Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Similar documents
Public Information Workshop

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

Kendall Drive Premium Transit PD&E Study

Traffic Impact Statement (TIS)

METRO Orange Line BRT American Boulevard Station Options

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Lacey Gateway Residential Phase 1

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

West Broadway Reconstruction/LRT Design. March 19, 2015

EXCEPTION TO STANDARDS REPORT

Rolling Road (Route 638) Widening Project

Business Advisory Committee. July 7, 2015

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

Attachment E3 Vibration Technical Memorandum

TIMBERVINE TRANSPORTATION IMPACT STUDY FORT COLLINS, COLORADO JANUARY Prepared for:

SH 249 IN GRIMES COUNTY. Open House April 3, 2014

TRAFFIC SIGNAL DESIGN REPORT KING OF PRUSSIA ROAD & RAIDER ROAD RADNOR TOWNSHIP PENNSYLVANIA

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

DRAFT Subject to modifications

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Business Advisory Committee. November 3, 2015

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

Harlem Avenue between 63 rd and 65 th

Plainfield, Indiana Speed Limit Study

Subarea Study. Manning Avenue (CSAH 15) Corridor Management and Safety Improvement Project. Final Version 1. Washington County.

Wentzville Parkway South Phase 2 & 2A

Waco Rapid Transit Corridor (RTC) Feasibility Study

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

APPENDIX C1 TRAFFIC ANALYSIS DESIGN YEAR TRAFFIC ANALYSIS

Purpose and Need Report

City of Pacific Grove

Citizens Committee for Facilities

2.0 Development Driveways. Movin Out June 2017

Major Widening/New Roadway

I-405 Sepulveda Pass Improvements Project

Letter of Transmittal

CITY OF POWAY MEMORANDUM

AASHTO Policy on Geometric Design of Highways and Streets

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

Appendix 3 Traffic Technical Memorandum

West Santa Ana Branch Transit Corridor. Informational Briefing Gateway Cities Service Council April 13, 2017

FREQUENTLY ASKED QUESTIONS

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

FREQUENTLY ASKED QUESTIONS

To: File From: Adrian Soo, P. Eng. Markham, ON File: Date: August 18, 2015

LACEY CITY COUNCIL MEETING July 09, 2015

Dixie Transportation Planning Office

Roundabout Feasibility Study SR 44 at Grand Avenue TABLE OF CONTENTS

Purple Line Extension, Section 2 Southern California Edison, Phase I

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Evaluation Considerations and Geometric Nuances of Reduced Conflict U-Turn Intersections (RCUTs)

Project Working Group Meeting #5

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

TRAFFIC IMPACT STUDY DERRY GREEN CORPORATE BUSINESS PARK MILTON SECONDARY PLAN MODIFICATION

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Memorandum. To: Sue Polka, City Engineer, City of Arden Hills. From: Sean Delmore, PE, PTOE. Date: June 21, 2017

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

2030 Multimodal Transportation Study

PUBLIC INFRASTRUCTURE PROJECTS

STH 60 Northern Reliever Route Feasibility Study Report

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BERKELEY DOWNTOWN AREA PLAN PROGRAM ENVIRONMENTAL IMPACT REPORT TRAFFIC IMPACT ANALYSIS

CTA Blue Line Study Area

INTERSECTION CONTROL EVALUATION

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

Federal Way Link Extension

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Highway 23 New London Access & Safety Assessment. Public Open House #2 October 3, :00 to 7:00 PM

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Reston Transportation Strategy July 9, 2018

Mobility Corridor Updates. Transit & Active Transportation Projects

Harlem Avenue between 63 rd and 65 th

Committee Report. Transportation Committee. Business Item No

East Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary

STATE LOOP 195 PUBLIC MEETING. Footer Text

ACTION TRANSMITTAL No

Community Advisory Committee. October 5, 2015

FY Regional Surface Transportation Program (RSTP) Allocations *

Speed measurements were taken at the following three locations on October 13 and 14, 2016 (See Location Map in Exhibit 1):

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

The Design-Builder shall meet local road criteria provided by the local governing agencies.

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Traffic Impact Analysis. Yelm East Gateway Planned Action

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

August 2, 2010 Public Meeting

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

APPENDIX B Traffic Analysis

Attachment F Transportation Technical Memorandum

Restoration of Historic Streetcar Services in Downtown Los Angeles

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3. April 19, 2018 NHHIP April 19, 2018

TRAFFIC IMPACT ANALYSIS FOR. McDONALD S RESTAURANT IN CARMICAEL Sacramento County, CA. Prepared For:

Transcription:

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project No: N/A ETDM No: 13120 BICYCLE, PEDESTRIAN, AND TRAILS ADVISORY COMMITTEE PRESENTATION September 21, 2015

Agenda What is a PD&E Study? Background Design Alternatives Conclusion 2

What is a PD&E Study? Project Development & Environment (PD&E) Study A process to analyze a transportation project 1. Engineering Identify potential design solutions 2. Environmental Evaluate potential impacts to the natural, social, and physical environments 3. Public Involvement Seek public input 3

Study Limits Industry Road E. INDUSTRY RD. N From Michigan Avenue to Industry Road Approximately 1.3 miles in length Michigan Avenue 4

Purpose and Need Accommodate future traffic needs based on anticipated population and employment growth Certain roadway segments are nearing capacity Enhance safety and mobility Gaps exist in sidewalks and bicycle lanes 5

Existing Roadway Typical Section - From Michigan Ave to 720 feet north of Michigan Ave SB NB 3' 12' 12' 12' 12' 12' 10 ' EXISTING R/W 73' 6' Sidewalk 6

Existing Roadway Typical Section - From 720 feet north of Michigan Ave to north of Walmart SB NB 5' Sidewalk 16' - 42' 12' 12' 10' - 12' 10' - 12' 11' - 34' EXISTING R/W VARIES 73' - 120' 5' Sidewalk 7

Existing Roadway Typical Section - From north of Walmart to Industry Road ±5' Paved Shoulder EB WB ±5' Paved Shoulder 5' Sidewalk 12' - 22' 0' - 12' 12' - 33' VARIES (129' 164') VARIES (75' 100') EXISTING R/W VARIES 229' - 239' 8

Alternatives Considered Build Alternative Widen road to four lanes, two travel lanes in each direction Realign existing curve at Walmart Provide continuous 7-ft bicycle lanes and 6-ft sidewalks on both sides Provide access management 22-foot grass/concrete median will limit left turns along corridor Locate potential pond sites No-Build or Do Nothing Alternative No corridor improvements No continuous sidewalks and designated bicycle lanes No-Build continues as an alternative throughout the PD&E study 9

Design Alternatives 10

Design Alternatives - From Michigan Avenue to Otterbein Avenue (Segment 1) N Otterbein Avenue Michigan Avenue 11

Proposed Roadway Typical Section - From Michigan Avenue to Otterbein Avenue 4-Lane Urban Divided Roadway Typical Section 6' Sidewalk SB NB 6' Sidewalk VARIES 12' Min. 7' 11' 11' 22' 11' 11' 7' VARIES 12' Min. 104 MINIMUM PROPOSED R/W EXISTING R/W VARIES 73' - 120' 12

Design Alternatives - From Michigan Ave to Otterbein Ave The proposed roadway typical section can be built along three different alignments: West Center East Each alignment has different right-of-way impacts 13

Design Alternatives - From Michigan Ave to Otterbein Ave West Alignment N Will require additional right-of-way from the west side of Clearlake Road only 14

Design Alternatives - From Michigan Ave to Otterbein Ave Center Alignment N Will require additional right-of-way from both the west side and east side of Clearlake Road 15

Design Alternatives - From Michigan Ave to Otterbein Ave East Alignment N Will require additional right-of-way from the east side of Clearlake Road Some right-of-way will still be needed on the west side of Clearlake Road, north and south of Mantes Drive 16

Design Alternatives - From Michigan Ave to Otterbein Ave Right-of-Way Impacts Each alignment has a different right-of-way impact and associated cost Evaluation Criteria Four-Lane Urban Typical Section West Alignment Center Alignment East Alignment Residential Parcels Impacted 17 17 3 Business Parcels Impacted 4 7 10 Unimproved Parcels Impacted 1 3 2 Total Parcels Impacted 22 27 15 Relocations # of Residences Relocated 17 17 2 # of Businesses Relocated 0 0 4 Total Number of Relocations 17 17 6 Right-of-Way Cost $6,400,000 $7,876,000 $11,714,500 17

Design Alternatives - From Otterbein Avenue to Industry Road (Segment 2) Industry Road E. INDUSTRY RD. N Otterbein Avenue 18

Proposed Roadway Typical Section - From Otterbein Avenue to Industry Road 4-Lane Urban Divided Roadway Typical Section 6' Sidewalk SB NB 6' Sidewalk VARIES 12' Min. 7' 11' 11' 22' 11' 11' 7' VARIES 12' Min. 104 MINIMUM PROPOSED R/W EXISTING R/W VARIES 120' - 239' 19

Design Alternatives - From Otterbein Avenue to Industry Road Four alternatives developed to realign the existing curve: 45 mph curve 35 mph curve Bulb-Out Roundabout N Existing Curve Each alternative to realign curve has different right-of-way impacts 20

Design Alternative to Realign Curve - 45 MPH Curve 21

Design Alternative to Realign Curve - 45 MPH Curve N 22

Design Alternative to Realign Curve - 35 MPH Curve 23

Design Alternative to Realign Curve - 35 MPH Curve N 24

Design Alternative to Realign Curve - Bulb-Out 25

Design Alternative to Realign Curve - Bulb-Out N 26

Design Alternative to Realign Curve - Roundabout 27

Design Alternative to Realign Curve - Roundabout N 28

Design Alternatives - From Otterbein Avenue to Industry Road Right-of-Way Impacts Each alternative to realign the curve has a different right-of-way impact and associated cost Evaluation Criteria Realign Curve 45 mph curve 35 mph curve Roundabout Bulb-Out Residential Parcels Impacted 0 0 0 0 Business Parcels Impacted 3 3 2 3 Unimproved Parcels Impacted 0 0 1 2 Total Parcels Impacted 3 3 3 5 Relocations # of Residences Relocated 0 0 0 0 # of Businesses Relocated 2 0 0 0 Total Number of Relocations 2 0 0 0 Right-of-Way Cost $4,762,500 $2,538,000 $813,000 $3,102,000 29

Cost Estimate for Entire Study Limit - Michigan Avenue to Industry Road Realign Curve Evaluation Criteria 45 mph curve 35 mph curve Roundabout Bulb-Out Phase Cost Construction (Entire Study Limits) $10,100,999 $10,260,818 $10,393,540 $10,509,539 Design (Entire Study Limits) $1,800,000 $1,800,000 $1,800,000 $1,800,000 Right-of-Way (Otterbein Ave to Industry Rd) $4,762,500 $2,538,000 $813,000 $3,102,000 Right-of-Way (Ponds) TBD TBD TBD TBD Construction Engineering and Inspections $1,010,100 $1,026,082 $1,039,354 $1,050,954 Mitigation TBD TBD TBD TBD Total Cost * $17,775,439 $15,749,371 $14,068,525 $16,841,565 Four-Lane Urban Typical Section Evaluation Criteria West Alignment Center Alignment East Alignment Right-of-Way Cost (Michigan Ave to Otterbein Ave) $6,400,000 $7,876,000 $11,714,500 * Option chosen to realign curve Option chosen to align the typical section Total Estimated Project Cost Bulb-Out West Alignment $23,241,565 30

Conclusion 31

Funding Design Funded in 2016 Concurrent PD&E & Design phases New process by FDOT to streamline and accelerate all projects in the pre-construction phases Right-of-Way Purchase Currently not funded Construction Currently not funded 32

Next Steps Further refine and evaluate design alternatives Select a recommended design alternative Complete environmental and engineering reports Public Hearing Anticipated in February of 2016 All reports will be available for public review 21 days prior to the Public Hearing Obtain State Environmental Impact Report (SEIR) approval from the FDOT District Five Secretary Anticipated in April of 2016 33

Study Website www.clearlakeroadstudy.com Documents & Publications: All information presented at public meetings, including the presentation All draft engineering and environmental and reports 34

Contact Us! Jazlyn Heywood, P.E. FDOT Project Manager FDOT District Five 719 South Woodland Blvd., M.S. 501 Deland, FL 32720 Tel: (386) 943-5388 Email: jazlyn.heywood@dot.state.fl.us Aniruddha (Rudy) Gotmare, P.E. Consultant Project Manager Scalar Consulting Group, Inc. 4152 W. Blue Heron,P.E. Blvd. Suite 119 Riviera Beach, FL 33404 Tel: (954) 263-3243 Email: agotmare@scalarinc.net www.clearlakeroadstudy.com

Thank you for attending! BICYCLE, PEDESTRIAN, AND TRAILS ADVISORY COMMITTEE PRESENTATION Clearlake Road PD&E Study 36