CALIFORNIA ERIC GARCETTI MAYOR

Similar documents
CITY OF LOS ANGELES CALIFORNIA

TRANSMITTAL THE COUNCIL SEP THE MAYOR TRANSMITTED FOR YOUR CONSIDERATION. PLEASE SEE ATTACHED. ERIC GARCET Mayor.

TM INSTALLATION GUIDE TM 1

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

POWER RAIL TM P8. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

Temporarily Approved Solar Photovoltaic System Electrical Schematics

EZ SunBeam Ground Mount System. with Self-grounding Hardware UL2703 Compliant. Pub. D10034-V003 Copyright of 28

Photovoltaic Solar Plan Review

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

2016 Photovoltaic Solar System Plan Review List

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

SECTION 1: Field Inspection Guide for Rooftop Photovoltaic (PV) Systems

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

POWER XPRESS TM. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN

Installation and Operations Manual

Solar PV Standard Electric Plan

CHAPTER 10 ELECTRICAL. Notes:

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19

Solar PV General Introduction Guide for Electricians

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PV INSTALLATIONS

2.0 RAIL FREE SOLAR ROOF MOUNT. Utilizes EcoFasten Solar s patented technology

Grounding Systems. Equipment Grounding & Grounded Conductors

INSTALLATION GUIDE GFT GROUND FIXED TILT

Copyright 2012 DelSolar Co. Ltd MQWRD installation manual-iec Ver. 1.4

SunModo PV Rack Mounting System UL2703 Compliant

READ AND FOLLOW ALL SAFETY INSTRUCTIONS! SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION.

CPS 3Phs String Inverters NEC 2014 Compliance

SINGLE PHASE WIRING SPECIFICATIONS

A Look at the 2017 NEC Significant Changes

INSTALLATION GUIDE GFT GROUND FIXED TILT. NOTE: GFT construction drawings have precedence over these installation guidelines.

Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller)

4.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

MP461SC Flex Probes* Installation Instructions

INSTALLATION MANUAL.

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Non-Residential Solar Energy Photovoltaic (PV) Packet

Solar PV Standard Electrical Plan

THREE PHASE WIRING SPECIFICATIONS

INSTALLATION INSTRUCTIONS AM rev. A

MP56xSA Flex Probes* Installation Instructions

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

3.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology

SunModo PV Rack Mounting System UL2703 Compliant

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved.

Schletter. Solar Mounting Systems

YGE-Z 60 Cell Series PV Modules

CHAPTER 10 ELECTRICAL

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

City of Manhattan Beach Community Development

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

GROUNDING & BONDING PRODUCTS

7. Protection System Testing

White River Electric Association, Inc. Net Metering Information & Service Requirements

672W Off Grid Residential Package

Mike Holt s Illustrated Guide to SOLAR PV SYSTEMS

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

General Installation Manual Mar 2009, Sanyo Electric Co., Ltd. All Rights Reserved 3/23/09

TMS Series MP46x Flex Probes* Installation Instructions

CP /240-MC4 User Manual

panelclaw.com Polar Bear III for 10 Degree

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

Los Angeles. June 17, The Honorable City Council c/o Office of the City Clerk Room 395, City Hall Mail Stop 160


VITALink Taped Splice Pigtail Crimp

Safety and Installation Instructions

FOR REVIEW SERVICE BULLETIN SB-AG-65. Installation of Click Bond Electrical Grounding Spacer Stud on the Header Tank. Revision IR 11/20/2017

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

ENGINEERING SPECIFICATION

Application Note Three Phase String Inverters NEC 2014 Compliance

FIXED POWER FACTOR CORRECTION EQUIPMENT 5KV CLASS MEDIUM VOLTAGE SECTION Z

Solar Photovoltaic (PV) Installation - Updates

SECTION 300 OVERHEAD SERVICE

Photovoltaic Installations

Electrical Hazards in Construction

Fee $20 Course: NEC Changes 1 This course is valid for these credentials: Credential Description Cred Code Credit Hours

Installation Instructions for Lifeline MC: Cable Splice Using Ceramic Standoffs Technical Information Sheet #402

Grounding Accessories

SunWize SW and OEM Series Solar Modules GENERAL INSTALLATION & USER GUIDE

SAMPLE PERMIT APPLICATION PACKAGE

For Professional Solar only

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Listing Constructional Data Report (CDR)


Residential Photovoltaic (PV) Packet

Installation Instructions for Lifeline MC Cable Splice Using Ceramic Standoffs

NEC 2014 Code Changes

INSTALLATION INSTRUCTION AND MAINTENANCE MANUAL

SPECIFICATIONS FOR RESIDENTIAL CONSTRUCTION

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

UniRac. 28 MOUNTING STRUCTURES Roof Mounts. SolarMount

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

PHOTOVOLTAIC ARRAY WIRING HANDBOOK FOR STANDARD NOMINAL 6, 12, 24, AND 48 VOLT SYSTEMS. (for SX-60 series or smaller and MSX-120 solar modules)

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Transcription:

BOARD OF BUILDING AND SAFETY COMMISSIONERS VAN AMBATIELOS PRESIDENT E. FELICIA BRANNON VICE PRESIDENT JOSELYN GEAGA-ROSENTHAL GEORGE HOVAGUIMIAN JAVIER NUNEZ CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI MAYOR DEPARTMENT OF BUILDING AND SAFETY 201 NORTH FIGUEROA STREET LOS ANGELES, CA 90012 FRANK M. BUSH GENERAL MANAGER SUPERINTENDENT OF BUILDING OSAMA YOUNAN, P.E. EXECUTIVE OFFICER ------- Orion Solar Racking 2917 Vail Ave. Commerce, CA 90040 Attn: Bob Sinai RESEARCH REPORT (RR) NO.: 930521 Approval Date: June 24, 2017 Expires: June 24, 2018 GENERAL APPROVAL - Renewal - Photovoltaic (PV) Module Rack Grounding System - Orion Belt Series & Venus Series - Manufactured by Orion Solar Racking. CONDITIONS OF APPROVAL The installation of the above PV Rack Grounding System is approved when the following conditions are met: 1. Only the following components are approved for use as a part of the PV Rack Grounding System: LADBS G-5 (Rev.06/30/2013) Item # Description Part Number Material System 1 Grounding Cap HDW-GR-CAP SS - 301 AMS 5517 OB & V 2 Grip Mid Clamp OSB-MC-G Stainless Steel OB 3 Grounding End Plate OSB-EP-G AA - 5052-H32 OB 4 Solar Belt OSB-SB AA - 5052-H32 OB 5 Connect Belt OSB-CB AA - 5052-H32 OB 6 Ballast Pan OSB-BP AA - 5052-H32 OB 7 Low Bracket OSB-LB AA - 5052-H32 OB 8 High Bracket OSB-HB AA - 5052-H32 OB 9 Wire Management Raceway OSB-WM-RW AA - 6061-T6 OB 10 Ground Lug OSB-G-SGB-5 AA - 6005-T5 OB & V 11 Orion Standard Rail GR-R-STD Stainless Steel V 12 Spring Mid Clamp GR-MC-GSP AA - 6063-T6 V 13 Universal End Clamp GR-EC-UNV Stainless Steel V 14 Grounding T Bolt assembly GR-G-TB Stainless Steel V 15 Grip End Clamp GR-EC-G Stainless Steel V 16 Smart Ground Clip GR-G-SGC Stainless Steel V 17 Rail Ground Lug GR-G-RGL-ST Stainless Steel V 18 Grounding Splice Bar GR-SPL-G AA-6063.T6 V SS = Stainless Steel OB = Orion Belt AA= Aluminum Alloy V = Venus Page 1 of 6

2. Each component of the PV Rack Grounding System shall be plainly and permanently marked with the following: a. Manufacturer s Name, b. Model or Part number. 3. Upon installation, the following marking shall be permanently printed on a tag and placed on each end of PV Rack Grounding System run(s): The installation of this PV Racking System shall comply with City of Los Angeles Research Report (RR) number 930521. Not valid if the RR is expired. For a copy of RR visit www.ladbs.org or call 323-224-2168. 4. This PV Rack Grounding System is only approved for use with aluminum framed PV modules that provide a minimum surface contact width of not less than ½" for use with the Mid-Clamp and End-Clamp. The following listed PV modules were evaluated with this PV Rack Grounding System: Manufacturer s Name Model or Series Manufacturer s Name Model or Series SUNPOWER X Series Mitsubishi Electric MLE Series Sun-Module Plus SW Series Hanwha Q-Cells Q.PRO - G3, G4.0, G4.1 Hyundai MG Series Canadian Solar CS6P LG LG Neon 2 5. The PV module frames shall be made of aluminum channels connected together at each corner using aluminum screws / bolts to form one solid frame around the module. 6. The maximum number of adjacent bonded PV modules or straps from the Grounding Lug (GR-G-SGB-5) attached to the first supporting bracket shall not exceed 28 in each direction. 7. For installations, where some of the modules can not be installed adjacent to each other one of the following methods shall be used to maintain the bonding between the PV modules using approved Grounding Lug ( GR- G-SGB-5): a. A solid #6 AWG copper conductor with a maximum length of 15 feet, b. Solar Belt (OSB-SB) or Ballast Pan (OSB-BP) where the total number of modules and straps does not to exceed 28. Page 2 of 6

8. The size of the equipment grounding conductor from the inverter to the Grounding Lug (GR-G-SGB-5) shall be based on the requirements of the 2014 Los Angeles Electrical Code. 9. The installed PV module, shall be supported by two Brackets on each side. The Bracket shall be provided with a Grounding Cap or Grounding End Plate. 10. Every Grip Mid Clamp shall consist of a minimum of one Grounding Cap in contact with the PV module frame. The Grounding End Plate shall consist of aluminum plate with two grounding studs. 11. The Grip Mid Clamp shall bond two adjacent PV modules and the maximum distance between the installed modules shall not exceed 3/4 Inch. 12. The aluminum frame of each PV module shall have a positive contact with a minimum of two Grounding Caps at all times, where the maximum DC ground fault current from a PV source circuit does not exceed 25 Amperes. 13. The aluminum frame of each PV module shall have a positive contact with two Grounding Caps at all times where the maximum DC ground fault current from a PV source circuit exceeds 25 Amperes. 14. The installed Grip Mid Clamps and Grounding End Plates shall be securely torqued in place in accordance with the manufacturer s installation instructions. 15. The Grounding End Plate (OSB-EP-G) shall bond the first and the last PV module to the Bracket through the built-in Pem Nut on the Bracket. 16. The Grip Mid Clamp (OSB-MC-G) shall bond the adjacent PV modules to the Bracket through a built-in Pem Nut on the Bracket. 17. Upon the completion of the installation of the PV system, the grounding continuity of all the PV modules and the PV Rack System shall be verified by the Qualified Installer. 18. Dissimilar metal parts of the PV rack system grounding path shall not have a combined electrochemical potential above 0.6 ev. 19. If any component of the installed PV Rack Grounding System or the PV modules is removed or replaced, the Qualified Person shall maintain the grounding resistance at a maximum of 0.1 ohms from the grounding clamp to the furthest PV module. 20. The installation of the PV Rack Grounding System shall comply with the applicable provisions of the Los Angeles City Electrical Code. 21. A component, when replaced, shall be of the identical original manufacturer s part that was approved by the Los Angeles City Electrical Testing Laboratory. 22. The PV Rack Grounding System shall only be used in PV systems with DC ground fault protection. Page 3 of 6

23. This PV Rack Grounding System shall not be installed in the following conditions or areas: a. In Hazardous / Classified Areas, b. Where subject to physical damage, c. Within 5 miles of a marine environment. 24. The PV Rack Grounding System shall be installed and maintained by a Qualified Person as defined in the Los Angeles Electrical Code and in compliance with manufacturer s instructions. 25. If the PV Rack Grounding System is no longer in service, it shall be disconnected and removed, and the electrical supply shall be permanently de-energized. 26. An electrical permit shall be obtained prior to the installation or relocation of this PV Rack Grounding System in the City of Los Angeles. 27. Clearances or approval from Zoning, Building Plan Check, and Los Angeles Fire Department as applicable, shall be obtained prior to installation. 28. This approval shall be void if the product is modified or moved without prior authorization from the Los Angeles City Electrical Testing Laboratory. DISCUSSION The product covered under this Research Report is a PV Rack Grounding System intended to provide equipment grounding for PV module frames using approved mounting means and devices identified for bonding of adjacent PV modules. This PV Rack Grounding System consist of a Grounding Cap, Solar Belt, Low Bracket, High Bracket, Grip Mid Clamp and Grounding End Plate. Each Grip Mid Clamp (OSB-MC-G) consists of a 1/4" x 20 x 2.5" machine screw with a 7/16" hex head, a 3/4 serrated washer, a 9/16" lock washer, and one 1 3/8" Dia Grounding Cap. The Solar Belts (OSB-SB) are made of Aluminum Alloy 5052-H32, sized 32" x 3" x 0.08". The Grounding Lug (GR-G-SGB-5) is listed for use with #4 - #14 AWG copper or aluminum conductors. Each PV module is supported by two Grip Mid Clamps or one Grounding End Plate on each side, for a total of 3 or 4 points of support. The Grounding Cap (HDW-GR-CAP) is a circular stainless steel material with sharp triangular edges. When installed in accordance with the manufacturer s installation instructions, it will pierce through the protective anodized layer of the aluminum frames of two adjacent modules to make a positive electrical path between them. Page 4 of 6

When this PV Rack Grounding System is installed in accordance with the provisions of this General Approval and manufacturer s installation instructions, it provides equipment ground continuity from the Ground Lug to the PV modules throughout the PV system and complies with section 690.43 of the Los Angeles City Electrical Code. For this General Approval to be valid on any installation in the City of Los Angeles, an engineer or inspector of the Department of Building and Safety must make a determination that all conditions of the General Approval required to provide equivalency have been met. This General Approval is in accordance with Section 93.0303 of the Electrical Code pertaining to "New Materials and Methods of Construction" and does not waive the requirements of the City of Los Angeles Building Code. This General Approval is neither a product endorsement nor a certification of accuracy or function of the approved item. PICTURES: 1 Grounding Cap 2 Grip Mid Clamp 3 Grounding End Plate 4 Solar Belt 5 Connect Belt 6 Ballast Pan 7 Low Bracket 8 High Bracket 9 Wire Management Raceway LADBS G-5 (Rev. 7/06) Page 5 of 6

10 Ground Lug, #SGB-5 11 Orion Standard Rail 12 Spring Mid Clamp 13 Universal End Clamp 14 Grounding T Bolt assembly 15 Grip End Clamp 16 Smart Ground Clip 17 Rail Ground Lug 18 Grounding Splice Bar Edwin J Perez Electrical Engineer Associate Electrical Testing Laboratory 201 N Figueroa st. Los Angeles, CA 90012 (323) 224-2168 Tel (323) 224-2161 Fax www.ladbs.org LADBS G-5 (Rev. 7/06) Page 6 of 6