ST. LOUIS DISTRICT MOBILITY

Similar documents
ST. LOUIS DISTRICT MOBILITY

ST. LOUIS DISTRICT MOBILITY

St. Louis District Mobility

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

St. Louis District Mobility

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA MAY 2013 MONTHLY REPORT

WIM #41 CSAH 14, MP 14.9 CROOKSTON, MINNESOTA APRIL 2014 MONTHLY REPORT

NEWS RELEASE November 8, 2017

2017 Annual Report Kansas Department of Transportation

Wichita TMC Support- Monthly Incident Report for December 2017

Wichita TMC Support- Monthly Incident Report for July 2018

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Wichita TMC Support- Monthly Incident Report for June 2018

I-405 Sepulveda Pass Improvements Project

Operate a Reliable and Convenient. Becky Allmeroth, State Maintenance Engineer. Tracker. Measures of Departmental Performance

WIM #48 is located on CSAH 5 near Storden in Cottonwood county.

2016 Congestion Report

2013 Operations Statistics Report Triangle Expressway Fourth Quarter

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

CLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 3rd Street Tunnel at Massachusetts Avenue Exit

TxDOT TRAFFIC INCIDENT MANAGEMENT UPDATE. ITS Texas 2016

Figure 1 Map of intersection of SR 44 (Ravenna Rd) and Butternut Rd

Metropolitan Freeway System 2013 Congestion Report

Traffic Accident Statistics

Collision Analysis Safety Tables

Study Area and Location District PSA Ward ANC Phase Description C Planned Suitland Parkway Westbound at Stanton Road Southeast

Project Advisory Committee

1999 Missouri State Highway System. Missouri Department of Transportation - Transportation Management Systems

I-405 Sepulveda Pass Improvements Project

WIM #40 is located on US 52 near South St. Paul in Dakota county.

Operate a Reliable and Convenient. Becky Allmeroth, State Maintenance Engineer. Tracker. Measures of Departmental Performance

RTCSNV CRASH ANALYSIS REPORT

Algo Traffic and the Tuscaloosa RTMC. Chris Sewell, P.E. ITS Operations Manager ALDOT West Central Region

WIM #39 MN 43, MP 45.2 WINONA, MN APRIL 2010 MONTHLY REPORT

Alberta. Collision Facts. 330 people killed. 17,907 people injured. 140,705 collisions.

Tracker. Operate a reliable and COnvenient transportation system. Becky Allmeroth, Chief Safety and Operations Officer

Request for Design Exception (#1) S.M. Wright Phase IIB

Study Area and Location District PSA Ward ANC Phase Description C Existing 100 Block Michigan Avenue Northeast Westbound

Florida s Turnpike Enterprise. Incident Management Program for All Levels & Specialty Towing & Roadside Repair (STARR)

Transit City Etobicoke - Finch West LRT

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Traffic Engineering Study

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command

WIM #40 US 52, MP S. ST. PAUL, MN APRIL 2010 MONTHLY REPORT

TABLE OF CONTENTS CRASHES.. VI TRENDS. VII

RIDERSHIP TRENDS. March 2017

ALCOHOL AND WYOMING TRAFFIC CRASHES

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 400 Block 14th Street SW

Monterey County Freeway Service Patrol Annual Report

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel

CITY OF BEVERLY HILLS STAFF REPORT

Annual Statistical Report

FREQUENTLY ASKED QUESTIONS

LAWRENCE TRANSIT CENTER LOCATION ANALYSIS 9 TH STREET & ROCKLEDGE ROAD / 21 ST STREET & IOWA STREET LAWRENCE, KANSAS

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Metropolitan Freeway System 2007 Congestion Report

Event Chronology. Sarasota I-75 NB Exit SUMTER BLVD. County: Road: Location: Rollover:

ODOT District Two Monthly Construction Update

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

IH 45 (GULF FWY) IH 10 (Katy Fwy) to IH 610 S (South Loop) 2010 Rank: Rank: 12

USE RESTRICTED 23 USC 409

EXECUTIVE SUMMARY. The following is an outline of the traffic analysis performed by Hales Engineering for the traffic conditions of this project.

Sound Transit Operations July 2016 Service Performance Report. Ridership

ODOT District Two Monthly Construction Update

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Study Area and Location District PSA Ward ANC Phase Description B Existing 600 Block New York Avenue Northeast Westbound

Presentation to the Customer Service, Operations and Safety Committee OPERATIONS PERFORMANCE INDICATORS

Over-Dimensional Vehicle Restriction Study for US 129 in TN

Wisconsin Motor Vehicle Crash Report. Agency Crash Number Date Arrived 11/17/2017. Total Units 02. School Bus Related No

MEMO VIA . Ms. Amy Roth DPS Director, City of Three Rivers. To:

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

US 59 (SOUTHWEST FWY) IH 610 (West Loop) to SH 288 (South Fwy)

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

Strategies to keep people and goods moving in and through Seattle

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MO 370 Interchange Ramp at Salt River Road - Phase 1

Regional Safety Study

VEHICLE / PEDESTRIAN COLLISIONS

Safety Assessment. Intersection of Route 29 (Seminole Trail) and Ashwood Blvd (Route 1670). Albemarle County

Study Area and Location District PSA Ward ANC Phase Description A Proposed Monroe Street Northeast Eastbound at Rhode Island Avenue

IMPROVEMENT CONCEPTS

FREQUENTLY ASKED QUESTIONS

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Florida Department of Transportation. Road Ranger Performance Measures 2nd Quarter Report. October 1 to December 31, 2014 Fiscal Year (FY) 2014/2015

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

Department of Highway Safety and Motor Vehicles

Traffic Analysis for Bon Air Bridge Mitigation Magnolia Storm Water Quality Project

USE RESTRICTED 23 USC 409

Proposed location of Camp Parkway Commerce Center. Vicinity map of Camp Parkway Commerce Center Southampton County, VA

STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION OFFICE OF ENGINEERING AMENDMENT NO. 4 TO: IN THE LETTING OF FEBRUARY 21, 2013

Study Area and Location District PSA Ward ANC Phase Description C Proposed 2600 Block Lincoln Road Northeast Northbound

Existing Conditions Belmont Circle Bourne, MA. Belmont Circle Improvements

Brookline Police Department

Transcription:

ST. LOUIS DISTRICT MOBILITY BI-MONTHLY REGIONAL MOBILITY REPORT JANUARY / FEBRUARY 2018 EDITION NO. 02 Table of Contents EXECUTIVE SUMMARY Provide Outstanding Customer Service & Deliver Transportation Services of Great Value 5 6 8 3 40 50 4-15 WORK ZONE MANAGEMENT Keep Roads and Bridges in Good Condition 16-17 INCIDENT MANAGEMENT Keep Customers and Ourselves Safe 18-34 10 00 12 14 16 18 6 20 4 11 0 FREEWAY MANAGEMENT Operate a Reliable and Convenient Transportation System Use Resources Wisely & Advance Economic Development 10 8 10 1 30 2018 9 2 20 2017 7 4 1-3 20 Text Area Major WZ Impacts 15 2 22 0 25 Moderate Text Area WZ Impacts 30 60 Text Area 40 20 50 10 10 70 ATC Incident YTD Text Area ATC 30 00 8 2 10 6 12 4 14 2 12 14 Text Area JanFeb 2017 Text Area Jan-Feb 2018 User Delay Cost in Millions User Delay Cost in Millions 2017 vs. 2018 # Work Zone Crashes -16.6% 70 8 10 4 Text Area ATC TT Incidents YTD Lanes YTD 6 60 2017 vs. 2018 Fatal Crash Clearance - 5.7% 2017 vs. 2018 TT Crash YTD AVG. +28.6% User Delay Cost: Passenger Vehicle $17.67 Commercial Vehicle $68.09 Sources Texas Transportation Institute & American Transportation Research Institute January thru February 2017 Grand Total and Average Delay cost: Vehicle Miles traveled (VMT) Total $6,563,832.43 Per VMT $0.00 Total: 1,414,303,554 miles Hours of delay: Passenger: 1,272,873,198 miles Person-hours: 301,287h 50m 48s Commercial: 141,430,355 miles Vehicle hours: 245,949h 15m 45s Delay per VMT: 0.0104 mins/mile 1 January thru February 2018 Grand Total and Average Delay cost: Vehicle Miles traveled (VMT) Total $7,554,056.37 Per VMT $0.01 Total: 1,416,925,025 miles Hours of delay: Passenger: 1,275,232,522 miles Person-hours: 346,740h 19m 22s Commercial: 141,692,502 miles Vehicle hours: 283,053h 19m 29s Delay per VMT: 0.012 mins/mile

EXECUTIVE SUMMARY ZONING IN New Freeway Mobility Reporting Detailed For I-270 Corridor Average Time To Clear Lanes Increased From A Year Ago There Were 13 Fatal Crashes In January and 1 In February Work Zone Delays Confined To Poplar Street Bridge work EB I-64 @ I-70/I-55/US 40 Moved Up A Spot From # 2 in 2017 To # 1 On Top 5 Congestion Spots For January/February 2018 Most Significant Impact Events Planned Event TMS Work Zones: January 2018: 203 February 2018: 228 Work Zone Impact Breakdown: Major: 8 0.9% Moderate: 20 7.3% Minor: 343 91.8% WORK ZONE CRASHES: 5 Dates:1-1 2-28 Date:1-23 Location: Eastbound I-64 Poplar Street Bridge Event Detail: Bridge work 3 right lanes closed 25 minutes of additional travel time during non-peak period Unplanned Event Location: Eastbound I-64 before I- 270 Event Detail: Fatal Multi-vehicle crash involving a small car cutting in front of a tractor trailer causing a 6 car chain reaction crash 2

EXECUTIVE SUMMARY Top 5 Congestion Locations / January February 2017 vs. 2018 Congestion Locations 2017 *Base Impact Average Queue Length Miles Average Daily Duration Total Duration 1 SB I-170 @ Galleria Parkway 11,684.09 1.47 2h 04 m 5d 02h 29m 2 EB I-64 @ I-70/I-55/US40 11,369.74 2.04 1h 36m 3d 22h 44m 3 SB I-270 @ MO100 Manchester Road 11,161.38 1.45 2h 07m 5d 05h 36m 4 EB I-64 @ Big Bend Boulevard 10,419.55 2.91 0h 55m 2d 06h 49m 5 WB I-64 @ Clayton Ave / Oakland Ave 10,292.54 2.29. 1h 17m 3d 04h 31m Locations ranked on *Base Impact (The aggregation of Queue Length over time for congestion originating at each location in mile minutes) Congestion Locations 2018 *Base Impact Average Queue Length Miles Average Daily Duration Total Duration 1 EB I-64 @ I-70/I-55/US40 21,484.02 1.32 4h 29m 11d 00h 39m 2 WB I-64 @ Clayton Ave / Oakland Ave 9,960.02 2.11 1h 23m 3d 09h 57m 3 EB I-64 @ Big Bend Boulevard 9,540.95 2.95 0h 51m 2d 02h 33m 4 SB I-170 @ I-64/US 40/Eager Road 7,630.57 1.20 2h 12m 5d 09h 58m 5 EB I-270@ US 67/Lindbergh Boulevard 7,612.99 0.74 2h 53m 7d 02h 58m Locations ranked on *Base Impact (The aggregation of Queue Length over time for congestion originating at each location in mile minutes) Average Incident Duration Comparison / 2017 vs. 2018 Month Average Incident Duration 2017 2018 (Minutes : Seconds) January Lane Clearance 27:39 28:41 February Lane Clearance 25:52 26:17 January Incident Clearance 32:06 33:20 February Incident Clearance 29:06 31:35 3

FREEWAY MANAGEMENT Overall AM Regional Mobility DECREASED 6 am 7 am AM Peak Period Mobility January/February 2017 7 am 8 am 9 am 10 am 8 am 9 am AM Peak Period Mobility January/February 2018 6 am 7 am 7 am 8 am 8 am 9 am 9 am 10 am 4

FREEWAY MANAGEMENT Highlighted Corridor I-270 Comparing AM January/February 2017 to AM January/February 2018 AM Northbound I-270 Mobility DECREASED 2017 2018 AM Southbound I-270 Mobility INCREASED 2017 2018 5

FREEWAY MANAGEMENT AM Northbound/Eastbound 2017 6 AM 7 AM 8 AM 9 AM 2 1 6

FREEWAY MANAGEMENT AM Northbound/Eastbound 2018 6 AM 7 AM 8 AM 9 AM 2 Mobility improvements between I-44 and Manchester Road (MO-100) during the 9am 10am hour. 1 Decreased mobility between Tesson Ferry and I-44 from 8:45am to 9:45am. 7

FREEWAY MANAGEMENT AM Westbound/Southbound 2017 6 AM 7 AM 8 AM 9 AM 3 4 5 8

FREEWAY MANAGEMENT AM Westbound/Southbound 2018 6 AM 7 AM 8 AM 9 AM 3 Improved mobility between Washington/Elizabeth and McDonnell from 6:30am 8:30am. 4 Decreased mobility between Dorsett Road and Olive Blvd. (MO 340) from 7:30am 8:30am. 5 2017 congestion between Olive Blvd. (MO 340) and Manchester (MO 100) not present in 2018. Congestion likely shifted upstream and accounted for between Dorsett and Olive. 9

FREEWAY MANAGEMENT Overall PM Regional Mobility DECREASED SLIGHTLY PM Peak Period Mobility January/February 2017 3 pm 4 pm 4 pm 5 pm 5 pm 6 pm 6 pm 7 pm A PM Peak Period Mobility January/February 2018 3 pm 4 pm 4 pm 5 pm 5 pm 6 pm 6 pm 7 pm 10

FREEWAY MANAGEMENT Highlighted Corridor I-270 Comparing PM January/February 2017 to PM January/February 2018 PM Northbound I-270 Mobility DECREASED 2017 2018 PM Southbound I-270 Mobility INCREASED 2017 2018 11

FREEWAY MANAGEMENT PM Northbound/Eastbound 2017 3 PM 4 PM 5 PM 6 PM 1 2 12

FREEWAY MANAGEMENT PM Northbound/Eastbound 2018 3 PM 4 PM 5 PM 6 PM 1 Decreased mobility 4pm 5:15pm between Washington/Elizabeth and Route 367. 2 Decreased mobility between McDonnell and I-170 during the hour of 2:45pm 3:45pm. 13

FREEWAY MANAGEMENT PM Westbound/Southbound 2017 3 PM 4 PM 5 PM 6 PM 3 4 14

FREEWAY MANAGEMENT PM Westbound/Southbound 2018 3 PM 4 PM 5 PM 6 PM 3 Improved mobility between I-64 and I-44 from 3:15pm 4:00pm. 4 Improved mobility in 2018 between Olive Blvd. (MO 340) and Dougherty Ferry from 6:15pm 7:00pm. 15

WORK ZONE MANAGEMENT TMC Observed Work Zones January 2018 February 2018 Level of Travel Time Impact Number of Work Zones Level of Travel Time Impact Number of Work Zones Major Impact 2 Major Impact 6 Moderate Impact 6 Moderate Impact 14 Minor Impact 162 Minor Impact 181 Total 170 Total 201 SL Mobility Rating: Jan 2018: 92% Feb 2018: 91% Goal: 91% *Impact Levels described in Data Key: SL Visibility levels: Jan 2018: 97% Feb 2018: 93% Goal: 91% 16

WORK ZONE MANAGEMENT Additional Travel Time Impacts through Work Zones Major Impact (15 Minutes or Above): # Moderate Impact (10-14 Minutes): # # # 1/1 2/28 (Daily) Eastbound I-64 Poplar Street Bridge 3 right lanes: Closed leaving one lane of traffic open eastbound before Poplar Street Bridge daily All mitigation efforts were in use RITIS data recorded additional travel times up to 25 minutes during non-peak hours 8 20 17

INCIDENT MANAGEMENT 18

INCIDENT MANAGEMENT 19

Incidents INCIDENT MANAGEMENT Total Number of Incidents: / December: 906 / January: 800 / February: 726 250 200 Total Number of Lane Blocking Incidents Major Impact Incidents January 2018 vs. February 2018 (4) (3) Fatal Incidents January 2018 vs. February 2018 (13) (1) Tractor Trailer Incidents January 2018 vs. February 2018 (56) (43) 150 100 50 0 I-270 I-70 I-64 I-44 I-55 I-170 Mo-364 Mo-370 All Others Dec 225 177 149 103 90 48 25 21 68 Jan 176 179 96 114 68 60 20 5 82 Feb 159 142 122 111 76 32 20 8 56 20

INCIDENT MANAGEMENT Lane Blocking Incidents by Freeway January and February 2018 Interstate Month Number of Incidents Average Time to Clear Incident from Lanes = T4 - T1 Average Time for Backup to Clear = T6 - T4 Freeway Miles Incidents per Mile I-44 Jan 114 17:37 00:17 33 3.45 I-44 Feb 111 34:53 00:46 33 3.36 I-55 Jan 68 19:16 00:38 23 2.96 I-55 Feb 76 24:07 00:33 23 3.30 I-64 Jan 96 25:42 01:28 40 2.40 I-64 Feb 122 22:02 01:05 40 3.05 I-70 Jan 179 29:51 02:16 38 4.71 I-70 Feb 142 29:55 01:06 38 3.74 I-170 Jan 60 25:40 00:42 11 5.45 I-170 Feb 32 21:54 01:22 11 2.91 I-270 Jan 176 25:11 02:53 36 4.89 I-270 Feb 159 26:25 01:41 36 4.42 MO-364 Jan 20 26:30 01:00 11 1.82 MO-364 Feb 20 14:36 00:48 11 1.82 MO-370 Jan 5 2:29:48 01:24 13 0.38 MO-370 Feb 8 18:37 00:00 13 0.62 Total Jan/Feb 1388 32:00 01:07 410 3.39 21

INCIDENT MANAGEMENT 22

INCIDENT MANAGEMENT 23

INCIDENT MANAGEMENT 2018 Tractor Trailer Incidents by Route 2018 I-44 I-55 I-64 I-70 I-170 I-255/I- Route Route 270 364 370 Other Total Jan 10 2 8 15 3 16 0 1 1 56 Feb 9 3 4 12 1 11 0 0 3 43 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Yearly Total 19 5 12 27 4 27 0 1 4 99 24

INCIDENT MANAGEMENT January 2018 February 2018 Tractor Trailer Incidents Map Number of Crashes: 1 2 3 4 5 6 Incidents Crashes 25

INCIDENT MANAGEMENT January 2017 December 2017 Tractor Trailer Incidents Map Number of Crashes: 1 2 3 4 5 6 Incidents Crashes 26

INCIDENT MANAGEMENT Incidents over Two Hours January / February 2018 Incidents in red denote high mobility impact Day of Duration # Date & Time Week Route Location Description HH/MM 1 1/5/2018 11:08 Friday MO 370 EB TO MISSOURI BOTTOM RD Single Vehicle Overturned Tractor Trailer 11:03 2 1/8/2018 19:24 Monday Route A TO MO 21 NB Ramp Fatal Crash 2:29 3 1/9/2018 6:45 Tuesday I-44 EB AT PARK AVE Pedestrian Struck By Hit And Run Driver 2:53 4 Multi-Vehicle Medical Emergency Fatal 1/9/2018 16:27 Tuesday MO 94 WB BEFORE I-64 Crash 3:00 5 1/9/2018 19:13 Tuesday 30 SP LOCAL HILLSBORO RD CRD Two-Vehicle Double Fatal Crash 3:35 6 1/13/2018 2:19 Saturday I-70 WB AT SALISBURY Fatal Crash With Ejection 2:55 7 1/14/2018 10:34 Sunday US 67 SB PAST OLD LEMAY FERRY RD Fatal Crash 3:17 8 1/15/2018 7:39 Monday I-70 EB/WB PAST ROUTE T/W Fatal Crossover Crash 3:08 9 1/19/2018 19:33 Friday MO 364 EB TO MO 94 WB Single-Vehicle Crash 2:21 10 1/20/2018 14:09 Saturday 61 US ROUTE W NB RT Two-Vehicle Fatal Crash 2:42 11 1/21/2018 5:01 Sunday I-44 WB BEFORE I-64 Two-Vehicle Medical Emergency Crash 2:13 12 1/22/2018 8:27 Monday I-70 EB AT I-270 Tractor Trailer Crash With State Damage 2:00 13 1/23/2018 6:15 Tuesday I-170 NB BEFORE I-270 Rollover Crash With Serious Injuries 2:34 14 1/23/2018 8:19 Tuesday I-64 EB/WB BEFORE I-270 Multi-Vehicle Fatal Crash TT Vs. Car 3:41 15 1/23/2018 12:13 Tuesday US 67 SB PAST MO 94 Stolen Vehicle Police Chase Crash 2:18 16 1/24/2018 15:42 Wednesday I-270 EB AT MO 367 Multi-Vehicle Chain Reaction Crash 2:00 17 1/24/2018 20:08 Wednesday 50 US DENMARK RD CRD Fatal Crash 4:05 18 1/27/2018 11:51 Saturday EB/WB 100 MO OO RT Motorcycle Vs Car Head-On Fatal Crash 2:42 19 1/27/2018 17:45 Saturday I-64 WB AT TIMBERLAKE MANOR PKWY High Speed Crash With Serious Injuries 4:50 20 1/29/2018 5:34 Monday ST CHARLES ROCK RD PENNRIDGE DR CST Two-Vehicle Fatal Crash 3:45 21 2/1/2018 23:34 Thursday I-55 SB PAST POTOMAC ST Non-Hazmat Chemical Spill Cleanup 2:21 22 2/4/2018 3:29 Sunday I-170 NB BEFORE AIRPORT RD Crash Involving A MSHP Vehicle Struck 2:27 23 2/8/2018 21:13 Thursday I-44 WB TO VANDEVENTER AVE Wrong-Way Driver Tractor Trailer Vs. Car 2:14 24 2/10/2018 21:32 Saturday I-44 WB PAST EXIT 225 MO 185/ROUTE D Tractor Trailer Crash Into Bridge Structure 4:54 27

INCIDENT MANAGEMENT # Date & Time Route Location Description Duration HH/MM 25 2/11/2018 3:57 Sunday I-70 EB BEFORE BRYAN RD Tractor Trailer Slid Off Roadway 6:48 26 2/13/2018 17:42 Tuesday E MANCHESTER RD S SAPPINGTON RD CST Sewer Grate Collapsed 2:53 27 2/14/2018 4:57 Wednesday 340 MO EMERSON RD CST Power Lines Down Alongside Roadway 7:18 28 2/14/2018 8:43 Wednesday AC RT PARKER SPUR CST School Bus Crash With Injuries 2:59 29 2/17/2018 8:21 Saturday I-44 WB AT BOWLES AVE Tractor Trailer Crash 2:08 30 2/19/2018 10:57 Monday I-270 NB BEFORE DOUGHERTY FERRY RD Multi-Vehicle Crash 4:17 31 2/19/2018 13:48 Monday I-64 EB BEFORE GRAND BLVD Single-Vehicle Crash 3:55 32 2/20/2018 21:08 Tuesday I-44 WB AT I-64 Roadway Flooded Clogged MSD Drain 4:06 33 2/23/2018 7:08 Friday I-70 WB PAST MO 370 A Tractor Trailer vs Car Crash TT Hit Barrier Wall Broke Both Axles 2:33 28

INCIDENT MANAGEMENT January / February 2018 Incidents with Mobility Impact Map Eastbound I-70 past Westbound I-70 past Route T Eastbound Route 370 MO 370 to MO Bottom Road Eastbound I-270 at Route 367 Eastbound I-44 at Park Avenue Westbound MO 94 before I-64 Eastbound I-64 before I-270 Northbound I-270 before Dougherty Ferry road Number of Crashes: 1 2 3 4 5 6 Incidents Crashes Denotes Location of Major Impact Traffic Incidents 29

INCIDENT MANAGEMENT Major Impact Traffic Incidents and Mitigation 1/9/2018 (Tuesday) Time: 6:45 am 9:38 am *** Fatality *** Location: St. Louis City Eastbound I-44/Northbound I-55 at Park Avenue Event Type: Pedestrian Struck/Hit and Run Estimated Initial Impact: : Rush Hour: 3 of 3 travel lanes affected equals (=) 100% Incident Details: The TMC received a call from the St. Louis City Police Department advising them of an accident in which a pedestrian was struck. The vehicle involved had fled the scene without stopping. Action Taken: St. Louis City Police, Fire, and EMS responded, as did the MSHP who took command of the scene. The TMC immediately entered the incident into ATMS and activated all available DMS boards within one minute. This also created an event in TMS to notify the public of the closure. MoDOT Emergency Responders were dispatched and assisted with traffic control. All lanes of traffic were closed and drivers were diverted off onto Park Avenue as well as Truman Parkway with city streets used as a detour. A MoDOT Traffic Engineer was notified and began to adjust necessary signal timing for traffic. The ER Supervisor, Communication Staff, Maintenance Superintendent and the MoDOT Incident Management Coordinator were all notified. An incident alert was sent, updated and cleared to keep management informed of the closure. Reconstruction had a delayed response, which contributed to the extended duration of the incident. Emergency crews were able to get the right and exit lanes opened within 42 minutes to relieve some congestion. However, traffic queued approximately 5.2 miles on Northbound I-55 and approximately 1.1 miles on Eastbound I-44. It quickly returned to normal once all lanes were reopened. Event Duration: 2 hours 53 minutes Eastbound I-44/NB I-55 at Park Avenue Left Shoulder Lane 1 Lane 2 Lane 3 Exit Lane Right Shoulder Closed Hours/Minutes 2:53 2:53 2:53 0:42 0:42 0:42 30

INCIDENT MANAGEMENT Major Impact Traffic Incidents and Mitigation 1/15/2018 (Monday) Time: 7:39 am 10:48 am *** Fatality *** Location: St. Charles County Eastbound/Westbound I-70 past Route T Event: Two-Vehicle Crash Estimated Initial Impact: Rush Hour: 2 of 2 travel lanes affected equals (=) 100% Incident Details: The driver of a vehicle traveling westbound on I-70 fell asleep at the wheel causing the vehicle to travel off the left side of the roadway, over the cable barriers and onto Eastbound I-70. A second vehicle traveling eastbound struck the right side of the first vehicle. The front seat passenger of the first vehicle was pronounced on scene by Wentzville EMS. The driver and five additional passengers in the first vehicle were transported to a local hospital with injuries. This included 3 children ages 5 and under who were not in child safety seats. The driver of the second vehicle was transported with serious injuries. Action: Wentzville PD, Wright City PD, Fire, and St. Charles County and Warren County EMS responded, as did the MSHP who took command of the scene. Both lanes of Eastbound I-70 were closed and the #1 lane of Westbound I-70 was also closed for emergency vehicles. MoDOT Emergency Response assisted with traffic control, diverting drivers onto Veterans Memorial Parkway and the North Outer Road. The detour took drivers to Wentzville Parkway and back onto I-70. An Engineer was notified and began to adjust necessary signal timing for traffic. The ER Supervisor, Communication Staff, Maintenance Superintendent, EOC, Motor Carriers and the MoDOT Incident Management Coordinator were all notified. The TMC messaged for the event and entered it into TMS to notify the public of the closure. KC Scout was advised of the closure and helped message for eastbound traffic. An incident alert was sent to notify management of the closure. Reconstruction had a delayed response which contributed to the extended duration. Traffic queued approximately 4.8 miles on I-70 eastbound and approximately 2 miles on I-70 westbound. However, traffic returned to normal approximately 8 minutes after all lanes were opened. Event Duration: 3 hours 8 minutes Eastbound I-70 past Route T Left Shoulder Lane 1 Lane 2 Right Shoulder Closed Hours/Minutes 3:08 3:08 3:08 3:08 Westbound I-70 before Route T Left Shoulder Lane 1 Lane 2 Right Shoulder Closed Hours/Minutes 2:42 2:42 0:00 3:04 31

INCIDENT MANAGEMENT 32

INCIDENT MANAGEMENT Major Impact Traffic Incidents and Mitigation 1/23/2018 (Tuesday) Time: 8:19 am 12:07 pm *** Fatality *** Location: St. Louis County Eastbound I-64 before I-270 Event: Multi-Vehicle Crash Estimated Initial Impact: Rush Hour: 5 of 5 travel lanes affected equals (=) 100% Incident Details: The TMC operators overheard units being dispatched to a multi-vehicle crash while monitoring police scanners. It was determined to be a chain reaction accident involving six vehicles including a tractor trailer. The driver of a small passenger vehicle cut in front of the tractor trailer who was unable to stop and rear ended the vehicle. The tractor trailer and passenger vehicle immediately burst into flames, fatally injuring the driver of the passenger vehicle. Three others were transported to a local hospital for treatment. Action: The MSHP, Town & Country Police, Des Peres Police, Creve Coeur Police, and West County Fire and EMS responded to work the scene. The TMC entered the incident into ATMS and activated available DMS boards within one minute. This also created an entry into TMS to notify the public. MoDOT Emergency Response Units were dispatched to assist with traffic control. All lanes of Eastbound I-64 were closed as were the two left lanes of Westbound I-64 to allow emergency responders additional room to work. Eastbound traffic was diverted onto MO 141 giving drivers several detour options. MoDOT Traffic Engineers were notified and began to adjust necessary signal timing to assist with the flow of the detoured traffic. The ER Supervisor, Communication Staff, Maintenance Superintendent, EOC, Motor Carriers and the MoDOT Incident Management Coordinator were all notified. Further, an incident alert and updates were sent to keep MoDOT management apprised as the incident progressed. Reconstruction had a delayed response and with maintenance sweeper down from Special Ops, SWAT was dispatched to manually sweep up the large amounts of debris. This contributed to the extended duration of the incident, as well as the number of vehicles involved and extent of damage. All vehicles had to be towed from the scene. Traffic queued approximately 5 miles on I-64 eastbound and approximately 1 mile on I-64 westbound, but returned to normal approximately 7 minutes after all lanes were opened Event Duration: 3 hours 48 minutes Eastbound I-64 before I-270 Left Shoulder Lane 1 Lane 2 Lane 3 Exit Lane 1 Exit Lane 2 Right Shoulder Closed Hours/Minutes 3:41 3:41 3:41 3:41 3:41 3:41 3:41 Westbound I-64 past I-270 Left Shoulder Lane 1 Lane 2 Lane 3 Lane 4 Exit Lane 1 Right Shoulder Closed Hours/Minutes 1:57 1:57 1:48 0:00 0:00 0:00 0:00 33

INCIDENT MANAGEMENT 34