DISTRICT/ATP 6 Data Input Worksheet Final STIP

Similar documents
# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Southern Minnesota Initiative Foundation Region - Potential Child Care Need Summary

Southern Minnesota Initiative Foundation Region - Potential Child Care Need Summary

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

Local Public Agency Obligated Projects SFY 2018

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

STATE OF MINNESOTA STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

US 10 Corridor Performance

Local Public Agency Obligated Projects SFY 2015

Rural Planning. Highway Projects - CULLMAN COUNTY

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

Williamson County Projects

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Kentucky Highway District 6

December 12, Dear Secretary Foxx:

Population Trends. US 12 Corridor Performance

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

2040 Metropolitan Transportation Plan -- Table XVII-1

District 7 10-Year Capital Highway Investment Plan ( )

Current Corridor Characteristics. MN 62 Corridor Performance

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

ACTION TRANSMITTAL No

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

District 2 Projects Scheduled for award during the period from 06/19/17 to 06/18/18 Sorted by PID

FREQUENTLY ASKED QUESTIONS

TRANSPORTATION IMPROVEMENT PROGRAM

EXCEPTION TO STANDARDS REPORT

Business Advisory Committee. July 7, 2015

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

Nonprofit Insurance Trust (NIT) Preferred Shop Network

State of Minnesota August 2002

Public Works. Capital Projects FY

Richmond Area MPO Regional Priority Transportation Projects

Region PROJECT PHASE PROGRAM ROUTE TOWN DESCRIPTION TOTAL COST

I-394 Corridor Performance

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

FFY 2019 Williamsport TIP 1 / 6

South Dakota Transportation Improvement Program Economic Stimulus Package ( AND STIPs) Report Date 09/26/2011

FREQUENTLY ASKED QUESTIONS

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

FY Regional Surface Transportation Program (RSTP) Allocations *

Recommended Transportation. Capital Improvement Program

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Wentzville Parkway South Phase 2 & 2A

800 Access Control, R/W Use Permits and Drive Design

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

FALL 2017 ADVERTISING SCHEDULE

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

COST ESTIMATES: Curb-Running

TRANSPORTATION IMPROVEMENT PROGRAM

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

Kentucky Highway District 1

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Transportation Planning: Non-System Specific


DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

Fiscal Year 2016 CDOT RAP USAGE REPORT Asphalt Pavement Projects Awarded in Fiscal Year 2016 (July June 2016)

City of Houston Fondren Road Paving and Drainage

PUBLIC INFRASTRUCTURE PROJECTS

Anderson Area Transportation Study ANATS Transportation Improvement Plan FY

Highway Improvement Plan. CSAH 11 Resurfacing. Adopted 4/10/18

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: Interstate

SECONDARY ROAD CONSTRUCTION PROGRAM

IMPROVEMENT CONCEPTS

Lacey Gateway Residential Phase 1

Kalamazoo Area Transportation Study FY Transportation Improvement Program 10/1/2016 (05/30/18)

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

Indianapolis MPO Annual Listing of Obligated Projects

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Trunk Highway Bridge Improvement Program

City of Grand Forks Staff Report

GOODHUE COUNTY TRANSPORTATION PLAN ( )

Dixie Transportation Planning Office

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Riverside County Transportation Department Summary of Bids

The Design-Builder shall meet local road criteria provided by the local governing agencies.

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

NCTCOG CATEGORY 5 RECAP FY 2016

Western ND Meeting. February 19, 2014 Grant Levi, NDDOT Director

Trunk Highway Bridge Improvement Program

Richmond Area MPO Regional Priority Transportation Projects

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Plan and Profile for the Black Dog Natural Gas Pipeline Project Docket No. G002/GP

Transcription:

DISTRICT/ATP 6 Data Input Worksheet Final STIP 2015 2018 STIP FTA State TH DIST C TH TH Bond Other 2015 232,801,042 2,296,420 87,853,654 1,461,075 91,611,149 18,781,608 18,781,608 12,800,880 12,800,880 3,765,856 50,477,964 3,724,000 54,201,964 42,979,375 27,441,818 238,781,770 2016 133,155,527 49,851,353 49,851,353 21,031,608 21,031,608 21,259,093 21,259,093 2,878,656 29,257,309 1,250,000 30,507,309 15,300,000 13,359,116 132,928,042 2017 100,176,445 37,740,138 3,880,000 41,620,138 14,700,000 14,700,000 6,909,856 26,398,590 26,398,590 10,547,861 85,476,445 2018 159,626,164 45,042,973 3,600,000 48,642,973 35,868,368 35,868,368 1,611,748 22,981,730 22,981,730 28,500,000 57,889,713 195,494,532 625,759,178 2,296,420 220,488,118 8,941,075 231,725,613 75,681,584 75,681,584 48,759,973 48,759,973 15,166,116 129,115,593 4,974,000 134,089,593 86,779,375 109,238,508 652,680,789 Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other BB TRF 0047 15A 2015 L ROCHESTER 6 SECT 5307: ROCHESTER DAR TRANSIT 0.0 B9 LF 709,553 709,553 709,553 BB TRF 0047 15B 2015 L ROCHESTER 6 SECT 5307: ROCHESTER RR TRANSIT 0.0 B9 FTA 6,796,257 1,735,856 5,060,401 6,796,257 BB TRF 0047 15C 2015 L ROCHESTER 6 SECT 5307: CONSTRUCT SMH BUS STOP 0.0 B9 FTA 300,000 240,000 60,000 300,000 IMPROVEMENTS BB TRF 0047 15D 2015 L ROCHESTER 6 SECT 5307: ROCHESTER RR PURCHASE 5 0.0 B9 FTA 2,120,000 1,696,000 424,000 2,120,000 BUSES (CLASS 700) BB TRF 3780 15 2015 L LA CRESCENT 5 SECT 5307: LA CRESCENT TRANSIT 0.0 B9 FTA 330,900 94,000 236,900 330,900 RR 50 00114 2015 A MOWER COUNTY DM&E INSTALL GATES CSAH 6, 110TH ST, 0.0 SR RRS 275,000 275,000 275,000 275,000 LYLE, MOWER COUNTY RR 50 00115 2015 A MOWER COUNTY DM&E INSTALL GATES CSAH 4, 175TH ST, 0.0 SR RRS 275,000 275,000 275,000 275,000 AUSTIN (3 MI S), MOWER COUNTY RR 74 00136 2015 A STEELE COUNTY DM&E INSTALL GATES CSAH 18, SW 92ND AVE, MERIDEN, STEELE COUNTY 0.0 SR RRS 275,000 275,000 275,000 275,000 CSAH 25 023 625 009 2015 L FILLMORE COUNTY CSAH 25, REPLACE BRIDGE 9923 WITH BR 23566 OVER PINE CREEK CR 249 028 598 011 2015 L HOUSTON COUNTY CR 249, REPLACE BRIDGE 6940 2.7 MILES WEST OF JCT TH 26 CSAH 17 028 617 010 2015 L HOUSTON COUNTY CSAH 17, REPLACE BRIDGE 88425 WITH BR 28J48 1.9 MI SOUTH OF JCT TH 44 CSAH 45 050 645 008 2015 L MOWER COUNTY CSAH 45, GRADING, PAVEMENT, REPLACE BR 88952 WITH BR 50K15, REPLACE BR 88953 WITH BR 50K16, STORM SEWER, CURB AND GUTTER FROM TH 218 TO E LIMITS AUSTIN CSAH 25 055 625 023 2015 L OLMSTED COUNTY 6 CSAH 25, CONCRETE OVERLAY BETWEEN OLMSTED CSAH 22 (WEST CIRCLE DRIVE) AND OLMSTED CSAH 3 LOCAL 999 066 070 012 2015 L RICE COUNTY RICE COUNTY ROADSIDE HAZARD ELIMINATION 0.2 BR BROS 570,000 376,000 376,000 194,000 570,000 0.2 BR BROS 580,000 350,000 350,000 230,000 580,000 0.1 BR BROS 405,000 245,000 245,000 160,000 405,000 0.8 RC STP 5K 200 2,000,000 1,400,000 1,400,000 600,000 2,000,000 5.6 RS STP 5K 200 4,100,000 3,225,100 3,225,100 874,900 4,100,000 0.0 SH HSIP 300,000 270,000 270,000 30,000 300,000 LOCAL 999 074 070 004 2015 L STEELE COUNTY 2015 HSIP STRIPING PROJECT 0.0 SH HSIP 57,460 51,714 51,714 5,746 57,460 CSAH 25 079 625 015 2015 L WABASHA COUNTY CSAH 25, CONCRETE PAVEMENT, BOX CULVERT CONSTRUCTION, AND SHOULDER WIDENING FROM OLMSTED COUNTY LINE TO TH 42 3.5 RD STP<5K 1,700,000 1,304,900 1,304,900 395,100 1,700,000 CSAH 2 079 602 039 2015 L WABASHA COUNTY **AC** CSAH 2, FROM WABASHA CSAH 25 TO TH 247, RECONDITIONING AND NEW CONCRETE PAVEMENT (AC PROJECT, PAYBACK IN 2017) MSAS 111 101 111 011 2015 L ALBERT LEA MSAS 11, RECONSTRUCTION OF LAKEVIEW BLVD FROM ABBOTT STREET TO WEDGE STREET PED/BIKE 097 080 004 2015 L WINONA STATE UNIVERSITY **MN139**MN222** CONSTRUCTION OF GRADE SEPARATED RAILROAD CROSSINGS ADJACENT TO WINONA STATE UNIVERSITY APPROACH CONSTRUCTION 2.0 RD STP<5K 300,000 700,000 700,000 300,000 1,000,000 0.8 RC STP 5K 200 1,700,000 976,972 976,972 723,028 1,700,000 0.2 EN DEMO 4,005,741 584,231 584,231 3,421,510 4,005,741

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other PED/BIKE 104 090 007 2015 L AUSTIN SOUTHWEST TRAIL FROM 200 FEET EAST OF 0.8 EN TAP 5K 200 252,000 201,600 201,600 50,400 252,000 JCT 9TH PLACE SW AND 2ND DRIVE SW TO JCT 4TH ST SW AND 16TH AVE SW MSAS 122 156 122 008 2015 L RED WING MSAS 122, RECONSTRUCT LEVEE ROAD 0.6 RC STP 5K 200 1,894,000 867,484 867,484 1,026,516 1,894,000 FROM BROAD STREET TO BAY POINT PARK AND INTERSECTION IMPROVEMENT PED/BIKE 159 090 019 2015 L ROCHESTER 6 SOUTH BROADWAY MULTI USE TRAIL PATH FROM 20TH ST SE TO THE ZUMBRO RIVER 1.6 EN TAP 5K 200 1,100,000 623,400 623,400 476,600 1,100,000 MUN 158 159 158 002 2015 L ROCHESTER 6 MUN 158, PAVEMENT WIDENING 55TH ST NW 50TH AVE NW TO CSAH 22 LOCAL 999 025 070 008 2015 L GOODHUE COUNTY RUMBLE STRIP AND RUMBLE STRIPE THROUGHOUT GOODHUE COUNTY 1.0 RC STP 5K 200 2,750,000 2,100,000 2,100,000 650,000 2,750,000 0.0 SH HSIP 42,570 38,313 38,313 4,257 42,570 LOCAL 999 066 070 013 2015 L RICE COUNTY CSAH 29 SHOULDER PAVING WITH RUMBLE 0.0 SH HSIP 277,778 250,000 250,000 27,778 277,778 STRIPES AND SAFETY WEDGE IN CONJUNCTION WITH EXISTING PAVEMENT REHAB LOCAL 999 066 070 014 2015 L RICE COUNTY CSAH 21 SHOULDER PAVING WITH RUMBLE 0.0 SH HSIP 222,222 200,000 200,000 22,222 222,222 STRIPES AND SAFETY WEDGE IN CONJUNCTION WITH EXISTING PAVEMENT REHAB LOCAL 999 066 070 015 2015 L RICE COUNTY CR 68 SHOULDER PAVING WITH RUMBLE 0.0 SH HSIP 222,222 200,000 200,000 22,222 222,222 STRIPES AND SAFETY WEDGE IN CONJUNCTION WITH EXISTING PAVEMENT REHAB LOCAL 999 079 070 007 2015 L WABASHA COUNTY WABASHA CSAH 25 INTERSECTION 0.0 SH HSIP 300,000 270,000 270,000 30,000 300,000 LOCAL 999 085 070 009AC 2015 L WINONA COUNTY **AC** 2' SHOULDER PAVING PLUS RUMBLE STRIP PLUS SAFETY WEDGE THROUGHOUT WINONA COUNTY (AC PAYBACK 1 OF 1) PED/BIKE 097 080 003 2015 L WINONA STATE UNIVERSITY **MN222** CONSTRUCTION OF GRADE SEPARATED RAILROAD CROSSINGS ADJACENT TO WINONA STATE UNIVERSITY RR FORCE ACCOUNT 0.0 SH HSIP 200,880 200,880 200,880 0.2 BT DEMO 2,140,236 1,712,189 1,712,189 428,047 2,140,236 PED/BIKE 156 591 002 2015 A RED WING **SRTS** INFRA IN RED WING, PRELIMINARY ENGINEERING INCLUDING THE ENVIRONMENTAL DOCUMENTS, DESIGN, PLANS, ESTIMATES, AND SPECIFICATIONS FOR RED WING S SRTS PROJECT PED/BIKE 156 591 003 2015 A RED WING **SRTS** INFRA IN RED WING, CE AND RECONSTRUCTION OF THE SKEW INTERSECTION AT TWIN BLUFF RD AND PIONEER RD TO IMPROVE CROSSINGS FOR TWIN BLUFF MIDDLE SCHOOL PED/BIKE 228 591 001 2015 A STEWARTVILLE 6 **SRTS** INFRA IN STEWARTVILLE, CONSTRUCTION OF SIDEWALK IN THE VICINITY OF BONNER ELEMENTARY AND STEWARTVILLE MIDDLE SCHOOL. PRELIMINARY ENGINEERING AND CONSTRUCTION ENGINEERING ARE SOFT MATCH FOR THE CONSTRUCTION US 14 2001 36 2015 S MnDOT US 14 FROM I 35 TO DODGE CENTER, MEDIUM BITUMINOUS MILL AND OVERLAY US 14 5503 44 2015 S MnDOT 6 US 14, FROM 1090' W OF MN 42 TO 1890' E OF MN 42, GRADING, BITUMINOUS & CONCRETE SURFACING, ROUNDABOUT, ADA IMPROVEMENTS AND LIGHTING US 14 5503 44S 2015 S MnDOT 6 US 14, FROM 1090' W OF MN 42 TO 1890' E OF MN 42, GRADING, BITUMINOUS & CONCRETE SURFACING, ROUNDABOUT, ADA IMPROVEMENTS AND LIGHTING US 14 7401 41 2015 S MNDOT FROM 0.6 MI W OF OWATONNA CITY LIMITS TO W JCT I35 AND FROM E JCT I35 TO SIGNAL ON HOFFMAN STREET (STATE AVENUE), ROADWAY RECONSTRUCTION, CONCRETE PAVEMENT REHAB AND BITUMINOUS SHOULDER REPLACEMENT, TURNBACK OF OLD TH 14 BT TAP 5K 49,083 31,904 31,904 17,179 49,083 BT TAP 5K 479,492 311,671 311,671 167,821 479,492 BT TAP 5K 175,000 140,000 140,000 35,000 175,000 16.2 RS NHPP 5,909,000 4,727,200 4,727,200 1,181,800 1,181,800 5,909,000 0.6 SC SF 1,500,000 1,500,000 1,500,000 1,500,000 0.6 SH HSIP 1,550,000 1,395,000 1,395,000 155,000 155,000 1,550,000 2.2 RC SF 2,750,000 2,750,000 2,750,000 2,750,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other US 14 7402 30 2015 S MNDOT **COC**ELLA** FROM TH 218 TO CR 180 IN STEELE COUNTY, TWO LANE TO FOUR LANE EXPANSION; GRADING, CONCRETE AND BITUMINOUS SURFACING, LIGHTING, SIGNING AND CULVERT IMPROVEMENTS (CHAP 117) 3.2 MC BF 12,010,983 12,010,983 12,010,983 US 14 2001 38 2015 A MNDOT **COCII** PURCHASE RIGHT OF WAY FOR EXPANSION BETWEEN DODGE CENTER AND OWATONNA MN 19 6604 15 2015 S MnDOT MN 19, NEAR CARLTON COLLEGE IN NORTHFIELD, REHAB HISTORIC STONE ARCH BRIDGE 8096 MN 26 2802 65 2015 S MnDOT MN 26, NEAR BROWNSVILLE, REPLACE BRIDGE 5720 WITH BRIDGE 28007 I 35 2480 104 2015 S MnDOT **PV40M**AC**I 35 SB FROM 0.55 MI. S. CSAH 23 TO 0.53 MI. N. MN 30, UNBONDED CONCRETE OVERLAY (AC PROJECT, PAYBACK IN 2016) I 35 6680 112 2015 S MnDOT **ITS** I 35 PHASE III NORTH SEGMENT FROM RICE COUNTY CSAH 1 INTERCHANGE NORTH TO DAKOTA CR 70 16.1 RW SF 1,500,000 1,500,000 1,500,000 1,500,000 0.0 BI SF 500,000 500,000 500,000 500,000 0.0 BR STP<5K 1,250,000 1,000,000 1,000,000 250,000 250,000 1,250,000 13.7 RC NHPP 13,650,757 11,880,681 11,880,681 4,050,000 4,050,000 1,770,076 1,770,076 17,700,757 15.4 SC NHPP 925,000 697,500 697,500 227,500 227,500 925,000 I 35 7480 113AC1 2015 S MnDOT **AC** I 35 NB AND SB FROM 0.5 MI N OF S LIMITS OF OWATONNA (40.787) TO 0.25 MI N OF N JCT US 14 (42.856), RECONSTRUCT PAVEMENT AND NB AND SB FROM BRIDGE STREET TO N JCT US 14, OWATONNA, CONSTRUCT AUXILIARY LANE AND REPLACE BRIDGES 74815, 74816, 74817 AND 74818 (AC PAYBACK 1 OF 2) I 35 7480 124PE 2015 S MnDOT **RI20M** PRELIMINARY ENGINEERING FOR STRAIGHT RIVER REST AREA MN 42 5506 22 2015 S MnDOT 6 MN 42 FROM US 14 TO 0.35 MI N OF MN 247, MEDIUM BITUMINOUS MILL AND OVERLAY 2.1 RC NHPP 10,000,000 10,000,000 10,000,000 0.0 RB SF 500,000 500,000 500,000 500,000 14.8 RS STP<5K 5,831,000 4,664,800 4,664,800 1,166,200 1,166,200 5,831,000 MN 43 8503 5900G 2015 S MnDOT **CMGC** WORK PACKAGE #3 BRIDGE 85851 EARLY FOUNDATIONS FOR RIVER PIERS AND NORTH ABUTMENT AND BRIDGE 5900 SCOUR CONTERMEASURES IN WINONA (CHAP 152) (MAX FEDERAL PARTICIPATION OF $30.7M FOR BRIDGE 85851) MN 43 8503 46 2015 S MnDOT **CMGC**AC** WORK PACKAGE #4 REMAINDER OF BRIDGE 85851, GRADING, PAVING, DRAINAGE, RETAINING WALLS, SIGNING, LIGHTING AND STRIPING WINONA (CHAP 152) (MAX FEDERAL PARTICIPATION OF $30.7M FOR BRIDGE 85851) (AC PROJECT, PAYBACK IN 2016) MN 43 8510 11 2015 S MnDOT MN 43, INSTALL WEIGH IN MOTION FOR WINONA BRIDGE MN 44 2804 35 2015 S MnDOT MN 44 IN HOKAH, SLOPE RESTORATION FROM APPROX. 250' WEST OF 6TH STREET TO 4TH STREET 1.1 MC BF NHPP 16,000,000 12,800,000 12,800,000 3,200,000 16,000,000 1.1 MC BF NHPP 36,693,392 8,200,000 8,200,000 13,331,608 13,331,608 27,768,392 725,000 50,025,000 0.0 SC SF 250,000 250,000 250,000 250,000 0.2 RC SF 500,000 500,000 500,000 500,000 MN 44 2804 36 2015 S MnDOT MN 44, IN CALEDONIA ON EAST SIDE MN 44 FROM FOLTZ DRIVE TO NORTH PARK, TRAIL CONSTRUCTION MUNICIPAL AGREEMENT PROGRAM F.Y. 2015 total project cost is $133,667 US 52 5508 121 2015 S MnDOT 6 **ITS** US 52 EXTENSION OF FIBER OPTIC COMMUNICATION LINE NORTH FROM 75TH ST TO ELK RUN INTERCHANGE NORTH OF ORONOCO US 52 5508 122 2015 A MnDOT 6 US 52 AND US 14 IN ROCHESTER, REPLACE LIGHTING LUMINAIRES 0.3 AM SF 50,000 50,000 50,000 50,000 7.3 SC NHPP 350,000 280,000 280,000 70,000 70,000 350,000 7.9 SC SF 407,000 407,000 407,000 407,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other MN 60 7902 23 2015 S MnDOT **AC** MN 60, FROM CSAH 1 TO CSAH 7, GRADING, BITUMINOUS SURFACING, APPROACHES AND BRIDGE NUMBERS 79012 AND 79013 (AC PROJECT, PAYBACK IN 2016) 0.3 BR STP<5K 2,589,000 1,931,200 1,931,200 700,000 700,000 657,800 657,800 3,289,000 US 61 2513 92 2514 122 2015 S MnDOT **CIMS**ADA5M** US 61 IN RED WING FROM POTTER STREET TO OLD WEST MAIN STREET, MILL AND OVERLAY RECONSTRUCTION, MEDIAN CONSTRUCTION AND PEDESTRIAN SAFETY IMPROVEMENT MUNICIPAL AGREEMENT PROGRAM F.Y. 2015 $2.445M CIMS & **ADA5M** $630,000 US 61 2513 93 2015 S MnDOT US 61 AT SEVASTOPOL ROAD AND WACOUTA ROAD SOUTH OF RED WING, ADD LEFT TURN LANES AND REMOVE ACCESSES TIED WITH S.P. 2514 120 US 61 2514 120 2015 S MnDOT **PV40M** US 61 NB AND SB FROM READY MIX ENTRANCE IN RED WING TO POTTER ST AND FROM OLD WEST MAIN ST TO MN 19, MEDIUM BITUMINOUS MILL AND OVERLAY TIED WITH S.P. 2513 93 US 63 2313 22 2015 S MnDOT US 63 FROM IOWA/MN SL TO E JCT MN 16, CONCRETE PAVEMENT REHABILITATION, CONCRETE PLANING AND BITUMINOUS SHOULDER REPLACEMENT US 63 5509 78 2015 S MnDOT 6 US 63 FROM CSAH 35 TO CR 120 (STEWARTVILLE), SHARED USE PATH MUNICIPAL AGREEMENTS PROGRAM US 63 5509 79 2015 S MnDOT 6 **PV40M** US 63 NB & SB FROM 0.1 MI. N. N. JCT. MN 30 TO 28TH ST SE (ROCHESTER), MEDIUM BITUMINOUS MILL AND OVERLAY US 63 5509 80 2015 S MnDOT 6 **TED14** TH 63, CSAH 16 & US 63 INTERCHANGE RECONSTRUCTION (BRIDGE 9407) AND AIRPORT ACCESS IMPROVEMENT PROJECT $2.224 TED14 FUNDS US 63 5509 82 2015 S MnDOT 6 US 63 NB AND SB FROM ROOT RIVER BRIDGE (STEWARTVILLE) TO 0.1 MI N OF N JCT MN 30, CONCRETE PAVEMENT REHABILITATION, PLANING AND BITUMINOUS SHOULDER REPLACEMENT 0.8 AM SF 7,064,912 4,397,000 4,397,000 2,667,912 7,064,912 1.0 SC SF 1,193,323 1,193,323 1,193,323 1,193,323 7.5 RS NHPP 4,382,800 3,506,240 3,506,240 876,560 876,560 4,382,800 13.5 PM SF 2,620,740 2,620,740 2,620,740 2,620,740 0.5 AM SF 50,000 50,000 50,000 50,000 6.3 RS NHPP 4,765,088 3,812,070 3,812,070 953,018 953,018 4,765,088 0.0 AM SF 11,519,000 2,500,000 2,224,000 4,724,000 6,795,000 11,519,000 2.3 PM NHPP 1,150,000 920,000 920,000 230,000 230,000 1,150,000 US 63 7908 30 2015 S MnDOT US 63, OVER MILLER CREEK, REPLACE BRIDGE 9166 WITH BRIDGE 79021 AND BRIDGE 9167 WITH BRIDGE 79026 US 65 2404 41 2015 S MnDOT **ADA5M** US 65 NB AND SB FROM 0.5 MI. S. OF I 35 TO NEWTON AVE, MEDIUM BITUMINOUS OVERLAY & MILL & FILL, SIDEWALK REPLACEMENTS AND ADA RAMP WORK; EB AND WB ON TH 13 FROM 0.05 MI E OF EUCLID AVE TO US 65, MEDIUM BITUMINOUS OVERLAY, SIDEWALK REPLACEMENTS AND ADA RAMP WORK I 90 5580 90 2015 S MnDOT 6 **PV40M** I 90, I 90, WB LANES FROM 1.3 MI W OF TH 42 TO 2.3 MI E OF TH 74, UNBONDED CONCRETE OVERLAY, CULVERT WORK, LIGHTING, RWIS AND BRIDGE 85817 I 90 8580 149OV2 2015 S MnDOT 5 I 90 DRESBACH BRIDGE (CHAP 152) 2015 COSTS FOR CONSTRUCTION OVERSIGHT I 90 8580 165AC 2015 S MnDOT **AC** I 90 EB FROM 0.8 MI W MN 76 TO O.69 W OF CSAH 12 OVERPASS, UNBONDED CONCRETE OVERLAY (AC PAYBACK 1 OF 1) I 90 8580 168 2015 S MnDOT I 90, AT DAKOTA, REPLACE INTERCHANGE LIGHTING SYSTEM I 90 8580 166 2015 S MnDOT 5 I 90 FROM INTERCHANGE 273A TO 0.5 MILE WEST OF I 90/61/14 INTERCHANGE, BITUMINOUS OVERLAY, GRADING AND ADA FOR BIKE TRAIL 0.0 BR STP<5K 2,446,000 1,956,800 1,956,800 489,200 489,200 2,446,000 3.6 RS STP 5K 200 4,720,903 2,673,000 2,673,000 1,177,177 1,177,177 870,726 4,720,903 12.2 RC NHPP 13,816,200 12,119,580 12,119,580 1,696,620 1,696,620 13,816,200 0.0 BR SF 2,221,000 2,221,000 2,221,000 2,221,000 8.4 RC NHPP 2,600,000 2,600,000 2,600,000 0.8 SC SF 160,000 160,000 160,000 160,000 2.1 BT STP<5K 1,200,000 960,000 960,000 240,000 240,000 1,200,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other MN 109 2407 09 2015 S MnDOT MN 109, BROADWAY, ALDEN, FREEBORN COUNTY, DM&E, UPGRADE TO GATES 0.0 SR RRS 275,000 275,000 275,000 275,000 MN 999 8826 110 2015 S MnDOT **ADA** PEDESTRIAN RAMPS VARIOUS LOCATIONS DISTRICTWIDE 2015 MN 999 8826 166 2015 S MnDOT VARIOUS LOCATIONS DISTRICTWIDE, ROUT AND SEAL BITUMINOUS PAVEMENT CRACKS MN 999 8826 146 2015 S MnDOT **RI20M** CULVERT LININGS, REPAIRS AND REPLACEMENTS ACROSS DISTRICT 6 F.Y. 2015 ($291,000 DISTRICT FUNDS AND $850,000 RI20M FUNDS) 0.0 SC STP STATE 287,500 230,000 230,000 57,500 57,500 287,500 0.0 PM STP STATE 1,283,250 1,026,600 1,026,600 256,650 256,650 1,283,250 0.0 DR SF 1,141,000 1,141,000 1,141,000 1,141,000 MN 999 8826 167 2015 S MnDOT **IDIQ** DISTRICT WIDE BRIDGE CRACK 0.0 BI SF 300,000 300,000 300,000 300,000 SEALING, VARIOUS BRIDGES ON MN 13, US MN 999 8826 168 2015 S MnDOT **IDIQ** BRIDGE REPAIRS, VARIOUS 0.0 BI SF 300,000 300,000 300,000 300,000 LOCATIONS DISTRICT WIDE MINIMUM MN 999 8806 BI 15 2015 S MnDOT DISTRICTWIDE SETASIDES BRIDGE REPAIR 0.3 BI SF 650,000 650,000 650,000 650,000 2015 MN 999 8806 CA 15 2015 S MnDOT DISTRICTWIDE SETASIDES CONSULTANT 0.0 CA SF 4,560,500 4,560,500 4,560,500 4,560,500 AGREEMENTS 2015 MN 999 8806 MA 15 2015 S MnDOT DISTRICTWIDE SETASIDES MISCELLANEOUS 0.0 MA SF 100,000 100,000 100,000 100,000 AGREEMENTS 2015 MN 999 8806 RS 15 2015 S MnDOT DISTRICTWIDE SETASIDES THIN OVERLAYS 0.0 RS SF 800,000 800,000 800,000 800,000 2015 MN 999 8806 RX 15 2015 S MnDOT DISTRICTWIDE SETASIDES BARC 2015 0.0 RX SF 350,000 350,000 350,000 350,000 MN 999 8806 RW 15 2015 S MnDOT DISTRICTWIDE SETASIDES R/W 2015 0.0 RW SF 6,150,000 6,150,000 6,150,000 6,150,000 MN 999 8806 SA 15 2015 S MnDOT DISTRICTWIDE SETASIDES SUPPLEMENTAL 0.0 SA SF 4,002,300 4,002,300 4,002,300 4,002,300 AGREEMENTS AND COST OVERRUNS 2015 MN 999 8806 SN 15 2015 S MnDOT DISTRICTWIDE SETASIDES SIGNING 2015 0.0 SC SF 220,000 220,000 220,000 220,000 MN 999 8806 ST 15 2015 S MnDOT DISTRICTWIDE SETASIDES STRIPING 2015 0.0 SC SF 850,000 850,000 850,000 850,000 BB TRF 0047 16A 2016 L ROCHESTER 6 SECT 5307: ROCHESTER DAR TRANSIT 0.0 B9 LF 737,935 737,935 737,935 BB TRF 0047 16B 2016 L ROCHESTER 6 SECT 5307: ROCHESTER RR TRANSIT 0.0 B9 FTA 7,185,545 1,735,856 5,449,689 7,185,545 BB TRF 0047 16C 2016 L ROCHESTER 6 SECT 5307: ROCHESTER RR PURCHASE 3 0.0 B9 FTA 1,311,000 1,048,800 262,200 1,311,000 BUSES (CLASS 700) BB TRF 3780 16 2016 L LA CRESCENT 5 SECT 5307: LACRESCENT TRANSIT 0.0 B9 FTA 340,827 94,000 246,827 340,827 BB TRS 0001 16 2016 L MOWER COUNTY CVS PURCHASE 2 BUSES (CLASS 400) 0.0 TR STP 5K 200 148,000 118,400 118,400 29,600 148,000 BB TRS 0047 16 2016 L ROCHESTER 6 ROCHESTER RR PURCHASE 1 BUS (CLASS 0.0 TR STP 5K 200 437,000 211,500 211,500 225,500 437,000 700) BB TRS 0065 16 2016 L WINONA CITY OF WINONA PURCHASE 2 BUSES 0.0 TR STP 5K 200 440,000 352,000 352,000 88,000 440,000 (CLASS 600) BB TRS 7284 16 2016 L NORTHFIELD THREE RIVERS PURCHASE 1 BUS (CLASS 0.0 TR STP 5K 200 146,000 116,800 116,800 29,200 146,000 500) CITY OF NORTHFIELD BB TRS 7284 16A 2016 L THREE RIVERS THREE RIVERS PURCHASE 1 BUS (CLASS 0.0 TR STP 5K 200 74,000 59,200 59,200 14,800 74,000 400) FARIBAULT BB TRS 7284 16B 2016 L THREE RIVERS THREE RIVERS PURCHASE 1 BUS (CLASS 0.0 TR STP 5K 200 74,000 59,200 59,200 14,800 74,000 400) PLAINVIEW BB TRS 7284 16C 2016 L THREE RIVERS THREE RIVERS PURCHASE 1 BUS (CLASS 0.0 TR STP 5K 200 146,000 116,800 116,800 29,200 146,000 500) RED WING RR 20 00002 2016 A DODGE COUNTY DM&E INSTALL GATES 8TH AVE SW, CSAH 0.0 SR RRS 250,000 250,000 250,000 250,000 34, DODGE COUNTY RR 24 00133 2016 A FREEBORN COUNTY DM&E INSTALL GATES S 1ST AVE WEST, MSAS 112, ALBERT LEA, FREEBORN COUNTY 0.0 SR RRS 250,000 250,000 250,000 250,000 RR 55 00129 2016 A OLMSTED COUNTY 6 DM&E INSTALL GATES CSAH 22, EAST CIRCLE DRIVE, ROCHESTER, OLMSTED COUNTY RR 85 00147 2016 A WINONA COUNTY DM&E INSTALL GATES CSAH 37, ST CHARLES (.5 MI E), WINONA COUNTY CSAH 23 023 623 026 2016 L FILLMORE COUNTY CSAH 23, REPLACE BRIDGE 9922 OVER WEISEL CREEK TWP 237 028 599 077 2016 L HOUSTON COUNTY TWP 237, REPLACE BRIDGE L4556 WITH BR 28553 0.3 MILES EAST OF JCT MN 76 CSAH 9 055 609 018 2016 L OLMSTED COUNTY 6 CSAH 9, GRADE AND SURFACE BETWEEN JCT OLMSTED CSAH 22 AND JCT OLMSTED CSAH 11 AND MILL AND SURFACE BETWEEN JCT OLMSTED CSAH 11 AND JCT OLMSTED CR 119 0.0 SR RRS 300,000 300,000 300,000 300,000 0.0 SR RRS 275,000 275,000 275,000 275,000 0.2 BR BROS 260,000 208,000 208,000 52,000 260,000 0.2 BR BROS 420,000 272,000 272,000 148,000 420,000 4.0 RC STP<5K 4,200,000 2,838,200 2,838,200 1,361,800 4,200,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other CSAH 46 066 646 005 2016 L RICE COUNTY CSAH 46, PAVEMENT RESURFACING AND 7.0 RS STP<5K 4,000,000 2,908,200 2,908,200 1,091,800 4,000,000 SHOULDER PAVING BETWEEN MN 21 AND RICE CSAH 1 CSAH 23 104 020 014 2016 L AUSTIN CSAH 23, RECONSTRUCT 4TH DRIVE SW FROM TURTLE CREEK BRIDGE TO AUSTIN CITY LIMITS 0.6 MC STP 5K 200 1,300,000 1,006,340 1,006,340 293,660 1,300,000 MSAS 158 159 158 003 2016 L ROCHESTER 6 MSAS 158, CONSTRUCT 41ST AVENUE NW 0.3 MC STP 5K 200 5,500,000 2,821,260 2,821,260 2,678,740 5,500,000 FROM WEST CIRCLE DRIVE (CSAH 22) TO 55TH ST NW AND 55TH ST NW FROM 41ST AVENUE TO CSAH 22 PED/BIKE 159 090 021 2016 L ROCHESTER 6 ROCHESTER 2016 BUNDLED TRAIL PROJECT 0.0 EN TAP STATE 1,084,765 825,000 825,000 259,765 1,084,765 LOCAL 999 023 070 002 2016 L FILLMORE COUNTY FILLMORE COUNTY CHEVRON PROJECT 0.0 SH HSIP 55,400 49,860 49,860 5,540 55,400 CSAH 8 024 070 017 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 8 CSAH 10 024 070 018 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 10 CSAH 16 024 070 019 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 16 CSAH 31 024 070 020 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 31 CSAH 35 024 070 021 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 35 CSAH 45 024 070 022 2016 L FREEBORN COUNTY TWO FOOT SHOULDER PAVING WITH CSAH 45 EAST LOCAL 999 025 070 009 2016 L GOODHUE COUNTY GROUND IN 6" EPOXY WET REFLECTIVE MARKING THROUGHOUT GOODHUE COUNTY I 35 2480 104AC 2016 S MnDOT **AC** I 35 SB FROM 0.66 MI. S. CSAH 23 TO 0.5 MI. N. MN 30, UNBONDED CONCRETE OVERLAY (AC PAYBACK 1 OF 1) I 35 7480 113AC2 2016 S MnDOT **AC** I 35 NB AND SB FROM 0.5 MI N OF S LIMITS OF OWATONNA (40.787) TO 0.25 MI N OF N JCT US 14 (42.856), RECONSTRUCT PAVEMENT AND NB AND SB FROM BRIDGE STREET TO N JCT US 14, OWATONNA, CONSTRUCT AUXILIARY LANE AND REPLACE BRIDGES 74815, 74816, 74817 AND 74818 (AC PAYBACK 2 OF 2) I 35 7480 124 2016 S MnDOT I 35, STRAIGHT RIVER REST AREA REPLACEMENT 0.0 SH HSIP 285,000 256,500 256,500 28,500 285,000 0.0 SH HSIP 332,000 298,800 298,800 33,200 332,000 0.0 SH HSIP 200,000 180,000 180,000 20,000 200,000 0.0 SH HSIP 148,500 133,650 133,650 14,850 148,500 0.0 SH HSIP 272,000 244,800 244,800 27,200 272,000 0.0 SH HSIP 307,000 276,300 276,300 30,700 307,000 0.0 SH HSIP 56,100 50,490 50,490 5,610 56,100 13.7 RC NHPP 4,050,000 4,050,000 4,050,000 2.1 RC NHPP 3,177,485 3,177,485 3,177,485 0.0 RB NHPP 4,500,000 4,050,000 4,050,000 450,000 450,000 4,500,000 MN 42 7901 47 2016 S MnDOT MN 42 (ELGIN), REPLACE BRIDGE 5969 0.0 BR STP<5K 850,000 680,000 680,000 170,000 170,000 850,000 MN 43 8503 46C 2016 S MnDOT **CMGC** WORK PACKAGE #5 COMPLETE ROADWAY APPROACHES FOR BRIDGES 85851 AND 5900, REHABILITATION AND RECONSTRUCTION BRIDGE 5900 AND COMPLETE BRIDGE 85851 IN WINONA (CHAP 152) (AC PROJECT, AC PAYBACK 2017 & MANAGED INTO THE FUTURE) 1.1 MC BF NHPP 33,968,392 22,668,392 22,668,392 21,031,608 21,031,608 11,300,000 55,000,000 MN 43 8503 46AC 2016 S MnDOT **CMGC**AC** WORK PACKAGE #4 REMAINDER OF BRIDGE 85851, GRADING, PAVING, DRAINAGE, RETAINING WALLS, SIGNING, LIGHTING AND STRIPING WINONA (CHAP 152) (MAX FEDERAL PARTICIPATION OF $30.7M FOR BRIDGE 85851) (AC PAYBACK 1 OF 1) US 52 2505 53 2016 S MnDOT US 52, SB LANES FROM 0.4 MI. S. CSAH 11 TO 100' S MAIN ST. RAMP (PINE ISLAND) AND FROM S JCT MN 60 (S OF ZUMBROTA) TO 1.2 MI N CSAH 7, MEDIUM BITUMINOUS MILL AND OVERLAY MN 56 5005 63 2016 S MnDOT MN 56, OVER STREAM, REPLACE BRIDGE 6470 AND OVER LITTLE CEDAR RIVER, REPLACE BRIDGE 6469 1.1 MC NHPP 13,331,608 13,331,608 13,331,608 7.8 RS SF 2,500,000 2,500,000 2,500,000 2,500,000 0.0 BR STP<5K 1,200,000 960,000 960,000 240,000 240,000 1,200,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other MN 57 2007 27 2016 S MnDOT MN 57, FROM 6TH STREET TO 7TH STREET IN MANTORVILLE, GRADING, BITUMINOUS SURFACING, ADA IMPROVEMENTS, RETAINING WALL RECONSTRUCTION AND RESTORATION AND FUTURE LIGHTING 0.8 RD SF 1,430,000 1,250,000 1,250,000 180,000 1,430,000 MN 60 7902 23AC 2016 S MnDOT **AC** MN 60, FROM CSAH 1 TO CSAH 7, GRADING, BITUMINOUS SURFACING, APPROACHES AND BRIDGE NUMBERS 79012 AND 79013 (AC PAYBACK) US 61 8504 75 2016 S MnDOT US 61 SB OVER TROUT CREEK, REPLACE BRIDGE 9065 US 61 8505 39 2016 S MnDOT US 61, GILMORE AVENUE, WINONA, RECONSTRUCT INTERSECTION AND INSTALL NEW SIGNAL I 90 5080 161 2016 S MnDOT I 90, UNDER 11TH DRIVE NE, AUSTIN, REPLACE OR REHAB BRIDGE 9177 (NEW BRIDGE 50808) HISTORIC BRIDGE STUDY I 90 8580 149OV3 2016 S MnDOT 5 DRESBACH BRIDGE (CHAP 152) 2014 COSTS FOR CONSTRUCTION OVERSIGHT MN 105 5007 32 2016 S MnDOT **PV40M** MN 105, FROM N END BR 5971 TO JCT W RAMPS I 90, MEDIUM MILL AND OVERLAY MN 250 2319 16 2016 S MnDOT MN 250, OVER S BRANCH ROOT RIVER, REPLACE BRIDGE 6975 AND OVER N BRANCH ROOT RIVER REPLACE BRIDGE 6977 (CHAP 152 4M) 0.3 BR STP<5K 700,000 700,000 700,000 0.0 BR SF 1,001,952 1,001,952 1,001,952 1,001,952 0.1 SC NHPP 2,000,000 1,600,000 1,600,000 400,000 400,000 2,000,000 0.0 BR NHPP 1,468,500 1,321,650 1,321,650 146,850 146,850 1,468,500 0.0 BR SF 1,591,000 1,591,000 1,591,000 1,591,000 2.4 RS NHPP 1,100,000 880,000 880,000 220,000 220,000 1,100,000 0.0 BR STP<5K 6,737,422 2,737,422 2,737,422 4,000,000 6,737,422 MN 999 8806 ACC 16 2016 S MnDOT DISTRICTWIDE SETASIDES ACCESS MANAGEMENT 2016 0.0 SC SF 245,000 245,000 245,000 245,000 MN 999 8806 AM 16 2016 S MnDOT DISTRICTWIDE SETASIDES MUNICIPAL 0.0 AM SF 2,140,000 2,140,000 2,140,000 2,140,000 AGREEMENTS 2016 MN 999 8806 BI 16 2016 S MnDOT DISTRICTWIDE SETASIDES BRIDGE REPAIR 0.0 BI SF 490,500 490,500 490,500 490,500 2016 MN 999 8806 CA 16 2016 S MnDOT DISTRICTWIDE SETASIDES CONSULTANT 0.0 CA SF 3,500,000 3,500,000 3,500,000 3,500,000 AGREEMENTS 2016 MN 999 8806 LT 16 2016 S MnDOT DISTRICTWIDE SETASIDES LIGHTING 2016 0.0 SC SF 50,000 50,000 50,000 50,000 MN 999 8806 LT 16S 2016 S MnDOT DISTRICTWIDE SETASIDES LIGHTING 2016 0.0 SH HSIP 50,000 45,000 45,000 5,000 5,000 50,000 MN 999 8806 MA 16 2016 S MnDOT DISTRICTWIDE SETASIDES MISCELLANEOUS 0.0 MA SF 100,530 100,530 100,530 100,530 AGREEMENTS 2016 MN 999 8806 PM 16 2016 S MnDOT DISTRICTWIDE SETASIDES PREVENTIVE 0.0 PM SF 3,100,000 3,100,000 3,100,000 3,100,000 MAINTENANCE 2016 MN 999 8806 RW 16 2016 S MnDOT DISTRICTWIDE SETASIDES R/W 2016 0.0 RW SF 5,400,000 5,400,000 5,400,000 5,400,000 MN 999 8806 RX 16 2016 S MnDOT DISTRICTWIDE SETASIDES BARC 2016 0.0 RX SF 1,569,134 1,569,134 1,569,134 1,569,134 MN 999 8806 SA 16 2016 S MnDOT DISTRICTWIDE SETASIDES SUPPLEMENTAL AGREEMENTS AND COST OVERRUNS 2016 0.0 SA SF 3,819,500 3,819,500 3,819,500 3,819,500 MN 999 8806 SG 16 2016 S MnDOT DISTRICTWIDE SETASIDES SIGNAL 0.0 SC SF 800,000 800,000 800,000 800,000 REPLACEMENT 2016 MN 999 8806 SHS 16 2016 S MnDOT DISTRICTWIDE SETASIDES HSIP 2016 0.0 SH HSIP 478,432 430,589 430,589 47,843 47,843 478,432 original total $989,216 us $510,784 on S.P. 5503 44S in 2015 MN 999 8806 SN 16 2016 S MnDOT DISTRICTWIDE SETASIDES SIGNING 2016 0.0 SC SF 220,000 220,000 220,000 220,000 MN 999 8806 ST 16 2016 S MnDOT DISTRICTWIDE SETASIDES STRIPING 2016 0.0 SC SF 850,000 850,000 850,000 850,000 MN 999 8826 159 2016 S MnDOT DISTRICTWIDE ADA IMPROVEMENTS 2016 0.0 SC SF 200,000 200,000 200,000 200,000 BB TRF 0047 17 2017 L ROCHESTER 6 SECT 5307: CONSTRUCT PARK & RIDE STRUCTURED PARKING BB TRF 0047 17A 2017 L ROCHESTER 6 SECT 5307: ROCHESTER DAR OPERATING ASSISTANCE BB TRF 0047 17B 2017 L ROCHESTER 6 SECT 5307: ROCHESTER RR OPERATING ASSISTANCE 0.0 B9 FTA 5,000,000 4,000,000 1,000,000 5,000,000 0.0 B9 LF 767,453 767,453 767,453 0.0 B9 FTA 7,472,967 1,735,856 5,737,111 7,472,967

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other BB TRF 3780 17 2017 L LA CRESCENT 5 SECT 5307: LACRESCENT TRANSIT 0.0 B9 FTA 351,052 94,000 257,052 351,052 BB TRF 0047 17A 2017 L ROCHESTER 6 SECT 5307: ROCHESTER RR, PURCHASE 3 0.0 B9 FTA 1,350,000 1,080,000 270,000 1,350,000 BUSES (CLASS 700) BB TRS 0001 17 2017 L MOWER COUNTY CVS PURCHASE 1 BUS (CLASS 400) 0.0 TR STP 5K 200 82,000 65,600 65,600 16,400 82,000 BB TRS 0001 17A 2017 L MOWER COUNTY CVS PURCHASE 1 BUS (CLASS 400) 0.0 TR STP 5K 200 82,000 65,600 65,600 16,400 82,000 BB TRS 0001 17B 2017 L ALBERT LEA ALBERT LEA PURCHASE 1 BUS (CLASS 400) 0.0 TR STP 5K 200 82,000 65,600 65,600 16,400 82,000 BB TRS 0047 17 2017 L ROCHESTER 6 ROCHESTER RR, PURCHASE 1 BUS (CLASS 700) CSAH 1 023 601 024 2017 L FILLMORE COUNTY CSAH 1, FROM JCT FILLMORE CSAH 4 NORTH TO COUNTY LINE, GRADING AND BRIDGE REPLACEMENT CSAH 22 024 622 010 2017 L FREEBORN COUNTY CSAH 22, I 90 TO HAMMER ROAD, RESURFACING CSAH 28 066 628 008 2017 L RICE COUNTY CSAH 28, BETWEEN TH 246 AND PRAIRIE ST, RECONSTRUCTION CSAH 2 079 602 039AC 2017 L WABASHA COUNTY **AC** CSAH 2, FROM WABASHA CSAH 25 TO MN 247, RECONDITIONING AND NEW CONCRETE PAVEMENT (AC PAYBACK 1 of 1) 0.0 TR STP 5K 200 450,000 343,200 343,200 106,800 450,000 5.0 RC STP<5K 3,100,800 2,200,000 2,200,000 900,800 3,100,800 1.0 RS STP 5K 200 1,000,000 800,000 800,000 200,000 1,000,000 0.7 RC STP 5K 200 950,000 760,000 760,000 190,000 950,000 2.0 RD STP<5K 700,000 700,000 700,000 MSAS 106 159 106 020 2017 L ROCHESTER 6 MSAS 106, 16TH AVE SW TO 11TH AVE SW, 0.4 RC STP 5K 200 2,500,000 2,000,000 2,000,000 500,000 2,500,000 RECONSTRUCTION PED/BIKE 020 596 002 2017 L DODGE COUNTY DODGE CENTER WEST SIDEWALK PROJECT 0.0 EN TAP STATE 360,756 288,605 288,605 72,151 360,756 PED/BIKE 236 090 002 2017 L LA CRESCENT 5 WAGON WHEEL TRAIL PHASE 2 0.0 EN TAP STATE 392,763 314,210 314,210 78,553 392,763 PED/BIKE 153 090 001 2017 L OWATONNA STRAIGHT RIVER TRAIL PROJECT 0.0 EN TAP STATE 468,350 374,680 374,680 93,670 468,350 CSAH 30 079 630 017 2017 L WABASHA COUNTY CITY OF WABASHA TRAIL AND WABASHA CSAH 30 SHOULDER IMPROVEMENT PROJECT 0.0 EN TAP STATE 403,132 322,505 322,505 80,627 403,132 LOCAL 999 8806 SHL 17 2017 L LOCAL HSIP SETASIDE LOCAL 2017 0.0 SH HSIP 2,444,444 2,200,000 2,200,000 244,444 2,444,444 US 14 5503 45 2017 S MnDOT 6 US 14 FROM 0.2 MI E OF CSAH 19 TO W JCT MN 74, MEDIUM BITUMINOUS MILL AND OVERLAY MN 16 2801 87 2017 S MnDOT MN 16 FROM 0.56 MI W OF MN 26 TO 0.8 MI S OF US 61 MEDIUM BITUMINOUS MILL AND OVERLAY MN 19 7013 04 2017 S MnDOT MN 19, OVER STREAM, REPLACE BRIDGE 8844 MN 30 2004 22 2017 S MnDOT MN 30, OVER STREAM, OSLO, REPLACE BRIDGE 6746 MN 42 7901 48 2017 S MnDOT MN 42, NEAR KELLOGG, REPLACE BRIDGE 5787 MN 43 8503 46CAC 2017 S MnDOT **CMGC** WORK PACKAGE #5 COMPLETE ROADWAY APPROACHES FOR BRIDGES 85851 AND 5900, REHABILITATION AND RECONSTRUCTION BRIDGE 5900 AND COMPLETE BRIDGE 85851 IN WINONA (CHAP 152) (AC PAYBACK 1 OF 1) MANAGED INTO THE FUTURE FOR REMAINING PAYBACK US 52 2506 75 2017 S MnDOT 6 US 52, NB LANES, ROCHESTER TO CANNON FALLS WITH EXCEPTIONS FROM R.P. 64.398 TO 66.632 AND R.P. 79.360 TO 82.206, MEDIUM BITUMINOUS OVERLAY US 52 5507 63 2017 S MnDOT 6 US 52 OVER US 63, REPLACE DECKS NB BRIDGE 55009 AND SB BRIDGE 55010 MN 56 2508 29 2017 S MnDOT MN 56, OVER N FORK ZUMBRO RIVER (NEAR KENYON), REPLACE BRIDGE 4617 WITH NEW BRIDGE 25020 MN 56 2508 33 2017 S MnDOT MN 56, OVER PRAIRIE CREEK, REPLACE BRIDGE 6543 MN 56 5005 62 2017 S MnDOT **ELLA** MN 56 FROM MAPLE STREET IN TAOPI TO CSAH 46, MEDIUM BITUMINOUS MILL AND OVERLAY MN 58 2510 50 2017 S MnDOT MN 58, OVER TH 52 IN ZUMBROTA, REPLACE BRIDGE 9661 US 61 2514 121 2017 S MnDOT US 61 OVER HAY CREEK AND WITHERS HARBOR DRIVE, REPLACE BRIDGE 6483 AND OVER ABANDONED C&NW RR, PLUG BRIDGE 6482 IN RED WING US 63 5509 81 2017 S MnDOT 6 **ITS** US 63 EXTENSION OF ROCHESTER TMS FROM TH 52 TO I 90 INTERCHANGE MN 139 2316 16 2017 S MnDOT MN 139, IA/MN STATE LINE TO US 52 (HARMONY), MEDIUM BITUMINOUS MILL AND OVERLAY 14.2 RS STP<5K 5,700,000 4,560,000 4,560,000 1,140,000 1,140,000 5,700,000 3.0 RS SF 1,128,648 1,128,648 1,128,648 1,128,648 0.0 BR SF 231,150 231,150 231,150 231,150 0.0 BR SF 1,000,000 1,000,000 1,000,000 1,000,000 0.0 BR SF 986,790 986,790 986,790 986,790 1.1 MC NHPP 14,000,000 14,000,000 14,000,000 27.4 RS NHPP 10,400,000 8,320,000 8,320,000 2,080,000 2,080,000 10,400,000 0.0 BR NHPP 4,244,173 3,395,338 3,395,338 848,835 848,835 4,244,173 0.0 BR SF 600,000 600,000 600,000 600,000 0.0 BR SF 882,060 882,060 882,060 882,060 16.4 RS STP<5K 5,831,000 4,664,800 4,664,800 1,166,200 1,166,200 5,831,000 0.0 BR NHPP 4,000,000 3,200,000 3,200,000 800,000 800,000 4,000,000 0.2 BR NHPP 7,500,000 6,000,000 6,000,000 1,500,000 1,500,000 7,500,000 6.7 SC NHPP 350,000 280,000 280,000 70,000 70,000 350,000 3.9 RS SF 1,455,636 1,455,636 1,455,636 1,455,636

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other MN 999 8806 AM 17 2017 S MnDOT DISTRICTWIDE SETASIDES MUNICIPAL 0.0 AM SF 400,000 400,000 400,000 400,000 AGREEMENTS 2017 MN 999 8806 BI 17 2017 S MnDOT DISTRICTWIDE SETASIDES BRIDGE REPAIR 0.0 BI SF 1,683,716 1,683,716 1,683,716 1,683,716 2017 MN 999 8806 CA 17 2017 S MnDOT DISTRICTWIDE SETASIDES CONSULTANT 0.0 CA SF 1,500,000 1,500,000 1,500,000 1,500,000 AGREEMENTS 2017 MN 999 8806 LT 17 2017 S MnDOT DISTRICTWIDE SETASIDES LIGHTING 2017 0.0 SC SF 50,000 50,000 50,000 50,000 MN 999 8806 MA 17 2017 S MnDOT DISTRICTWIDE SETASIDES MISCELLANEOUS 0.0 MA SF 200,000 200,000 200,000 200,000 AGREEMENTS 2017 MN 999 8806 PM 17 2017 S MnDOT DISTRICTWIDE SETASIDES PREVENTIVE 0.0 PM SF 1,500,000 1,500,000 1,500,000 1,500,000 MAINTENANCE 2017 MN 999 8806 RW 17 2017 S MnDOT DISTRICTWIDE SETASIDES R/W 2017 0.0 RW SF 2,000,000 2,000,000 2,000,000 2,000,000 MN 999 8806 RX 17 2017 S MnDOT DISTRICTWIDE SETASIDES BARC 2017 0.0 RX SF 700,000 700,000 700,000 700,000 MN 999 8806 SA 17 2017 S MnDOT DISTRICTWIDE SETASIDES SUPPLEMENTAL AGREEMENTS AND COST OVERRUNS 2017 0.0 SA SF 2,500,000 2,500,000 2,500,000 2,500,000 MN 999 8806 SG 17 2017 S MnDOT DISTRICTWIDE SETASIDES SIGNAL 0.0 SC SF 250,000 250,000 250,000 250,000 REPLACEMENT 2017 MN 999 8806 SHS 17 2017 S MnDOT DISTRICTWIDE SETASIDES HSIP 2017 0.0 SH HSIP 1,555,555 1,400,000 1,400,000 155,555 155,555 1,555,555 MN 999 8806 SN 17 2017 S MnDOT DISTRICTWIDE SETASIDES SIGNING 2017 0.0 SC SF 220,000 220,000 220,000 220,000 MN 999 8806 ST 17 2017 S MnDOT DISTRICTWIDE SETASIDES STRIPING 2017 0.0 SC SF 850,000 850,000 850,000 850,000 MN 999 8826 148 2017 S MnDOT CULVERT LININGS, REPAIRS AND 0.0 DR SF 300,000 300,000 300,000 300,000 REPLACEMENTS ACROSS DISTRICT 6 F.Y. 2017 MN 999 8826 160 2017 S MnDOT DISTRICTWIDE ADA IMPROVEMENTS 2017 0.0 SC SF 200,000 200,000 200,000 200,000 BB TRF 0047 18 2018 L ROCHESTER 6 SECT 5307: ROCHESTER DAR OPERATING ASSISTANCE BB TRF 0047 18A 2018 L ROCHESTER 6 SECT 5307: ROCHESTER RR OPERATING ASSISTANCE BB TRF 3780 18 2018 L LA CRESCENT 5 SECT 5307: LACRESCENT TRANSIT BB TRS 7284 18 2018 L THREE RIVERS THREE RIVERS NORTHFIELD, LAKE CITY AND RED WING, PURCHASE 3 BUSES (CLASS 400) 0.0 B9 LF 790,477 790,477 790,477 0.0 B9 FTA 7,697,156 1,539,431 6,157,725 7,697,156 0.0 B9 FTA 361,584 72,317 289,267 361,584 0.0 TR STP<5K 234,000 187,200 187,200 46,800 234,000 BB TRS 0001 18 2018 L CVS CVS STEELE COUNTY AND FREEBORN 0.0 TR STP<5K 156,000 124,800 124,800 31,200 156,000 COUNTY, PURCHASE 2 BUSES(CLASS 400) BB TRS 1977 18 2018 L SEMCAC SEMCAC FC, PURCHASE 1 BUS (CLASS 400) 0.0 TR STP<5K 78,000 62,400 62,400 15,600 78,000 BB TRS 0047 18 2018 L ROCHESTER 6 ROCHESTER DAR (D6), PURCHASE 1 BUS (CLASS 600) 0.0 TR STP 5K 200 234,000 187,200 187,200 46,800 234,000 PED/BIKE 092 090 054 2018 L DNR MILL TOWNS STATE TRAIL FARIBAULT 0.0 EN TAP STATE 1,230,000 768,750 768,750 461,250 1,230,000 PED/BIKE 159 090 020 2018 L ROCHESTER 6 ROCHESTER LINK CHESTER WOODS TRAIL 0.0 EN TAP STATE 935,500 531,250 531,250 404,250 935,500 LOCAL 999 8806 SHL 18 2018 L LOCAL HSIP SETASIDE LOCAL 2018 0.0 SH HSIP 2,444,444 2,200,000 2,200,000 244,444 2,444,444 CSAH 25 085 625 063 2018 L WINONA COUNTY CSAH 25, FROM US 14 TO 7 MI NORTH, RECLAMATION AND RESURFACE CSAH 21 020 621 004 2018 L DODGE COUNTY CSAH 21, FROM CSAH 12 TO 5TH STREET NW IN KASSON, PAVEMENT REMOVAL AND RESURFACE CR 112 159 080 017 2018 L ROCHESTER 6 18TH AVE NW (CR 112), FROM 37TH STREET NW TO 55TH STREET NW IN ROCHESTER, BITUMINOUS PAVEMENT, TRAFFIC SIGNAL, STORM SEWER, CURB AND GUTTER LOCAL 156 080 015 2018 L RED WING US 61, CR 53, SPRING CREEK AVE, SOUTH AND NORTH SERVICE DRIVES, INTERSECTION REALIGNMENT WITH FRONTAGE ROAD CONSTRUCTION US 14 7408 47 2018 S MnDOT US 14 OVER UP RAIL REHAB BRIDGES 74001 AND 74002 AND OVER STRAIGHT RIVER REHAB BRIDGES 74003 AND 74004 MN 19 2502 25 2018 S MnDOT MN 19, REHAB BRIDGE 25007 OVER PRAIRIE CREEK I 35 6680 103 2018 S MnDOT AT I 35/MN 21 INTERCHANGE IN FARIBAULT, IMPROVE RAMP GEOMETRICS I 35 8826 154 2018 S MnDOT DISTRICTWIDE DECK REPAIR ON I 35 NB AT VARIOUS LOCATIONS 7.0 RS STP<5K 2,600,000 1,439,984 1,439,984 1,160,016 2,600,000 1.9 RS STP<5K 2,100,000 1,163,064 1,163,064 936,936 2,100,000 1.2 RS STP 5K 200 3,600,000 1,661,520 1,661,520 1,938,480 3,600,000 1.0 MC STP<5K 2,465,000 1,273,832 1,273,832 1,191,168 2,465,000 0.0 BI NHPP 1,540,000 1,232,000 1,232,000 308,000 308,000 1,540,000 0.0 BI SF 257,033 257,033 257,033 257,033 0.4 SC SF 550,000 550,000 550,000 550,000 0.0 BI NHPP 960,000 864,000 864,000 96,000 96,000 960,000

Rte_Sys Projnu #Year Who Agency MPO Description Length FTA State TH TH TH Bond Other US 52 2506 77 2018 S MnDOT US 52, SB LANES FROM 1.2 MI N CSAH 7 TO 13.7 RS NHPP 5,675,033 4,540,026 4,540,026 1,135,007 1,135,007 5,675,033 2.2 MI S MN 19, MEDIUM BITUMINOUS MILL AND OVERLAY US 52 2506 79 2018 S MnDOT **AC** US 52 OVER LITTLE CANNON RIVER, 0.0 BR NHPP 2,937,552 1,958,368 1,958,368 1,958,368 1,958,368 979,184 979,184 4,895,920 REPLACE BRS 9485 AND 9486 (AC PROJECT PAYBACK IN 2019) MN 60 7902 25 2018 S MnDOT MN 60 FROM US 52 TO US 63, MEDIUM 12.3 RS STP<5K 5,200,596 4,160,477 4,160,477 1,040,119 1,040,119 5,200,596 BITUMINOUS MILL AND OVERLAY US 61 2514 114 2018 S MnDOT US 61 NEAR SPRING CREEK AVE., INCLUDING CAROL LANE, ACCESS MANAGEMENT AND INTERSECTION SAFETY IMPROVEMENTS 4.1 AM SF 700,000 700,000 700,000 700,000 US 61 8504 78 2018 S MnDOT US 61, SB OVER CEDAR CREEK, REPLACE BRIDGE 9063 US 63 2515 21 2018 S MnDOT **AC** US 63, RED WING, REHAB OR REPLACE BRIDGE 9040 OVER MISSISSIPPI RIVER AND CP RAIL PLUS APPROACH WORK AND REHAB OR REPLACE BRIDGE 9103 (CHAP 152) INCLUDES $14.53M SBPF AND $28.5M TH BONDS (AC PROJECT PAYBACK IN 2019 AND 2020) US 63 5510 85 2018 S MnDOT 6 US 63, REPLACE BRIDGE 8831 AND 8313 OVER STREAM US 63 7908 35 2018 S MnDOT US 63, 0.2 MI N OF CSAH 14 TO CSAH 78, MEDIUM BITUMINOUS MILL AND OVERLAY MN 74 8508 38 2018 S MnDOT MN 74, OVER BEAVER CREEK, REPLACE BRIDGE 85002, OVER STREAMS, REPLACE BRIDGES 8355, 8595 AND 8593 AND REHAB BRIDGES 5835, 5836, 8594 AND 8592 0.0 BR NHPP 1,881,522 1,505,218 1,505,218 376,304 376,304 1,881,522 0.3 BR NHPP BF 87,205,300 14,530,000 14,530,000 33,910,000 33,910,000 28,500,000 44,175,300 121,115,300 0.0 BR STP<5K 502,105 401,684 401,684 100,421 100,421 502,105 21.3 RS STP<5K 8,614,000 6,891,200 6,891,200 1,722,800 1,722,800 8,614,000 0.0 BR STP<5K 1,950,000 1,560,000 1,560,000 390,000 390,000 1,950,000 MN 999 8806 AM 18 2018 S MnDOT DISTRICTWIDE SETASIDES MUNICIPAL 0.0 AM SF 1,200,000 1,200,000 1,200,000 1,200,000 AGREEMENTS 2018 MN 999 8806 BI 18 2018 S MnDOT DISTRICTWIDE SETASIDES BRIDGE REPAIR 0.0 BI SF 351,307 351,307 351,307 351,307 2018 MN 999 8806 CA 18 2018 S MnDOT DISTRICTWIDE SETASIDES CONSULTANT 0.0 CA SF 2,000,000 2,000,000 2,000,000 2,000,000 AGREEMENTS 2018 MN 999 8806 LT 18 2018 S MnDOT DISTRICTWIDE SETASIDES LIGHTING 2018 0.0 SC SF 50,000 50,000 50,000 50,000 MN 999 8806 MA 18 2018 S MnDOT DISTRICTWIDE SETASIDES MISCELLANEOUS 0.0 MA SF 300,000 300,000 300,000 300,000 AGREEMENTS 2018 MN 999 8806 PM 18 2018 S MnDOT DISTRICTWIDE SETASIDES PREVENTIVE 0.0 PM SF 2,500,000 2,500,000 2,500,000 2,500,000 MAINTENANCE 2018 MN 999 8806 RW 18 2018 S MnDOT DISTRICTWIDE SETASIDES R/W 2018 0.0 RW SF 2,500,000 2,500,000 2,500,000 2,500,000 MN 999 8806 RX 18 2018 S MnDOT DISTRICTWIDE SETASIDES BARC 2018 0.0 RX SF 1,000,000 1,000,000 1,000,000 1,000,000 MN 999 8806 SA 18 2018 S MnDOT DISTRICTWIDE SETASIDES SUPPLEMENTAL AGREEMENTS AND COST OVERRUNS 2018 0.0 SA SF 2,500,000 2,500,000 2,500,000 2,500,000 MN 999 8806 SC 18 2018 S MnDOT DISTRICTWIDE SETASIDES SAFETY 0.0 SC SF 600,000 600,000 600,000 600,000 PROJECTS 2018 MN 999 8806 SG 18 2018 S MnDOT DISTRICTWIDE SETASIDES SIGNAL 0.0 SC SF 400,000 400,000 400,000 400,000 REPLACEMENT 2018 MN 999 8806 SHS 18 2018 S MnDOT DISTRICTWIDE SETASIDES HSIP 2018 0.0 SH HSIP 1,555,555 1,400,000 1,400,000 155,555 155,555 1,555,555 MN 999 8806 SN 18 2018 S MnDOT DISTRICTWIDE SETASIDES SIGNING 2018 0.0 SC SF 220,000 220,000 220,000 220,000 MN 999 8806 ST 18 2018 S MnDOT DISTRICTWIDE SETASIDES STRIPING 2018 0.0 SC SF 850,000 850,000 850,000 850,000 MN 999 8826 149 2018 S MnDOT CULVERT LININGS, REPAIRS AND 0.0 DR SF 500,000 500,000 500,000 500,000 REPLACEMENTS ACROSS DISTRICT 6 F.Y. 2018 MN 999 8826 161 2018 S MnDOT DISTRICTWIDE ADA IMPROVEMENTS 2018 0.0 SC SF 200,000 200,000 200,000 200,000 625,759,178 2,296,420 220,488,118 8,941,075 231,725,613 75,681,584 75,681,584 48,759,973 48,759,973 15,166,116 129,115,593 4,974,000 134,089,593 86,779,375 109,238,508 652,680,789