Bald Hill on track to start lithium concentrate production this quarter

Similar documents
Electrovaya Provides Business Update

ASX RELEASE. PAK receives drilling permit for Elko Coking coal project. Summary

Inland Truck Shortage in North America. February 2018

Garden Well Gold Deposit Diamond Drilling Confirms Gold at Depth Highlights

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

2.2 Deep-dive E-Mobility

TECHNOLOGY METALS AUSTRALIA LIMITED

Rapidly Progressing a Globally Significant Graphite Project

XXXXX. Kokish River Hydroelectric Project. Interconnection Facilities Study and Project Plan

1QFY2018 Financial Results. Quarter Ended 30 June 2017

3QFY2018 Financial Results. Quarter Ended 31 December 2017

ASX/MEDIA RELEASE 5 February 2010 DIAMOND CORE TESTWORK CONFIRMS POTENTIAL FOR HIGH GRADE DIRECT REDUCTION IRON CONCENTRATE AT BEYONDIE IRON PROJECT

Quarterly Activities Report

A strategic investment in Zimbabwe

For personal use only

126m strike length vein averaging 42.37g/t gold

QUARTERLY ACTIVITIES REPORT For the Quarter ended 30 June 2018

ELECTRICITY GENERATION LICENCE APPLICATION - PUBLIC CONSULTATION BADGINGARRA WIND FARM

ASX ANNOUNCEMENT / MEDIA RELEASE

ORCA GOLD PROVIDES GALAT SUFAR SOUTH UPDATE

Selected Unaudited 2017 Third Quarter Financial Data. 9 November, 2017

JP Morgan Clean Energy Corporate Day

LSC LITHIUM ANNOUNCES OPERATIONAL UPDATE AND COMMENCEMENT OF ADVANCED EXPLORATION ON POZUELOS, PASTOS GRANDES AND RIO GRANDE

JIFFY LUBE - HESPERIA, CALIFORNIA

Rio Alto completes 2014 oxide drilling program at La Arena

YULON MOTOR CO., LTD. Investor Conference

SUMMARY OF REPORT TO ENERGIAVIRASTO SEPTEMBER Study on the amount of peak load capacity for

HERA PROJECT UPDATE. Loading concentrate boxes at the Hera Mine Site

For personal use only

CINOVEC a globally significant previously mined lithium deposit in the heart of Europe. April 2017

Europe Far East Trade Product Changes from April March 29, 2018

VICTORIA ADVANCED EXPLORATION PROJECT

Analyst Briefing. FGV Green Energy Sdn Bhd ACQUISITION OF M2 BIODIESEL PLANT IN KUANTAN

Saft Groupe SA reports Quarterly Financial Information for the third quarter of 2007

POWER SYSTEM INCIDENT REPORT NORTHERN POWER STATION STABILISER OUTAGE APRIL AND MAY 2010

Selected Unaudited 2018 Third Quarter Financial Data. 25 October, 2018

PHASE TWO WET PLANT POWER ENERGISED. Phase Two wet beneficiation plant grid power energised successfully.

TRIP OF HORSHAM-REDCLIFFS 220 KV TRANSMISSION LINE AND MURRAYLINK INTERCONNECTOR ON 12 NOVEMBER 2015

Valvoline Fourth-Quarter Fiscal 2016 Earnings Conference Call. November 9, 2016

Tlou Energy Limited. ("Tlou" or "the Company") Tlou announces development partner for CBM to Power Project

Buzwagi - Site Presentation. March 2014

Merger of the generator interconnection processes of Valley Electric and the ISO;

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

Battery Grade Spherical Graphite Produced

ANNOUNCEMENT FOR PUBLIC RELEASE OPERATION AND MAINTENANCE AGREEMENTS NO. 1, NO. 2 AND NO. 3

POWER SYSTEM OPERATING INCIDENT REPORT: TRIP OF 837 TARONG MT. ENGLAND 275 KV LINE AND MT. ENGLAND NO KV BUSBAR ON 30 OCTOBER 2011

ShareSoc Seminar 11 th October, 2017 Anthony Kongats Chief Executive Officer 2017 CAP-XX (AUSTRALIA) PTY LTD

15 Premier Projects. In the World s Highest-Grade Lithium District TSX-V: LITH

Dr. Chris Dudfield. Chief Technology Officer Intelligent Energy. Sponsors

POWER SYSTEM OPERATING INCIDENT REPORT MULTIPLE CONTINGENCY EVENT IN NORTH WEST TASMANIA ON 6 APRIL 2012

UMW HOLDINGS BERHAD ( P)

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

Annual Press Conference 2011 Results

Oil Refineries Ltd. Fourth Quarter and Full Year 2011 Results. March 2012

Binding Agreement to Vertically Integrate

FORWARD-LOOKING INFORMATION

Formosa Petrochemical Corporation 2006 Q3 Financial Results

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

DSN Group Q Results Update

ND Pipeline Authority Web Presentation

CENTURY MONTHLY DEVELOPMENT UPDATE JUNE 2018

SERVICES INNOVATION. Montreal Symposium March 29, Jack Simpson Director, Generation & Capacity Planning

INVESTOR PRESENTATION June 2014 AIM:PGD

For personal use only

Header. Reasonableness Test RT 007/11 Balhannah & Uraidla 66 / 33 kv Substations. RT Balhannah and Uraidla - Final Draft Page 1 of 8

Investor Presentation I October 2014

Metal Bulletin Conference

Appendix E3. Open Pit Pioneering and Pre-production

HEAVY INDUSTRIAL WITH RAIL

For personal use only

2.1 Automotive OEM. Matthias Zink CEO Automotive OEM. September 20, 2018 Capital Markets Day 2018 Berlin

PRESS RELEASE INFILL DRILLING EAST OF MISHI PIT BUILDS CONFIDENCE

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF 220 KV C BUSBAR AT GORDON POWER STATION ON 26 NOVEMBER 2011

Renascor Resources Limited ASX code: RNU. Siviour: a Tier-1 Graphite Deposit in Australia. For personal use only. Investor Presentation July 2017

For personal use only

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

mining sector and look to grow our business through strategic investments and co-operation agreements leveraging off our existing infrastructure.

DSN Group Q Results Update

3 rd Quarter 2017 Results

Population Growth Estimates

2003 fourth quarter and full-year results

4 th April, 2018 I Industry Research

LSC LITHIUM ANNOUNCES EXPLORATION UPDATE ON ARGENTINIAN LITHIUM PROJECTS Accelerated Exploration Programs on Five Projects Underway

Managing Director & Country Manager Namibia. SVP, Exploration

FIRST MAJESTIC SILVER CORP.

Q3 and Q1-Q3Q preliminary results

Issue 97, January 16th January 31st

JAGUAR LAND ROVER RESULTS FOR THE THREE MONTHS ENDED 31 DECEMBER th FEBRUARY 2017

Quarterly Report to 30 June 2012

Belgrade PPP Parking Project. April 2017

Conference Call. Preliminary Key Figures Financial Year Bochum, February 7, GEA Group

personal use only Asian Investment Conference 5-8 April 2016 GO HERE MAIN HEADING Unsaved Document / 21/09/2012 /

CENTURY MONTHLY DEVELOPMENT UPDATE JULY 2018

IAMGOLD REPORTS FURTHER HIGH GRADE DRILL INTERSECTIONS AT ITS DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

AMAG reports revenue and earnings growth in Q3 2015

Power System Operating Incident Report Trip of Murray Lower Tumut No kv Transmission Line at Murray End Only on 18 November 2013

The San Juan Mine has been developed and production will commence during the fourth quarter at a rate of tpd.

Basic Connection Services Application and Price Guide

American Railcar Industries, Inc.

Transcription:

12 January 2017 Bald Hill on track to start lithium concentrate production this quarter Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:40F) (AMAL) are pleased to advise that the construction and development at the Bald Hill Lithium and Tantalum Mine, in the Eastern Goldfields region of Western Australia, is on track with lithium concentrate production to commence this Quarter. The Bald Hill project (the Project) is a joint project between Tawana and AMAL. Highlights DMS Plant construction activities have advanced significantly since the last update on 28 November 2017. Steelwork installation nearing completion. Piping and electrical cabling advancing. Power station installed and partly commissioned. ROM pad and crusher pad near completion. Mining ramping up with daily movements reaching 16,000m 3 per day. Personnel levels on site peaking at over 200. On schedule to commence production this Quarter. Work on reserve upgrade underway and results also expected this Quarter. Tantalum offtake negotiations are progressing. Tawana s Managing Director Mark Calderwood said The transformation on site since our last update on 28 November has been amazing, with construction pushing through the Christmas period. We are now entering the home straight with commissioning expected to commence within two months.

EPC-DMS Structural steelwork, walkway, handrail and chute installation nearing completion Installation of mechanical equipment well-advanced HDPE pipework in DMS area underway Electrical cabling installation well-advanced Mining Operations Construction of haul roads and laydown areas including SMS laydown yard, ROM, COS and magazine pad essentially complete Drill and blast, excavate, load and haul ramping up with more than 400,000m 3 mined to date. Grade Control drilling ongoing 22 pieces of heavy equipment and 5 Drill and Blast and Grade Control drill rigs on site Non-Process Infrastructure Power plant installed and partly commissioned Fuel farm concrete pads completed and ready to receive fuel tanks in January New stores shed concrete poured About the Bald Hill Project The Bald Hill Project comprises four mining leases, one mining lease application, 12 exploration licences, eight prospecting licences and one general purpose lease totalling 774km 2. The project is owned 50:50 by Tawana and AMAL. The first lithium concentrate production is targeted for the first quarter of 2018 and first delivery anticipated in April 2018. The Project is fully funded to first shipment. Each of Tawana and AMAL executed an offtake agreement in April 2017 (and subsequent variations thereto) for the supply of lithium concentrate from Bald Hill over a five-year term with pricing for 2018 and 2019 of US$880/t (FOB Esperance) for 6% Li 20. The prepayments from the aforesaid offtake agreement are being used towards the capital costs of the Project. The Project is located 50km southeast of Kambalda in the Eastern Goldfields of Western Australia, and approximately 75km southeast of the Mt Marion Lithium project. Refer Figure 1. A current Indicated and Inferred lithium Mineral Resource of 18.9 million tonnes at 1.18% Li 20, and 149ppm Ta 20 5 at a 0.5% Li 20 cut-off for the Project was calculated by CSA Global Pty Ltd. 1 The Project remains significantly underexplored and significant drilling is planned for 2018.

Figure 1 Project Location map Figure 2 Plant overview (DMS in foreground) - December 2017

Figure 3 DMS Plant December 2017 Figure 4 Piping and Electrical Work January 2018

Figure 5 Arrival of mine trucks December 2017 Figure 6 Truck loading January 2018

Figure 7 ROM and crusher pad December 2017 Forward Looking Statement This report may contain certain forward looking statements and projections regarding estimated, resources and reserves; planned production and operating costs profiles; planned capital requirements; and planned strategies and corporate objectives. Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon as representation or warranty, express or implied, of Tawana Resources NL and/or Alliance Mineral Assets Limited. They are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors many of which are beyond the control of Tawana Resources NL and/or Alliance Mineral Assets Limited. The forward looking statements/projections are inherently uncertain and may therefore differ materially from results ultimately achieved. Tawana Resources NL and/or Alliance Mineral Assets Limited does not make any representations and provides no warranties concerning the accuracy of the projections, and disclaims any obligation to update or revise any forward looking statements/projects based on new information, future events or otherwise except to the extent required by applicable laws. While the information contained in this report has been prepared in good faith, neither Tawana Resources NL and/or Alliance Mineral Assets Limited or any of their directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. Accordingly, to the maximum extent permitted by law, none of Tawana Resources NL and/or Alliance Mineral Assets Limited, their directors, employees or agents, advisers, nor any other person accepts any liability whether direct or indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of, the accuracy or completeness of the information or for any of the opinions contained in this announcement or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this announcement. End Notes 1. All material assumptions and technical parameters underpinning the Mineral Resource estimates in the ASX announcement dated 11 October 2017 / SGX announcement dated 12 October 2017 continue to apply and have not materially changed since it was last reported.