Friedens d lighting Sponsor Saint Charles Project No. B18-000009 Project Type Safety TOTAL FUNING Total County Sponsor Federal $1,100,000 $880,000 $220,000 $0 Project escription Friedens oad is a 4 lane roadway with a speed limit of 40 mph. Friedens oad does not have any streetlights along the corridor from MO oute 94 to S. iver d except at the entrances to subdivisions. The average measured light levels along Friedens oad are 0.1 to 0.2 footcandles. New roads and developments within the City are required to meet a minimum of 0.4 footcandles along the roadway. The City of Saint Charles is requesting County funds for new street lighting along Friedens oad. Providing streetlights along Friedens will increase safety along the corridor for vehicular drivers as well as pedestrians/bicyclists. According to the Crash Modification Factors Clearinghouse, adding lighting has the potential to reduce 28% of the nighttime crashes along Friedens oad. Friedens oad has sidewalks along the south side from Summitview rive to the Katy Trail and along the north side from Floyd rive to 1,000 feet west of Fairground d. The area around Friedens oad is mostly residential with a large walking community. Since there is access to the Katy Trail, a mid-block crossing is being installed between Montclair Manor rive and Prevot rive. The traffic volumes and speeds at night and during dusk/dawn increase the risk of collisions with pedestrian/bicyclists. At 40 mph, any collision between vehicles and pedestrians/bicyclists will result in serious injuries or fatalities. The City will fully fund the pedestrian lighting and any decorative lighting features. The City is requesting funds for only the standard street lighting to increase safety for both vehicular drivers and pedestrians/bicyclists.
FUNING FO IMPOVEMENTS - Friedens oad Lighting Safety Improvements County Sponsor Federal Other Total esign $80,000.00 $20,000.00 $0.00 $0.00 $100,000.00 Utility elocations $0.00 $0.00 $0.00 $0.00 $0.00 ight-of-way $0.00 $0.00 $0.00 $0.00 $0.00 Construction $800,000.00 $200,000.00 $0.00 $0.00 $1,000,000.00 TOTAL $880,000.00 $220,000.00 $0.00 $0.00 $1,100,000.00 PECENT (%) 80.00% 20.00% 0.00% 0.00% 100.00% FINANCIAL PLAN esign County Sponsor Federal Other Total 2019 $80,000.00 $20,000.00 $100,000.00 2020 $0.00 2021 $0.00 Utility elocations County Sponsor Federal Other Total 2019 $0.00 2020 $0.00 2021 $0.00 ight-of-way County Sponsor Federal Other Total 2019 $0.00 2020 $0.00 2021 $0.00 Construction County Sponsor Federal Other Total 2019 $0.00 2020 $800,000.00 $200,000.00 $1,000,000.00 2021 $0.00
Friedens oad Lighting Safety Improvements Y LN A F S P LE AL S N OU G FA I ENT E TIME C BILOX I BA ST OWN O E LL E MI SA N VIS TA AK IO UT ES TN I VE S PL E UZ AT T A SH SP EY E PL U PL Y WA C PL ON KS JA C B E N OL CH GE A H AN SK ET O E W S FIFTH ST AK OK I 70 BA O S EW OO ES H N SH E B T CA FA I WE G EW VI IT M I A SS SA ST VE A E NZ FO ST E LS IL CH E L E VA LLE VIE Y W BA B A A BE VE LY ON TE E Y SH A ON BO EL N YC FO EC WO N OL LIN C T L S IN E W SH O S 94 W AY HI GH M SU LN LN KU H YC LA K S N LL HI TL US EN OC YL NE E LL FO N HI A P FL EU HLA HO TO ES U BL NE HIG I 70 E Y LN VIE W CT US IN IST TE O PA EL A CLE A ESTEL IN G CH T Y WA O EP GE I G I LB TA B CT PA M CA WIL LO NT F OA K AI G OU O HE AY LW AI TT CA IVY G A IS TH N E NN SO U A NC K IC W S ES P LN WOO LAWN B O S O NE ME SL MO ICK I AL PK W Y M G HI S E A OL G HI AY HW 94 AY HW S AN SH LN K OO VE L CO LN B CO NN LY NN LY H ZUMBE G EA LE VE 94 VE TE E OL CO T U CT CT ISCLAIME: This map is based on information maintained by the City of St. Charles, Missouri. The City does not warrant or guarantee the accuracy or completeness of the information shown. It is the responsibility of the user of this information to verify independently its accuracy and completeness. By using this information, the user waives any and all claims against the City of St. Charles, Missouri, arising from such use. W NOT TO SCALE ATE: 3/7/2018
Project Sponsor: Project Title: ate: Estimate of Project Costs City of Saint Charles Friedens oad Lighting Safety Improvements 5/29/2018 Participating Items Pay Item escription Quantity Unit Unit Price Total Light Pole, 40 FT 56 EA $2,300.00 $128,800.00 Bracket Arm, 10 FT 56 EA $725.00 $40,600.00 Pole Foundation (40 FT) 56 EA $1,315.00 $73,640.00 Luminaire, 400w, LE 56 EA $385.00 $21,560.00 Conduit, Pushed 8,500 LF $27.00 $229,500.00 Pullbox, Performed, Class 1 90 EA $960.00 $86,400.00 Cabling 15,000 LF $2.50 $37,500.00 Powersupply/Controller 4 EA $17,000.00 $68,000.00 Subtotal Mobilization Traffic Control PE Construction Testing Contingency TOTAL $686,000.00 $70,000.00 $30,000.00 $100,000.00 $14,000.00 $200,000.00 $1,100,000.00 Non-Participating Items (City Funds Only) Pay Item escription Quantity Unit Unit Price Total Light Pole, 40 FT - Ornamental 56 EA $5,000.00 $280,000.00 Bracket Arm, 10 FT - Ornamental 56 EA $720.00 $40,320.00 Luminaire, 100w, LE - Ornamenta 73 EA $1,220.00 $89,060.00 Luminaire, 400w, LE - Ornamenta 56 EA $520.00 $29,120.00 Light Pole, 15 FT - Ornamental 25 EA $3,250.00 $81,250.00 Bracket Arm, 2 FT - Ornamental 73 EA $580.00 $42,340.00 Pole Foundation (15 FT) 25 EA $770.00 $19,250.00 Subtotal Mobilization Traffic Control PE Construction Testing Contingency NON-PATICIPATING TOTAL CITY POJECT TOTAL $562,090.00 $60,000.00 $20,000.00 $80,000.00 $10,910.00 $167,000.00 $900,000.00 $2,000,000.00
Friedens Lighting - 30 May 2018 18 Task Name Planned Start ate Planned Finish ate Planned uration Q3 '18 1 Planning 10/1/2018 2/22/2019 105 days 2 Prepare and Approve Project Charter 10/1/2018 10/26/2018 20 days 3 EOIs and Short-List 10/29/2018 11/9/2018 10 days 4 FPs and reviews 11/12/2018 12/7/2018 20 days 5 Consultant Selection with Council Notice 12/10/2018 12/21/2018 10 days 6 Scope and negotiate contract 12/24/2018 1/4/2019 10 days 7 Board/Council: Contract final approval and signatures 1/7/2019 2/15/2019 30 days 8 esign Notice to Proceed and Kick-Off Mtg 2/18/2019 2/22/2019 5 days 9 esign 2/25/2019 3/20/2020 280 days 10 ata Sharing 2/25/2019 3/1/2019 5 days 11 Site Assessment 2/25/2019 3/1/2019 5 days 12 Project Management Plan (PMP) 2/25/2019 3/1/2019 5 days 13 Alternatives Analysis - Concept Plans 3/4/2019 3/29/2019 20 days 14 AA and Concept Plan eview 4/1/2019 4/12/2019 10 days 15 Board/Committee Concept Approval 4/15/2019 4/26/2019 10 days 16 Survey 2/25/2019 5/17/2019 60 days 17 Title eports 2/25/2019 3/15/2019 15 days 18 Survey Notice 4/1/2019 4/5/2019 5 days 19 Field Survey and Submittal 4/8/2019 5/3/2019 20 days 20 Survey eview 5/6/2019 5/10/2019 5 days 21 Survey Approval 5/13/2019 5/17/2019 5 days 22 Preliminary Plans 5/20/2019 7/26/2019 50 days 23 Preliminary Plan esign 5/20/2019 7/11/2019 39 days 24 Preliminary Plan Submittal 7/15/2019 7/15/2019 1 day 25 Preliminary Plan eview 7/16/2019 7/22/2019 5 days 26 Field Check #1 7/16/2019 7/22/2019 5 days 27 Preliminary Plan Approval 7/23/2019 7/26/2019 4 days 28 Final PS&E 7/29/2019 12/20/2019 105 days 29 Pre-Final PS&E esign 7/29/2019 9/20/2019 40 days 30 Pre-Final PS&E eview(s) 9/23/2019 10/25/2019 25 days 31 Pre-Final PS&E QA/QC Check 9/23/2019 10/18/2019 20 days 32 Field Check #2 10/21/2019 10/25/2019 5 days 33 PS&E Adjustments (Utility/OW) and submittals 10/28/2019 11/22/2019 20 days 34 Field Check #3 11/25/2019 11/25/2019 1 day 35 Final PS&E eview and Approval 11/26/2019 12/20/2019 19 days 36 PS&E and OW Package Prep 12/23/2019 12/27/2019 5 days 37 esign Buffer 12/30/2019 2/21/2020 40 days 38 Bidding 2/24/2020 3/20/2020 20 days 39 Utility Coordination 5/6/2019 2/24/2020 211 days 40 Utility Survey Location Verification 5/6/2019 5/31/2019 20 days 41 Preliminary Utility Plan of Adjustment 7/16/2019 9/24/2019 51 days 42 Utility Agency eview of Project Preliminary Plans 7/16/2019 8/5/2019 15 days 43 Utility Coordination Meeting #1 8/6/2019 8/6/2019 1 day 44 Preliminary Utility Plans of Adustment 8/7/2019 9/17/2019 30 days 45 Preliminary Utility Plan of Adjustment eview and Approval 9/18/2019 9/24/2019 5 days 46 Utility elocation Plans 9/25/2019 11/27/2019 46 days 47 Utility elocation Plan esign 9/25/2019 11/5/2019 30 days 48 Utility Coordination Meeting #2 11/20/2019 11/20/2019 1 day 49 Utility elocation Plan eview and Approval 11/21/2019 11/27/2019 5 days 50 Utility elocation Agreements 11/28/2019 12/25/2019 20 days 51 elocation Scheduling 12/26/2019 12/30/2019 3 days 52 Utility elocations 12/31/2019 2/24/2020 40 days 53 Construction 3/23/2020 2/5/2021 230 days 54 Capability, Experience, eference, Bid, and Schedule Checks 3/23/2020 3/27/2020 5 days 55 Council Approval of Construction Contract 3/30/2020 5/8/2020 30 days 56 Construction Contract ocuments 5/11/2020 5/15/2020 5 days 57 Preconstruction Meeting and NTP 5/18/2020 5/18/2020 1 day 58 Contractor Tasks/Schedule 5/19/2020 11/2/2020 120 days 59 Construction Buffer 11/3/2020 12/25/2020 39 days 60 Substantial Completion 12/28/2020 12/28/2020 1 day 61 Final Completion 12/28/2020 2/5/2021 30 days 62 Project Closeout 2/8/2021 3/19/2021 30 days 63 Final Submittals 2/8/2021 2/19/2021 10 days 64 Final Payment and etainage elease 2/22/2021 3/5/2021 10 days 65 Asset Management Updates and O&M equirements 2/22/2021 3/5/2021 10 days 66 File eview and Closeout 3/8/2021 3/19/2021 10 days 67 Variable Project Phases 10/1/2018 5/25/2020 431 days 68 Community elations 9/24/2019 5/25/2020 175 days 69 Public Meeting Prep 9/24/2019 9/30/2019 5 days 70 Public Meeting - Preliminary Plans 10/1/2019 10/1/2019 1 day 71 Public Meeting Feedback and Eval 10/2/2019 10/8/2019 5 days 72 Construction Notice (CMBs/oor Hangers/Other) 5/19/2020 5/25/2020 5 days 73 Outside Funding - County 10/1/2018 2/7/2020 355 days 74 Agency Approval of Funding Agreement 10/1/2018 12/31/2018 66 days 75 Agency review and approval of Preliminary Plans 7/16/2019 8/5/2019 15 days 76 Agency intermediate reviews of Pre-Final PS&E 9/23/2019 9/27/2019 5 days 77 Agency review and approval of Final PS&E with obligation of funds and authority to bid 12/30/2019 2/7/2020 30 days Page 1
Average aily Traffic Summary - Friedens oad 2018 Existing AT Friedens oad South of Highway 94 Traffic Counts 5/18/2018 Time EB lane 1 EB lane 2 WB lane 1 WB lane 2 [00:00-01:00] 15 8 14 15 [01:00-02:00] 7 4 5 5 [02:00-03:00] 2 2 5 2 [03:00-04:00] 2 0 2 2 [04:00-05:00] 10 0 4 2 [05:00-06:00] 8 6 10 9 [06:00-07:00] 32 32 52 46 [07:00-08:00] 61 73 126 101 [08:00-09:00] 70 61 132 80 [09:00-10:00] 82 53 82 85 [10:00-11:00] 77 61 92 94 [11:00-12:00] 102 83 92 89 [12:00-13:00] 112 84 93 99 [13:00-14:00] 82 85 105 88 [14:00-15:00] 94 92 126 86 [15:00-16:00] 107 117 145 116 [16:00-17:00] 140 143 155 189 [17:00-18:00] 118 140 175 174 [18:00-19:00] 131 136 144 140 [19:00-20:00] 106 97 91 94 [20:00-21:00] 82 91 78 67 [21:00-22:00] 68 59 66 64 [22:00-23:00] 34 25 31 23 [23:00-00:00] 14 8 14 14 Subtotal 1,556 1,460 1,839 1,684 2018 Existing AT 6,539 2021 Projected AT 6,838 AT Projections assume 15% growth in traffic volumes each year
FIEENS OA LIGHTING SAFETY IMPOVEMENTS NIGHTTIME CASH SUMMAY 2014-2016 EPOT # ATE ONHWAY FOMHWAY FATALITY INCAPACI POPETY AMAGE 14000334 1/15/2014 21:51 ZUMBEHL S OL HIGHWAY 94 0 1 1 14002561 4/8/2014 20:01 FIEENS S FIST CAPITOL 0 0 1 14004438 6/8/2014 23:50 S FIST CAPITOL FIEENS 0 0 1 14007171 9/6/2014 1:08 ZUMBEHL S FIST CAPITOL 0 0 1 14008645 10/23/2014 19:27 S HWY 94 ZUMBEHL 0 0 1 14008742 10/26/2014 21:13 S FIST CAPITOL FIEENS 0 0 1 14008892 10/31/2014 22:20 S FIST CAPITOL ZUMBEHL 0 0 1 14010232 12/20/2014 4:15 FIEENS FIST CAPITOL 0 0 1 14010290 12/22/2014 6:20 ZUMBEHL S OL HIGHWAY 94 0 0 1 14010469 12/30/2014 21:00 S FIST CAPITOL ZUMBEHL 0 0 1 15000040 1/2/2015 19:28 ZUMBEHL S OL HIGHWAY 94 0 0 1 15000077 1/3/2015 20:24 S FIST CAPITOL FIEENS 0 0 1 15001323 2/17/2015 19:45 ZUMBEHL S FIST CAPITOL 0 0 1 15001906 3/7/2015 21:12 S FIST CAPITOL ZUMBEHL 0 0 1 15002018 3/11/2015 19:06 ZUMBEHL S FIST CAPITOL 0 0 1 15002045 3/12/2015 21:15 ZUMBEHL S FIST CAPITOL 0 0 1 15003560 4/25/2015 22:16 S FIST CAPITOL FIEENS 0 0 1 15003870 5/5/2015 20:46 S FIST CAPITOL FIEENS 0 0 1 15003980 5/8/2015 21:22 S FIST CAPITOL FIEENS 0 0 1 15004122 5/13/2015 0:08 S FIST CAPITOL FIEENS 0 0 1 15004154 5/14/2015 23:56 S FIST CAPITOL FIEENS 0 0 2 15004694 5/29/2015 2:31 S FIST CAPITOL FIEENS 0 0 1 15004739 5/31/2015 18:11 S FIST CAPITOL ZUMBEHL 0 0 1 15004764 6/1/2015 19:53 S FIST CAPITOL ZUMBEHL 0 0 1 15004822 6/3/2015 0:12 S FIST CAPITOL ZUMBEHL 0 0 1 15005026 6/9/2015 23:28 S FIST CAPITOL FIEENS 0 0 1 15005515 6/25/2015 0:26 S FIST CAPITOL ZUMBEHL 0 0 1 15005852 7/7/2015 18:06 S FIST CAPITOL FIEENS 0 0 1 15006088 7/16/2015 6:52 S FIST CAPITOL ZUMBEHL 0 0 1 15006494 7/28/2015 21:15 S FIST CAPITOL ZUMBEHL 0 0 2 15007534 9/1/2015 3:03 S FIST CAPITOL ZUMBEHL 0 0 1 15008564 10/5/2015 23:42 S FIST CAPITOL ZUMBEHL 0 0 1 15009042 10/21/2015 3:57 S FIST CAPITOL FIEENS 0 0 1 15009747 11/13/2015 3:37 S FIST CAPITOL ZUMBEHL 0 0 1 15009838 11/16/2015 20:12 ZUMBEHL S FIST CAPITOL 0 0 1 15009964 11/21/2015 18:52 S FIST CAPITOL ZUMBEHL 0 0 1 15010090 11/26/2015 4:04 FIEENS CHANLE WAY 0 0 2 15010751 12/18/2015 20:01 S FIST CAPITOL ZUMBEHL 0 0 1 15010782 12/19/2015 23:23 AENA PKWY FIEENS 0 0 1 15010957 12/26/2015 21:58 FIEENS FO LN 0 0 1 15011000 12/28/2015 BUNING TEE LN FIEENS 0 0 1 16000369 1/14/2016 S FIST CAPITOL FIEENS 0 0 1 16001046 2/5/2016 ZUMBEHL S FIST CAPITOL 0 0 1 16001090 2/6/2016 S IVE FIEENS 0 0 1 16001376 2/16/2016 S FIST CAPITOL FIEENS 0 0 1 16002955 4/6/2016 ZUMBEHL S FIST CAPITOL 0 0 1 16003299 4/18/2016 S FIST CAPITOL FIEENS 0 0 1
FIEENS OA LIGHTING SAFETY IMPOVEMENTS NIGHTTIME CASH SUMMAY 2014-2016 EPOT # ATE ONHWAY FOMHWAY FATALITY INCAPACI POPETY AMAGE 16004473 5/25/2016 ZUMBEHL S FIST CAPITOL 0 0 1 16004940 6/9/2016 S FIST CAPITOL FIEENS 0 0 1 16005972 7/12/2016 ZUMBEHL S FIST CAPITOL 0 0 1 16006174 7/20/2016 ZUMBEHL S FIST CAPITOL 0 0 1 16006601 8/3/2016 S FIST CAPITOL ZUMBEHL 0 0 1 16007099 8/19/2016 S FIST CAPITOL FIEENS 0 0 1 16007255 8/23/2016 S FIST CAPITOL FIEENS 0 0 1 16007356 8/26/2016 S FIST CAPITOL ZUMBEHL 0 0 1 16007700 9/5/2016 FIEENS 0 0 1 16008550 10/1/2016 FIEENS S FIST CAPITOL 0 0 1 16008804 10/8/2016 S FIST CAPITOL ZUMBEHL 0 0 1 16010648 12/6/2016 S FIST CAPITOL FIEENS 0 0 1 16010799 12/12/2016 FO LN FIEENS 0 0 2 16011123 12/23/2016 S FIST CAPITOL ZUMBEHL 0 0 1 TOTAL CASHES 2014 TO 2016 TOTAL NIGHT CASHES 2014 TO 2016 % OF NIGHT CASHES 205 61 30%
CMF / CF etails CMF I: 192 Provide highway lighting escription: Prior Condition: No Prior Condition(s) Category: Highway lighting Study: Handbook of oad Safety Measures, Elvik,. and Vaa, T., 2004 Star Quality ating: Crash Modification Factor (CMF) Value: 0.72 Adjusted Standard Error: 0.06 Unadjusted Standard Error: Crash eduction Factor (CF) Value: 28 (This value indicates a decrease in crashes) Adjusted Standard Error: 6 Unadjusted Standard Error:
Applicability Crash Type: Nighttime Crash Severity: A (serious injury),b (minor injury),c (possible injury) oadway Types: All Number of Lanes: oad ivision Type: Speed Limit: Area Type: All Traffic Volume: Time of ay: If countermeasure is intersection-based Intersection Type: Intersection Geometry: Traffic Control: Major oad Traffic Volume: Minor oad Traffic Volume: evelopment etails ate ange of ata Used: Municipality: State: Country:
Type of Methodology Used: Meta-analysis Sample Size Used: Other etails Included in Highway Safety Manual? Yes. HSM lists this CMF in bold font to indicate that it has the highest reliability since it has an adjusted standard error of 0.1 or less. ate Added to Clearinghouse: ec-01-2009 Comments: This site is funded by the U.S. epartment of Transportation Federal Highway Administration and maintained by the University of North Carolina Highway Safety esearch Center The information contained in the Crash Modification Factors (CMF) Clearinghouse is disseminated under the sponsorship of the U.S. epartment of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in the CMF Clearinghouse. The information contained in the CMF Clearinghouse does not constitute a standard, specification, or regulation, nor is it a substitute for sound engineering judgment.