Johannes Johannesson Naval Architect, FRINA, MIDA
The new ferry Length Breath Draught Car capacity 71,80 m 15,10 m 2,85 m 75 PCU Passenger capacity 540 Shaft Power Generator power Battery Capacity Speed 3.400 kw 4.200 kw 3.000 kwh 15,6 knots
References to ferries and battery operation Helsingør Helsingborg Design of ferries and harbours Rødby Puttgarden installation of batteries /operation Spodsbjerg Tårs Design of ferries and harbours Gedser Rostock Design of ferries and operation
Why Batteries and Electrical Operation Sustainable energy is one of Iceland's main resources Minimising environmental footprint by reducing fossil fuel Batteries save energy, even without charging from ashore Batteries increase the operational reliability and safety The operation of the ferry is firmer and smoother.
Energy Consumption for one crossing Basis for the operation is 45 minutes crossing and 30 minutes harbour Hybrid Batteries and Diesel Batteries alone
Environmental Impact 14 trips per day 5 months (high season) 10 trips per day 7 months (low season) Yearly energy usage around 5.500 MWh CO 2 emission (kg) 3.573.000 NO x emission (kg) 62.040 CO emission (kg) 9.020 HC emission (kg) Particular matter (kg) 2.820 (Hydro Carbons) 1.240 (Very small particles) SO 2 emission (kg) 2.370 based on SECA requirement s (0,1 %)
Engine Room - Arrangement and Suppliers Main Switchboard Marine Electric production & Propulsion thrusters Batteries Shore Connection
The Core The Switch Board Main Switchboard: 1000 V DC, Variable voltage Generators: 3 x 690 V AC, Variable frequency Propulsion thrusters: 3 x 690 V AC, Variable frequency Power consumers: 3 x 690 V AC, 50 H / 3 x 230 V AC, 50 H Shore Connection: 3 x 600 V AC Marine
Energy Storage System - Batteries (ESS) One Battery 5,65 kwh One Rack 22 batteries, 124,3 kwh Total Battery Capacity 24 racks 2983,2 kwh Typical Voltage DC 920-1000 VDC Typical state of charging 50% - 90%
The Propulsion Pulling Thrusters Rolls Royce Azipull 5 bladed fixed pitch propeller Power Output 2 x 1700 kw, Variable speed Rotation 2 RPM (12 O per second)
Elektrical Production - Diesel Engines and Generators Electrical Production 3 x 1,350 kw, Variable frequency Emission Class Tier III, EPA
Shore Connection Ferry Charger Capacity 2.500 kw 30 minutes Charging 1.250 kwh Fully Automatic Charging in both harbours
Batteries save energy even without shore connection Spinning reserves not needed The diesel engine can run at its optimum point Variable speed 205 g/kwh 20-100% Fixed speed 205 g/kwh 100% 350 g/kwh 20%
Thank you for your attention Johannes Johannesson Naval Architect, FRINA, MIDA
Power (kw) or Energy (kwh) SUSTAINABLE OPERATION ON THE Basis Energy Consumption 3.200 3.000 2.800 2.600 2.400 Power Consumption kw Energy Used kwh Battery Content kwh 2.200 2.000 1.800 1.600 1.400 1.200 1.000 800 600 Crossing to Vestmannaeyjar Crossing to Landeyjahöfn 400 Landeyjahöfn Vestmannaeyjar 200 0 Time in minuts 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
Single line diagram one side