METROPOLITAN COAL ENVIRONMENTAL PROTECTION LICENCE MONITORING SUMMARY

Similar documents
Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

ANCR CRU Statistics February 2007 to December 2007

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

SELF-STORAGE FOR SALE

ANCR CRU Statistics Februa.. to December 2007

Up and Down Months of the Stock Market

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

INTECH AUGUST QHSE PERFORMANCE

INTECH JUNE QHSE PERFORMANCE

DRINKING WATER SYSTEM ANNUAL REPORT Reporting Period: January 1 st to December 31 st, 2016

NE (SE) Beam

Sunrise: 05:48 N (S) Beam

Energy Produced by PV Array (AC):

NJ Solar Market Update As of 6/30/15

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

CLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014

Port Botany. Trade Statistics Bulletin 1 July June 2018

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

Daily Trends and Source Apportionment of Ultrafine Particulate Mass (PM 0.1 ) Over an Annual Cycle in a Typical California City

W (W) Beam

Total Production by Month (Acre Feet)

Oriented Strand Board Sheathing (delivered, Los Angeles) 7/16-inch 2005 to 2009

WAMBO COAL ENVIRONMENTAL REPORTING 1 FEBRUARY 28 FEBRUARY 2019

September 2016 Water Production & Consumption Data

Overview. Mercury Monitoring. Regulatory drivers Technology Overview Pros and Cons Alternative Hybrid Approach

Capacity Analysis Report. For. William E. Dunn Water Reclamation Facility 4111 Dunn Drive Palm Harbor, Florida 34683

Yield Reduction Due to Shading:

The Peoples Gas Light and Coke Company

November 2017 Customer Switching Report for the Electricity and Gas Retail Markets

Bulk Storage Containers

Prepared for: Prepared by: 4005 Port Chicago Highway Concord, California

Year to Date Summary. Average and Median Sale Prices

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

1. Trends in the current fiscal year and previous fiscal year 3. Business overview 2. Secular trends in first quarter financial results

WINNER. Orange County Public Schools. 100% Design Community Meeting Hidden Oaks Elementary School February 21, 2017

Preston s Edmond Market Report

Big Red Wraps Big Flavor, Small Price

Streetcar Update. Review of December 2018

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

Climatography of the United States No

Glendale Water & Power Smart Grid Project

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2007

Regulation Update. Operating Committee September 12, PJM 2017

Local Market Update February 2013

January During JANUARY. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 Dec Feb 2011

Utah Fatal Crash Summary 2014

Climatography of the United States No

FY2/18 2Q(March 2017~August 2018)

TABLE C-43. Manufacturers' new and unfilled orders, {Amounts in millions of dollars] Nondurable. Capital goods. Total. goods.

Production Part Approval - Material, Performance Test Results Discrete Semiconductor Component Qualification Plan

NEWS Release. U.S. Manufacturing Technology Orders. Year-to-date U.S. manufacturing technology orders up 4.1% over 2011

STATISTICS BOTSWANA ELECTRICITY GENERATION & DISTRIBUTION 2016/2 STATS BRIEF, FIRST QUARTER Copyrights Statistics Botswana 2016

increase of over four per cent compared to the average of $409,058 reported in January 2010.

Data Current Through: January, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory. 4 mo.

Algebra II Pacing Guide

AUTOMATED LAST/NEXT DUE 1/6

FOR IMMEDIATE RELEASE

NJ Solar Market Update As of 2/29/16

Horseshoe Bay Terminal Open House

Safety Communications Campaign

Performance Measures 4 th Quarter/Year End 2010

Florida Courts E-Filing Authority Board. Service Desk Report October 2018

Local Market Update 2012 Year In Review

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>

Technical Manual Index

Graph #1. Micro-Generation Generating Units in Alberta 20

Florida Courts E-Filing Authority Board. Service Desk Report December 2018

Englewood Area Board of Realtors Monthly Sales Trend Indicator 2017 Sales by Price Range - Single Family Homes & Villa s

TROLLEY ASSIST TO OPTIMISE HAULING CYCLES WITH ELECTRIC TRUCKS. Vicente E. Alvarado Planning and Development Engineer Grootegeluk Coal Mine

NJ Solar Market Update

SECOND QUARTER 2018 THE BLUE MOUNTAINS REAL ESTATE MARKET REPORT LOCATIONS ROYAL LEPAGE S 2016 BROKERAGE OF THE YEAR FOR ONTARIO

HELICOPTER OPERATIONS WITHIN THE LONDON HEATHROW AND LONDON CITY CONTROL ZONES

Parts Manual. PTAC PD Series (Electronic Controls) Packaged Terminal Air Conditioners Packaged Terminal Heat Pumps Serial Number LEAP and Later MODELS

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

End-use petroleum product prices and average crude oil import costs January 2010

Data Current Through: November, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory

Eastside (All Areas)

Dynamics of Cottonseed Oil Price

Data Current Through: April, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory 1,

Data Current Through: February, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory 1,

Price Category Breakdown - February 2010

If it ain t broke, don t t fix it. HMA Thin Lifts for Pavement Preservation in Tennessee 2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

January-March 2017 Customer Switching Report for the Electricity and Gas Retail Markets

MEDIA STATEMENT - FOR RELEASE ON 31 JULY 2015 RELEASED BY CEF (SOC) LTD ON BEHALF OF THE DEPARTMENT OF ENERGY ENQUIRIES: MR J MOKOBANE

SOUTHERN CALIFORNIA EGG PRODUCTION COSTS AND INCOME 1979 TO 2003

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

Your electricity bill

Data Current Through: March, Seattle (All Areas) RESIDENTIAL & CONDOMINIUM. Active, Pending, & Months Supply of Inventory 1,709 1,069 1,111 1.

December 2018 RenewableGenerations Monthly Report

End-use petroleum product prices and average crude oil import costs March 2011

Yield Reduction Due to Shading:

Transcription:

Introduction The Protection of the Environment Operations Act 1997 (POEO Act) requires that holders of an environment protection licence make their pollution monitoring data publicly available in a timely manner. Metropolitan Coal is holder of Environmental Protection Licence 767 (EPL 767). This licence pertains to Mining for Coal and Coal Works. EPL 767 identifies a number of monitoring points as shown in Table 1 and Figure 1. Table 1 EPL 767 Monitoring Points and Parameters Monitoring Point Number Name Parameter 1 Dust Gauge at 136 The Crescent Ash / / 2 Dust Gauge at 28 Old Station Road 3 Dust Gauge at The Mine Entrance 4 Dust Gauge at Helensburgh Golf Course Ash / / Ash / / Ash / / 5 Dust Gauge at 83 Parkes Street Ash / / 9* Clean Water Tank at Water Treatment Plant 10 Flowmeter on from Water Treatment Plant to Camp Creek Oil and Grease / ph / TSS Kilolitres Per Day 11 Dust Gauge at 59 Parkes Street Ash / / 12 Dust Gauge at 32 Old Station Road Ash / / 13 Dust Gauge at 88 Parkes Street Ash / / 14 Dust Gauge at Helensburgh Public School 15 Dust Gauge at Holy Cross Primary School 16 High Volume Air Sampler at 12 Robertson Street Ash / / Ash / / Micrograms Per Cubic Metre *Note: The monitoring at Point 9 required by condition M2 is conducted by the licensee to determine compliance with the limits specified for Points 6 & 7 in condition L3.3.

Figure 1 EPL 767 Monitoring Point Locations This environmental monitoring summary is provided in accordance with the requirements of the POEA Act. It is distinct to the environmental monitoring summary which is provided in accordance with the requirements of Project Approval 08_0149 which was granted under Section 75J of the NSW Environmental Planning and Assessment Act, 1979 on 22 June 2009. Monitoring Summary Monitoring Point 1 Dust Gauge at 136 The Crescent Ash Jan-18 1.2 0.6 0.6 Feb-18 1.4 0.7 0.7 Mar-18 0.5 0.3 0.2 Apr-18 0.4 0.3 0.1 May-18 0.5 0.3 0.2 Jun-18 Broken Bottle Broken Bottle Broken Bottle Jul-18 0.3 0.2 0.1 Aug-18 0.5 0.3 0.2 Sep-18 0.8 0.4 0.4 Oct-18 0.7 0.3 0.4 Nov-18 1.1 0.5 0.6

Monitoring Point 2 Dust Gauge at 28 Old Station Road Ash Jan-18 1.3 0.6 0.7 Feb-18 0.9 0.4 0.5 Mar-18 0.2 0.2 <0.1 Apr-18 0.3 0.2 0.1 May-18 0.3 0.2 0.1 Jun-18 0.4 0.2 0.2 Jul-18 0.1 0.1 <0.1 Aug-18 0.3 0.2 0.1 Sep-18 0.8 0.3 0.5 Oct-18 0.6 0.2 0.4 Nov-18 0.5 0.2 0.3 Monitoring Point 3 Dust Gauge at Mine Entrance Ash Jan-18 1.3 0.7 0.6 Feb-18 1.6 1.2 0.4 Mar-18 1.3 1.0 0.3 Apr-18 1.0 0.7 0.3 May-18 2.0 1.5 0.5 Jun-18 1.9 1.4 0.5 Jul-18 1.4 0.9 0.5 Aug-18 0.6 0.4 0.2 Sep-18 1.3 0.9 0.4 Oct-18 1.0 0.6 0.4 Nov-18 0.5 0.2 0.3

Monitoring Point 4 Dust Gauge at Helensburgh Golf Course Ash Jan-18 1.1 0.7 0.4 Feb-18 0.6 0.5 0.1 Mar-18 0.4 0.4 <0.1 Apr-18 1.5 1.3 0.2 May-18 0.7 0.6 0.1 Jun-18 1.3 0.9 0.4 Jul-18 0.3 0.3 <0.1 Aug-18 1.0 0.8 0.2 Sep-18 1.2 0.8 0.4 Oct-18 0.9 0.6 0.3 Nov-18 0.9 0.8 0.1 Monitoring Point 5 Dust Gauge at 83 Parkes Street Ash Jan-18 0.7 0.5 0.2 Feb-18 0.9 0.7 0.2 Mar-18 0.4 0.4 <0.1 Apr-18 0.6 0.4 0.2 May-18 0.7 0.5 0.2 Jun-18 0.6 0.3 0.3 Jul-18 0.1 0.1 <0.1 Aug-18 0.6 0.4 0.2 Sep-18 0.6 0.4 0.2 Oct-18 0.3 0.2 0.1 Nov-18 0.6 0.5 0.1

Monitoring Point 11 Dust Gauge at 59 Parkes Street Ash Jan-18 0.8 0.5 0.3 Feb-18 0.7 0.4 0.3 Mar-18 0.1 0.1 <0.1 Apr-18 0.3 0.2 0.1 May-18 0.3 0.2 0.1 Jun-18 0.2 0.1 0.1 Jul-18 0.2 0.2 <0.1 Aug-18 0.5 0.2 0.3 Sep-18 0.7 0.4 0.3 Oct-18 0.4 0.2 0.2 Nov-18 0.5 0.4 0.1 Monitoring Point 12 Dust Gauge at 32 Old Station Road Ash Jan-18 2.2 0.8 1.4 Feb-18 1.8 0.5 1.3 Mar-18 0.5 0.2 0.3 Apr-18 0.7 0.4 0.3 May-18 0.8 0.4 0.4 Jun-18 0.6 0.2 0.4 Jul-18 0.1 0.1 <0.1 Aug-18 0.8 0.3 0.5 Sep-18 0.9 0.4 0.5 Oct-18 0.5 0.2 0.3 Nov-18 1.9 0.5 1.4

Monitoring Point 13 Dust Gauge at 88 Parkes Street Ash Jan-18 1.6 0.9 0.7 Feb-18 1.6 1.1 0.5 Mar-18 1.2 0.8 0.4 Apr-18 1.1 0.8 0.3 May-18 1.5 0.9 0.6 Jun-18 1.1 0.6 0.5 Jul-18 0.6 0.4 0.2 Aug-18 0.8 0.5 0.3 Sep-18 1.9 1.2 0.7 Oct-18 0.9 0.7 0.2 Nov-18 1.7 1.0 0.7 Monitoring Point 14 Dust Gauge at Helensburgh Public School Ash Jan-18 0.9 0.4 0.5 Feb-18 1.0 0.5 0.5 Mar-18 0.4 0.3 0.1 Apr-18 0.8 0.3 0.5 May-18 0.5 0.3 0.2 Jun-18 0.2 0.1 0.1 Jul-18 0.2 0.1 0.1 Aug-18 0.4 0.2 0.2 Sep-18 0.8 0.3 0.5 Oct-18 0.3 0.1 0.2 Nov-18 0.8 0.2 0.6

Monitoring Point 15 Dust Gauge at Holy Cross Primary School Ash Jan-18 1.1 0.5 0.6 Feb-18 0.5 0.3 0.2 Mar-18 0.2 0.2 <0.1 Apr-18 1.0 0.6 0.4 May-18 0.6 0.4 0.2 Jun-18 1.1 0.4 0.7 Jul-18 0.3 0.2 0.1 Aug-18 2.1 1.2 0.9 Sep-18 1.6 0.7 0.9 Oct-18 0.6 0.2 0.4 Nov-18 0.8 0.4 0.4

Date Monitoring Point 16 High Volume Air Sampler at 12 Robertson Street PM10 (µg/m 3 ) Date PM10 (µg/m 3 ) 01/01/2018 22.2 06/07/2018 7.6 07/01/2018 24.2 12/07/2018 12.2 13/01/2018 14.6 18/07/2018 36.9 19/01/2018 14.3 24/07/2018 27.7 25/01/2018 9.5 30/07/2018 33.2 31/01/2018 13.4 05/08/2018 19.5 06/02/2018 5.0 11/08/2018 13.3 12/02/2018 16.5 17/08/2018 43.2 18/02/2018 19.0 23/08/2018 10.3 24/02/2018 16.2 29/08/2018 10.6 02/03/2018 15.1 04/09/2018 2.9 08/03/2018 9.3 10/09/2018 6.3 14/03/2018 15.0 16/09/2018 4.7 20/03/2018 27.8 22/09/2018 13.1 26/03/2018 8.7 28/09/2018 9.2 01/04/2018 22.8 04/10/2018 6.9 07/04/2018 19.6 10/10/2018 10.9 13/04/2018 23.9 16/10/2018 12.6 19/04/2018 18.8 22/10/2018 15.5 25/04/2018 9.3 28/10/2018 16.6 01/05/2018 5.8 03/11/2018 20.5 07/05/2018 12.6 09/11/2018 12.2 13/05/2018 5.0 15/11/2018 10.6 19/05/2018 6.4 21/11/2018 19.6 25/05/2018 20.0 27/11/2018 16.6 31/05/2018 5.2 03/12/2018 06/06/2018 4.3 09/12/2018 12/06/2018 7.5 15/12/2018 18/06/2018 1.0 21/12/2018 24/06/2018 5.3 27/12/2018 30/06/2018 2.6

Point 9 * The Clean Water Tank of the Water Treatment Plant Oil & Grease (mg/l) ph TSS (mg/l) Exceedance (Y/N) Jan-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Feb-18 <5 8.4 13 N Mar-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Apr-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A May-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Jun-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Jul-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Aug-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Sep-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Oct-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Nov-18 Invalid Sample # Invalid Sample # Invalid Sample # N/A Licence Limit 10mg/L 6.5-8.5 30 mg/l * Note: The monitoring at Point 9 required by condition M2 is conducted by the licensee to determine compliance with the limits specified for Points 6 & 7 in condition L3.3. # Note: No water discharged to Camp Creek at time of sampling Point 10 The Flowmeter on the Clean Water Discharge Tank at the Water Treatment Plant Volume (kl Per Day) Jan-18 465 Feb-18 471 Mar-18 307 Apr-18 140 May-18 52 Jun-18 80 Jul-18 0 Aug-18 14 Sep-18 128 Oct-18 300 Nov-18 195