WOC LP. Manual. Standards WOC HSE. WO Executive. Section L003 - Lifting Operations DOCUMENT NO: WOC-HSE-ST & EP Department

Similar documents
Cranes and Derricks. Objectives. Construction Safety Lecture 18

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

OVERHEAD & GANTRY CRANE / RIGGING

Note: under no circumstances will a carbon tetrachloride extinguisher be used.

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Rigging - Offshore OFFSHORE CRANES API RP 2D Operation and Maintenance of Offshore Cranes

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

LIFTING/MOBILE EQUIPMENT CRANES AND DERRICKS. Steingass Mechanical Contracting, Inc. 754 Progress Drive Medina, Ohio (330)

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

CRANE OPERATION INSTRUCTION AND GUIDELINES

Cranes. OSHA Office of Training & Education 1

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

CRANE & HOIST SAFETY PROGRAM

CRANE, HOIST AND SLING SAFETY PROGRAM

SAFETY GUIDANCE MATERIAL

2.0 Reference: 4.0 Applicability: TRF WORKS. 5.0 Responsibility :Contractors, Drivers of the equipment, shift Supervisor/Officers. 6.

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

OSHA PART 1: PREPARING FOR THE SESSION. 1. Training Booklet. 2. Why This Session Is Important. 3. Purpose and Objectives of the Session

29 CFR Ch. XVII ( Edition)

Crane & Derrick Operation Procedures for Construction

ESSENTIAL SAFETY RESOURCES

40' ' POWERED BOOM: MODE 1 40' - 126' POWERED BOOM: MODE 2

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

HYDRAULIC CRAWLER CRANE

Cranes. Range Diagram and Lifting Capacity RT TON LIFTING CAPACITY RANGE DIAGRAM 40' - 126'

Title: Lifting Operations Involving Crane or Gantry Offshore

MOBILE CRANES AND HOIST

British Columbia - Colombie-Britannique. Aerial Lift - Appareil de Levage

Series 1300 Hydraulic Crane 30 Ton Load Ratings

Chicago Crane Operators Examination Study Guide

Crane Safety Resource Guide P AGE 1

MOBILE CRANE/OVERHEAD & GANTRY CRANE/RIGGING

Cranes. Range Diagram and Lifting Capacity RT TON LIFTING CAPACITY RANGE DIAGRAM 33' - 110' BOOM

HYDRAULIC CRAWLER CRANE CK2500

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

Crane & Hoist Safety Guidelines

LOAD CHARTS TMS9000E 85% STABILITY SERIAL NUMBER

UNIVERSITY OF TOLEDO

MOBILE CRANES ONSHORE PROGRAM

Series 1400A Hydraulic Crane 33 Ton

Range Diagram and Lifting Capacity RT230. Cranes 30 TON LIFTING CAPACITY RANGE DIAGRAM 30' - 94' BOOM REDUCTION IN MAIN BOOM CAPACITY

Series 1400 Hydraulic Crane 33 Ton Load Ratings

Range Diagram and Lifting Capacity RT665. Cranes 65 TON LIFTING CAPACITY RANGE DIAGRAM 36' - 111' BOOM REDUCTION IN MAIN BOOM CAPACITY

Notice. Overhead Crane Safety and Inspection Requirements. Daily Operator Inspection Reuirements. Daily Operator Inspection Requirements

Occupational Safety and Health Admin., Labor

Chapter 22 Mobile Cranes

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Document Number: HSE May 1, 2014 LADDERS. Author: A Holland. Rev Date Rev # Description Revised By 05/01/14 1 Reformat A.

T 775. truck crane 75 ton capacity. range diagram & lifting capacities. Range Diagram (40' - 126' boom)

Humma UV35-25 LOAD CHARTS. Revision 9. A division of Westfield Nominees. Contains the following load charts: Main winch (Standard & Stationary)

LINK-BELT MODEL HTC-8675LB - 75 TON CAPACITY 48 7" (.80m) 41 0" /8" (3.52m) /16" (2.02m) /4" (.34m) 25" 11 0" (.

Range Diagram and Lifting Capacity T Cranes RANGE DIAGRAM BOOM

Series 1300A Hydraulic Crane 30 Ton Load Ratings

RELIANT HOLDINGS LTD AND ITS AFFILIATES Safety Management System. Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 5

Responsible Unit: Facilities Management

truck crane 140 tons link-belt htc-3140lb BOOM LENGTHS: 42 to 195 ft JIB LENGTHS: 38 to 109 ft JIB OFFSETS:

Ryko Solutions, Inc. Crane and Jib Safety Program

HEALTH AND SAFETY MANUAL

Liftcrane Boom Capacities 999 SERIES 2. Manitowoc Cranes, Inc.

LINK-BELT MODEL HTC TON CAPACITY RANGE DIAGRAM. LIFTING CHARTS - Hydraulic Truck Cranes

ROUGH TERRAIN VEHICLES

Lifting Capacities Telescopic Boom All Terrain Crane ATC ton (118 metric ton) Link Belt

Technical data Hydraulic crawler crane HS 895 HD

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

CRANE TESTING REQUIREMENTS FOR PERFORMANCE TESTS

For sales use only CRANE RATING MANUAL. RTC-8090 Series II 5 - Section Boom. Not for crane operations SERIAL NUMBER: XXXX-XXXX

Range Diagram and Lifting Capacity T Cranes. View thousands of Crane Specifications on FreeCraneSpecs.com RANGE DIAGRAM BOOM

CRANE RATING MANUAL HTC

CRANE RATING MANUAL HTC

RT555 TEREX. rough terrain crane 55 ton capacity. range diagram & lifting capacities. Range Diagram ( boom) HOOK BLOCK WEIGHTS

Liftcrane Boom Capacities 2250 SERIES 3

PROCEDURE. Revision: 1. Author: D Steel CONTENTS

While handling materials, employees must abide by the following requirements:

RTC 8050 Series II. 50 ton (45.36 metric tons) Telescopic Boom Rough Terrain Crane

Glossary of Crane and Rigging Terms

4600 SERIES 3 RINGER SERIES 2. Manitowoc Cranes, Inc. Manitowoc, Wisconsin U.S.A.

Technical data Hydraulic crawler crane HS 885 HD

Appendix D Glossary of Common Crane Terms

Cranes. Range Diagram and Lifting Capacity RT345-1XL 45 TON LIFTING CAPACITY RANGE DIAGRAM 33.75' - 105' BOOM

Technical data Hydraulic crawler crane HS 875 HD

Powered Industrial Vehicle Policy

Technical data Hydraulic crawler crane HS 835 HD

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Technical data Hydraulic crawler crane HS 845 HD

SECTION 14: AERIAL LIFT PROGRAM

Moving materials: Crane and hoist safety

National N-55. LOAD CHARTS for Use With WRITTEN EXAMINATIONS

Safe Operating Practices & Maintenance Manual

HOISTING APPARATUS Inspection Guidelines

The Sanford Underground Research Facility Revised: (07/31/2018) CRANES AND HOISTS Supersedes: (03/23/11)

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

Chapter 1 Safety and Operation

Liftcrane Boom Capacities Boom No. 58 HL 332,000 lb Crane Counterweight 120,000 lb Carbody Counterweight 360 Degree Rating SERIES 3

CPCS renewal test factsheet

Construction Machine HS 8300 HD. enus HS

Installation and Maintenance Manual for SPANCO A Series Aluminum Gantry Cranes

Transcription:

/31... ' \.4., _ 4. if IL C WOC LP & EP Department WOC HSE Standards Manual DOCUMENT NO: WOC-HSE-ST-0001 Section L003 - Lifting Operations REV ISSUE PREPARED BY REVIEWED BY APPROVED BY ISSUE DATE * NaviA,&...) ' 11 :, NO& fa 1141 WO Executive 0 Issued for Use W. Mc tosh LP & EP Manager Vice President June 2009 Operations

A OW A, -...- 4 OIL Lifting Operations WOC-HSE-ST-0001 0 June 2009 2 of 12 PURPOSE To provide Standard for safe lifting operation to protect safety of personnel, equipment, facility, and environment while lifting loads by crane, derrick, or other lifting machinery at offshore and onshore. [See Cranes] SCOPE This Standard applies to lifting activities including loading/unloading cargo, other lift handling of persons within WAHA Facilities. All personnel involved in the lifting activities shall comply with the requirement set forth in this Standard. This procedure excludes Forklift Operations. ROLES AND RESPONSIBILITIES The Site Leader of the lifting equipment is accountable to ensure that all requirements set forth in this Standard regarding to the compliance of lifting equipment and operator has been fulfilled prior to lifting load or personnel. The crane operator is responsible to ensure that the lifting operation follow the requirement set forth in this Standard. Under special circumstances, an equivalent Libyan or International operating standard could be applied upon department manager and LP & EP Manager approval. Any deviation from this Standard requires a Risk Assessment and approval by management. HAZARDS COMMON TO MOST LIFTING CRANE OPERATION The most common hazards found around crane and derrick incidents are: power line contact, overloading, un-determined load weight, outrigger failure (soft ground and structural), two-blocking, pinch point, unguarded moving parts, unsafe hooks,

- 1_0 1111 7$ 11peri.,,.,. ALM/.36,,,...L_ --- 4 0, c * Lifting Operations WOC-HSE-ST-0001 0 June 2009 3 of 12 hook caught on, obstruction of vision, sheave-caused cable damage, cable kinking, side pull, boom buckling (from striking objects), access to cabs, bridges, and/or runways, control confusion (non-uniform location), turntable failure, removable or extendible counterweight systems. OPERATOR REQUIREMENTS The Site Leader shall assign a designated person to operate, maintain, repair and inspect all hoisting machinery and rigging equipment prior to each use, and during use, to make sure it is in safe operating condition. The crane operator, who is in charge of operating the crane, must meet all requirements for certification and demonstrate competency skill and acknowledge for operating the Crane and meet minimum requirements for crane operators. Riggers, signallers, and others who involve with lifting work by crane, shall have rigger qualification and certification. Persons known to have defective uncorrected eyesight or hearing, or to be suffering from heart disease, epilepsy, or similar ailments that may suddenly incapacitate the person, shall not be permitted to operate a crane, winch or other power-operated cargo handling apparatus. Annual or when required Refractory Check shall be conducted for Crane Operator. CRANE REQUIREMENTS All cranes shall have valid certificate recognized under industry standards.

y Milk w(4,114,- +. ' 4 Or ' - c Lifting Operations WOC-HSE-ST-0001 0 June 2009 4 of 12 Cranes shall be equipped with the following: Manufacturer approved load chart mounted in the cab, which is correct for the counterweight, boom and jib supplied, Counterweight as specified by the manufacturer for mobile crane. A serviceable, approved fire extinguisher, which is readily accessible to the operator. A serviceable and adjustable seat. Guards for personal protection over all exposed moving parts, which are considered hazardous under normal operating conditions. Boom angle indicator A device to determine that the crane is level for onshore mobile crane. 30.5 meters, non-conducting tape measure. An audible horn or bell-signalling device. Safety Devices: anti two block, boom stopper, swing brake, parking break. A logbook (running hours, maintenance) A maintenance and inspection program for the crane and boom shall be established and followed. The crane shall be supplied with wire ropes equivalent in size, grade, and construction to those recommended by the crane manufacturer. The weight and capacity of crane shall be permanently and legibly marked on the blocks, equalizer beam, dragline, clamshell, concrete buckets, and any other accessories that contribute to the load, handled by the crane. Length and serial number are permanently and legibly marked on all boom and jib sections. Neither lifting machinery (crane or derrick) nor rigging equipment having a visible or known defect that affects safe operation shall be used.

4 1 9', c., Lifting Operations WOC-HSE-ST-0001 0 June 2009 5 of 12 All exhaust pipes shall be guarded or insulated in areas where contact by employees is possible in the performance of normal duties. Operator's cabin: Operating controls: The cabin, controls and mechanism of the equipment shall be so arranged that the operator have a clear view of the load or signalman, when one is used. Any deviation to the above condition, the following options shall be followed: o a single band radio shall be provided for communication between signalman and operator. o a series signalman system shall be in place. Only one dedicated signalman who is visible to the Crane Operator. Cabin glass shall be safety plate glass or equivalent. Cranes with missing, broken, cracked, scratched, or dirty glass (or equivalent) shall be rectified immediately. Cabin glass that impairs operator visibility shall not be used. Clothing, tools and equipment shall be stored so as not to interfere with access, operation, and the operator's view. All control mechanisms such as: operating controls, braking, locking and manoeuvres (radius indicator) shall be operable, properly maintained and in safe condition. Those operating controls shall be clearly marked, or a chart indicating their function shall be posted at the operator's position. Wind-indicating devices shall be available. In case of offshore crane, windindicating devices could be located at radio room. For cranes located on marine vessel, Pitching and Rolling indicating devices shall be available. Cranes shall be operated only with the specified type and amount of ballast or counterweights. Ballast or counterweight shall be located and secured only as provided in the manufacturer's specifications, which shall be available. Foot pedals shall have a non-skid surface.

OLM %LEW 6 -...1- -,-.- 4 OIL Lifting Operations WOC-HSE-ST-0001 0 June 2009 6 of 12 Access, ladders, stairways, stanchions, grab irons, foot steps or equivalent means shall be provided as necessary to ensure safe access to foot-walks, cabin platforms, the cabin and any portion of the superstructure which employees must reach: Foot walks shall be of rigid construction; Fix Ladder shall be equipped with cage. Stairways on cranes shall be equipped with rigid handrails. If any position of employee on the ladder or stairway could be struck by crane's manoeuvre, a prominent warning sign shall be posted at the foot of the ladder or stairway. A system of communication (such as a buzzer or bell) shall be established and maintained between the foot of the ladder or stairway and the operator's cabin. Outriggers shall be used according to the manufacturer's specifications or design data, which shall be available. Floats, when used, shall be securely attached to the outriggers. Wood blocks or other support shall be of sufficient size to support the outrigger, free of defects that may affect safety and of sufficient width and length to prevent the crane from shifting or toppling under load. Crane operator is responsible to ensure that outriggers are properly seated and the cabin position is levelled. Engine exhaust gases shall be discharged away from the normal position of crane operating personnel. Engine exhaust shall be equipped with a spark arresting type silencer. Electrical equipment shall be located or enclosed that live parts will not be exposed to accidental contact. Designated persons may work on energized equipment only if necessary during inspection, maintenance, or repair. At least three full turns of rope shall remain on un-grooved drums, and two turns on grooved drums, under all operating conditions. Wire rope shall be secured to drums by wedges and clamps or equivalent means. Fibre rope fastenings are prohibited. Mobile crane booms being assembled or disassembled on the ground with or without the support of the boom harness/cradle shall be blocked to prevent dropping of the boom or boom sections.

4110V -, 4, - vr: ot,,,,,,_,+ ci Lifting Operations WOC-HSE-ST-0001 0 June 2009 7 of 12 Brakes Each independent hoisting unit of a crane shall be equipped with at least one holding brake, applies directly to the motor shaft or gear train. Each independent hoisting unit of a crane, except worm geared hoists, the angle of worm is to prevent the load from accelerating in the lowering direction, shall, in addition to a holding brake, be equipped with a controlled braking means to control lowering speeds. Holding brakes for hoist units shall have not less than the required percentage of the rated load hoisting torque at the point where the brake is applied. All power control braking means shall be capable of maintaining safe lowering speeds of rated loads. 7. DERRICKS Derrick operations shall be directed only by the individual specifically designated for that purpose. Maximum load shall be 90% of rating of derrick SWL. For permanently installed derrick durable and clearly legible rating chart must be provided with each derrick and securely affix where it is Visible to personnel responsible for the safe operation of the equipment. Charts shall include manufacturer's approve load rating, specific length of component on which the load ratings are based, required parts for hoist reeving. For non-permanent installation, the manufacturer must provide sufficient information from which capacity chart can be prepared for the particular installation. The capacity charts must be located at the derrick and the job site office.

--I N. -,., *.,....4, '1'94 oil coe Lifting Operations WOC-HSE-ST-0001 0 June 2009 8 of 12 8. CRANE LIFTING OPERATION This lifting operation policy is applied for Pedestal or Mobile crane with hydraulic or mechanical boom or Derrick. 8.1. Critical Lifting No crane will be loaded beyond its rate capacity. A Critical Crane Lifting Plan and Permit to Work shall be made for the following conditions: At any time during a lift, the load is 80% of the crane SWL will be not exceeded. Irregular shape e.g. concrete, plate, pipe, rods, etc. Valuable material (see high risk level cost). Hazardous material Weather (maximum wind speed 25 knots) Rolling and Pitching Any time such as a lifting crossing the process plant, accommodation, etc. For more than 80 ton mobile crane (on shore) When the crane operator has no experience to lift a specific load. For complex lifting, JSA shall be thoroughly analyzed (e.g. tandem lifting) Crawler crane travels with load. At any time the Site Leader feels there is a requirement. No lifting shall be conducted when wind speed >36 knots. Only emergency lifting (safety of life) can be proceed with multi discipline risk assessment and site leader approval. Conduct pre-inspection prior to lifting at the beginning of the day for crane access ladders, walkways and hatches, pre-start checks, housekeeping of machine, structure, cabin, and personal belonging, prime movers, over-hoist limits/cut-outs, rated capacity indicators, emergency load release and gross overload protection system, emergency engine stops, safety equipment, fuel. An SOP for this inspection shall be provided. The operator shall refer to Crane Operation checklist prior to starting the crane. Hand signals to crane and derrick operators shall be those prescribed by the applicable API standard for offshore and ANSI standard for onshore use. An illustration of the signals shall be posted at the job site and visibly maintained.

, '94 0, c- HSE Standards Manual Lifting Operations WOC-HSE-ST-0001 0 June 2009 9 of 12 The crane operator is to make himself aware of all those personnel designated as Rigger and Signalman. Designated signalman shall be equipped with specific sign on his uniform for each lifting. The crane operator, signalman, and rigger shall have a designated separate radio channel available to them during all lifting operations. Maintain visual contact with the signalman. Lifting operations must cease if visual contact is lost. These operations can only recommence when a clear line of vision is re-established. Crane operator shall only respond to clear hand or radio signals given by the signalman, unless in emergency situation which requires an emergency stop. Load must be vertically lifted at any time. 8.2. Workplace and Housekeeping: 8.2.1. All employees shall be kept clear of loads about to be lifted and of suspended loads. 8.2.2. Accessible areas within the swing radius of the rear of the rotating superstructure of the crane or any hoisting machinery shall be free and signed to prevent any personnel from being struck or crushed by the crane. 8.2.3. Put cargo and material in the designated place. Do not obstruct any access and egress. Cargo handling operations shall not be carried on when noise-producing, maintenance, construction or repair work interferes with the communication of warnings or instructions. Cargo of hazardous materials shall be handled and lifted in accordance with materials safety data sheet (MSDS) and/or packaging rules. All hazardous cargo shall be slung and secured so that neither the draft nor individual packages can fall as a result of tipping the draft or slacking of the supporting gear. All chemical or oil drums shall be lifted in a certified steel half-height container where possible, skips, tote tank, or cargo net which will prevent drums from falling. Pallets are purely used for allowing forklift truck to transport cargo along flat solid ground/deck, NOT FOR CRANE LIFT.

4 4. 4'4 0n. coo -., Lifting Operations WOC-HSE-ST-0001 0 June 2009 10 of 12 Pre-lift safety meeting shall be attended by the crane or derrick operator, signal person(s). This meeting shall be held prior to lifting at each new work location, and shall be repeated for any personnel involved and newly assigned to the operation. The Site Leader or other authorized person shall post operating instructions for high wind conditions in the operator's cabin of each crane Night Lifting can be performed with sufficient illumination (300 flux). 8.3. Attaching the load 8.3.1. Use the proper sling size and type 8.3.2. The sliding choke sling shall not be used. Double wrap type may be used with shackle to secure the load. 8.3.3. The load shall be attached to the hook in accordance with API rigging requirement. 8.3.4. The operator shall aware that the hook load is within the crane's applicable static or dynamic rated load at the radius at which the load is to be lifted. 8.4. Moving the load 8.4.1. The load shall be well secured and properly balanced in the sling or lifting device before it is lifted more than a few inches. 8.4.2. Before starting to hoist, the following conditions shall be noted: Hoist rope shall not be kinked. Multiple part lines shall not be twisted around each other. The hook shall be brought over the load in such a manner to prevent swinging. 8.4.3. During hoisting, care shall be taken that: There is no sudden acceleration or deceleration of the moving load. Load does not contact any obstructions. 8.4.4. A derrick shall not be used for side loading except approved by Site Leader. 8.4.5. No hoisting, lowering, or swinging shall be done while anyone is on the load or hook. 8.4.6. The operator should avoid carrying loads over people. 8.4.7. Neither the load nor boom shall be lowered below the point where less than two full wraps of rope remain on their respective drums.

4101k AitAltj i'l ZL C Lifting Operations WOC-HSE-ST-0001 0 June 2009 11 of 12 8.4.8. When rotating a derrick, sudden starts and stops shall be avoided. Rotational speed shall be such that the load does not swing out beyond the radius at which it can be controlled. 8.4.9. Boom and hoisting rope systems shall not be twisted. 8.5. Holding the load 8.5.1. The operator shall not be allowed to leave his position at the controls while the load is suspended; 8.5.2. If the load must remain suspended for any considerable length of time, a dog, or pawl and ratchet, or other equivalent means, rather than the brake alone, shall be used to hold the load. 8.6. Use of winch heads 8.6.1. Ropes shall not be handled on a winch head without the knowledge of the operator; 8.6.2. While a winch head is being used, the operator shall be within convenient reach of the power unit control lever; 8.6.3. Dogs, pawls, or other positive holding mechanism on the hoist shall be engaged. When not in use, the derrick boom shall: Be laid down; Be secured to a stationary member, as nearly under the head as possible, by attachment of a sling to the load block; or Be hoisted to a vertical position and secured to the mast. 9. REFERENCE 29CFR1919 "Gear Certification" 29 CFR 1926.550 "Crane and Derricks" 29 CFR 1926.251 "Rigging Equipment for Material Handling" ANSI B15.1 (1958 Revision) "Safety Code for Mechanical Power Transmission Apparatus" ANSI B30.5 (1968) "American Standard Safety Code for Crawler, Locomotive, and Truck Crane"

-4:1 it 4, - 9.4 OIL 004.- Lifting Operations WOC-HSE-ST-0001 0 June 2009 12 of 12 ANSI B30.6 (1969) ANSI B30.9 (1971) ASME/ANSI B56.7 1987 API RP 2C API RP 2D "Safety Code for Derricks" "American National Safety Standard for Slings" "Safety Standard for Industrial Crane Truck" "Specification for Offshore Crane" "Recommended Practice for Operation and Maintenance of Offshore Cranes"