SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Similar documents
FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS

I-405 Sepulveda Pass Improvements Project

Janice Fortunato Senior Director Business Partnerships

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

I-405 Sepulveda Pass Improvements Project

30-Day Look Ahead Summary August 2011

Central Park Drives Traffic Management Overview

June WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Alaskan Way Viaduct and Seawall Replacement Program Seattle, Washington

Project Working Group Meeting #5

CITY OF BEVERLY HILLS STAFF REPORT

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Rolling Road (Route 638) Widening Project

Exposition Corridor Transit Project

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Business Advisory Committee. July 7, 2015

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

Clifton Corridor Transit Initiative. Briefing to Medlock Area Neighborhood Association (MANA) February 15, 2016

Fixing the Line s Canarsie Tunnel. Manhattan CB6 11/5/2018

NEWS RELEASE November 8, 2017

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Exposition Light Rail Transit Project

Click to edit Master text styles

Sepulveda Pass Corridor Systems Planning Study

VAN NESS AVENUE BUS RAPID TRANSIT

Strategies to keep people and goods moving in and through Seattle

Automated Photo Enforcement Annual Report 2015

Ottawa LRT Stage 2. McKellar Park Information Session

VAN NESS AVENUE BUS RAPID TRANSIT

Construction starts this summer on the second and final phase of the Interstate 95 Cottman/

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

WESTSIDE SUBWAY EXTENSION PROJECT. Construction Traffic Analysis Report

Westside Subway Extension Final EIS/EIR. January 2011 Community Update Meetings

Purple Line Extension, Section 2 Southern California Edison, Phase I

Purple Line Extension, Section 2 Southern California Edison, Phase I June 7, 2017

November 6, Agenda

I-225 Rail Line Iliff and Florida Stations Information Meeting

US 81 Bypass of Chickasha Environmental Assessment Public Meeting

West Broadway Reconstruction/LRT Design. March 19, 2015

Welcome. Please Sign In

Construction Staging Area 4 Avenue Road

Metropolitan Freeway System 2007 Congestion Report

Wentzville Parkway South Phase 2 & 2A

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Mobility Corridor Updates. Transit & Active Transportation Projects

Expo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011

Confederation Line West Queensway Terrace North. May 27, 2017

Corridor Management Committee. March 7, 2012

I-84 Hartford Project Public Advisory Committee Meeting #19. March 28, 2019

Mid-Coast Corridor Transit Project

RECOMMENDATION PAPER TO THE DULLES CORRIDOR COMMITTEE

South Gloucestershire Challenge Fund and Cycle Ambition Fund

Purple Line Extension Updates on La Cienega and Rodeo Stations December 13, 2017

Maryland Gets to Work

IMPROVEMENT CONCEPTS

Develop ground transportation improvements to make the Airport a multi-modal regional

Tunney s Pasture to Dominion Station Traffic and Transit Detours. April 4, 2017 C. Wheeler/ C. Swail

US 50/SOUTH SHORE COMMUNITY REVITALIZATION PROJECT

The Eastern Connector Study November, 2007 planning for the future

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

The Design-Builder shall meet local road criteria provided by the local governing agencies.

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

Committee Report. Transportation Committee. Business Item No

IV. REVISIONS TO THE DRAFT IS/MND

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.

ROUTE 85 (WASHINGTON STREET) OVER ASSABET RIVER

T-THIRD PHASE 3 CONCEPT STUDY C: DETAILED DESCRIPTIONS OF CONCEPT ALIGNMENTS D: CONSTRUCTABILITY ANALYSIS AND COST ESTIMATES (HNTB CONSULTANTS)

Expo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

December 12, Dear Secretary Foxx:

S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016

Federal Way Link Extension

Purple Line Extension Section 1 Construction Community Meeting April 19, 2018

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Business Advisory Committee. November 3, 2015

US 67 WIDENING PROJECT

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Doran Street and Broadway/Brazil Grade Separation Project

ODOT District Two Monthly Construction Update

Project Description: Georgia Department of Transportation Public Information Open House Handout PI#(s): , County: Muscogee

Mobility Corridor Updates. Transit & Active Transportation Projects

Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

IV. ENVIRONMENTAL IMPACT ANALYSIS B. TRAFFIC AND CIRCULATION

WOODVILLE HIGHWAY (SR 363) PD&E STUDY From Capital Circle Southeast To Paul Russell Road FPID NUMBER: Public Hearing

METRO Orange Line BRT American Boulevard Station Options

PROJECT: Wilkinson Road Corridor Improvement Traffic Management Planning Project SUBJECT: Traffic Analysis

ODOT District Two Monthly Construction Update

Peninsula Corridor Electrification Update Meeting

City of Beverly Hills North Santa Monica Blvd Reconstruction. Traffic & Parking Commission June 04, 2015

Restoration of Historic Streetcar Services in Downtown Los Angeles

Operations Center FAQs

Sepulveda Pass Corridor Systems Planning Study Update

Crenshaw-Prairie Transit Corridor Study Public Meetings

Transcription:

DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road Closures Other Impacts/Issues

Project Consensus and Coordination FHWA Doyle Drive Subcommittee

DOYLE DRIVE Project Acceleration

Original Project Time Line Summer 2000 Feb. 2000 Dec. 2005 Preferred Alt Sept. 2006 Dec 2008 Fall 2010 Winter 2011 Summer 2014 Environmental Studies begin ID Alternatives Begin Prelim Engineering Draft ESI/EIR Public Comment Begins Final EIS/EIR Detailed Design Completed Construction Start Project Complete Draft EIS/EIR For Comment Final EIS/EIR ROD Start Construction = Milestones Completed

Accelerated Schedule Replace deficient facility sooner Get in and get out Reduce escalation cost Qualify for federal stimulus Take advantage of favorable market conditions Help create jobs to support local and regional economy

Contracts Pre-Construction Contracts: Contract 1: Environmental mitigation (Built-Environmental Treatment Plan) Active through roadway contracts Contract 2: Utility Plan and Relocation Roadway Construction Contracts: Contract 3: Southbound Presidio Interchange/High Viaduct Contract 4: Southbound Battery Tunnel and At-Grade Detour Contract 5: Girard Interchange, Low Viaduct Contract 6: Northbound Battery Tunnel, Main Post Tunnels Contract 7: Northbound Presidio Interchange/High Viaduct Contract 8: Landscaping

DRAFT Schedule Contract 1 Seismic Safety Achieved Early 2011 R/W Activities Contract 2 Contract 3 Contract 4 Roadway Complete Late 2012 Contract 5 Contract 6 Contract 7 Contract 8 Original Project Schedule Completion Spring 2014

DOYLE DRIVE Contracts

Existing Site Golden Gate Bridge Toll Plaza National Historic Park Historic Buildings Presidio Trust

Contract #3 SB Presidio IC SB Park Presidio Viaduct Southern Park Presidio Interchange Ruckman Undercrossing Begin/End Construction: October 2009 - Early 2011

High Viaduct Renderings

Contract #4 SB Battery Tunnel SB Battery Tunnel and permanent roadway At-Grade Detour Begin/End Construction: December 2009 Early 2011

Battery Tunnel Portals

Contract No. 5 Tunnels Demolish Low Viaduct NB Battery Tunnel, Main Post Tunnels Roadwork and Mechanical and Electrical substations Begin/End Construction: Summer 2011- Late 2012

Main Post Tunnel Portals

Contract No. 6 Girard Interchange Girard Road Interchange Low Viaduct Begin/End Construction: Summer 2011 Late 2012

Contract No. 7 NB Presidio Interchange NB Presidio Viaduct Northern Park Presidio Interchange NB Roadway to Merchant Road Begin/End Construction: Summer 2011 Late 2012

Contract No. 8 Landscaping Begin/End: Early 2013 2016

DOYLE DRIVE Construction Overview

General Construction Impacts Noise Dust Traffic control and parking impacts Road closures and detours Large construction equipment Material storage and hauling Material delivery and associated truck traffic

Key Construction Mitigation Visual screening of construction sites Dust control Air/water quality management and monitoring Biological resource and tree protection Cultural resource protection and monitoring Advance notice for major activities No contractor parking outside of construction area

Schedule of Upcoming Activities

Expected Work Hours 7:00 a.m. 7:00 p.m. (Mon.-Fri.) 9:00 a.m. 6:00 p.m. (Sat.) Limited Sunday work Occasional night work

DOYLE DRIVE Construction Areas

Construction Work Areas

Western Section Mid-2009-Early 2011 Early 2011-Late 2012 (Site preparation in late 2010) Major Elements: Bridge construction Bridge demolition Roadway work Major Activities: Near Rod Road, Storey Ave., Ruckman Ave. and Armistead Road neighborhoods Tree removal, clearing, grubbing and grading (site preparation) Extended concrete pours Night work for traffic tie-ins

Central Area Battery Tunnels Late 2009-Early 2011 Early 2011-Late 2012 Key Elements: Battery Tunnels Roadway and Retaining Walls Major Activities: Near Riley Ave. (residential neighborhood) Closure of Lincoln Boulevard (near the National Cemetery) Deep soil excavation Stockpiling and hauling of material Concrete pours

Temporary Detour Detour Construction: Early 2010-Early 2011 Traffic on Detour: Early 2011-Late 2012 Key Elements Roadway construction Full Weekend Closure of Doyle Drive Major Activities Building demolition (Public Storage) Halleck St. and Marshall Ave. closures (Mason St. to Gorgas Ave.) Pedestrian access restricted (north- south connection from Richardson Blvd. or McDowell Ave. Loss of parking Visual impact

Eastern Section Late 2010-Late 2012 Key Elements Main Post Tunnels Girard interchange Connections to Marina and Richardson Ave. Low Viaduct Electrical and Mechanical Substation Major Activities Demolish existing low viaduct Halleck St. and Marshall Ave. closures (Mason St to Gorgas Ave) Pedestrian access restricted (north- south connection from Richardson Blvd. or McDowell Ave) Loss of parking Full weekend closure to switch traffic to new Doyle Drive

DOYLE DRIVE Lane/Road Closures

Primary Long-Term Road Closures

Doyle Drive and Park Presidio

Traffic Circulation During Construction PHASE I : Fall 2009-Early 2011 Traffic on Existing Road Construction adjacent to existing roadway 3-Day Weekend Closure of Doyle Drive #1: Early 2011 Purpose: To transfer traffic onto the temporary detour

At - Grade Detour Connection from Marina Blvd / Richardson Avenue to SB Battery Tunnel Staged Construction: Full Weekend closure required to demo existing structures, complete roadway and open detour to traffic. The detour opening requires the completion of SB High Viaduct and SB Battery Tunnel. Variable width (5 to 6 lanes) with moveable median barrier Length = 3789

Closure #1 - Detour Traffic will be routed to Route 1 with 2 lanes in each direction. Fulton Street, Geary Boulevard, and California Street are available detour routes.

Traffic Circulation During Construction PHASE II : Summer 2011-Early 2013 Traffic on new Roadway and Temporary Detour Construction off new roadway and deconstruction of existing Doyle Drive 3-Day Weekend Closure of Doyle Drive #2: Early 2013 Purpose: To transfer traffic onto the final roadway MAJOR CONSTRUCTION COMPLETE : Early 2013 Traffic on Final Roadway Construction complete

DOYLE DRIVE Issues

Concerns Construction Issues GGB as Potential Construction route Expected trucking volume Construction hours Weekend closure needs / Detour Other construction contracts by others Presidio Trust / GGBD Blocked days Construction Route Communication Plan

Concerns (cont d) Other concerns: P3 Proposal Funding agreement R/W Certification with GGBD Operation / Escort agreement Maintenance agreement plan TOS Equipment Joint room Movable Barrier machine storage

Presidio Parkway Corridor

The Parkway Alternative

The End Q &A