1

Similar documents
Rural School Bus Pilot Project Applicant Webinar February 16, 2017 Grant Specific Q&A

SCAQMD s Proposition 1B Goods Movement Emission Reduction Program

VOUCHER INCENTIVE PROGRAM Application Package

VOUCHER INCENTIVE PROGRAM Application Package

ON-ROAD HEAVY-DUTY TRUCK APPLICATION

VOUCHER INCENTIVE PROGRAM. Application Package

Emergency Vehicle Application Package

School buses must be at least 14 years old but no older than 16 years to receive funding.

2018 Clean Diesel Rebate Program

2018 CLEAN AIR GRANTS ON-ROAD VEHICLE PROGRAM

Fleet Incentives for Clean Vehicles. June 23, 2015

Solano County Transit

Ports of Delaware and Virginia (DE-VA)* Dray Truck Replacement Program Application

ELECTRIFIED DAIRY FEED MIXING PROGRAM

Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop

Metro and you, building together.

Mid-Atlantic GREEN OPERATOR GO Program: Replacement Funding Assistance Program Application

CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM OFF-ROAD COMPRESSION-IGNITION (CI) APPLICATION

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

MARINE VESSEL REPOWER APPLICATION

DIESEL TO DIESEL ENGINE REPOWER OPTION

DRIVING TOWARDS A CLEANER FUTURE

CITY OF LOS ANGELES DEPARTMENT OF AIRPORTS

Off road and On road Diesel Regulations

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

Grant Funding for School Bus Replacements

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

NEW JERSEY S ALTERNATIVE FUEL VEHICLE REBATE PROGRAM

Air Quality Mandates Affecting the Caltrans Fleet Caltrans Division of Equipment Sacramento, CA June, 2009

2017 DieselWise Indiana Solicitation for Projects. Shawn Seals DieselWise Indiana Administrator

Electric School Bus Pilot Program - Webinar

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

CALIFORNIA S COMPREHENSIVE PROGRAM FOR REDUCING HEAVY- DUTY VEHICLE EMISSIONS

Qualifying trucks must be a Class 3 to Class 8 truck with a history of operating in Hunts Point and/or Port Morris.

Ohio Diesel Fleets: Applying for VW Funds 2018 Application Cycle

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

Hunts Point Clean Trucks Program

Worcester Public Schools Student Transportation Contract Proposed Bid Specification Change Summary Sheet

National Clean Diesel Rebate Program 2016 School Bus Replacement and Retrofit Funding Opportunity. Program Guide

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

IMPLEMENTATION MANUAL FOR THE HYBRID AND ZERO-EMISSION TRUCK AND BUS VOUCHER INCENTIVE PROJECT (HVIP) AND LOW

MSRC and Other AB 2766 Funding Opportunities

Green Mobility Group Purchasing Program

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

Federal Funding Opportunities Northeast Drayage Workshop October 13, Reema Loutan Environmental Engineer EPA Region 2

Fleet Sustainability Policy

DATE: MAY 3, 2007 ENVIRONMENTAL MANAGEMENT DIVISION

Zero Emissions Airport Vehicle and Infrastructure Pilot Program Webinar

IMPLEMENTATION MANUAL FOR THE HYBRID AND ZERO-EMISSION TRUCK AND BUS VOUCHER INCENTIVE PROJECT (HVIP) AND LOW

Electric Vehicle Charging Station Incentives PROGRAM HANDBOOK

Truck and Bus Regulation National Pavement Expo West

Diesel Rules Compliance Update. Presented by Sean Edgar, Project Manager

Grant Opportunities for Vehicle-based Projects in the Bay Area

Georgia Department of Revenue Policy Bulletin - MVD HB 170 Transportation Funding Act of 2015

San Joaquin Valley Air Pollution Control District Governing Board Meeting. June 15, 2017

RENEWABLE FUEL INFRASTRUCTURE PROGRAM APPLICATION FORM

California Vehicle Incentives

County of Sonoma Agenda Item Summary Report

Florida Department of Agriculture and Consumer Services Office of Energy NATURAL GAS FUEL FLEET VEHICLE REBATE PROGRAM

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm

January 8, ATTN: VW Settlement. Dear Mr. Phillips:

MEMORANDUM. Proposed Town of Chapel Hill Green Fleets Policy

CPUC Transportation Electrification Activities

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

NYSERDA Alternative Fuel Vehicle Programs. Patrick Bolton and Adam Ruder NYSERDA April 24, 2013

Evolution Of Tier 4 Regulations & Project Specific Diesel Engine Emissions Requirements

Port of Long Beach Clean Trucks Program Frequently Asked Questions

SECTION 1 - APPLICANT INFORMATION. 1) Legal Name: 2) Mailing Address: 3) Physical Address (if different from mailing address):

GREAT BASIN UNIFIED AIR POLLUTION CONTROL DISTRICT FORKLIFT COMPONENT

Volkswagen Settlement: Opportunities for States. Karen El Mann Senior Vice President

Considerations for Reducing Emissions from the In-Use Diesel Fleet

SCHOOL PUPIL ACTIVITY BUSES (SPAB) MANUAL

Hybrid and Zero-Emission Truck and Bus Voucher Incentive Project (HVIP) and Low NOx Engine Incentives

Public Access Electric Vehicle Charging Station Rebate Program Agreement

LANCASTER CHOICE ENERGY S BIENNIAL ENERGY STORAGE PROCUREMENT COMPLIANCE REPORT

June 12, 2013 Tom Brotherton

Dean Saito Manager, On-Road Mobile Source. South Coast Air Quality Management District

The Benefits of New Technology Diesel Technology to California

Heavy-Duty Low-NOx and Phase 2 GHG Plans

Questions/Comments During Workshop

Diesel Vehicle Regulation Overview. Eloy Florez, Air Pollution Specialist In Use Control Measures Air Resources Board

2018 Oklahoma Alternative Fuel School Bus Funding Program Application [Volkswagen Settlement Trust Funds]

Town of Centreville Automated Speed Enforcement Program

RIDESMART VAN START PROGRAM & EMERGENCY ASSISTANCE PROGRAM FOR EXISTING VANPOOLS ELIGIBILITY AND APPLICATION FORM

Truck and Bus and Off- Road Regulations. Grant Workshop

Portable Equipment Registration Program (PERP) and the Portable Engine ATCM. What is Portable?

MAPC s Green Mobility Group Purchasing Program. Megan Aki, Clean Energy Analyst, MAPC Wednesday, June 20, 2018

California Low Emission Truck Policies and Plans

Item No.: 5B-Supp Date of Meeting: July 17, Briefing on Air Quality Grant Funding

Ohio Alternative Fuel Vehicle Conversion Grant Program. Information Session January 25, 2018 Updated February 27, 2018

Oklahoma Volkswagen Settlement

Your Fuel Can Pay You: Maximize the Carbon Value of Your Fuel Purchases. Sean H. Turner October 18, 2017

CARB Mobile Sources: Off-Road Diesel Equipment

REMOVE II VANPOOL VOUCHER INCENTIVE PROGRAM

RATE SCHEDULE CNG COMPRESSED NATURAL GAS SURCHARGE INCENTIVE MECHANISM

Clean Diesel Funding. Clean Airport Fleets Workshop June 14, 2011

Agricultural Internal Combustion (IC) Engine Conversion Incentive Program Questions and Answers

California Energy Commission. December 7, 2015

Transcription:

Rural School Bus Pilot Project Application Workshop June 13, 2018 1 How to Ask Questions Submit your questions by typing them in Question Tab as shown on the right hand side of your screen Questions can be submitted at any time during the webinar After the webinar you can submit questions to ruralschoolbus@ncuaqmd.org Technology specific questions will not be addressed, please contact a school bus vendor 2 Overview Background Eligibility Project Types Application Process Document Submission & Application Readiness Contact Us 3 ruralschoolbus@ncuaqmd.org 1

Background Part of the California Climate Investments Program Funded with proceeds from CA s Cap-and-Trade Program Goals: Accelerate turnover of CA s school bus fleet to zeroemission technology and encourage the use of alternative fuel types Further CA s goal of 5 million zero-emission vehicles on the road by 2030 Reduces student exposure to pollutants, making a positive impact on children s health 4 http://www.caclimateinvestments.ca.gov/ Year 1 Recap The first cycle of the Rural School Bus Pilot Project (16/17 GGRF) received over 400 applications from 262 School Districts The program received a total of $15 million in funding As of this presentation, the NCUAQMD has awarded funding for over 40 new school buses Schools began accepting delivery of new school buses in December 2017 5 Updates to Year 2 Applicants may now submit up to 12 applications in either of the project categories Applications collected during this solicitation may be used for multiple years of the program 6 ruralschoolbus@ncuaqmd.org 2

Who is Eligible to Apply? Public School Districts Public Charter Schools County Offices of Education Joint Power Authorities (JPAs) Division of State Special Schools of the State Department of Education To participate, applicants must own and operate a school bus that is at least 20 years old and is currently CHP Certified. 7 Project Types School bus replacement utilizing Zero-Emission Vehicle Technology School bus replacement utilizing Hybrid or Internal Combustion Engine Technology, using Renewable Fuel Types 8 Zero-Emission School Bus Zero-Emission School Bus Allows for fleet expansion Destruction required if old bus is not retained as a back-up vehicle Battery electric or fuel cell Up to three projects can be awarded, per applicant, per funding year Funding Amounts Up to $400,000 school bus, taxes, delivery Up to $5,000 electric school bus charging infrastructure Only allowable costs will be funded 9 ruralschoolbus@ncuaqmd.org 3

Hybrid or Internal Combustion Engine Hybrid or Internal Combustion Engine (ICE) School Bus Replaces old bus (destruction required) New engine must meet the following emission standards: NOx - 0.20 g/bhp-hr and PM 0.01 g/bhp-hr One project awarded, per applicant, per funding year Requires the use of Renewable Fuel types Funding Amounts $165,000 school bus, taxes, delivery, and incremental renewable fuel costs Only allowable costs will be funded 10 Renewable Fuel Projects choosing bus replacement utilizing Hybrid or Internal Combustion Engine Technology must purchase enough renewable fuel to propel the new bus for the length of the contract term. Renewable Diesel (renewable hydrocarbon diesel) o Can be transferred and stored in the same infrastructure as traditional diesel o Biodiesel is not the same as Renewable Diesel Renewable CNG (biogas-derived biomethane) Renewable Propane (renewable liquefied petroleum gas) 11 Funding Amounts New School Bus Technology Maximum Funding Level Hybrid and internal combustion $165,000 engine school buses and incremental (includes school bus, taxes, and renewable fuel costs incremental renewable fuel costs) Zero-emission school buses $400,000 Electric school bus charging infrastructure $5,000 Incremental renewable fuel costs are the difference in costs between the renewable fuel type and the comparable non-renewable fuel type that would be purchased to perform the same function Electric school bus charging infrastructure funding is per project (school bus) Projects that receive co-funding cannot exceed allowable projects costs 12 ruralschoolbus@ncuaqmd.org 4

Poll Question 13 Application Process Two-part application process: Application Part A Accepted June 20 August 10, 2018 Requires basic information about the applicant, old school bus, and desired technology Applicants may submit up to twelve applications in either project category. Award letters and Application Part B will be sent on or before September 14 10, 2018 Application Part B Only sent to applicants initially selected for funding Requires the submission of supporting documentation for the old school bus, vendor estimates, and school board resolutions Wet Signature required, documents can be emailed Due within 30 days, requests for extensions are available, on a limited basis, for supporting documentation Applicants will be notified when their submission has been reviewed and their project verified as eligible 15 ruralschoolbus@ncuaqmd.org 5

Grantee Requirements Agreement: Enter into a three-year agreement with the North Coast Unified Air Quality Management District Purchase New School Bus: Submit a purchase order for the new school bus(es) and charging infrastructure, if applicable, within 30 days of agreement execution Place New School Bus into Service: New school buses are required to be delivered and CHP certified no later than February 1, 2021 Reporting: Submit annual reporting on the use of both the new and old school bus, if applicable, per the conditions of your grant agreement for three years 16 How to Apply Application Part A can be submitted in three ways: Using the online application submittal page http://www.ncuaqmd.org/index.php?page=rural.school.bus Mail paper copy to the North Coast Unified AQMD Email application to ruralschoolbus@ncuaqmd.org 17 Document Submission and Application Readiness Application Part A does not require the submission of any records/documents. For example, estimates are not required at this time. If the documents submitted with Application Part B do not support the same information submitted on Part A, your initial grant offer will be terminated and you will be placed back on the ranked list at your new location. 18 ruralschoolbus@ncuaqmd.org 6

Application Part A Old Bus Information The following are details that you will provide on Part A that will impact your project ranking: Vehicle Model Year of the non-engine portion of the vehicle (chassis) as listed on the CA DMV Registration Total chassis mileage, and when applicable: o Mileage at engine replacement or rebuild o Mileage at odometer replacement 19 Application Part B New Bus Selection and Documentation Submission Part B requires submission of supporting documentation for the old school bus, vendor estimates, and school board resolutions. Applicants must submit the following records to demonstrate project eligibility and to determine grant funding amount. Additional records may be required, depending on your project type. 20 CHP Safety Certification (Form 292) CHP certifies buses that are part of your active fleet. This record verifies that your old bus is an in-use vehicle and signals the date your new bus is placed into active service. Helpful Tip If possible, retain them for the life of your vehicle Helps to verify mileage, odometer roll-over, provides additional VIN and license plate verification 21 ruralschoolbus@ncuaqmd.org 7

DMV Registration This document provides verification for: model year of the non-engine portion of the vehicle owner vehicle identification number (VIN) license plate 22 Bus & Engine Plates (tags) These photos provide verification for: VIN GVWR Make and Model of bus Engine Serial Number Engine Model Year and Engine Family Helpful Tip Pre-take these photos and put in bus file Find this information before you need it 23 Engine Plates If the Engine Model Year or Engine Family Number is not listed on the plate or you no longer have the plate (can t locate it, lost to age, or is illegible) you will need to contact your engine manufacturer and request alternate documentation showing that information. 24 ruralschoolbus@ncuaqmd.org 8

Title 13, 2183(c) requires that: No 1974 or newer diesel powered heavy-duty commercial vehicle shall operate in California without evidence that, at the time of manufacture, the installed engine met emission standards at least as stringent as applicable federal emission standards for the model year of the engine. An ARB Fact Sheet can be found here: https://www.arb.ca.gov/enf/advs/advs364.pdf 25 Examples of Bus & Engine Plates (1987 MY Bus) Engine Plate Bus Manufacturers ID Tag 26 Mileage Verification Records The Rural School Bus Pilot Project requires applications to be ranked based on the age and mileage of the old school bus. We must verify the mileage in one of two ways: Odometer reading, if engine and odometer are original (Photograph) Maintenance records demonstrating odometer reading/mileage at time of major repairs or replacements in addition to the current odometer reading 27 ruralschoolbus@ncuaqmd.org 9

Vendor Estimates The following estimates are required with the submission of Application Part B: All Projects New school bus: Estimates must include a breakdown of options selected for verification of allowable bus costs Zero-Emission Vehicles Only Purchase of EV Charging Equipment Installation of EV Charging Equipment: To be completed by a licensed electrician or contractor and must include license number. o Check with your local utility to ensure the electrical lines can handle the additional load of charging 28 Additional records All Projects CARB Executive Orders School Board Resolution (template available) Hybrid or Internal Combustion Engine Projects Verification of the availability of Renewable Fuel, letter from your fuel provider 29 School Bus Replacement Program Jennifer Masterson Fuels and Transportation Division California Energy Commission June 2018 C A L I F O R N I A E N E R G Y C O M M I S S I O N ruralschoolbus@ncuaqmd.org 10

School Bus Program Overview $75 million in grant funds for replacement of oldest school buses in CA. Eligible applicants: school districts and county offices of education (COE) in CA. Priority given to oldest school buses, or buses operating in disadvantaged communities and schools that have majority of students eligible for free or reduced-price meals. C A L I F O R N I A E N E R G Y C O M M I S S I O N 31 Program Design 1. School bus replacement (2 phases) Phase 1: Solicit public school districts/coes to establish a list of buses eligible for replacement based on applications received. Phase 2: Solicit manufacturers to design, construct, and deliver the replacement electric buses to school districts and COEs awarded in Phase 1. This phase is a separate solicitation which is planned for release in late 2018. C A L I F O R N I A E N E R G Y C O M M I S S I O N 32 Cont. Program Design 2. Provide fueling infrastructure to support awarded school buses. 3. Provide workforce training and development opportunities and resources to support electric school bus maintenance, charging, and operations. C A L I F O R N I A E N E R G Y C O M M I S S I O N 33 ruralschoolbus@ncuaqmd.org 11

Schedule Key activities including dates and times for this solicitation are presented below. An addendum will be released if the dates change for the asterisked (*) activities. Activity School District Solicitation Released School District Pre-Application Workshop Deadline for Written Questions by 5:00 p.m. * Deadline to Submit Applications by 5:00 p.m. * Date May 31, 2018 June 12, 2018 June 15, 2018 September 20, 2018 C A L I F O R N I A E N E R G Y C O M M I S S I O N 34 How to Apply & Stay Connected How to apply: http://www.energy.ca.gov/contracts/tran sportation.html#gfo-17-607 Complete application and submit by September 20, 2018 List Server: http://www.energy.ca.gov/transportation /schoolbus/index.html Follow instructions on bottom left corner C A L I F O R N I A E N E R G Y C O M M I S S I O N 35 Questions and Answers Please send all questions related to GFO-17-607 to: Crystal Presley-Willis Commission Agreement Officer 1516 Ninth Street, MS-18 Sacramento, CA 95814 (916) 653-6110 Crystal.Presley-Willis@energy.ca.gov Deadline to submit questions is June 15, 2018 5:00 PM PDT! C A L I F O R N I A E N E R G Y C O M M I S S I O N 36 ruralschoolbus@ncuaqmd.org 12

Helpful Links California Air Resources Board www.arb.ca.gov/homepage.htm The Truck Stop (diesel information) www.arb.ca.gov/msprog/truckstop/truckstop.htm Join a CARB Email List public.govdelivery.com/accounts/carb/subscriber/new?topic_id=listserv Rural School Bus Pilot Project www.ncuaqmd.org/index.php?page=rural.school.bus CARB - Financial Opportunities for California School Buses www.arb.ca.gov/msprog/truckstop/funding/schoolbus_fa.htm Truck & Bus Regulation School Bus Provision Fact Sheet www.arb.ca.gov/msprog/onrdiesel/documents/fsschoolbus.pdf CARB - School Bus Fleet webinar www.arb.ca.gov/msprog/truckstop/video/04201810.26carbschoolbusfleetwebinar.mp4 37 Contact Us North Coast Unified Air Quality Management District 707 L Street Eureka, CA 95501 (707) 443-3093 www.ncuaqmd.org ruralschoolbus@ncuaqmd.org Project Lead- Erin Squire, Special Projects Coordinator (x111) esquire@ncuaqmd.org Project Support- Chrystal Ales, Administrative Support (x123) cales@ncuaqmd.org Project Supervisor-Jason Davis, Permitting and Planning Division Manager (x114) jdavis@ncuaqmd.org 38 Poll Question 39 ruralschoolbus@ncuaqmd.org 13

Questions? Check the FAQ on our website Email- ruralschoolbus@ncuaqmd.org 40 ruralschoolbus@ncuaqmd.org 14