Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

Similar documents
PSNH INTERCONNECTION REQUEST

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

GENERATOR INTERCONNECTION APPLICATION

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION

CUSTOMER / ACCOUNT INFORMATION Electric Utility Customer Information (As shown on utility bill)

Electric Utility Contact Information Indiana Michigan Power

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

If any further information is required for CHELCO to fulfill its reporting requirements, please let us know.

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 25 kw)

Request for Payment Instructions Rule 21 Export Submittal Instructions

GENERATING FACILITY INTERCONNECTION APPLICATION. Part 1 Introduction and Overview

Section 6. Generation Interconnection

Form G5-1 PACIFIC GAS AND ELECTRIC COMPANY GENERATION PRE-PARALLEL INSPECTION

Request for Payment Instructions form. Rule 21 Non-Exporting Generators Submittal Instructions

Request for Payment Instructions Rule 21 Non-Exporting Generators Submittal Instructions

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Please Refer to Attached Sample Form

August 2, 2001 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Southern Company Interconnection Process. Dexter Lewis Research Engineer Research and Technology Management

APPLICATION ELECTRICITY SERVICES. APPLICATION FOR THE CONNECTION OF SMALL SCALE EMBEDDED GENERATION Page 1

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Please Refer to Attached Sample Form

Application for Interconnection and Net Metering Revision: 1 Revised: November 7, 2017

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Louisville Gas and Electric Company

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

HCI 534E/544E - Technical Data Sheet

HCI 434E/444E - Technical Data Sheet

Spec Information. Reactances Per Unit Ohms

Interconnection Process for Customer-Owned Generation (QFs)

MICHIGAN ELECTRIC UTILITY

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

UCDI224F - Technical Data Sheet

Micro-Generation Connection Application For Connection of Micro-Generation Facilities of 10 kw

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

UCI224C - Technical Data Sheet

UCI224F - Technical Data Sheet

UCDI274J - Technical Data Sheet

Enquiry Form (Non-Registered Generator With Capacity less than 5 MW)

UCI274D - Technical Data Sheet

UCI274H - Technical Data Sheet

UCDI274K - Technical Data Sheet

To complete the process for a net metering interconnection, please follow the steps below:

UCI274D - Technical Data Sheet

UCI274G - Technical Data Sheet

Definitions. Scope. Customer Generation Interconnection Requirements

PI144D - Technical Data Sheet

PI144J - Technical Data Sheet

UCDI224E - Technical Data Sheet

GENERATOR DATA MAY 10, 2018

UCDI274K - Technical Data Sheet

MICHIGAN ELECTRIC UTILITY

HCI634V - Technical Data Sheet

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

GENERATOR DATA SEPTEMBER 29, 2015

34 th Hands-On Relay School

UCM274C - Technical Data Sheet

UCM274H - Technical Data Sheet

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

HCI 534C/544C - Technical Data Sheet

HCI 534E/544E - Technical Data Sheet

UCM274E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

MICHIGAN ELECTRIC UTILITY

UCM274C - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

California PUC Rule 21 Generating. Facility Interconnection Application Guide. Technical Note

HCI 434E/444E - Technical Data Sheet

HCI 534F/544F - Technical Data Sheet

HCI634G - Technical Data Sheet

HCI 434D/444D - Technical Data Sheet

HCI 434F/444F - Technical Data Sheet

PM734E - Winding 28. Technical Data Sheet APPROVED DOCUMENT

MICHIGAN ELECTRIC UTILITY

UCI274E - Winding 14 APPROVED DOCUMENT. Technical Data Sheet

STATE OF NORTH DAKOTA DISTRIBUTED GENERATION INTERCONNECTION REQUIREMENTS TABLE OF CONTENTS

Power Systems Trainer

UCI224F - Winding 25. Technical Data Sheet APPROVED DOCUMENT

UCI224G - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

UCI224F - Winding 14. Technical Data Sheet APPROVED DOCUMENT

UCI224E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

TERMS AND CONDITIONS

UCI224C - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

UCI224D - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

HCM534D - Winding 14 APPROVED DOCUMENT. Technical Data Sheet

HCM534F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

UCI274D - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

PI734G - Winding 312. Technical Data Sheet APPROVED DOCUMENT

Transcription:

Generating Facility Level 2 or 3 Interconnection Review (For Generating Facilities with Electric Nameplate Capacities no Larger than 20 MW) Instructions An Interconnection Customer who requests a Utah Public Service Commission jurisdictional interconnection must submit this Interconnection Request by hand delivery, mail, or delivery service to the public utility, PacifiCorp, d/b/a Rocky Mountain Power. This application should be completed by Interconnection Customers that are not eligible for net metering and with facility nameplate capacities no larger than 20 MW. The Interconnection Customer is to complete all fields of this application form to the extent that such requested information is applicable to the proposed Generating Facility. If questions exist about the applicability of the requested information or assistance is needed, please contact the designated contact person identified below: Designated Contact Person: Laura Raypush Address: 825 NE Multnomah, Suite 1600, Portland, OR 97232 Telephone Number: 503-813-7040 Facsimile Number: 503-813-6893 E-Mail Address: laura.raypush@pacificorp.com Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code: Telephone (Daytime): (Evening): Facsimile Number: E-Mail Address: Address of Customer Facility Where Proposed Generating Facility will be Interconnected: Street Address: City: State: Zip Code: System Installer/Consulting Engineer:

Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code: Telephone (Daytime): (Evening): Facsimile Number: E-Mail Address: Electric Service Information for Applicant s Facility Where Generator Will Be Interconnected : Application is for: New Generating Facility Capacity addition to existing Generating Facility If capacity addition to existing Generating Facility, please describe: Will the Generating Facility be used for any of the following? To Supply Power to the Interconnection Customer? Yes No To Supply Power to Others? Yes No For installations at locations with existing electric service to which the proposed Generating Facility will interconnect, provide: (Local Electric Service Provider*) (Existing Account Number*) Type of Service: Single Phase Three Phase Requested Point of Interconnection: Interconnection Customer's Requested In-Service Date: Is Facility going to be a Qualified Facility ( QF )? Yes No 2

If yes, has Applicant completed FERC Notice of Self Certification? Yes No Requested Procedure Under Which to Evaluate Interconnection Request 1 : Please indicate below which review procedure applies to the interconnection request. Level 2 Certified interconnection equipment with an aggregate electric nameplate capacity of 2 MW or less. Generation facility does not qualify for a Level 1 review or has been reviewed but not approved under a Level 1 review. The application fee amount is $50 plus $1.00 per kw of the Generating Facility s capacity. Proof provided demonstrating certification with the following standards as applicable; please indicate type of certification below: IEEE Standard 1547; and UL Standard 1741 Inverters, Converters, and Controllers for Use in Independent Power Systems (January 2001). Level 3 Aggregate electric nameplate capacity rating is 20 MW or less and the Generating facility is not certified; does not qualify for a Level 1 or Level 2 review; or has been reviewed but not approved under a Level 1or Level 2 review. The application fee amount is $100 plus $2.00 per kw of the Generating Facility s capacity. 1 Note: Descriptions for interconnection review categories do not list all Level 2 and 3 criteria that must be satisfied. For a complete list of criteria, please refer to R746-312, Electrical Interconnection. Level 1 interconnection review of certified inverter-based Generating Facilities having a generation capacity of 25 kw or less requires a separate application form. Generating Facility Information: Energy Source: Solar Wind Hydro - Hydro Type (e.g. Run-of-River): Diesel Natural Gas Fuel Oil Biomass Other (state type) Prime Mover: Fuel Cell Reciprocating Engine Gas Turbine Steam Turbine Microturbine PV Other Type of Generator: Synchronous Induction Inverter Generator Nameplate Rating: kw (Typical) Generator Nameplate kvar: Interconnection Customer or Customer-Site Load: kw (if none, so state) 3

Typical Reactive Load (if known): Maximum Physical Export Capability Requested: kw List components of the Generating Facility equipment package that are currently certified (include proof from manufacture of certification in accordance with R746-312-5, Certifications): Equipment Type or Package 1. 2. 3. 4. 5. Certifying Entity Is the prime mover compatible with the certified protective relay package? Yes No Generator (or solar collector) Manufacturer, Model Name & Number: Version Number: Nameplate Output Power Rating in kw: (Summer) (Winter) Nameplate Output Power Rating in kva: (Summer) (Winter) Rated Power Factor: Leading: Lagging: Total Number of Generators in generation facility to be interconnected pursuant to this Interconnection Request: #: Elevation: Single phase Three phase Inverter Manufacturer, Model Name & Number (if used): List of adjustable set points for the protective equipment or software: Note: A completed Power Systems Load Flow data sheet must be supplied with the Interconnection Request. Proposed Generating Facility Characteristic Data (for inverter-based machines): Model: Type: Forced Commutated Line Commutated 4

Electric Nameplate Capacity Rated Output: Amps Volts kw Efficiency: % Power Factor: % Max design fault contribution current: Instantaneous RMS Harmonics characteristics: Start-up requirements: Proposed Generating Facility Characteristic Data (for rotating machines): RPM Frequency: (*) Neutral Grounding Resistor (if applicable): Synchronous Generators: Submit copies of the Saturation Curve and the Vee Curve. Salient Non-Salient Torque: lb-ft Rated RPM: Field Amperes: at rated generator voltage and current and % PF over-excited Type of Exciter: Output Power of Exciter: Type of Voltage Regulator: Locked Rotor Current: Amps Synchronous Speed: RPM Min. Operating Freq./Time: Generator Connection: Delta Wye Wye Grounded Direct Axis Synchronous Reactance, Xd: Direct Axis Transient Reactance, X' d: Direct Axis Subtransient Reactance, X" d: Negative Sequence Reactance, X 2 : Zero Sequence Reactance, X 0 : KVA Base: Field Volts: Field Amperes: 5

Induction Generators: Model No.: Locked Rotor Current: Phases: Single Three-Phase Motoring Power (kw): I 2 2 t or K (Heating Time Constant): Rotor Resistance, Rr: Stator Resistance, Rs: Stator Reactance, Xs: Rotor Reactance, Xr: Magnetizing Reactance, Xm: Short Circuit Reactance, Xd'': Exciting Current: Frame Size: Design Letter: Temp. Rise: Reactive Power Required In Vars (No Load): Reactive Power Required In Vars (Full Load): Total Rotating Inertia, H: Version No.: Amps O C. Per Unit on kva Base Excitation and Governor System Data for Synchronous Generators Only: Provide appropriate IEEE model block diagram of excitation system, governor system and power system stabilizer (PSS). A PSS may be determined to be required by applicable studies. A copy of the manufacturer's block diagram may not be substituted. Interconnection Facilities Information: Will a transformer be used between the generator and the point of common coupling? Yes No Will the transformer be provided by the Interconnection Customer? Yes No Interconnection Customer Transformer Data (please provide information for all transformers, attach separate sheet if necessary): Is the transformer: single phase three phase Size: kva Transformer Impedance: % on kva Base 6

Transformer Primary: Volts Delta Wye Wye Grounded Transformer Secondary: Volts Delta Wye Wye Grounded Transformer Tertiary: Volts Delta Wye Wye Grounded Transformer Fuse Data (if applicable, for Interconnection Customer-Owned Fuse): (Attach copy of fuse manufacturer's Minimum Melt and Total Clearing Time-Current Curves) Type: Size: Speed: Interconnecting Circuit Breaker (if applicable): Type: Load Rating (Amps): Interrupting Rating (Amps): Trip Speed (Cycles): Interconnection Protective Relays (if applicable): If Microprocessor-Controlled: List of Functions and Adjustable Setpoints for the protective equipment or software: Setpoint Function Minimum Maximum 1. 2. 3. 4. 5. 6. If Discrete Components: (Enclose Copy of any Proposed Time-Overcurrent Coordination Curves) 7

Current Transformer Data (If Applicable): (Enclose Copy of Manufacturer's Excitation and Ratio Correction Curves) Type: Accuracy Class: Proposed Ratio Connection: Type: Accuracy Class: Proposed Ratio Connection: Potential Transformer Data (If Applicable): Type: Accuracy Class: Proposed Ratio Connection: Type: Accuracy Class: Proposed Ratio Connection: Other Facility Information: Enclose copy of site electrical one-line diagram showing the configuration of total proposed Generating Facility equipment, current and potential circuits, and protection and control schemes. Please include system impedance and distance for all segments of the generating facility. One Line Diagram attached: Yes No Enclose copy of any site documentation that indicates the precise physical location of the proposed Generating Facility (e.g., USGS topographic map, distance from public utility facility number, other diagram or documentation). Plot Plan attached: Yes No Enclose copy of any documents that provide proof of site control. Site Control attached: Yes No 8

Applicant Signature: I hereby certify that all of the information provided in this application request form is correct. Applicant Signature: Name: Title: Date: An application fee may be required before the application can be processed. Please verify that the appropriate fee is included with the application: Application fee included: Yes No Amount $ Printed Name: Title: 9