Net Metering and Solar Incentive Proposed Framework

Similar documents
MA SREC Update August 21, SRECTrade, Inc.

Next Generation Solar Incentive Program

(2) Scope. 220 CMR applies to all Distribution Companies subject to the jurisdiction of the Department.

Creating A Cleaner Energy Future For the Commonwealth. Growing Solar in MA. MMA Annual Meeting. Boston, 1/24/14

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

Net Metering & Compensation Seminar

INTRODUCTION. June 15, Mark D. Marini, Secretary Massachusetts Department of Public Utilities One South Station Boston, MA 02110

Community Shared Solar Opportunities in Massachusetts Emma Krause Rooftop Solar Challenge Coordinator MA DOER

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

FITCHBURG GAS AND ELECTRIC LIGHT COMPANY NET METERING SCHEDULE NM

JEA Distributed Generation Policy Effective April 1, 2018

The Commonwealth of Massachusetts

The Gambia National Forum on

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Decision on Merced Irrigation District Transition Agreement

Overview of S.L Competitive Energy Solutions for North Carolina

SMART Program: Ensuring Expanded Access for Low-Income Ratepayers and Communities Updated May 11, 2017

Creating A Greener Energy Future For the Commonwealth. Massachusetts Solar Carve-Out (SRECs): Overview & Program Basics.

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

WinnCompanies Community Solar Photovoltaic to Benefit Affordable Housing Darien Crimmin Vice President of Energy & Sustainability

Net Metering Policy Framework. July 2015

a) The 2011 Net Metering and Buyback Tariff for Emission Free, Renewable Distributed Generation Serving Customer Load

216B.164 COGENERATION AND SMALL POWER PRODUCTION.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

Clean Energy Policy & Procurement- Regional v. Go-It-Alone Approach

Net Metering Webinar

SDG&E Customer Distributed Generation Programs. Steve Jaffe Senior Market Advisor Customer Innovations Group September 14, 2009

Solar-Wind Specific Request for Proposals

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

Increasing Access: Low Income Community Shared Solar 101

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

SMART Program Overview and Transition Process

Feed-In Tariffs Presentation to the Nevada Production and Use of Energy Committee

KANSAS CITY POWER AND LIGHT COMPANY P.S.C. MO. No. 7 Fourth Revised Sheet No. 39 Canceling P.S.C. MO. No. 7 Third Revised Sheet No.

Solar Act 2012 Changes to the Energy Efficiency and Renewable Energy Rules (N.J.A.C 14:8) August 15, 2013 (Revised)

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

Renewable Energy System Tariffs and Pricing

Merger of the generator interconnection processes of Valley Electric and the ISO;

What, Why, and Where? Brian Lips Senior Project Manager for Policy NC Clean Energy Technology Center

New Jersey Solar Roundtable

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Solar Massachusetts Renewable Target (SMART) Program Summary Kaitlin Kelly Renewable Energy Program Coordinator

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

HOUSE BILL No Koch

Solar Project Development in Regulated Markets. Smart and Sustainable Campuses Conference 2017

Electricity Trends in Pennsylvania

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

RIPUC No Cancelling RIPUC No Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY NET METERING PROVISION

24. SOLAR INCENTIVE PROGRAM II

Net Energy Metering and Interconnections. Community Solar in the District of Columbia

Senate Bill 1547 Ordered by the House February 29 Including Senate Amendments dated February 12 and House Amendments dated February 29

Community Solar Policy

Guideline on Energy Storage

Interconnection and Net Metering Service in Ohio

City of, Kansas Electric Department. Net Metering Policy & Procedures for Customer-Owned Renewable Energy Resources

The Commonwealth of Massachusetts

Village of Enosburg Falls Water & Light Department. Tariff No. NM-1. Net Metering

RAPPAHANNOCK ELECTRIC COOPERATIVE SCHEDULE NEM-8 NET ENERGY METERING RIDER

National Grid s Solar Initiatives and Net-Metering

Minnesota Power s Community Solar Garden Program. Minnesota Senate Legislative Energy Commission 7/12/2018

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

Distributed Solar Policy Case Study: NEVADA

78th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 4036

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

NET METERING. The terms set forth below shall be defined as follows, unless the context otherwise requires.

Overview of Net Energy Metering (NEM) Successor Tariff (NEM 2.0)

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Solar Massachusetts Renewable Target (SMART) Program Summary

University of Alberta

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Becket Energy Committee Informational Session September 9, Jim Barry, Regional Coordinator Mass DOER COMMONWEALTH OF MASSACHUSETTS

Central Hudson Solar Summit 2017 Poughkeepsie, NY NY-Sun Program Updates. March 9, 2017

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

ROANOKE ELECTRIC COOPERATIVE RATE SCHEDULES

THE PUBLIC SERVICE COMMISSION OF MARYLAND

Review of Reliability Must-Run and Capacity Procurement Mechanism BBB Issue Paper and Straw Proposal for Phase 1 Items

Thomas Edison, U.S. inventor, in 1931 conversation with Henry Ford and Harvey Firestone

NSTAR ELECTRIC COMPANY M.D.P.U. No. 28 EASTERN MASSACHUSETTS CAMBRIDGE SERVICE AREA GENERAL SERVICE

SCHEDULE 62 COGENERATION AND SMALL POWER PRODUCTION SCHEDULE - IDAHO

Illinois and Renewable Energy

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Illinois Renewable Energy Portfolio Net Metering Grid Interconnection Requirements Financing Options

HOUSE BILL 589: Competitive Energy Solutions for NC.

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

Welcome. Join the Conversation #LECONNECT

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

Montana Renewable Energy Association

Senate Substitute for HOUSE BILL No. 2101

Understanding Impacts of Distributed Solar Generation on Cost Recovery and Rates IAMU Annual Energy Conference Preconference Seminar

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

The Essentials of Community Solar

Community Solar Projects: Glossary of Terms

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

Transcription:

Net Metering and Solar Incentive Proposed Framework STAKEHOLDER MEETING JUNE 11, 2014 June 12, 2014 1

Meeting Agenda June 11, 2014 2-3pm. Review framework. Today s Meeting is to EXPLAIN a compromise framework for net metering and solar incentives. This is not a regulatory proceeding nor is it a legislative hearing. 3-4pm. Q&A. Please consider those waiting to speak after you and limit your time at the mic. All parties are willing to follow up with additional conversations. June 12, 2014 2

Process Multiple bills with different approaches filed to address net metering caps. TUE hearing March 11. DOER engaged each bills major proponents, SEIA and NGRID with NECEC, NU and DPU for stakeholder discussion. Meetings began March 14 th. Agreement on framework and legislation reached for the future of net metering and solar incentives. June 12, 2014 3

Negotiation Objectives 1. Continue the deployment of DG while reducing ratepayer impacts. 2. Relieve pressure on renewable energy development from net metering caps, and create a sustainable future framework for small scale renewable energy systems. 3. Preserve availability of both behind the meter and virtual net metering. 4. Maintain opportunities for customers (hosts and off-takers) to directly benefit from DG. 5. Enable market to reach 1600 MW DC goal at lower cost and with comparable market outcomes. 6. Map out a seamless transition that allows for shift from one incentive regime to another with minimal market disruption; protect existing projects. June 12, 2014 4

Market Gains 1600 MW solar goal written into statute. No NEM caps for solar, effective immediately. Transition begins 7/1/15, completed 9/30/16. Retains allowance of virtual metering (VM), with restrictions. Certainty beyond current political context. Takes risk out of solar incentive program (as a fixed known payment). Avoids an inherently uncertain process with respect to the value of virtual metering. Maintains SREC II policy goals re: project type, size, and locations as well as reduced ratepayer impacts. Provides for continuation of Ag, AD, and wind net metering projects. June 12, 2014 5

Phase 2 Solar Net Metering Systems (Behind-the-Meter) Continuation of full retail valuation of NEM credits. Can not be sized larger than what is needed to meet 100% of expected future load; customer has some leeway in representing future load growth. Customer has option to cash out if credits accumulate to more than half the annual load (cash payment calculated at Class III private rate). Net Metering eligibility lasts for life of Unit. Facility size limited to 5 MW AC. June 12, 2014 6

Solar Virtual Metering Systems Virtual metering preserved for eligible projects/off-takers Credit calculation changed no kwh distribution credit included (current Private Class III rate). Division between preferred off-takers and others: Preferred Sectors facilities limited to 2 MW AC per parcel, 5 MW AC per landfill: Municipalities and other governmental entities Affordable housing/low income Campus projects; (i.e., multiple meters served by same on-site system) Community shared solar, as defined in SREC II Private entities facilities limited to 1 MW AC per parcel: Host and off-taker must be related parties Same geographic boundaries as today (same utility service territory and load zone). Utilities may elect to provide payments to Municipalities rather than continuing the allocation of credits to multiple accounts. June 12, 2014 7

Declining Block Incentive Structure 1,600 MW total solar program goal - total capacity includes SREC, SREC II, and this successor program New declining MW block design Transparent schedule laying out block sizes and related incentive levels Declining Block Values designed to provide sufficient revenues to build facilities and with differential values for market sectors similar to SREC II Market Sectors. Incentive level automatically steps down as blocks are filled First come first served based on capacity reservations, projects must be advancedstage to reserve capacity 15 year Incentive payment stream (may be shorter for smaller systems). NEM and VM credits continue for lifetime of project. Phase 2 Solar Net Metering systems Incentive independent of NEM credit value. Solar Virtual Metering systems Contracts for difference framework VM credits and incentive operate in tandem to achieve fixed revenue stream. As NEM credit value increases, incentive decrease and vice-versa. June 12, 2014 8

Cents/kWh Contract for Differences 0.3 0.25 End of incentive term 0.2 0.15 Incentive Electricity 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Years June 12, 2014 9

DOER and DPU Regulatory Role Historical Background At March 22, 2013 Stakeholder Meeting, DOER stated its interest in central procurement to reduce price risk, enhance project financing, and save ratepayers costs. DOER recognized need for legislative process and committed to SREC II regulatory process to assure market continuity. DOER commissioned Task 2 Report: Comparative Evaluation of Current Carve-out Policy to Other Policy Alternatives. Evaluation demonstrated significant ratepayer cost savings of central procurement with standard offer. Declining Block Tariff Development Under the Declining Block framework, DOER will engage in a stakeholder process to develop block values. DOER will file a petition with the DPU for program approval following an adjudicated process. Utilities will file associated illustrative tariffs. June 12, 2014 10

Declining Block Incentive Mechanics Under the Declining Block Incentive (DBI) Program, there will be no SRECs created. Any project qualified to receive SREC or SREC II credits under the current programs will continue to do so until they expire. DBI non-energy attributes of solar facilities will be minted as Class I RECs and may be used by utilities for their basic service Class I requirement or sold in the Class I market. Proceeds will be credited back to distribution customers. Facilities will receive incentive payments via tariff mechanism approved by the DPU. Competitive Suppliers will NOT have a new solar carve-out obligation but retain their obligations under SREC and SREC II. June 12, 2014 11

Minimum Bill Instructs utility regulators to implement a minimum monthly bill for all customers, to ensure that all customers are paying something each month to cover their fair share of the costs incurred by the utility in developing, maintaining, operating and upgrading the distribution system. Non-discriminatory charge. Applies equally to all customers whether they have DG or not. May be scaled depending upon customer load. DPU process would establish minimum bill value. This is not a fixed charge. DPU may exempt or modify the minimum bill for the low income rate class. June 12, 2014 12

Transition NEM caps lifted immediately. DPU Order and conforming tariffs by July 1, 2015. New program effective immediately upon issuance of DPU order. Projects obtaining Assurance of Qualification (AoQ) prior to effective date safe harbored in SREC II and existing net metering rules. Program choice (SREC II or Declining Block) optional for projects receiving AoQ between July 1 and December 31, 2015, but if electing SREC II, must pay $60/kW deposit against completion. Beginning January 1, 2016 all projects that do not have an AoQ will be in the Declining Block Incentive Design and new metering framework. SREC II Minimum Standard adjusted to reflect final supply pool of SREC II qualified projects. Other mechanics of program and transition to be worked out as part of DOER filing by November 2014. June 12, 2014 13

Other Issues Merchant Solar Generating Facilities (QF/stand-alone projects) will receive a fixed 15-year incentive ; energy will be sold at the wholesale rate. Incentive will be set at the time the facility qualifies for the DBI at the same level a comparable solar virtual metering facilities would receive. Segmentation of facilities: prohibits facilities built on contiguous parcels unless parcels and facilities owned by different people/entities or facilities are built 12 months apart. A Phase 2 Solar Net Metering facility and a Solar Virtual Metering facility may be located on the same parcel IF the total aggregate capacity is no larger than 2 MW AC. Certain policy-driven project types will receive an additional incentive to encourage their development, including: municipal/other gov. entities; low income housing; geographically target areas of the distribution system; and emergency power generating facility. June 12, 2014 14

Non-Solar Net Metering Agriculture, AD, Wind and non-solar DG facilities under 60 kw will continue under a new 3 % peak load cap exclusive of solar qualified under SREC, SREC II and the new program (this allows for approx. 275 MW of non-solar DG capacity to be built). Continuation of current valuation of NEM credits. Once the cap is reached, new projects may meter at the Class III rate. June 12, 2014 15

Responsibilities Under New Programs DOER will Design the declining block program with fixed prices for bundled and unbundled tariffs, with stakeholder input. Develop the eligibility criteria/regulations for projects and qualify projects for RPS eligibilty. DPU will Review the program design and proposed tariffs. Assign a party to run the eligibility and enrollment assurance system (potentially same as Mass ACA today). Review the program s progress, and balance the costs between the companies. Distribution companies will Develop new tariffs to comply with Act. Collect deposits during transition period for projects. Develop tariffs to implement payments, and implement needed system changes. June 12, 2014 16

Program Highlight Review 1,600 MW of Solar will be incentivized. Eliminates net metering cap for solar projects. Preserves opportunity for behind-the meter and virtual metering via new net metering/virtual metering program (Section 139 ½). Known, predictable payment stream for projects through the Declining Block Incentive Program (Section 11K). Provides ample transition timeline for solar projects in development or about to start development. Affords continued net metering for non-solar DG. Opens DOER-driven public stakeholder process to determine incentive values based on market segments and conditions. June 12, 2014 17