Tired Iron to Increased Readiness: F/A-18 Super Hornet Renewing the Fleet for the Future Fight

Similar documents
Mike Gibbons Paul Summers John Murnane

Aviation S&T: Future Vertical Lift & JMR Tech Demonstrator

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #15

F/A-18A/B/C/D Flight Control Computer Software Upgrade

Technology for the Future of Vertical Lift

F-22 System Program Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Alternative Fuels

Headquarters U.S. Air Force

Phase I Submission Name of Program: B-1 Program, Integrated Battle Station (IBS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Air Force Operational Energy

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Aviation S&T: Joint Multi-Role Technical Demonstrator

Propulsion Controls and Diagnostics Research at NASA GRC Status Report

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Aerospace Propulsion and Power Technology

SEASPRITE. SH-2G Super MODERN MARITIME SOLUTION

Breakout Session 1 Report-out presentations

Wide Bandgap for Aerospace Applications

Singapore Airlines Flight 368 Engine Fire. Ng Junsheng Head (Technical)/Senior Air Safety Investigation Transport Safety Investigation Bureau

A r m y S c i e n c e & Te c h n o l o g y

ABB Drive Services Your choice, your future

Exhibit R-2, RDT&E Budget Item Justification

UTILITY HELICOPTERS & CORPUS CHRISTI ARMY DEPOT Our Key s to Aviation Readiness

The F/A-18E/F Super Hornet

CLASSIFICATION: UNCLASSIFIED. Exhibit P-40, BUDGET ITEM JUSTIFICATION CLASSIFICATION: UNCLASSIFIED. P-1 Item No. 46. Page 1 of 17. DATE: February 2011

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Acme NonStop Power. for Every Mission

LAND DOMAIN. Defence Led UNCLASSIFIED 2

Statement of Jim Schoppenhorst, Director, DD(X) BAE Systems / Armament Systems Division. Before the

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Biofuels Public / Private Initiatives

Contextual note SESAR Solution description form for deployment planning

UNCLASSIFIED MOBILITY ROTARY WING UNCLASSIFIED

Future Vision in Composites & Manufacturing and their Challenges. Lars Sjostrom Director Future Business Saab Aeronautics

Future C4ISR Technologies on Ground Platforms

Energy & Power Community of Interest March 21, 2018

Teijo Kärnä, Industry segment manager wind

FRCSE tests jet engines, reduces noise pollution

GM-TARDEC Autonomous Safety Collaboration Meeting

GRIPEN FUTURE DEVELOPMENT

Overview of Intelligent Power Controller Development for the Deep Space Gateway

UNCLASSIFIED UNCLASSIFIED

Background. If It Ain t Broke CASE STUDY

Span m [65.16 ft] Length m [43.89 ft] Height m [12.08 ft]

Type Acceptance Report

RAMP NDIA Brief. Alex M. Olaverri AMSRD-AAR-WSW-P Weapons System and Technology Directorate Weapons and Software Engineering Center ARDEC

CharIN e.v. The path to a global charging standard. Coordination Office CharIN c/o innos - Sperlich GmbH 2017/02/ /03/23

Accelerating Advances in Environmental Performance

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Aerospace Propulsion and Power Technology FY 2012 OCO

Introduction to General Requirements for CORSIA. Tetsuya Tanaka Chief, Climate Change Section - Environment ICAO Secretariat

The Future of Engine Technology

ARC-ALERT CIRCUIT INTERRUPTER TECHNOLOGY NEXT GENERATION OF CIRCUIT PROTECTION

Powering a better world: Rolls-Royce and the environment

MULTI-MISSION FAMILY OF VEHICLES M-ATV INNOVATION DRIVES FORWARD

Highly Augmented Flight Controls

Size and Weight Size - Travel Size - Flight Config. Prop Size Frame Construction Weight Power and Flight Controller Flight Controller Motors ESC

Predator B: The Multi-Role UAV

Energy - Why is it Important?

Developments on Remote DP Control and Autopilot with Collision Avoidance System

Aviation and the Environment

Zero Emission Bus Deployment Best Practices and Lessons Learned from Around the World

American Helicopter Society Washington, DC 20 November 2013 Approved for Public Release

NAVAIR Public Release SPR Distribution statement A -- approved for public release, distribution is unlimited.

Operations Research & Advanced Analytics 2015 INFORMS Conference on Business Analytics & Operations Research

Electrification of Vehicles in the Transportation Class

The Imperative to Deploy. Automated Driving. CC MA-Info, 15th December 2016 Dr. Hans-Peter Hübner Kay (CC/EB4) Stepper

AIRGLIDE PRESENTATION

WHEN BORDER SECURITY MATTERS

Exhibit R-2, RDT&E Budget Item Justification

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

NDIA Tactical Wheeled Vehicles (TWV) Conference 8 February 2010 COL Mark Barbosa, G-8

Consumers, Vehicles and Energy Integration (CVEI) project

Aerospace and Automotive Manufacturing Specific Differences and Trends

Solar Impulse, First Round-The-World Solar Flight. Ralph Paul Head of Flight Test and Dynamics Solar Impulse June 22, 2017

ABB Ability Performance Optimization for power generation

UNCLASSIFIED: Distribution Statement A. Approved for public release.

Analysis of JSF Prototypes

Retrofitting unlocks potential

Equipment Management Department. Council Budget Presentation

Underpinning Readiness at the Right Cost and Effective Life Cycle Maintenance

MICHELIN COMMERCIAL SERVICE NETWORK. Delivering Consistent, High-Quality Service Nationwide.

Engine Maintenance Management

T-38 FUSELAGE STRUCTURAL LIFE ASSESSMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE

APKWS II Turning 2.75-Inch Rockets into Precision Guided Munitions 15 May 2012

The role of simulation in contemporary Industrial Research Sharing experiences

Wireless Monitoring of Airport Fuel Tank Farms to Optimize Operations

Focus Areas Power and Energy Operational Environments

Power for the SKA Dr Georgina Harris MEng(Hons), MBA, EngD, CEng, MIMechE SKA Program Development Office with Contributions from the Power and

ABB FACTS Customer Service. FACTS Care Upgrades

Y. Lemmens, T. Benoit, J. de Boer, T. Olbrechts LMS, A Siemens Business. Real-time Mechanism and System Simulation To Support Flight Simulators

VALUE PROPOSITION SUBSEA ALL-ELECTRIC

ABB Services for Low Voltage equipment Your choice, your future

Design and evaluate vehicle architectures to reach the best trade-off between performance, range and comfort. Unrestricted.

Advancing the TWV Fleet 10 May 2016

On-off and safety valve diagnostics. Juha Kivelä Business Development Manager Valve Controls Business Line

Transcription:

Tired Iron to Increased Readiness: F/A-18 Super Hornet Renewing the Fleet for the Future Fight Travis McBurnett Director, F/A-18 Sustainment BOEING is a trademark of Boeing Management Company.

F/A-18E/F Super Hornet and EA-18G Readiness Boeing Mod/Production Flow New Aircraft Production Increased aviation capacity 10,000 hour new build aircraft creates future readiness Integrated supply chain with sustainment Service Life Modification Productionized process to maximize throughput Validate and replicate results to Scale Accelerate warfighting capabilities Engineering Empowerment SEAL SLM Enabled At Lemoore Improved Readiness Aircraft Availability Sufficient Capacity Improved Capability Rhino Readiness Data analytics drives predictive decision making SHOGUN Improved Parts Availability SEAL Building jets at Lemoore 2

Super Hornet Service Life Modification Program Service Life Modification (SLM) is the recapitalization of the F/A-18E/F fleet to Block III capability. Airframe Service Life Extension Block III Upgrade Subsystem Inspection Mission Capable Airframe lifetime extension from 6000 flight hours to 9000+ flight hours Capability Integration Advanced Cockpit System Advanced Network Integration Common Tactical Picture (DTP-N/TTNT) Conformal Fuel Tanks Signature Improvements SATCOM Restore high priority subsystems to improve maintainability Service Life Modification Systems checkout and fleet inspection to deliver mission ready aircraft Service Life Modification: Renewing the Fleet for the Future Fight NAVAIR Public Release 2018-250. Approved for public release; distribution is unlimited. 3

Service Life Modification: a Novel Approach Analyze Productionize Deliver Service Life Assessment Program (SLAP) Service Life Extension Program (SLEP) F/A-18 Block I and Block II Fatigue Life Analysis Using Fleet Utilization Data Tear Down of 2 USN Aircraft to Augment Analysis with Inspection Airframe Lifetime Extension From 6,000 to 10,000 Flight Hours Deploy Best of Boeing Manufacturing Practices Define a Production Flow Approach and Deploy BDS, BGS, and BCA Best Practices in St. Louis and San Antonio Integrate SLM Specification, Fleet TDs, and O-Level Maintenance Work Scope and Remove Redundant Sequences to Benefit Cost and Schedule Drive Traditionally Unplanned Work into Planned, Kitted Repeatable Work Service Life Modification (SLM) Develop Material and Tooling Kits for Service Life Extension, Block III Upgrade, Subsystems Inspection, and Mission Capability On Cost and on Schedule, Continuously Improving Continuous Updates to Repair Bill of Material (RBOM) Based on Usage Standard dispositions in Structural Repair Manual (SRM) for Fleet Use NAVDER engineering Authority to Shorten Defect Resolution Cycle Improved Fleet Readiness Contribute Findings to Spares Configuration Block III Capabilities to Stay Ahead of Future Threats 2 USN Learning Aircraft F/A-18 E Block III Production best practices yielding predictable, repeatable results 4

F/A-18E/F Super Hornet Block III Conformal Fuel Tanks Compatible Range Signature Improvements Lower Radar Cross Section Advanced Cockpit System Increased Situational Awareness 10,000+ Hour Airframe DTP-N Open Architecture, Multi-level secure processor TTNT High Throughput, Low Latency Data Link Block II IRST* Long Range. Counter Stealth SATCOM* Advanced Network Connectivity *Program of Record independent of Block III NAVAIR Public Release 2018-449. Approved for public release; distribution is unlimited. 5

Summary Super Hornet transitioning from a Tired Iron aircraft to one with extended life and improved readiness Value proposition increased when combined with improved capability Productionized process and engineering empowerments are key enablers Continuously learning to drive unplanned work into planned and kitted repeatable work 6