 PERFORMANCE INSTALLATION GUIDE. Rear Application

COUNTY ROAD COMMISSION RULES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

CNG LPG PRODUCT OFFERINGS

Recreational Off-Highway Vehicles

REPORT NUMBER: 120-MGA

SNOWPLOW PREP PACKAGE (VYU)... SP

Powered Cart Guidelines

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

Table of Contents. SECTION 4: Trunk Mounting Considerations

BODY BUILDERS INSTRUCTIONS...

GENERAL TESTING LABORATORIES, INC LEEDSTOWN ROAD COLONIAL BEACH, VIRGINIA 22443

Department of Transportation. National Highway Traffic Safety Administration. [Docket No. NHTSA ; Notice 2]

TECHNICAL STANDARDS DOCUMENT No. 500, Revision 2 Low-Speed Vehicles

Toyota Motor Engineering & Manufacturing North America, Inc., Grant of Petition for Decision of Inconsequential Noncompliance

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 2 HOUSE BILL 469* Committee Substitute Favorable 4/24/17

B-026INT October 6, 1999 FUEL FILTER BRACKET RETROFIT (JAPAN ONLY) GENERAL RETURN THIS TO: INITIAL HERE TECHNICIAN NO.

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan Ford Customer Service Division

DO NOT REMOVE THIS DOCUMENT MUST REMAIN WITH THIS VEHICLE UNTIL IT IS CERTIFIED AS A COMPLETED VEHICLE

Fuels Safety Division. Propane Code Adoption Document Amendment

Kits 52420, 52440, 52445, and 52465


11/12/2017 # C: MIL Illuminated, DTCs P0442, P0446, P0455 or P0449 Set - Fuel Tank Hard to Fill - Moisture, Water, Corrosion at EVAP Can

1. Highway Traffic Act Weight & Dimension Limitations

HOUGHTON COUNTY ROAD COMMISSION GUIDELINES FOR THE MOVEMENT OF OVERSIZE OR OVERWEIGHT VEHICLES AND LOADS

PART A STATEMENT OF PRINCIPLES

100-30(02) (External Projections)

City of Storm Lake Fire Department Heavy Rescue Specifications

FEDERAL EXCISE TAXES (F.E.T.) CALCULATIONS

Toyota Motor North America, Inc. Grant of Petition for Temporary Exemption from an Electrical Safety Requirement of FMVSS No. 305

F/CMVSS Noncompliance Recall Electronic Brake Control Module Memory Failure

ORDINANCE NO AN ORDINANCE REGULATING SPECIAL VEHICLES. The City Council of the City of Cokato, Minnesota hereby ordains as follows:

BRAKES. Air Brake Modifications DURASTAR SERIES BODY BUILDER BRAKES FEBRUARY 2015 PAGE 159 ALL MODELS - AIR BRAKE MODIFICATIONS

2007 Saturn Truck Outlook V6-3.6L

DEPARTMENT OF TRANSPORTATION. National Highway Traffic Safety Administration. [Docket No. NHTSA ]

#14515B: Product Safety - Chassis Electronic Control Module Internal Contamination - (Feb 2, 2015)

PERFORMANCE SUSPENSION PARTS

Micro Motion F-Series Coriolis Flow and Density Sensors. Installation Manual , Rev CC December 2010

15031A Safety Belt Lap Anchor Tensioner Cable

Tennessee Requirement for a Stamped VIN on Trailers

By the Book: How to Offer E15

Transcription:

Special Applications PB 1 Contents 1 PICKUP BOX REMOVED RPO ZW9 PROGRAM... 2 Alterations to Complete Vehicles... 2 Vehicle:... 3 Service Parts:... 3 Areas of Modification... 4 CMVSS and FMVSS... 4 Box Removed RPO ZW9 Fuel Fill System Modifications for Gasoline fueled Vehicles with Fuel Filler Pipe RPO BJA... 5 Chevrolet Colorado/GMC Canyon (1/T) ZW9 Option & RPO BJA non-e85 Fuel Filler Torque Values... 8 Fuel Fresh Air Line Removal Graphic for fitting to RPO BJA Fuel Fill Pipe... 9 Fuel Air Fuel Line & Axle Vent Tube Installation Graphic for RPO ZW9 / RPO BJA... 10 Box Removed RPO ZW9 Fuel Fill System for Gasoline fueled Vehicles with Standard Fuel Filler Pipe (NON RPO BJA Fuel Fill Pipe System)... 11 Axle Vent Attachment Graphic for Attaching to Fuel Filler Pipe 10 Chevrolet Colorado/GMC Canyon (1/T) ZW9 Box Removed & Standard Fuel Filler Pipe (NON RPO BJA)....... 11

Special Applications PB 2 PICKUP BOX REMOVED RPO ZW9 PROGRAM Alterations to Complete Vehicles Persons who complete (certify) Pickup Trucks with removed Pickup box RPO ZW9 should be aware that this type of activity would impose upon them the corresponding responsibility for ensuring that the units as sold are in compliance with all applicable safety and/or emissions (including noise and RFI) requirements. Specific questions concerning compliance or certification to these requirements should be directed to the vehicle alterer s legal counsel or the National Highway Traffic Safety Administration, the Environmental Protection Agency, the California Air Resources Board, or in Canada, the Ministry of Transport or the Canadian Department of Commerce. The Environmental Protection Agency has provided an explanation of the policy they will follow regarding the modification by the secondary manufacturers of complete Light Duty Trucks prior to sale and delivery to the ultimate purchaser. This explanation is contained in a letter from C. N. Freed of the EPA to M.H. McBride of the Recreation Vehicle Industry Association, dated July 13, 1979. A portion of this letter states: Secondary manufacturers are not manufacturers under the [Clean Air] Act when the following conditions are met: 1. The vehicles produced by a secondary manufacturer conform in all material respects to the design specification in the original manufacturer s application for certification (hereafter Application ); and 2. The weight of the vehicles produced by a secondary manufacturer, including the weight of fuel at nominal tank capacity, is no more than 500 lbs. above the maximum vehicle weight. No frontal area restrictions will apply to secondary manufacturers who comply with the conditions above. However, every vehicle sold to an ultimate purchaser must be covered by emission warranty mandated by section 207(a) of the Act. Secondary manufacturers who do not meet the above conditions will be considered manufacturers under the Act and will be required to ensure that the vehicles they produce are covered by a certificate of conformity. The Maximum vehicle weight for a given vehicle is determined by: A) Subtracting 300 lbs. from the highest loaded vehicle weight (see 40 CFR 86.082-2 for loaded vehicle weight definition and the table at 40 CFR 86.129-94) associated with the test weight listed in the application for the vehicle, and B) Adding the weight of all options that are offered by the original manufacturer for the applicable truck line that were not included in the curb weight reported in the application. In the case of mutually exclusive options, only the weight of the heavier option is to be used when computing the maximum vehicle weight. (Alterations continued from previous page)

Special Applications PB 3 In addition, the California Air Resources Board has provided an explanation of the policy they will follow regarding the modification by the secondary manufacturers of complete Light Duty Trucks prior to sale and delivery to the ultimate purchaser. This explanation is contained in the California Exhaust Emission Standards and Test Procedures for Passenger Cars, Light Duty Trucks and Medium Duty Vehicles, adopted March 22, 2012 and dated December 6, 2012. A portion of this document states: Certification, if granted, is effective only for the vehicle/test group described in the original manufacturer s certification application. Modifications by a secondary manufacturer to vehicles/engines shall be deemed not to increase emissions above the standards under which those vehicles/engines were certified and to be within the original certification if such modifications do not: (1) increase vehicle weight more than 10 percent above the curb weight, increase frontal area more than 10 percent, or result in a combination increase of weight plus frontal area of more than 14 percent; or (2) include changes in axle ratio, tire size, or tire type resulting in changes in the drive train ratio of more than 5 percent; or (3) include any modification to the emission control system. No originally certified vehicle/engine which is modified by a secondary manufacturer in a manner described in items (1) through (3) of the preceding sentence may be sold to an ultimate purchaser, offered or delivered for sale to an ultimate purchaser, or registered in California unless the modified vehicle/engine is certified by the state board in accordance with applicable test procedures to meet emission standards for the model year for which the vehicle/engine was originally certified. For the purposes of this subsection, secondary manufacturer means any person, other than the original manufacturer, who modifies a new motor vehicle prior to sale to the ultimate purchaser. Those who wish to remove the Pickup box from a Pickup Truck for the purpose of installing special equipment or another type of body should be further advised that a Pickup may require modification in one of the following areas. Before a decision is made to alter a C/K Pickup Model, please be advised of the following considerations: Vehicle: Analyze the vehicle specifications for product content. The option content of a particular vehicle will determine which if any of the five areas of modification might not be applicable to the vehicle alterations contemplated. Service Parts: The service parts and related service part number as outlined in the five areas of modification may be ordered through your local Chevrolet/GMC Dealer. Contact your Dealer s Service Parts Representative for availability and price.

Special Applications PB 4 Areas of Modification: 1. Fuel filler neck assembly, housing, and ground strap. 2. Rear axle vent hose. 3. Removal of any protective covering on fuel tank system. CMVSS and FMVSS Compliance of Canadian and Federal Motor Vehicle Safety Standards will be affected by Upfitters removing Pickup Box and Rear Bumper to install a second unit body: MVSS 105 Hydraulic brake (Vehicles greater than 3500 kg (7716 lb) GVWR) MVSS 108 Lighting Equipment MVSS 111 Rear View Mirrors MVSS 135 Light Vehicle Brakes, applies to vehicles 3500 kg (7716 lb.) GVWR or less MVSS 204 Steering Control Rear Displacement MVSS 208 Occupant Crash Protection MVSS 219 Windshield Zone Intrusion 4536 kg (10,000 lb.) or less MVSS 301 Fuel System Integrity, trucks Refer to the generic (non-vin Specific) Incomplete Vehicle Document for detailed requirements now available on the GM Upfitter Integration website (http://www.gmupfitter.com/pages/incomplete-vehicle-documents).

Special Applications PB 5 Box Removed RPO ZW9 Fuel Fill System Modifications for Gasoline fueled Vehicles with Fuel Filler Pipe RPO BJA Certain guidelines must be adhered to in modifying the fuel fill, fuel vent system systems, axle vent and grounding to ensure that the completed product meets the manufacturer s requirements. 1. The fuel fill and fuel vent lines must be installed such that there is adequate clearance between them and the chassis parts under all operating conditions, including protection from road debris. Body attachment brackets must also be located such that there is adequate clearance to all fuel system components, such as the fuel lines, fuel vent lines, and the fuel level sending unit, under all operating conditions. This also applies to the axle vent system. 2. Removal of any and all shipping fuel tank protection consisting of wraps or covers must be done prior to upfit of truck. The truck should not be exposed to the environment without these wraps or covers being in place prior to upfit. 3. For use of option BJA both the fuel fill and fuel fresh air line vent hoses must be routed (and supported, if needed such that there are no sags or kinks. Routing and location shown on page PB-7 of this document are required in order to meet vehicle Federal US EPA and California emission and certification requirements with BJA fuel filler pipe. 4. The fuel fill, fuel fresh air line, fuel vent system and axle vent hose should be restrained in the upfit vehicle. This is necessary to avoid chaffing, fretting, rubbing, perforation, etc. which may cause failure to pipes and hoses. 5. The fuel fill pipe inlet area of the fill pipe assembly maintained at 35 degrees from ground (horizontal). 6. Both the fill, fuel vent hoses and axle vent must be routed (and supported, if needed) such that there are no sags or kinks. As viewed from the filler neck, pipes and hoses must have a min downward slope of 4º of downward slope at any location. 7. A minimum of 8.0 inches of fill hose must be maintained between the filler neck and the fuel tank as measured in an outboard direction from the tank surface (at the fill hose nipple) to the outlet end of the filler neck. 8. The fuel fresh air line should be carefully unattached from the non BJA fuel fill neck area, see PB-9, if BJA is used. 9. For BJA the fuel fill hose clamp between the fuel tank inlet check valve and the fill pipe hose is to be tightened to 3.5 Nm +/- 0.5Nm (dynamic) torque. The clamp between the fuel fill pipe inlet and the fill pipe hose is to be tightened to 5.5Nm +/-0.5 Nm (dynamic), and 2.0 Nm static torque (as assembled at the fill pipe supplier). See PB-8 10. The BJA fuel vent hose clamps are to be tightened to 2.49 Nm torque. See PB-8 11. Attach the fuel fresh air line from procedure on Line#7 to the same area of the fuel fill neck area of PN 84139591. Direct the end of the fuel fresh air line down to prevent moisture intrusion. Also secure the end of the axle vent tube in the same area facing upward. Install axle vent so the shipping attachment barb does not cause chaffing on any other components. Secure with Special Use Strap Truck PN 11509086/87 and trim off excess. See PB-10. 12. Re Install fuel tank vent pipe to fuel tank. 13. Install ground strap securely torqued dynamically to 9 (+/- 1.5) Nm or statically 7.5-10.5 Nm to the frame with bolt insuring proper grounding.

Special Applications PB 6 14. Inspect and make corrections to the fuel system to make sure there are NO Openings or unmade connections that will allow the escape of liquid fuel or fuel vapors. 15. Reinstall carryover gas cap. 16. If a RPO ZW9 truck was modified with option RPO BJA fuel filler hose, the fuel fill cap PN 23361879 may be required and available at your Chevrolet Dealer to be installed. Otherwise use the fuel fill cap that comes with the RPO ZW9 truck.

Special Applications PB 7 Chevrolet Colorado/GMC Canyon (1/T) ZW9 Option & RPO BJA non-e85 Fuel Filler/Positioning A C D (RPO-BJA) Chevrolet Colorado/GMC Canyon (1/T) ZW9 Fuel Filler Assembly (non-e85) **Scoop Location / Positioning Tolerance A 262.61 (10.39 ) +/- 25.4 C 354.17(13.95 ) +/- 13.0 D 261.75(10.31 ) +/- 13.0 **Fuel Filler Scoop location & routing within above tolerance zone are validated by GM to meet Federal requirements

Special Applications PB 8 Chevrolet Colorado/GMC Canyon (1/T) ZW9 Option & RPO BJA non-e85 Fuel Filler Torque Values 2.49 Nm 5.5 Nm 3.5 Nm P/N 84139591 Kit

Special Applications PB 9 Fuel Fresh Air Line Removal Graphic for fitting to RPO BJA Fuel Fill Pipe Remove any cap, tarp or any other UV protection prior to upfit. Upfit should protect top of fuel sending unit from UV rays rays. Carefully remove Fresh Air Line from factory fuel filler neck for later attachment to RPO BJA fuel filler asm.

Special Applications PB 10 Fuel Air Fuel Line & Axle Vent Tube Installation Graphic for RPO ZW9 / RPO BJA Install fuel vent pipe to fuel tank Use Special Use Truck strap to secure Fuel Fresh Air Line and Axle Vent Line to shown area on BJA fuel filler neck. Point end of Fuel Fresh Air Line downward. Do not collapse Fresh Air Fuel Line /Axle Vent with excessive strap force. *** The Axle Vent Line will have to be moved to this position pointing upward on both the ZW9 and BJA Fuel Fills applications. Reinstall fuel fill cap from truck with ZW9 factory fuel option or order as needed. Install ground strap securely to frame with bolt to insure proper grounding

Special Applications PB 11 Box Removed RPO ZW9 Fuel Fill System for Gasoline fueled Vehicles with Standard Fuel Filler Pipe (NON RPO BJA Fuel Fill Pipe System) Certain guidelines must be adhered to in mounting the fuel fill, fuel vent system systems, axle vent and grounding to ensure that the completed product meets the manufacturer s requirements. 1. The fuel fill, fuel vent lines and other associated components must be installed in the position shown to maintain compliance to FMVSS Regulations and other guidelines. There should be adequate clearance between them and the chassis parts under all operating conditions, including protection from road debris. Body attachment brackets must also be located such that there is adequate clearance to all fuel system components, such as the fuel lines, fuel vent lines, and the fuel level sending unit, under all operating conditions. This also applies to the axle vent system and grounding system. 2. Removal of any and all shipping fuel tank protection consisting of wraps or covers must be done prior to upfit of truck. The truck should not be exposed to the environment without these wraps or covers being in place prior to upfit. 3. The fuel fill and fuel fresh air line vent hoses must be routed (and supported, if needed such that there are no sags or kinks. routing and location shown on page PB-12 of this document are required in order to meet vehicle Federal US EPA and California emission and certification requirements with the factory installed RPO ZW9 fuel filler pipe. 4. The fuel fill, fuel fresh air line, fuel vent system, grounding wires and axle vent hose should be restrained in the upfit vehicle. This is necessary to avoid chaffing, fretting, rubbing, perforation, etc. which may cause failure to pipes and hoses. 5. The fuel fill pipe inlet area of the fill pipe assembly maintained at 35 degrees from ground (horizontal). 6. Both the fill, fuel vent hoses and axle vent must be routed (and supported, if needed) such that there are no sags or kinks. As viewed from the filler neck, pipes and hoses must have a min downward slope of 4º of downward slope at any location. 7. A minimum of 8.0 inches of fill hose must be maintained between the filler neck and the fuel tank as measured in an outboard direction from the tank surface (at the fill hose nipple) to the outlet end of the filler neck. 8. Insure the end of the fuel fresh air line points down to prevent moisture intrusion. Also secure the end of the axle vent tube in the same area facing upward on fuel fill pipe 84139578. Install axle vent so the shipping attachment barb does not cause chaffing on any other components. Secure with Special Use Strap Truck PN 11509086/87 and trim off excess. See PB-10 for typical installation. Screw on fuel fill cap part number 23361879 to complete. 9. Inspect and make corrections to the fuel system to make sure there are NO Openings or unmade connections that will allow the escape of liquid fuel or fuel vapors.

Special Applications PB 12 84139578 Fuel Filler Inlet* Location & Position Tolerances