PSE Attachment K Puget Sound Area Transmission Meeting

Similar documents
2013 ANNUAL PROGRESS REPORT

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Final System Impact Study for. Sierra Pacific Industries 31 MW Generation Project. Mount Vernon, WA. November 16, 2006

Transmission Planning Report

REDACTED. Eastside Needs Assessment Report Transmission System King County. Redacted Draft. October 2013 Puget Sound Energy

Ten-year Plan. Figure 1 and Table 1. Each of the facilities shown in the plan is described in greater depth in the last appendix of this report.

2015 System Assessment

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

System Impact Study for. Puget Sound Energy s Share of Frederickson I Generation Project. Pierce County, WA

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

THE TRES AMIGAS PROJECT

Interconnection System Impact Study Report Request # GI

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Merger of the generator interconnection processes of Valley Electric and the ISO;

Transmission Planning. WECC 2014 Progress Report. March 14, 2014

Process Timeline. Area Bubbles. Legend. Problem Area that have been resolved. Recurring Areas from previous System Assessment.

Update to the 2004 Puget Sound Area Study Group ( PSASG ) Report: Assessment of Puget Sound Area / Northern Intertie Curtailment Risk

SERTP rd Quarter Meeting

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009

Decision on Merced Irrigation District Transition Agreement

Feasibility Study Report

Overview of ISO New England and the New England Wholesale Power Markets

Transmission Planning using Production Cost Simulation & Power Flow Analysis

Arizona Transmission Challenges

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

2013 ANNUAL PROGRESS REPORT

APPENDIX F: Project Need and Description

Southwest Power Pool Network Integration Transmission Service Application

SPS Planning Criteria and Study Methodology

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

Western Area Power Administration Sierra Nevada Region

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

2013 Biennial Transmission Expansion Plan

Terry Blackwell Page 1 of 5. Education North Carolina State University BS, Electrical Engineering Power Systems emphasis

2015 Grid of the Future Symposium

New Jersey State Report

Pacific Northwest/Canada To Northern California Transmission Feasibility Study

Public Review Draft. June 30, System Assessment

System Impact Study Report

ENERGY STORAGE AS AN EMERGING TOOL FOR UTILITIES TO RESOLVE GRID CONSTRAINTS. June 18, 2015 E2Tech Presentation

Cross Cascades North Study Team Report

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

SERTP rd Quarter Meeting

Illinois State Report

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

SERTP - 1 st Quarter Meeting

Feasibility Study Report

Transmission Planning Attachment K Public Input Meeting

Consulting Agreement Study. Completed for Transmission Customer

Western Area Power Administration Sierra Nevada Region

Western NY Public Policy Transmission Planning Report

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

15 Nelson-Marlborough Regional Plan

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Introducing ITC Midwest

Economics of Integrating Renewables DAN HARMS MANAGER OF RATE, TECHNOLOGY & ENERGY POLICY SEPTEMBER 2017

New Mexico Transmission Expansion Concepts For Wind Resources

Midway/Monument Area TTC Study

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

15 Nelson-Marlborough Regional Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan

SPP OVERVIEW. Mike Ross Senior Vice President, Government Affairs and Public Relations

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Richard A. Vail

Feasibility Study Report

Japanese version of Connect & Manage for expanded introduction of renewable energies

The Capital Grid Project:

WIRES University Overview of ISO/RTOs. Mike Ross Senior Vice President Government Affairs and Public Relations Southwest Power Pool

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

Panel Discussion: Planning for Today and Tomorrow

Market Efficiency Update

Western NY Public Policy Transmission Report

100 MW Wind Generation Project

SPP-RTO: Operational Characteristics

2018 Load & Capacity Data Report

WestConnect Regional Planning Update

ISO on Background. Energy-efficiency forecast. Anne George. Stephen J. Rourke VICE PRESIDENT, SYSTEM PLANNING DECEMBER 12, 2012

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

Kansas Legislature. Briefing for the. March 6, Paul Suskie & Mike Ross

WESTERN EIM BENEFITS REPORT Second Quarter 2018

Attached is Idaho Power s 2013 WECC Annual Progress Report. Please contact me if you have any questions.

Envisioning Future Energy Technologies Aaron Melda Tennessee Valley Authority

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Western Area Power Administration Rocky Mountain Region Annual Progress Report. Projects. Weld Substation Stage 04

The Transmission Lay of the Land

Avista BPA, IPCO, PAC Project identified as long term need. Project Committed under Network Open Season. Plan of Service Determined

Market Efficiency Update

Improving Transmission Asset Utilization Through Advanced Mathematics and Computing

The Green Line Project

Minnesota Biennial Transmission. Zone Meeting 8

May 11, Ms. Kavita Kale Executive Secretary Michigan Public Service Commission 7109 West Saginaw Highway Post Office Box Lansing, MI 48909

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Georgia Transmission Corporation Georgia Systems Operations Corporation

Transcription:

PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011

Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects Update Sub-Regional Projects ColumbiaGrid Order 1000 2

Attachment K: Transmission Planning Process Attachment K required as part of pro forma OATT - outlines PSE s transmission planning process Annual update of PSE s local and regional planning This meeting is intended to include local issues not raised in ColumbiaGrid or other regional planning forums 3

Economic Studies Process Intended to address generation integration and transmission congestion Requests for studies should be submitted to Transmission Provider: transmaster@pse.com, see Part VII All requests/results will be posted on OASIS Requests received by Oct. 31 st will be responded to in the following calendar year Will be evaluated by public meeting within 3 months of receipt for input and investigation Non-local requests will be forwarded to ColumbiaGrid or WECC Transmission Expansion Planning Policy Committee for consideration 4

PSE Transmission Plan Development Held on June 16, 2011 Today s Meeting 5

Planning Assumptions Base Cases Northwest Loads Utilize peak load forecasts for 10 years out, updated annually Load forecasts for both winter and summer seasons Rely on input from customers for accurate forecasts Resources Model existing generating resources and projects with interconnection agreements Resources or demand response programs provided in annual customer data submittal Cases assembled through the WECC Annual Study Program 6

PSE Load Growth 2010/11 Winter Peak: 4818 MW @ 27 F All-time Winter Peak: 5166 MW @ 25 F in 2008/09 2011 Summer Peak: 3164 MW @ 82 F All-time Summer Peak: 3774 MW @ 100 F in 2009 PSE Historical Peak Load MW 5500 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0 BA Winter Peak BA Summer Peak 1981 1986 1991 1996 2001 2006 2011 Year PSE s Electric Customer Count: More than 1 million 7

PSE 2011 Planning Considerations Near and Far-term 2012 Light Summer, 2012 Heavy Summer, 2012-13 Heavy Winter 2021 Heavy Summer, 2017-18 Heavy Winter Integrated Resource Plan Interconnection and Transmission Service Requests Generation dispatch variations All Puget Sound area generation ON All Puget Sound area generation OFF Regional flowgates/cutplanes Northern Intertie import and export flow conditions Raver to Paul and Paul to Raver flow conditions Input from Customers and Stakeholders 8

Northern Intertie Typical Stressed Winter Regional Power Flows Low Puget Sound Area Generation Monroe Echo Lake West of Cascades North BPA s 500 kv High Intertie Flows 9

Northern Intertie Typical Stressed Summer Regional Power Flows High Intertie Flows High Puget Sound Area Generation Monroe Echo Lake West of Cascades North BPA s 500 kv High Intertie Flows Raver - Paul 10

Current PSE Planning Activities Recently Completed Projects PSE Specific Areas North Puget Sound Area Central Puget Sound Area South Puget Sound Area Other Significant Projects 11

Recently Completed Significant Transmission Projects Sedro Woolley-Baker River Switch #2 115 kv Line Reconductor Sedro Woolley-Horse Ranch 230 kv Line (2010) Horse Ranch 230 kv Switching Station 12

North Puget Sound Area Proposed Transmission Projects Portal Way 2 nd Transformer Sedro Woolley 2 nd Transformer Service requests on PSE and BPA systems Changing generation and industrial loads Operational constraints (N-1) Need for 230/115 kv transformer capacity increase 13

Central Puget Sound Area Proposed Transmission Projects Sammamish-Lakeside-Talbot 230 kv Line And Lakeside 230/115 kv Transformer Need for 230/115 kv transformer capacity for growing load service and operational needs Increase transmission capacity 14

South Puget Sound Area Proposed Transmission Projects Alderton Transformer St Clair Transformer Local load growth Need for 230/115 kv transformer capacity 15

Additional Proposed Significant Single System Transmission Projects Bellingham 115 kv Substation Rebuild Sedro Woolley Bellingham #4 115 kv Line Reconductor Sedro Woolley-Baker River Switch #1 115 kv Line Reconductor Sammamish 230 kv 2 nd Bus Section Breaker Talbot 230 kv Bus Improvements White River 115 kv 2 nd Bus Section Breaker Woodland-St. Clair 115 kv 16

ColumbiaGrid Areas of Focus for PSE Biennial Planning Area screening studies to address load growth and transmission path ratings Puget Sound Area Study Team (PSAST) Transmission Expansion Plan/Update includes improvements to PSE, SCL, and BPA facilities in the Puget Sound Area Wind Integration Study Team (WIST) Facilitate the integration of renewable generation in the Northwest Dynamic Transfer Capability Task Force 17

ColumbiaGrid Areas of Focus for PSE (cont.) Cross Cascades Study Team Impacts to PSE generation and transmission across the West of Cascades North path Changes to regional generation dispatch with additional wind generation in Eastern Washington Growing Puget Sound load For upcoming ColumbiaGrid Meetings, check out the calendar on their website at www.columbiagrid.org 18

Order 1000 Targets regional and interregional transmission planning and cost allocation requirements Regional level being coordinated through ColumbiaGrid Interregional level being coordinated at WECC (planning) Workshop in first quarter 2012 19

Questions? Contacts George Marshall, Director Electric Transmission george.marshall@pse.com John Phillips, Manager Transmission Contracts john.phillips@pse.com Laura Hatfield, Transmission Contracts Manager laura.hatfield@pse.com Kebede Jimma, Lead Engineer Transmission Planning kebede.jimma@pse.com Don Yuen, Electric Distribution Planning Supervisor don.yuen@pse.com Stephanie Lu, Senior Engineer Transmission Contracts stephanie.lu@pse.com 20