December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

Similar documents
January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Department of Market Quality and Renewable Integration November 2016

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market

Market Monitoring Update

DMM 2017 Q4 Report Highlights

Re: California Independent System Operator Corporation

WESTERN EIM BENEFITS REPORT Second Quarter 2018

February 13, Docket No. ER ; ER Response to Request for Additional Information

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

California ISO. Q Report on Market Issues and Performance. December 8, Department of Market Monitoring

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Reactive Power Requirements and Financial Compensation. Addendum to Draft Final Proposal

Large General Service Time-of-Use Storage Program

Supply Margin Assessment (SMA) test announced in the SMA Order 2 with

April 6, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Decision on Merced Irrigation District Transition Agreement

Pacific Gas and Electric Company TM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Operational Opportunities to Minimize Renewables Curtailments

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

ATLANTA CLEVELAND DAYTON WASHINGTON, D.C. CINCINNATI

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

Merger of the generator interconnection processes of Valley Electric and the ISO;

Proxy Demand Resource FERC Order. Margaret Miller Manager, Market Design & Regulatory Policy August 24, 2010

Flexible Ramping Product Technical Workshop

September 2, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

MCE SPECIAL MEETING Friday, September 28, :00 A.M. Agenda Page 1 of 2

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

February 8, Southwest Power Pool, Inc. Revisions to SPP Open Access Transmission Tariff to add Schedule 12 Docket No.

November 16, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

August 1, Amended Attachment S under Southern Companies Open Access Transmission Tariff, effective January 1, 2014

Pacific Gas and Electric Company Monthly Report On Interruptible Load and Demand Response Programs for December 2009 [Amended Version]

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

Capacity Market Rules for Energy Storage Resources

MONTHLY NEW RESIDENTIAL SALES, AUGUST 2017

ILLINOIS COMMERCE COMMISSION

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Frequently Asked Questions New Tagging Requirements

MONTHLY NEW RESIDENTIAL CONSTRUCTION, JULY 2017

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

PREPARED REBUTTAL TESTIMONY OF BETH MUSICH SOUTHERN CALIFORNIA GAS COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY

Memorandum. This is a status report only. No Board action is required.

FUEL ADJUSTMENT CLAUSE

ELECTRICITY GENERATION AND DISTRIBUTION. Electricity Generation & Distribution Q2,

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

RE: Advice Schedule 45 Public DC Fast Charger Delivery Service Optional Transitional Rate REPLACEMENT PAGES

Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020

MONTHLY NEW RESIDENTIAL SALES, APRIL 2017

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

2016 UC Solar Research Symposium

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA SOUTHERN CALIFORNIA EDISON COMPANY S (U 338-E) NOTICE OF EX PARTE COMMUNICATION

NEW HAMPSHIRE GAS CORPORATION WINTER PERIOD ORIGINAL FILING CONTENTS 3. CONVERSION OF GAS COSTS - GALLONS TO THERMS SCHEDULE A

Appendix E Water Supply Modeling

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

May 9, Tess Park, Vice President of Power Supply Idaho Power Company

best to you all Gail Carbiener Page 1 of 5

PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: NEW ENGLAND GAS COMPANY DOCKET NO ANNUAL GAS CHARGE FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

New York s Mandatory Hourly Pricing Program

MONTHLY NEW RESIDENTIAL CONSTRUCTION, AUGUST 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) APPLICATION

Large Power Service Time of Use

MONTHLY NEW RESIDENTIAL CONSTRUCTION, APRIL 2017

MONTHLY NEW RESIDENTIAL SALES, SEPTEMBER 2018

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

D.P.U A Appendix B 220 CMR: DEPARTMENT OF PUBLIC UTILITIES

MONTHLY NEW RESIDENTIAL CONSTRUCTION, FEBRUARY 2017

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Year to Date Summary. Average and Median Sale Prices

NYISO Tariffs. New York Independent System Operator, Inc. Document Generated On: 2/27/2013

ls2288 ORDINANCE NO. _

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA %% CHARLESTON

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) Southwest Power Pool, Inc. ) Docket No. ER ) )

Review of U.S. market reforms for renewable integration, flexibility, and storage

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Vermont Public Power Supply Authority 2018 Tier 3 Annual Plan

IMM Quarterly Report: Summer 2017

Fuel Charges in Reference Levels

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

STATE OF NEW YORK PUBLIC SERVICE COMMISSION

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

MONTHLY NEW RESIDENTIAL CONSTRUCTION, NOVEMBER 2017

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Energy Storage and Distributed Energy Resource ( ESDER ) Initiative

Examinations of Working Places in Metal and Nonmetal Mines. AGENCY: Mine Safety and Health Administration, Labor.

Transcription:

California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket: ER15-2565- Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company Dear Secretary Bose: The Department of Market Monitoring (DMM) hereby submits its Energy Imbalance Market (EIM) special report on the transition period of Idaho Power Company (IPCO) during its first six months of participation in the EIM for July 2018. IPCO entered the EIM on April 4, 2018. Please contact the undersigned directly with any questions or concerns regarding the foregoing. Respectfully submitted, By: /s/ Eric Hildebrandt Eric Hildebrandt Director of Market Monitoring California Independent System Operator Corporation 250 Outcropping Way Folsom, CA 95630 Tel: (916) 608-7123 Fax: (916) 608-7222 ehildebrandt@caiso.com www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

California Independent System Operator Corporation California ISO Report on energy imbalance market issues and performance: Idaho Power for July 2018 December 4, 2018 Prepared by: Department of Market Monitoring

Executive summary Pursuant to the Commission s October 29, 2015 Order on the ISO s energy imbalance market (EIM), the ISO filed a report on September 6, 2018 covering the period from July 1 through July 31, 2018 (July report) for the Idaho Power area in the energy imbalance market. 1 This report provides a review by the Department of Market Monitoring (DMM) of energy imbalance market performance in the Idaho Power area during the period covered in the ISO s July report. Key findings in this report include the following: Prices in the Idaho Power area often tracked similarly to prices in PacifiCorp East on average and remained lower on average than system prices. Price separation between these two areas and the ISO was most pronounced during peak load hours when high system prices caused transfers from these areas to reach export limits. Prices averaged about $33/MWh in the 15-minute market and $34/MWh in the 5-minute market. Idaho Power failed the upward sufficiency test less frequently in July, during 2 hours (or about 0.27 percent of hours). In the downward direction, Idaho Power did not fail the sufficiency test. In both the 5-minute market and the 15-minute market no valid under- or over-supply infeasibilities occurred. As a result, transition period pricing was not triggered during the month of July. DMM reviewed the results and conclusions in the ISO s July report and found that the results are consistent with those reported in this document. Section 1 of this report provides a description of prices and power balance constraint relaxations, section 2 discusses the load bias limiter, and section 3 discusses the flexible ramping sufficiency test. 1 The ISO s July 2018 Report was filed at FERC and posted on the ISO website on September 6, 2018, http://www.caiso.com/documents/sep6_2018_eimtransitionperiodreport_ipco_jul2018_er15-2565.pdf Report on Energy Imbalance Market Issues and Performance 1

1 Energy imbalance market prices Figure 1.1 and Figure 1.2 show hourly average 15-minute and 5-minute prices during July for Idaho Power, PacifiCorp East, and Pacific Gas and Electric (PG&E), as well as the bilateral prices DMM used as an additional benchmark for energy imbalance market prices. The bilateral price benchmark for Idaho Power is composed of energy prices at the Mid-Columbia hub published by ICE. These are representative of prices used for settling imbalance energy in the Idaho Power area prior to energy imbalance market implementation. Prices in the Idaho Power area often tracked similarly to prices in PacifiCorp East on average and remained lower on average than system prices. Price separation between these two areas and the ISO was most pronounced during peak load hours when high system prices caused transfers from these areas to reach export limits. Further, average prices in the ISO were high during the month of July, driven in part by high gas prices, seasonally high load, and reduced renewable generation. In the Idaho Power area during the month, prices averaged about $33/MWh in the 15-minute market and $34/MWh in the 5-minute market. Figure 1.1 Average hourly 15-minute price (July 2018) Average hourly price ($/MWh) $160 $140 $120 $100 $80 $60 $40 Idaho Power PacifiCorp East Southern California Edison (ISO) Bilateral price benchmark $20 $0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Report on Energy Imbalance Market Issues and Performance 3

Figure 1.2 Average hourly 5-minute price (July 2018) Average hourly price ($/MWh) $160 $140 $120 $100 $80 $60 $40 Idaho Power PacifiCorp East Southern California Edison (ISO) Bilateral price benchmark $20 $0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 All power balance constraint relaxations that would have occurred in July would have been subject to the six-month transition period pricing that expires in October 2018. The transition period pricing mechanism sets prices at the highest cost supply bid dispatched to meet demand rather than at the $1,000/MWh penalty parameter while relaxing the constraint for shortages, or the -$155/MWh penalty parameter while relaxing the constraint for excess energy. 2 Power balance constraint relaxations can be grouped in the following categories: Valid under-supply infeasibility (power balance constraint shortage). These occurred when the power balance constraint was relaxed because load exceeded available generation. The ISO validated that ISO software was working appropriately during these instances. Valid over-supply infeasibility (power balance constraint excess). These occurred when the power balance constraint was relaxed because generation exceeded load. The ISO validated that ISO software was working appropriately during these instances. Load bias limiter would have resolved infeasibility. These occurred when a load adjustment entered by operators exceeded the amount of the power balance constraint relaxation and in the same direction. During the transition period, the load bias limiter did not change price outcomes because transition period pricing was applied during these intervals instead. However, in these 2 When transition period pricing provisions are triggered by relaxation of the power balance constraint, any shadow price associated with the flexible ramping product is set to $0/MWh to allow the market software to use the last economic bid dispatched. 4 Report on Energy Imbalance Market Issues and Performance

cases, the load bias limiter would have reduced the operator adjustment in the pricing run to resolve the infeasibility had transition period pricing not been in effect. Correctable infeasibility. These occurred when the ISO software relaxed the power balance constraint because of either a software error or data error. These required a price correction or would have triggered a price correction if transition period pricing were not active. 3 Figure 1.3 and Figure 1.4 show the monthly frequency of under-supply and over-supply infeasibilities, respectively, in the 5-minute market and 15-minute market. As shown in Figure 1.3, valid under-supply infeasibilities did not occur in the 15-minute or 5-minute markets for Idaho Power during July. Additionally, there were no valid over-supply infeasibilities in either the 15-minute or 5-minute markets during the month. Figure 1.3 Frequency of under-supply power balance infeasibilities by month Idaho Power 1.0% 0.8% Valid under-supply infeasibility Load bias limiter would have resolved infeasibility Corrected or invalid infeasibility Percent of intervals 0.6% 0.4% 0.2% 0.0% April May June July April May June July 15-minute market 5-minute market 3 Section 35 of the ISO tariff provides the ISO authority to correct prices if it detects an invalid market solution or issues due to a data input failure, occurrence of hardware or software failure, or a result that is inconsistent with the ISO tariff. During erroneous intervals, the ISO determined that prices resulting under transition period pricing were equivalent to prices that would result from a price correction, so no further price adjustment was appropriate. http://www.caiso.com/documents/section35_marketvalidationandpricecorrection_may1_2014.pdf. Report on Energy Imbalance Market Issues and Performance 5

Figure 1.4 Frequency of over-supply power balance infeasibilities by month Idaho Power 1.0% 0.8% Corrected or invalid infeasibility Load bias limiter would have resolved infeasibility Valid over-supply infeasibility Percent of intervals 0.6% 0.4% 0.2% 0.0% April May June July April May June July 15-minute market 5-minute market Figure 1.5 and Figure 1.6 show the average monthly prices in the 15-minute market and 5-minute market with and without the special transition period pricing provisions applied to mitigate prices in the Idaho Power area during July. 4 These figures also include the average bilateral price benchmark for comparison to Idaho Power prices, depicted by the dashed blue line. There were no valid power balance constraint relaxations during July for Idaho Power in either the 15-minute or 5-minute market, therefore, prices with or without transition period pricing were identical. 4 A detailed description of the methodology used to calculate these counterfactual prices that would result without transition period pricing was provided on p. 7 of the January 2017 report for Arizona Public Service from DMM: https://records.oa.caiso.com/sites/gca/legal/mm/records/eim/ferc%20report/2017-01%20arizona/eim%20special%20report%20january%20aps.pdf. 6 Report on Energy Imbalance Market Issues and Performance

Figure 1.5 Average prices by month Idaho Power (15-minute market) Average monthly price ($/MWh) $60 $50 $40 $30 $20 $10 Idaho Power Price Idaho Power price without transition period pricing Bilateral price benchmark $0 Apr May Jun Jul 2018 Figure 1.6 Average prices by month Idaho Power (5-minute market) Average monthly price ($/MWh) $60 $50 $40 $30 $20 $10 Idaho Power Price Idaho Power price without transition period pricing Bilateral price benchmark $0 Apr May Jun Jul 2018 Report on Energy Imbalance Market Issues and Performance 7

2 Load bias limiter When the load bias limiter is triggered it has the same effect as the transition period pricing feature and causes prices to be set by the last economic bid dispatched rather than the $1,000/MWh penalty price for under-supply power balance relaxations or the -$155/MWh penalty price for over-supply power balance relaxations. A more detailed description of the load bias limiter is included in DMM s April 2015 report. 5 Table 2.1 shows average 15-minute and 5-minute market prices with transition period pricing as well as counterfactual estimates for prices without transition period pricing and without either transition period pricing or the load bias limiter. As there were no power balance constraints in the month of July, the load bias limiter was not triggered during this period. As a result, the load bias limiter would have had no impact on prices had transition period pricing not been in effect. Table 2.1 Impact of load bias limiter on Idaho Power prices (July 2018) Estimated price Estimated price without Potential impact of load Average proxy Price with transition without transition transition period pricing bias limiter price period pricing period pricing or load bias limiter Dollars Percent Idaho Power 15-minute market (FMM) $54.42 $33.13 $33.13 $33.13 $0.00 0.0% 5-minute market (RTD) $54.42 $34.03 $34.03 $34.03 $0.00 0.0% 5 Report on Energy Imbalance Market Issues and Performance, Department of Market Monitoring, April 2, 2015, pp.34-35. http://www.caiso.com/documents/apr2_2015_dmm_assessmentperformance_eim-feb13-mar16_2015_er15-402.pdf. Report on Energy Imbalance Market Issues and Performance 9

3 Flexible ramping sufficiency test The flexible ramping sufficiency test ensures that each balancing area has enough ramping resources over each hour to meet expected upward and downward ramping needs. The test is designed to ensure that each energy imbalance market area has sufficient ramping capacity to meet real-time market requirements without relying on transfers from other balancing areas. When the energy imbalance market was initially implemented there was an upward ramping sufficiency test. In November 2016, the ISO implemented an additional downward ramping sufficiency test in the market with the introduction of the flexible ramping product, which replaced the flexible ramping constraint. If an area fails the upward sufficiency test, energy imbalance market imports cannot be increased. 6 Similarly, if an area fails the downward sufficiency test, exports cannot be increased. In addition to the sufficiency test, each area is also subject to a capacity test. If an area fails the capacity test, then the flexible ramping sufficiency test automatically fails as a result. 7 Limiting transfers can impact the frequency of power balance constraint relaxations and, thus, price separation across balancing areas. Constraining transfer capability may also impact the efficiency of the energy imbalance market by limiting transfers into and out of a balancing area that could potentially provide benefits to other balancing areas. Figure 3.1 shows the frequency that Idaho Power failed the sufficiency test in the upward or downward direction. As shown in Figure 3.1, Idaho Power continued to fail the upward sufficiency test less frequently during July as compared to other months. Idaho Power failed the upward sufficiency test during 2 hours (or about 0.27 percent of hours) during the month of July. In the downward direction, Idaho Power did not fail the sufficiency test in July. 6 Business Practice Manual for the Energy Imbalance Market, August 30, 2016, p. 45-52: https://bpmcm.caiso.com/bpm%20document%20library/energy%20imbalance%20market/bpm_for_energy%20imbalance% 20Market_V6_clean.docx. 7 Business Practice Manual for the Energy Imbalance Market, August 30, 2016, p. 45. Report on Energy Imbalance Market Issues and Performance 11

Figure 3.1 Idaho Power flexible ramping sufficiency test results 12% Failed sufficiency test 10% Percent of hours 8% 6% 4% 2% 0% Apr May Jun Jul Apr May Jun Jul Upward sufficiency test Downward sufficiency test 12 Report on Energy Imbalance Market Issues and Performance

CERTIFICATE OF SERVICE I certify that I have served the foregoing document upon the parties listed on the official service list in the captioned proceedings, in accordance with the requirements of Rule 2010 of the Commission s Rules of Practice and Procedure (18 C.F.R. 385.2010). Dated at Folsom, California, on this 4 th day of December, 2018. /s/ Anna Pascuzzo Anna Pascuzzo