Newsletter. November First flight of SH09 third prototype (P3) 22 November 2018 Watch our video at

Similar documents
NEWS. photo by Benjamin Dieckmann

For Missions Accomplished. Whatever the missions, whatever the times, wherever the places, we ll get you where you re going.

Project Book Engine Tech

The Single Spool Core: A proven design for performance and simplicity

Analyst Lunch Meeting at Paris Air Show 2017

INNOVATION POWERING SAFRAN

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

AW119Kx FAST AND FLEXIBLE

FACT SHEET: Press Releases and Project Overview DAIMLER & RENAULT-NISSAN ALLIANCE. Press releases (one-sided press releases are marked with [ ])

Innovation Takes Off

HARAS High Availability Redundant Actuation Systems

Respect for customers, partners and staff. Service: another name for the respect that a company owes its customers, partners and staff.

The UK s Industrial Strategy; the Automotive Sector Deal

AW119Kx MORE VALUE FOR MONEY WORLDWIDE SUPPORT DISTINCTIVE FEATURES SAFETY BY DESIGN MORE ROOM VERSATILITY

Clean Sky 2. LifeCraft Demonstrationt (IADP RC 2 & ITDs) Consultation meetings Brussels th December 2012 OUTLINE

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Better Performance Starts with Better Technology THE BLR ADVANTAGE

Increase of the sales by 33% mainly due to the Safelite acquisition

Electric Vehicles Initiative activities

Transit Project Delivery Status Report. Significant Issues

June 14-16, Reserve Your Space Today! Centro Banamex, Mexico City, Mexico

HELICOPTER SOLUTIONS TURN-KEY HELICOPTER MODIFICATION SOLUTIONS

SKT HELICOPTERS Agricultural Spray Kit.

Research Update Briefing for 18 November HSRMC

LEGACY SWISS MADE ITALIAN POWER

Bild : Bernhard Mühr German Aerospace Center Flight Operations

Piper Aircraft, Inc.: Overview and Trainer Updates

Smart Grid Foundation Course

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

KONGSBERG DEFENCE & AEROSPACE

H2020 (ART ) CARTRE SCOUT

Certified by: FAA, DULV

The BOXER. Addressing the UK Mechanised Infantry Vehicle (MIV) Requirement. January 26, 2018

STAFF REPORT ACTION REQUIRED

CHAPTER 1 INTRODUCTION

How do you make your vehicles fit for the future?

the most flexible one stop shop

First Civilian Tiltrotor Takes Flight

Equipment Management Department. Council Budget Presentation

Analysts/Fund Managers Visit 19 April Autonomous Systems and Future Capability Mark Kane

Electric Vehicle Initiative (EVI) What it does & where it is going

Propeller Blade Bearings for Aircraft Open Rotor Engine

EXHIBITOR PROSPECTUS NADA SHOW THE POWER OF FACE-TO-FACE BUSINESS. Las Vegas Convention Center March 23-25, 2018

LIGHT RAIL VEHICLE PROCUREMENT PHASE 2 Replacement Fleet Upgrades, February 2019

neuron An efficient European cooperation scheme

EXHIBITOR PROSPECTUS THE POWER OF FACE-TO-FACE BUSINESS. January 24-27, 2019 San Francisco

V-280 Valor Joint Multi-Role Technology Demonstrator

Evaluating Stakeholder Engagement

European Responsible Care Award Celanese Contractor Safety Improvements. About Celanese

ASSAG SWITZERLAND ASSAG NETHERLANDS

Background. If It Ain t Broke CASE STUDY

ASSEMBLÉE GÉNÉRALE EXTRAORDINAIRE DE LECLANCHE SA 21 JANVIER 2016, YVERDON-LES-BAINS, 11H00

Aviation Industry Roadmap to Sustainability. Thomas Rötger IATA

Open Source Big Data Management for Connected Vehicles

Comhairle Cathrach Chorcaí Cork City Council

European Bus System of the Future

2019 SpaceX Hyperloop Pod Competition

UNCLASSIFIED: Distribution Statement A. Approved for public release.

HELICOPTERS Civil Range

Air Platforms Community of Interest Update

SEE FURTHER. GO ANYWHERE

WHY TWO SPOOLS ARE BETTER THAN ONE: EQUIPPING OUR MILITARY WITH THE BEST TECHNOLOGY FOR EXISTING AND EMERGING THREATS

Decommissioning & Re-use in NL: A Joint Effort

Summary of survey results on Assessment of effectiveness of 2-persons-in-the-cockpit recommendation included in EASA SIB

EASA s Safety Analysis Supporting EGU

Regulation of Unmanned Aircraft

AOPA Summit. Unleaded Avgas Transition Aviation Rulemaking Committee (UAT-ARC) UAT ARC. Presented to: By: Date:

Annual General Meeting Queries & Answers for Minority Shareholder Watchdog Group (MSWG)

ABB life cycle services Uninterruptible power supplies

Engineers Journal I Volume 60: Issue 10 I December 2006

Peninsula Corridor Electrification Project (PCEP)

Final Report. LED Streetlights Market Assessment Study

ZF TRW Highlights Why Automated Driving Starts with Safety at the Tokyo Motor Show

Final Administrative Decision

1959 March Production commences at Yulon Motor Co., Ltd. in Taiwan, the Company s first overseas KD factory.

THE PEP PARTNERSHIP ON ECODRIVING Goals, achievements and next steps November 2017

What We Heard Report - Metro Line NW LRT

European Helicopter Safety Team EHEST. EHEST Secretariat - February 2015

Using Asta Powerproject in a P6 World. Don McNatty, PSP July 22, 2015

A Transformational Approach to Energy Supply. September 2016 Gail Scholes, Jo Gilbert

Keynote from Andreas Renschler, CEO Volkswagen Truck & Bus GmbH and Yoshio Shimo, President & CEO Hino Motors Ltd.

SRP AND THE EVOLVING ENERGY WORLD ANDREA CHALMERS SENIOR SUSTAINABILITY STRATEGIST

Strategic spare parts planning for industrial gas turbines

EPR TM reactors in the world

Retrofitting unlocks potential

CONCEPTUAL DESIGN OF UTM 4-SEATER HELICOPTER. Mohd Shariff Ammoo 1 Mohd Idham Mohd Nayan 1 Mohd Nasir Hussain 2

EU Interregional Cooperation

Automotive Forum&Expo AUTOMOTIVE FORUM: AUTOMOTIVE CONFERENCE AUTOMOTIVE MEETINGS AUTOMOTIVE CARRIER DAYS AUTOMOTIVE EXPO AUTOMOTIVE FUTURE

SAFRAN OVERVIEW 8% OF SALES INVESTED IN R&D. $18.5 BILLION IN SALES generated in 2017 (1) #1 WORLDWIDE AEROSPACE: PROPULSION SYSTEMS

TORONTO TRANSIT COMMISSION REPORT NO.

F/A-18A/B/C/D Flight Control Computer Software Upgrade

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

Volkswagen s strategic realignment is delivering

Citi's 2016 Car of the Future Symposium

Reliability is our profession

Director s Report and Work plan 2009/2010

Specifications AGUSTA A109A MK II. Serial Number 7277

Light Single Multi-Purpose Helicopter

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

At the SUN n FUN expo, Daher introduces Garmin s latest G3000 features and functionality on the TBM 930

Transcription:

Newsletter November 2018 6 First flight of SH09 third prototype (P3) 22 November 2018 Watch our video at http://koptergroup.com/videos

First P3 flight test completed successfully! Dear Customers and Partners, 2018 has been a crucial year for Kopter where we made significant progress on the development path of the SH09. The aircraft is approaching its final configuration, getting close to certification. Our third prototype (P3) is now flying and we are extremely pleased with the handling characteristics of the helicopter. All improvements we implemented on P3 are bringing clear benefits in terms of performance and maneuverability of the SH09. We plan to transfer P3 to Sicily so that it can perform an extensive flight test campaign. Our Pre-Series 4 (PS4), which will benefit from the results of P3 tests and latest design improvements, will start flying into 2019. 2019 will be THE year for the SH09, with our overarching objective being to obtain EASA Type Certificate (TC) and during 2020 the TC from the FAA, allowing us to start delivering our aircraft in that year. Our Program and Production Organizations are now in place to support the achievement of the certification and manage the delivery of the first contracts as we strongly gear up our manufacturing capabilities. We established our Customer Support & Services core team to define a roadmap that will ensure we will have all the necessary services available for our customers from delivery of the first SH09 helicopter. We have reviewed our supplier selection and are progressing on the negotiation of strategic agreements with experienced, trusted and competitive partners in the industry, such as Garmin. Our supply chain quality and reliability is and will be crucial in establishing the SH09 on the market. The SH09 order book continues to grow. The exhibitions that we attended this year allowed us to demonstrate to customers from various geographies and market segments the superiority of the SH09 compared to its competitors. Our new standards in terms of safety, mission capability and cost efficiency are decisive arguments for many operators who look forward to adding our helicopter to their fleet. Andreas Löwenstein

All three SH09 prototypes in the Mollis facility. Program Organization at Kopter In 2018, Kopter has been evolving from the development phase of the SH09 to the preparation of serial production. This was the right time to move from a project team to a program organization. Hence the creation of the Programs Management (PM) function within Kopter. Role of PM The PM has a strong coordination role with all stakeholders in the organization and operates as the backbone of the company to ensure delivery of the SH09 on time, on budget and built to the highest quality standards. Until Type Certificate (TC), PM is in charge of coordinating the Type Certificate (TC) process within the agreed schedule & budget as well as developing and certifying contractual agreed helicopter options and equipment. In parallel, PM is ensuring production readiness of the Program and that the serial ramp-up is successful. After TC, PM s main focus will change. It will manage individual customer contracts in an end-to-end process all the way to final delivery of the helicopter. Additionally, the PM will also coordinate further SH09 optimizations and variants. Communication and coordination with all our customers during this production phase will be done jointly with the Sales team, who remains the primary point of contact for the customers. Newsletter 6, November 2018 3

SH09 Update How does our third prototype (P3) compare to its predecessor (P2) Our P3 has commenced its flight tests. Richard Trueman, the Kopter Chief Test Pilot commented that P3 has been demonstrating excellent handling characteristics. P3 incorporates several improvementsbased on the feedback resulting from the testing of prototypes 1 and 2. They are described below: Blades The main rotor blades were modified to decrease vibration and enhance aircraft performance. Main Gear Box (MGB) The MGB internal architecture has been improved to reduce manufacturing complexity, servicing and improve reliability. Weight Reduction The primary modification to P3 is weight reduction. The empty weight of P3 as a prototype stands at 1520 kg (3351 lbs.) and gets closer to the empty weight of 1450 kg ( 3197 lbs.) for the serial production aircraft, giving us confidence in maintaining the payloads required by the operators. Contributing factors to achieving the desired weight reductions are the optimization of the airframe design, rotor head and main gear box. Flight Controls The fixed and rotating flight controls have been upgraded. The engineering of the flight control chain and the stiffness have been improved. Horizontal stabilizer The stabilizer now passes through the tail boom as opposed to underneath. The incidence will be adjusted during P3 flight tests to optimize the aerodynamics and load. New Flight Test Instrumentation (FTI) We have implemented a new FTI system developed by Zodiac Data Systems. This system is a state-of-the-art turnkey solution, easy-to-install, and efficient. This system will contribute to the acceleration of the develop- ment process. All modifications are expected to continue to improve the aircraft handling properties. We will update on the progress made by the Kopter team in certification of the SH09 using the P3 aircraft. P3 will perform its intensive flight test campaign in Sicily (Pozzallo, Province of Ragusa), which is set to start in the coming weeks, and allow expanding the flight envelope as successful test flights continue. Newsletter 6, November 2018 4

P2 prototype at the Mollis airfield. Customer Support & Services Organization Service offer Since the beginning of the year, Kopter accelerated the set-up of the Customer Support & Services (CSS) organization. A strong and efficient CSS function is critical to support our customers success. We have defined clear targets for the development of our services, in accordance with customers expectations and the deployment of the fleet, in order to ensure: the availability of all must have services at Entry into Service (EIS), followed by a step-by-step development of our services portfolio; the achievement of the highest customer satisfaction level. We have recruited a team of specialists with significant aeronautical experience and extensive knowledge in each domain of the CSS activities: MRO, Technical Support and Field Services, Spare Parts Management, Training and CSS Supplier Management, etc. All specialists have started to develop their respective services with the target of being the new benchmark in the industry. Digitalization Our objective is to design our services digitally from the beginning. As Kopter is not constrained by legacy products or organizations, we will build an integrated digital support infrastructure system. This system will facilitate easy interaction with Kopter and reduce operators workload associated with operation and maintenance of the helicopter. We are currently in advanced negotiations with established IT companies to support us in the development of our digital tools which will be available as of EIS. Newsletter 6, November 2018 5

Kopter s Activity in 2018 Following the announcement of our rebranding in February together with the inauguration of our new production and corporate/engineering facilities in Switzerland, Kopter participated in several key events. HeliExpo in Las Vegas was an extremely successful exhibition for Kopter. Many new contracts and engagements for the SH09 were announced across a range of missions and geographies. Two aircraft were showcased for the first time, with the mockup in medical configuration and P2 making its first appearance outside Switzerland. Air Zermatt, our Launch Customer, celebrated their 50th anniversary in mid-may. P2 was sent to Raron, Switzerland to support this event, which attracted thousands of attendees. In mid-june, Kopter were present at Heli UK Expo at Wycombe Air Park. Excellent connections were made with operators, suppliers and partners coming from all over the UK. In July Kopter participated in APSCON, the Airborne Public Safety Conference, in Louisville, Kentucky. The SH09 mockup was presented with a law enforcement interior and equipment. It generated significant interest from potential customers, who see the SH09 as a perfect mission tool. Kopter s hangar doors in Mollis were opened up to the Swiss Ferrari Club in mid-july, where the high speed and sleek design enthusiasts were drawn to Prototype 2 of the SH09. In October, Kopter took part in Helitech in Amsterdam, where we exhibited our first prototype, P1, in the livery of SAS, a new Malaysian customer. We expanded our distributors network with the addition of Swiss Helicopter Norway. In the same month, we made a first appearance at the Air Medical Transport Conference (AMTC) in Phoenix, Arizona withthe SH09 mock-up presented with a medical interior. The SH09 in this configuration was the talk of the show. Newsletter 6, November 2018 6

Contacts Kopter Group Binzstrasse 31 8620 Wetzikon Switzerland Registered Office Flugplatzareal 10 8753 Mollis Switzerland +41 44 552 33 33 contact@koptergroup.com koptergroup.com