CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE THE POWER OF ASTRONERGY

Similar documents
CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE THE POWER OF ASTRONERGY

Crystalline Silicon PV Module Installation Guide (JET)

Crystalline Silicon PV Module Installation Manual

INSTALLATION & OPERATING MANUAL FOR KIT 2KW~20KW

PV MODULE ACCESSORY MOUNTING SYSTEMS ASTRONERGY KITS -- PV SYSTEM PV GRID-CONNECETD INVERTER

Installation guide for Suntech Power photovoltaic module Purpose of this guide

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

Installation Manual AXITEC SOLAR MODULES

Photovoltaic Modules Installation Manual for Australia

Safety and Installation Instructions

Solar module user manual Conergy PM 225P-250P

Jinko Solar. Photovoltaic Module Eagle Dual. Installation Manual

INSTALLATION MANUAL.

Installation Manual. Installation Manual. AXITEC, LLC 160 Greentree Drive, Suite 101 Dover, Delaware

Product Manual. Installation Instructions for CHSM-230M Series Solar Module

JinkoSolar. Photovoltaic Module-Eagle Dual. Installation Manual

GENERAL INSTALLATION MANUAL

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved.

INSTALLATION AND SAFETY MANUAL for Cigs-2000A1 and Cigs-2000E1 Solar Photovoltaic Modules Release Date: Version: 1.1

INSTALLATION MANUAL ECOSOLARGY SOLAR MODULE

General Installation Manual 2007 Sanyo Electric Co., Ltd. All Rights Reserved 6/15/07

Installation. Guide. HSL Poly Series

INSTALLATION INSTRUCTION AND MAINTENANCE MANUAL

Installation Manual for the photovoltaic modules brand Eurener

Photovoltaic Module User Manual

Photovoltaic Module User Manual (CSA-UL1703)

Installation And User Manual SCHOTT PERFORM POLY SCHOTT PERFORM MONO

INSTALLATION MANUAL THE / MODULE. IEC & UL version

INSTALLATION MANUAL MODULE TSM-PDG5/PDG5(C) TSM-PEG5/PEG5(C) TSM-PEG40 THE. UL version IEC version. TSM_UL/IEC_IM_Dec_2014_RevB - 1 -

PM220P00 / PM240P00 Installation Guide for Users

General Installation Manual Mar 2009, Sanyo Electric Co., Ltd. All Rights Reserved 3/23/09

Installation Manual LIGHTWAY PV MODULES. Revision Date March 30, 2013 /Applicable for IEC certified products

Grape Solar Photovoltaic Modules. Safety and Installation Manual

Safety and Installation Instructions For Fluitecnik PV Modules

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

Installation and Safety Manual

JinkoSolar. Photovoltaic Module. Installation Manual

Philadelphia Solar Installation and Operation Manual

INSTALLATION MANUAL. IEC version. TSM_IEC_IM_2012_RevB

INSTALLATION MANUAL. For Monocrystalline Modules. According with IEC61215 edition 2 & IEC61730 standards

PM300P00 Installation Guide for Users

JinkoSolar. Photovoltaic Module. User Manual (UL1703) 1500V

JinkoSolar. Photovoltaic Module. Installation Manual

SunWize SWPB Series Solar Modules GENERAL INSTALLATION & USER GUIDE

JinkoSolar. Photovoltaic Module. Installation Manual

Installation Instructions

Installation and Maintenance Manual

UL Installation guide for Suntech Power photovoltaic module

Suniva OPTIMUS Installation and Instruction Manual Introduction. Electrical Characteristics. Safety. Mounting Overview. Product Information

INSTALLATION MANUAL WAAREE ENERGIES LIMITED

JinkoSolar. Photovoltaic Module. User Manual (UL1703)

PV Module Installation Manual

INSTALLATION AND USER MANUAL FOR SHARP PHOTOVOLTAIC MODULES A) GENERAL MANUAL

JinkoSolar. Photovoltaic Module. User Manual (UL1703) 1500V

Installation Instructions

Contents. VBHNxxxSJ40 series. VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT TM. VBHNxxxSJ40 series. VBHNxxxSJ25 series

Contents. VBHNxxxSJ40 series VBHNxxxSJ47 series. General Installation Manual. Photovoltaic Module HIT R. VBHNxxxSJ25 series VBHNxxxSJ40 series

Installation manual. For professional use only

IEC INSTALLATION INSTRUCTION AND MAINTENANCE MANUAL FOR CRYSTALLINE SOLAR PV MODULE

KD240GX-LFB2, KD245GX-LFB2 KD250GX-LFB2

Rev.A. Crystalline silicon solar photovoltaic modules INSTALLATION MANUAL. Please. future reference.

Solar Module Installation and User Manual

INSTALLATION MANUAL CRYSTALLINE SOLAR MODULES

INSTALLATION MANUAL Crystalline Photovoltaic Module

JinkoSolar. Photovoltaic Module. User Manual (UL1703)

General Installation Manual for POWERCOM Photovoltaic Modules

Version: GCLSI_ _V2. Photovoltaic Module Installation Manual for GCL System Integration Technology Co., Ltd.

Installation Manual. Opal Solar QSA Series

AEG GLASS-GLASS SOLAR MODULES INSTALLATION MANUAL

AUO Photovoltaic Module Installation Manual. Version 2.0

General Safety & Installation Instructions

OPTXXX-##-4-1YY IEC & UL EN Suniva, Inc. SI&IM _9 Rev 9 Page 1

SOLAR MODULE AS-M6, AS-M7 SOLAR MODULE SERIES AS-P6/AS-P7 AS-M6/AS-M7

Installation Guide. X-tra modules

Installation Manual for LONGi Solar Modules

idealpv SSP1 220/270 Solar Panel

Grape Solar Photovoltaic Modules. User Manual

VBHNxxxKA01 series. General Installation Manual Photovoltaic Module HIT. Contents. Model No. VBHN315KA01

SOLAR MODULE AS-M6, AS-M7 SOLAR MODULE SERIES AS-P6/AS-P7 AS-M6/AS-M7

Grape Solar Photovoltaic Modules. User Manual

General Installation Manual Photovoltaic Module HIT. Contents. Model No. VBHN330SA16 and 16B VBHN325SA16 and 16B

Installation Manual for ZNSHINE Solar. PV Modules

photovoltaikforum.com

Installation & Assembly. Panel SAM-CS6C-130P. Please read these instructions before installing and using this panel

PV Solar MODULE. Installation manual. Please read this manual carefully before operating your set and retain it for future reference.

INSTALLATION MANUALFOR RISEN SOLAR MODULE

Installation and Operations Manual

JA SOLAR INSTALLATION MANUAL

JinkoSolar. Photovoltaic Module. User Manual (UL1703)

KANEKA Thin Film PV Installation Manual MODULE TYPE: KANEKA CORPORATION

PV Solar MODULE. Installation manual. Please read this manual carefully before operating your set and retain it for future reference.

FLEXIBLE PHOTOVOLTAIC MODULES. Instruction Manual

Monocrystalline Solar Module LGXXXN1C(W, K)-G4. Installation Instructions MFL

For our present, For their future. Version 11.03

Installation Manual for LONGi PV Solar Modules

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

Installation Instructions

INSTALLATION MANUAL For crystalline solar photovoltaic modules According with IEC61215 edition 2 & IEC61730 standards

YINGLI SOLAR PV MODULES Installation and User Manual

PV Solar MODULE. Installation manual. Please read this manual carefully before operating your set and retain it for future reference.

Transcription:

CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE THE POWER OF ASTRONERGY

CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE 1. Introduction 1.1 Purpose 1.2 Limitation of Liability 2. Safety 2.1 General Safety 2.2 Installation Safety 3. Mechanical Installation 3.1 Installation Condition 3.2 Installation Methods 4. Electrical Installation 4.1 Installation Condition 4.2 Grounding 5. Maintenance and Disposal 2

1. Introduction 1.1 Purpose This document provides detailed instructions and valuable safety information regarding the installation, electrical connection, and maintenance of the following ASTRONERGY Crystalline Photovoltaic modules: CHSM5409M CHSM5611M CHSM5612M CHSM6608M CHSM6609M CHSM6610M CHSM6612M CHSM6606P CHSM6609P CHSM6610P CHSM6611P CHSM6612P CHSM5612M(BL) CHSM6609M(BF) CHSM6610M(BL) All instructions and mechanical and electrical requirements should be read and understood before attempting installation. The installer should conform to all safety precautions in this guide when installing the module. Keep this guide in a safe place for further reference. 1.2 Limitation of Liability Because the use of this manual and the conditions or methods of installation, operation, use and maintenance of photovoltaic (PV) products are beyond Astronergy s control, Astronergy does not accept responsibility and expressly disclaims liability for loss, damage, or expense arising out of or in any way connected with such installation, operation, use or maintenance. Astronergy reserves the right to change the manual without prior notice. 2. Safety 2.1 General Safety 2.1.1 Consult and follow local codes and other applicable laws concerning required permitting as well as installation & inspection requirements, rules, and regulations. 2.1.2 PV modules should be installed and maintained by qualified personnel. 2.1.3 Use the same performance modules within a given series. 2.1.4 Follow all safety precautions of all components used in the system. 2.1.5 Do not shade portions of the PV module surface from the sun for a long period of time. The shaded cell may become hot (hot spot phenomenon), which can result in solder joints peeling off. 2.1.6 Do not clean the glass surface with chemicals. 2.1.7 Do not drop the PV module or drop objects onto the PV module. 2.1.8 Do not concentrate sunlight on the modules or panels. 2.1.9 Do not attempt to disassemble the modules, and do not remove any attached components from the modules. 2.1.10 Do not scratch or hit at the back sheet, the glass, the terminal box. Do not pull the cables or touch them with bare hands. 2.1.11 Do not drill holes in the frame or scratch the insulating coating of the frame. 3

2.1.12 Keep the PV module packed in the carton until installation. 2.1.13 Do not use modules near equipment or in places where flammable gases may be generated. 2.2 Installation Safety 2.2.1 Wear protective head gear, insulating gloves, safety shoes, and insulated tools when installing the modules. 2.2.2 Do not install the modules in rain, snow, or otherwise wet or windy conditions. 2.2.3 Completely cover the PV module surface with an opaque material during PV module installation and wiring to prevent accidental charge buildup. 2.2.4 Plug in connectors tightly when working on wiring. 2.2.5 Due to the risk of electrical shock, do not perform any work if the terminals of PV module are wet. 2.2.6 Do not touch the terminal box and the end of output cables (connectors) with bare hands. 2.2.7 Do not unplug the connector under load. 2.2.8 Do not work alone. 2.2.9 Wear a safety belt if working far above the ground. 2.2.10 Do not wear metallic jewelry, which can cause electric shock, while installing or troubleshooting the PV system. 2.2.11 Follow the safety regulations for any and all other system components, including wires, connectors, charging regulators, batteries, inverters, etc. 2.2.12 Do not expose wires to direct sunlight. Use UV-resistant cabling. 2.2.13 Do not damage the surrounding PV modules or mounting structure when replacing a PV module. 2.2.14 Do not change any PV module components (diode, junction box, plug connectors, etc.). 2.2.15 Maximum reverse current is 13.5A for module with 5 inch cells and 20.25A for module with 6 inch cells. Use a blocking diode and fuse in the combiner box are recommended for reverse current protection when more than three strings are connected in parallel. 2.2.16 The solar modules are recommended to be installed over a fireproof and insulating roof covering when installed on a roof. 3. Mechanical Installation 3.1 Installation Conditions 3.1.1 Environment temperature: -40 to 85 C 3.1.2 Operating temperature: -40 to 85 C 3.1.3 Mechanical load on panels (e.g., from wind or snow): less than 5400 Pa 3.1.4 Tilt Angle selection: The installation should be facing north in the southern hemisphere and facing south in the northern hemisphere. 3.1.5 To maintain the modules Class C fire rating, the fire class of the roof and building materials should higher than Class C. 3.2 Installation Methods 3.2.1 Bolting All modules must be securely fastened with at least 4 bolts (Fig. (a) and (b)). For maximum security against strong winds or heavy snow falls, suggestion for all of the mounting holes should be used. 4

(a) (b) Remark: As for above diagram, the solid red arrows indicate primary bolt positions; dashed blue arrows indicate positions where bolts can be added for additional support. Especially, the Fig. (b) is only suitable for CHSM6611P / CHSM6612P / CHSM6612M. Bolts are inserted as described in the process below (Fig. (c) ). 1. Place the module on the supporting bars underneath. 2. Insert four stainless-steel bolts (M6) through the holes (7x11.5mm) in the frame according tothe Fig. (a) & (b). For maximum security against strong winds and heavy snow, all available mounting holes should be used. 3. Secure each bolt to the frame with 2 stainless-steel washers, one on each side of the mounting structure; and screw on either a stainless-steel spring washer or a toothed lock washer. Finally, secure with a stainless steel nut (M6). 4. The torque for tightening the nut and bolts recommended 13Nm when the property class of bolts and screws is Class 8.8. Module Frame M6 Bolt Washer Mounting Structure Washer Spring Washer M6 Nut (c) 3.2.2 Clamping Modules can be laid either across the supporting bars (Fig. (d) ) or parallel to them (Fig. (e) & (f) ). (d) (e) 5

(f) Remark: Illustrations of the three different methods for clamping modules onto the frame with aluminum clamps. Each aluminum mounting clamp comes with an M8 bolt, a plain washer, a spring washer, and an M8 nut. To fasten the module: 1. Place the module on the two supporting bars (not provided). The bars should be made with stainless material or treated with an anti-corrosion process (e.g., anodic oxidation treatment). 2. The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt. 3. If the bars do not come with grooves, holes of a suitable diameter may need to be drilled to allow bolts to be attached to the bars at the same locations as mentioned before. 4. Secure each clamp by attaching plain washer, spring washer, and nut, in that order. 5. Both of close-ups of Fig. (g) indicate the middle clamps and Fig. (h) indicate the side clamps for your reference. The dimensions for the middle clamps are a 40 mm, b 26 mm, c = 8 mm, d 28 mm, and Ø = 9 mm. The torque for tightening the nut and bolts recommended 28Nm when the property class of bolts and screws is Class 8.8. (g) (h ) 6. Especially for Fig. (d) mounting method, slide bolts through groove on the supporting bars next to the locations where the 4 clamps are to be fastened. The module may be clamped only in the permitted clamping are as on the long edge of the frame. For exact locations on the frame refer to Fig. (i) in conjunction with table 1 below. 6

Variable clamping range For exact dimensions for a given module series, please see the following table 1. Use in conjunction with Fig. (i) to determine permitted clamping locations for a given module series for clamping with clamps: Module Series Dimension A B C CHSM5409M 1200*554*35 1200 50 250 CHSM5611M 1453*808*35 1453 200 160 CHSM5612M/(BL) 1580*808*35 1580 200 200 CHSM6610M/(BL) 1652*994*35 1652 200 210 CHSM6610P 1652*994*35 1652 200 210 CHSM5612M/(BL) 1580*808*45 1580 50 350 CHSM6608M 1336*994*45 1336 50 280 CHSM6609M/(BF) 1494*994*45 1494 50 320 CHSM6610M/(BL) 1652*994*45 1652 50 360 CHSM6606P 1020*994*45 1020 50 205 CHSM6609P 1494*994*45 1494 50 320 CHSM6610P 1652*994*45 1652 50 360 CHSM6612M 1956*994*50 1956 60 440 CHSM6611P 1798*994*50 1798 60 400 CHSM6612P 1956*994*50 1956 60 440 7. Especially for Fig. (e) mounting method, the modules may be mounted using clamps designed for solar modules refer to Fig. (g), the modules must be supported along the length of the long edge, and should overlap the array rail by 10mm 14mm (g) 7

8. Especially for Fig. (f) mounting method which is not suitable for 35mm frame thickness module with 6 inch cells, clamp positions are important the clamp centerlines refer to mark D which must be between 50mm and 200mm from the end of the module. 4. Electrical Installation and Grounding 4.1 Installation 4.1.1 The electrical characteristics are within ±10 percent of the indicated values of Isc. Voc and Pmp under test conditions (irradiance of 100mW/cm²,AM1.5 spectrum, and a cell temperature of 25 C). 4.1.2 The maximum system voltage for all module series is 600 V for North American Market and 1000V for European Market. 4.1.3 Connect quantity of modules that match the voltage specifications of the inverters used in system. Modules must not be connected together to create a voltage higher than the permitted maximum system voltage under the worst local temperature conditions. 4.1.4 Under normal conditions, a photovoltaic module is likely to experience conditions that produce more current and/ or voltage than reported at standard test conditions. Accordingly, the values of Isc and Voc marked on this module should be multiplied by a factor of 1.25 when determining component voltage ratings, conductor ampacities, fuse sizes, and size of controls connected to the PV output. 4.1.5 Refer to Section 690-8 of the National Electrical Code for an additional multiplying factor of 125 percent (80 percent derating) which may be applicable. 4.1.6 Each module (or series-connected string of modules) shall be provided with the maximum series fuse, specified as 10 A for the 5 inch cell module series and 15A for the 6 inch cell module series. 4.1.7 Use a special solar cable and plugs for installing the PV system and make sure that all connections are safe and tight. The cable should be 4 mm2 (12AWG), and able to withstand the maximum possible system open-circuit voltage. 4.1.8 Bypass diodes are included in module junction boxes to avoid decreased module performance in the event of shade or shelter. Please check the relevant product datasheet for the specific diodes of J-box 4.2 Grounding (k) Stainless steel M5 bolt Stainless steel M5 nut Stainless steel spring washer Stainless steel cut washer Stainless steel plain washer Copper wire Stainless steel M5 cup washer Stainless steel M5 bolt Grounding the aluminum frame with copper wire 8

4.2.1 Use the marked 5.5 mm grounding holes (5.5mm) to ground the anodized frame. Use an M5 nut, two M5 cut washers, an M5 plain washer, an M5 spring washer, and an M5 bolt and a copper wire. All nuts, bolts, and washers are type M5 and should be made of stainless steel (Fig. (k)). 4.2.2 Put the bolt through the cup washer and wrap the copper wire around the bolt. (Note that the copper wire cannot be attached directly to the aluminum.) 4.2.3 Put the bolt through the cut washer and then through the hole in the aluminum frame. 4.2.4 Add the spring washer and nut on the other side of the bolt and tighten to secure all parts. The tightening torque should be 210±20 N cm. 4.2.5 Approve the use of UL-467 approved bonding and grounding devices, including Burndy (formerly Wiley Electronics) Washer Electrical Equipment Bonding (WEEB) and similar devices, such as barbed washers, that meet the requirements of UL-467 as suitable for electrical bonding and grounding PV modules to PV mounting systems. 5. Maintenance 5.1 Regularly carry out a visual inspection for dirt, dust, bird dropping, leaves, and other detritus covering the modules. 5.2 If there is a build-up of dirt or dust on the module surface, wash the module with clean water and a gentle implement (a sponge). Never use chemicals on the surface of the module. 5.3 If snow is present, a soft-bristled brush with soft bristles may be used to clean the surface of the modules. 5.4 Regular electrical and mechanical inspection by a licensed professional will keep the system safe and operating at maximum efficiency. 9

SOUTH SAN FRANCISCO, USA RUTHERFORD, USA RAVENSBURG, GERMANY BARCELONA, SPAIN JIUQUAN,CHINA SEOUL, KOREA TOKYO, JAPAN SHANGHAI,CHINA HANGZHOU,CHINA BANGKOK, THAILAND CORPORATE HEADQUARTERS Chint Solar (ZheJiang) Co., Ltd. 1335 Bin an Road, Binjiang District Hangzhou, Zhejiang Province, 310053 China Tel: + 86 571 5603 1888 Fax: + 86 571 5603 2383 MANUFACTURING PLANTS Hanghou, Shanghai & Jiuquan SUBSIDIARIES Spain Chint Solar Hispania S.L. Paseo de Gracia, 78, 2-2A 08008 Barcelona, Spain Tel: + 34 9346 73778 Fax: + 34 9346 73789 Germany Astronergy GmbH Karlstr. 8 88212 Ravensburg, Germany Tel: + 49 (0)751 295096-0 Fax: + 49 (0)751 295096-39 North America Astronergy Solar, Inc. 377 Swift Avenue South San Francisco, CA 94080 USA Tel: + 1 650 392 2777 Fax: + 1 650 392 2778 1 Meadowlands Plaza, Suite 200 East Rutherford, NJ 07073 USA Japan KoyoAstro Co., Ltd. 1-5-6, Higashi-Nihonbashi, Chou-ku, Tokyo 103-0004, Japan Tel: + 03 5820 2141 Fax: + 03 5820 2142 Korea Astronergy Solar Korea Misung Bldg 3F, 91-5 Banpo-dong, Seocho-gu, Seoul, Korea Tel: + 82 (0)2 2226 3911 Fax: + 82 (0)2 2226 3910 Thailand Astronergy Solar Korea (Thailand) Co., Ltd. 184/88 Forum Tower 18FL Ratchadapisek Rd., Huay-Kwang, Bangkok 10320 Thailand Tel: + 662 645 4155 Fax: + 662 245 3185 http://www.astronergy.com 1015 P / 04-2012