Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Similar documents
Addressing ambiguity in how electricity industry legislation applies to secondary networks

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Energy Regulation : Australian Experience. Engr.Khondkar Abdus Saleque

SUBSIDIARY BODY FOR SCIENTIFIC AND TECHNOLOGICAL ADVICE Fourteenth session Bonn, July 2001 Item 3 (b) of the provisional agenda

PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

For personal use only

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

CLS Bank Protocol for FX. Overview

University of Alberta

Electrovaya Provides Business Update

Annual Distribution Pricing Proposal For 1 July 2018 to 30 June 2019 Overview

GC108: EU Code: Emergency & Restoration: Black start testing requirement

ROMPCO 120 ( GTA1 ) 2013 (2013 Q2)

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

Matters Arising from 13rd Annual General Meeting

TORONTO TRANSIT COMMISSION REPORT NO.

GC108: EU Code: Emergency & Restoration: Black start testing requirement

INFORMATION BULLETIN No. 165

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

POLICY NUMBER: SUPERSEDES: C462A. Planning and Development Department DATE: Business Revitalization Zone Establishment and Operation

COMPONENT HOMOLOGATION POLICY AND PROCEDURE

FAF & Private Company Issues

Rwanda Biofuels Limited. Powering Rwanda s Development

Land Transport Rule Traction Engines [2008]

Recharge Kick-off Meeting Recharge Activity Review Process for

Jemena Electricity Networks (Vic) Ltd

Unitil Energy Demand Response Demonstration Project Proposal October 12, 2016

DEPARTMENT OF TRANSPORTATION. Motor Carrier Safety Advisory Committee (MCSAC); Public Meeting

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 18, 2017

Chief Operating Officer. Nigel Bell, Energy Resource Manager

INFORMATION BULLETIN No. 165

Travel Action Plan De Montfort University

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

UK Power Networks Use of System Charging Methodology

Shipping Guidance Notice 069. EU Monitoring, Reporting and Verification (MRV) regulations and IMO Data Collection Data Collection System (DCS)

Introduction of the Digital Tachograph

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE TACHOGRAPH FORUM

MINUTES WA Generator Forum (WAGF)

Merger of the generator interconnection processes of Valley Electric and the ISO;

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

Price schedule for metering services 1 July 2017

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

BEFORE THE CANTERBURY REGIONAL COUNCIL. Act 1991 AND. of Plan Change 3 to the Waitaki Catchment Water Allocation Regional Plan

NERSA CONSULTATION PAPER PROCESS. Moefi Moroeng Specialist: Wholesale Electricity Trading

Positive Energy Roads CALL FOR PROPOSALS

Statement of Expected Price Trends

Powering Sydney s Future

Modernising the Great Western railway

Final Report. Solar feed in tariff for regional Queensland for


Item No Halifax Regional Council June 21, 2016

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

WELLINGTON, NEW ZEALAND. PURSUANT to sections 152, 155(a) and (e) and 158(a)(i) of the Land Transport Act 1998

Department of the Environment. Moving Away From Stage II Vapor Recovery

PROPOSED RULES FOR ENERGY STORAGE RESOURCES IN GENERATOR INTERCONNECTION STUDIES GI Improvement Task Force

18/10/2018. Mr Peter Adams General Manager, Wholesale Markets Australian Energy Regulator. By

INFORMATION FOR OWNERS AND OPERATORS OF HEAVY TRUCKS AND BUSES

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

Comhairle Cathrach Chorcaí Cork City Council

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Evaluating Stakeholder Engagement

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

Monitoring, reporting and verification of CO 2 emissions from ships - EU MRV regulation and obligations and the parallel IMO activities

Taxis and Accessible Services Division Medallion Reform Background May 1, 2018

Decision RIS-Proposal for national licencing of the Refrigeration and Air-Conditioning Occupations.

P. SUMMARY: The Southeastern Power Administration (SEPA) establishes Rate Schedules JW-

STAFF REPORT ACTION REQUIRED

Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

SWANTOWN MARINA MARINE FUELING FACILITY. Ed Galligan Executive Director

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

Environment and Infrastructure Services

Draft Results and Recommendations

CMP266 Removal of Demand TNUoS charging as a barrier to future elective Half Hourly settlement

Roundtable on Sustainable Palm Oil (Phase 2)

Late Starter. Tuesday, November 6, 2018

B. Approval of the Statement of Proceedings/Minutes for the meeting of October 24, 2017.

Consistent implementation of the 2020 sulphur limit and work to further address GHG emissions from international shipping

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Garden waste charging: implementation and impact mitigation measures

Streamlined Application Decision Perimeter Seating Bus Additional Vehicles

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

City of Palo Alto (ID # 6416) City Council Staff Report

Power market Natural gas market Redesign of mechanisms for RE promotion and integration

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Submission to the Transport and Public Works Committee s inquiry into the operations of toll roads in Queensland

The Commonwealth of Massachusetts

Revision of Directive 96/53/EC of 25 July 1996

CMP294: National Grid Legal Separation changes to CUSC Section 14. CUSC Modification Proposal Form

PIVE 1 PIVE 2 PIVE 3 PIVE 4 PIVE 5 PIVE 6 PIVE 7 PIVE

TORONTO TRANSIT COMMISSION REPORT NO.

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

THE PUBLIC UTILITIES BOARD ACT April 22, Graham F. J. Lane, C.A., Chairman Monica Girouard, C.G.A., Member Mario J. Santos, B.A., LL.B.

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

YUKON DEVELOPMENT CORPORATION

Regulation of Unmanned Aircraft

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

Final Administrative Decision

Improving Accessibility of Regional Bus Stops and Pathways

Transcription:

Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME Chair 2. INTRODUCTIONS, APOLOGIES / ATTENDANCE Chair 15 min 3. ROLE AND OPERATION OF THE GAS ADVISORY BOARD Chair 5 min 4. GAS INFORMATION SERVICES PROJECT IMO 10 min 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min 6. SCHEDULE OF MEETINGS IN 2012 Chair 2 mins 7. GENERAL BUSINESS 8. NEXT MEETING: Thursday 9 February 2012 Page 1 of 8

Agenda Item 4: Gas Information Services Project Overview 1. INTRODUCTION In December 2009, the Minister for Energy advised that the Western Australian (WA) Government would implement the recommendations of the Gas Supply and Emergency Management Committee (GSEMC), which was established in response to two major gas supply disruptions in WA in 2008. Key recommendations of the GSEMC included the establishment of a WA based Gas Bulletin Board (GBB) and production of a Gas Statement of Opportunities (GSOO). The GSEMC considered that these initiatives would improve information transparency and facilitate the security, reliability and competitiveness of the domestic gas supply market in WA. The Independent Market Operator (IMO) was selected in May 2011 as the WA Operator of the GBB and GSOO. The implementation of these information services by the IMO is now known as the Gas Information Services Project (GISP). The key deliverables of the GISP are the following three Gas Information Services (GIS): A web-based near-term gas market information service the GBB; An Emergency Management facility to be activated in the event of a gas supply disruption; and A periodic (annual) longer-term supply and demand forecast across all stages of the gas market supply-demand chain the GSOO. 2. LEGISLATIVE BASIS FOR THE GIS The GIS will be established under the Gas Services Information Bill 2011 (the Bill), which was introduced to Parliament on 29 November 2011. The Bill, which is available on the WA Parliament website, contains the following key provisions: Objective The objectives of the GBB (including the Emergency Management Facility) and GSOO are to promote the long term interests of consumers of natural gas in relation to a) the security, reliability and availability of the supply of natural gas in the State; b) the efficient operation and use of natural gas services in the State; c) the efficient investment in natural gas services in the State; and d) the facilitation of competition in the use of natural gas services in the State. Key Definitions The Bill generally adopts definitions from the National Gas Access (Western Australia) Law, although the definition of pipeline is adopted with amendments. The Bill also defines a number of key terms, including gas market participant, protected information and user. Regulations and Rules The Bill contains heads of power for the making of regulations and rules. The regulations are to provide for the establishment and operation of a GBB and the preparation and Page 2 of 8

publication of a GSOO, including conferring responsibility for these matters on a person (the IMO). The regulations are also to provide for the making of rules relating to the form, content and operation of the GBB and the form and content of the GSOO. Protection of Information The Bill authorises the Operator to use protected information for the purposes of the functions conferred under the Bill, and requires the operator to take all reasonable measures to secure protected information from unauthorised use. 3. GIS RULES The IMO will, in consultation with stakeholders, develop rules for the gas information services. Similar to the initial rules for the Wholesale Electricity Market (WEM), it is expected that the Minister for Energy will approve the initial rules for the GIS. The rules will then be administered by the IMO in accordance with the rule change process contained in the rules. The IMO anticipates the rules will: Set out the functions of the IMO (expected to mirror provisions in the Gas Services Information Regulations); Provide for the operation of the GBB; Provide for the operation of the Emergency Management facility; Provide for the preparation and publication of the GSOO; Provide for the establishment of a Gas Advisory Board (based on the arrangements for the IMO s Market Advisory Committee in the WEM Rules); Include a rule change process, including industry consultation, to enable market evolution; Empower procedures to be made; Provide for monitoring of the rules; and Set out how the IMO will recover the costs of operating the GIS. Specific requirements for the making and approval of the initial rules are not yet known and will be set out in the regulations. It is possible that the initial rules will need to be tabled in Parliament by the Minister with, or shortly after, the regulations. If this is the case, the rules may be developed in two stages, with governance rules developed alongside the regulations and operational rules developed later (possibly through a rule change process). 4. PRELIMINARY GISP BUDGET Subject to confirmation of the costs of the IT system and delivery model for the GBB, it is anticipated that the total cost of implementing the GIS will be approximately $3.3 million, made up of the following costs: Staffing $940,000 Administration $285,000 Advice $980,000 GBB System $1,035,000 Borrowing $ 75,000 Total GISP Costs $3,315,000 Page 3 of 8

The Office of Energy (OoE) has provided the IMO with $350,000 in seed funding for the GISP over the period 1 October 2011 to 30 June 2012. Subject to approval by the Government, the IMO proposes to use loan funding to fund the remainder of its implementation costs. It was initially anticipated that this approval would be obtained in late 2011, however it has now been delayed to the second quarter of 2012. Once the regulations and rules are in place, it is expected that the costs of implementing and operating the GIS will be met by fees charged on gas market participants. The methodology for determining these fees will be set out in the rules, which will be developed in consultation with stakeholders. However, until the delivery model for the GBB has been determined, it is not possible to estimate the ongoing operational costs of the GIS. 5. HIGH LEVEL WORK PROGRAM FOR THE GISP The following table summarises the key implementation tasks towards the delivery of the GIS. Subject to confirmation of the funding arrangements for the GISP and the specific requirements for making the initial rules, the IMO is currently working towards implementation of the GBB and GSOO by March 2013. Indicative Work Program for GISP Governance Legislation Regulations GAB Establishment Budget approval process Design of cost recovery Design and Rules Development Design of GBB and GSOO Development of initial Rules Approval of Rules by Minister Develop of Procedures & System Specifications Implementation of GBB Develop IT Strategy System build/integration Testing Training GBB go live Implementation of GSOO Collect data and develop forecasts Prepare report Publish GSOO 2011 2012 2013 N D J F M A M J J A S O N D J F M Key IMO task Government task Delivery milestone Until funding for the GISP is confirmed, the IMO is restricted in the amount of work it can undertake on the project and the project timelines cannot be confirmed. Page 4 of 8

6. PROGRESS TO DATE The IMO has commenced work on the GISP. Progress to date includes: The Project Director commenced in November 2011; The IMO is meeting regularly with the OoE on the progress of implementation and development of the regulations; The interim Gas Advisory Board (GAB) has been established; The IMO has been working with the Australian Energy Market Operator (AEMO), and engaged IT consultants, on options for delivery of the GBB (refer to Agenda Item 5); The IMO has obtained the consent of the Commonwealth Government to access the intellectual property for the bulletin board operated by AEMO; and Submissions on GISP funding have been submitted to the Minister for Energy. 7. NEXT STEPS Over the period from now until project funding is confirmed (expected around April 2012), the IMO will progress the following aspects of the GISP: Continue working with the OoE on the regulations for the GIS; Develop an IT Strategy for the GBB; Undertake preliminary work on the design of the GBB, Emergency Management facility and GSOO; Project planning and governance activities, including amending the IMO 2011-12 Operational Plan to include the GISP. The IMO does not anticipate that it will be able to engage any additional staff during this period and will be progressing these aspects of the GISP using the seed funding provided by the OoE. Once the further funding for the GISP has been confirmed, the detailed design of the GIS will commence in earnest, to inform the development of the initial rules. A number of key issues are likely to require resolution during this next phase, such as: Requirements to register and participate in the GBB, and what exemptions may apply; The information that will be collected by the IMO for the GIS; what information will be required from market participants and how that information will be treated and used by the IMO; Arrangements for the recovery of the IMO s GIS costs via fees on market participants; The methodology for forecasts in the GSOO. The IMO expects to bring proposals on these, and other matters about the design of the GIS, to the GAB for discussion around mid-2012. Where required, the IMO will also seek independent expert advice on both the design of the gas information services and the content of the initial rules. 8. RECOMMENDATIONS It is recommended that the GAB: a) Note the overview of the GISP, including the high level project plan. Page 5 of 8

Agenda Item 5: Options for Delivery of the Gas Bulletin Board Background 1. BACKGROUND The Gas Bulletin Board (GBB) will be a web-based information service displaying near-term information about gas production, storage, transportation and demand. It is intended that the information displayed on the GBB will be provided by gas market participants and will be publicly available. The GBB will also have an Emergency Management facility. It is intended that gas market participants will also provide information for this facility, but it will only be available when activated (in the event of an emergency or supply shortfall) and access to the page will be limited to those involved in managing gas supply shortfalls and emergencies. A key aspect of the implementation of the GBB will be the establishment of IT systems and processes that will deliver the service. The GBB system will need to do a number of things, including: provide an interface for registered participants to provide the information required by the rules; convert the data provided by participants into the information to be displayed on the GBB; display the GBB on a public website and activate the Emergency Management facility when required; maintain security arrangements to ensure that access to the information provided by participants and contained in the Emergency Management facility is restricted to authorised persons; and enable the IMO to monitor compliance by participants. The IMO is currently investigating options for delivery of the GBB service in order to develop an IT Strategy for the implementation of the GBB. 2. USE OF THE AUSTRALIAN ENERGY MARKET OPERATOR S BULLETIN BOARD SYSTEM Because the GBB is intended to be similar to the National Bulletin Board (NBB) already operated by the Australian Energy Market Operator (AEMO), and some Western Australian (WA) gas market participants are already participants on the NBB, it may be appropriate to use the existing NBB systems as a basis for the WA GBB. However a range of issues need to be considered in determining the best approach to delivering the GBB, including: any technical (IT) limitations; how the GBB will be developed and modified over time in line with the specific requirements of the WA GBB rules; how any differences between the WA GBB and NBB will be managed; and how the GBB will be operated in the context of broader governance arrangements for the WA gas information services. Page 6 of 8

As some WA market participants have existing interfaces with the NBB system, the IMO will seek to minimise any differences between the NBB and the WA GBB in the process for, or form of, information provision by participants. 3. PROCESS TO EVALUATE The IMO has identified three options for utilising the NBB system to deliver the GBB. Option 1 Option 2 Option 3 Outsourcing to AEMO the development and operation of the GBB, with AEMO to modify the NBB to incorporate all elements of the WA GBB, including the Emergency Management facility, and host the GBB. Outsourcing to AEMO development and operation of those elements of the GBB which are already included in the NBB, with remaining elements developed and operated by the IMO. Migrating the software from the NBB into the IMO IT framework, with the IMO to develop and operate the GBB. A further option to be considered is development of a GBB independently by the IMO, possibly with some guidance from the AEMO bulletin board but not directly using the NBB system or software. The IMO has engaged Systemic Pty Ltd to provide expert, technical advice on these options. This advice will be considered, along with the other business impacts of each option (such as how compliance with and changes to the GBB will be managed over time) in the development of the IT Strategy for the GBB. AEMO is working with the IMO on a cost-recovery basis to help the IMO understand the technical, business and cost impacts of options 1 to 3 above. The cost of AEMO s assistance to develop the IT Strategy for the GBB is expected to be between $20,000 and $30,000. Any further costs of AEMO s assistance in establishing the GBB will depend on the delivery option chosen. 4. INTELLECTUAL PROPERTY FOR THE NBB In order to investigate the options identified above, the IMO has needed access to the intellectual property (IP) for the NBB business methods, systems and software applications. The IP for the NBB is vested in the Commonwealth of Australia. The IMO has requested, and been grated, access to the IP for the NBB from the Department of Resources, Energy and Tourism, on behalf of the Commonwealth. A copy of the letter granting access is attached. 5. RECOMMENDATIONS It is recommended that the GAB: a) Note the work being undertaken to determine how the system for the GBB will be delivered and operated. Page 7 of 8

Gas Advisory Board Meetings 2012 Venue: IMO Board Room Level 3, 197 St Georges Terrace, Perth Meeting No. Date Time 2 Thursday, 9th February 2012 1.00 3.00 pm 3 Tuesday, 13th March 2012 1.00 3.00 pm 4 Tuesday, 10th April 2012 1.00 3.00 pm 5 Tuesday, 15th May 2012 1.00 3.00 pm 6 Tuesday, 12th June 2012 1.00 3.00 pm 7 Tuesday, 10th July 2012 1.00 3.00 pm 8 Thursday, 9th August 2012 1.00 3.00 pm 9 Tuesday, 11th September 2012 1.00 3.00 pm 10 Tuesday, 9th October 2012 1.00 3.00 pm 11 Thursday, 8th November 2012 1.00 3.00 pm 12 Tuesday, 11th December 2012 1.00 3.00 pm Page 8 of 8