Railway. assembly instructions. data and power solution. model# RAIL-LINEAR model# RAIL-90 model# RAIL-BULLPEN model# RAIL-3WAY model# RAIL-4WAY

Similar documents
idrive Power Cord Extender Installation Instructions MODELS: 3960M/3961S (1) 25 POWER CORD DRILL WITH 3/32 DRILL BIT

Installation Instructions

Installation Instructions

Installation Instructions PART NUMBERS: 24954, 77336, CQT24954

COVER PAGE CUSTOM QUICK INSTALL MOUNTING KIT NOTE!

Crestron TTK-MP/MPC/IPAC & SMK-MP/MPC/IPAC TableTop and Swivel Mount Kits Installation Guide

4-Way Trailer Tow Harness for Jeep Wrangler (JK)

MaxLite LED Linear HighBay Fixtures

Installation Instructions Roughrider Tailgate Shelf

Cequent Performance Products, Inc. LIMITED LIFETIME WARRANTY.

PLEASE ENSURE THE JUMP STARTER IS FULLY CHARGED PRIOR TO FIRST USE.

Installation Instructions **THIS RAIL MOUNTING KIT USES 11 BOLTS**

GC-1. Roof and Gutter De-Icing Control Installation and Operating Instructions FOR EXTERIOR INSTALLATION ONLY

Please visit for the latest version of these installation instructions.

Installation Instructions

Instruction Sheet SRSR SERIES. Rotating Sliding Rail System

Please visit for the latest version of these installation instructions.

Crestron MMK-G1-CBF-T Mud Ring Mount Kit for Cameo Installation Guide

Please read BOTH these Installation Instructions and the General Information sheet prior to installing or operating this equipment.

Instruction Sheet DWRSR-ZL. Zero Clearance Latch

UNIVERSAL CUSTOMIZABLE MUD FLAP INSTALLATION INSTRUCTIONS

AGCO. Corn Header Manual d HEADSIGHT.COM

RANGE HOODS USER INSTRUCTIONS

AWE S-FLO Carbon Intake System Mini F5X. AWE website here

Assembly, Installation, Operation and Maintenance Instructions. Base Rail Bracket Kit. For updates see PRODUCT SUPPORT tab at

Installation Instructions

DRAGO. Corn Header Manual f HEADSIGHT.COM

Please visit for the latest version of these installation instructions.

POWER GEAR SLIDE-OUT MANUAL

INSTALLATION INSTRUCTIONS SINGLE HORIZONTAL ACCESS DOOR PANTRY INSERT MANUAL

Model AS-RC3260 TV Cart. Rolling Cart for Audio Mount System & Flat Panel TVs

Power Controller IMPORTANT INFORMATION. What s In the Box? Assembly, Operation, & Maintenance

Installation / Owners Manual

Installation Instructions

Deluxe Hitch 3-Bike Rack Instructions for Part # BC-3581

16K and 19K Sidewinder TM Service Kit Instructions 86005

Please visit for the latest version of these installation instructions.

Please visit for the latest version of these installation instructions.

Installation Instructions

Installation Instructions PART NUMBERS: 76128, 84128, CQT76128

6-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

TACTIK Factory Headlight Euro-Guards

60 PSI Boost Gauge. For Product Numbers: MT-DV01_60, MT-WDV01_60

GM 6.6L Duramax. Up to 90HP Gain. AgDieselSolutions.com

84in. Driveway Drag. Owner s Manual

Installation Instructions PART NUMBERS: 76192, 84192, CQT76192

Assembly, Installation, Operation and Maintenance Instructions. Base Rail Bracket Kit. For updates see PRODUCT SUPPORT tab at

Installation Instructions

GERINGHOFF. Corn Header Manual f HEADSIGHT.COM

Installation Instructions

Ford F250/F350 Super Duty 2x4, 4x4 ( ) Part #SSR Installation Instructions

Installation Power Management Unit Battery Cables and Battery Harness

BX Jeep Liberty Renegade 2012 Jeep Liberty Sport Installation Instructions

Please visit for the latest version of these installation instructions.

Installation Instructions

Please visit for the latest version of these installation instructions.

Installation Instructions

3 Station Bike Rack Organization Center

Installation Instructions

2060F / 2062F / 2064F

Terms and Conditions

Ultra-Thin DASH SPEAKERS

2019-ON RAM 1500 INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE DIRECT-REPLACEMENT

3-TON DOUBLE LOCKING JACK STANDS OWNER S MANUAL

Operation & Installation Guide 2074F / 2079F. Manual # M Digital Anti-Theft Drawer Safe. Manual # M

Installation Instructions

Please visit for the latest version of these installation instructions.

ROCK HARD 4X4 JEEP WRANGLER JK 2/4-DOOR L EVAP CANISTER RELOCATION KIT PART #: RH-6005-B Installation Manual

WARNING!!! READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE PROCEEDING. MAKE SURE THAT YOU HAVE ALL TOOLS AND PARTS BEFORE BEGINNING THE INSTALLATION.

SLAB SAW SERIES PARTS LIST

Standard Series STEREO SPEAKERS

Model AS-FM64 Wall Mount. Full Motion Television Wall Mount

Installation Instructions YJ Hardtop

Compressor Clutch Replacement Procedure

Please visit for the latest version of these installation instructions.

stroller kit Burley Stroller Kit Owner s Instruction and Safety Manual For D Lite, Solo, Encore, Cub, Honeybee, and Tailwagon

Dual Fueler Kit Dodge Cummins 6.7L kit w/no pump ( ) package w/pump ( ) Installation Guide

Please visit for the latest version of these installation instructions.

Model T2642 Wall Mount. Television Wall Mount with Tilt Option

Sport Sway Bar Kit (22431 ) Subaru Forester INSTALLATION OF HOTCHKIS FRONT SWAY BAR

CSA CERTIFIED Conforms to UL 507

Installation Instructions

Installation Instructions

HBC-20 - LED HIGH BAY

Installation Instructions

RAM 1500, 2019 CLASSIC & 2010-ON 2500/3500 INSTALLATION INSTRUCTIONS

HP30 Slab Saw Owner s Manual and Operating Instructions

Installation Instructions

LU27 Series Quick Start

Installation Instructions

A/C PRESSURE MONITOR INSTALLATION INSTRUCTIONS SYSTEM OPERATION GREEN INDICATOR LIGHT

Model FM2642 Wall Mount. Full Motion Television Wall Mount

Please visit for the latest version of these installation instructions.

StormPro BA Series Sump Pump

INSTALLATION GUIDE. Rainier Coil Pull Down Kitchen Faucet PB-K01

CU6703 Module Installation Guide


Please visit for the latest version of these installation instructions.

LED 3rd Brake Light Ring

Transcription:

assembly instructions Railway data and power solution model# RAIL-LINEAR model# RAIL-90 model# RAIL-BULLPEN model# RAIL-3WAY model# RAIL-4WAY linear 90 bullpen 3-way 4-way

Components and tools Safety instructions/warning Only a licensed electrician should connect the power feed to building power. Connect the power feed to the unit before connecting it to building power. Please review these instructions before beginning the installation. Use the illustrations below and the table on the next page to check that the all components needed for your installation were provided with your order. Do not discard the packaging until the product works to your satisfaction. Components rail assembly 36", 48", 60", or 72" rail posts post cap mounting bracket top data cover 36", 48", 60", or 72" end post (1 cutout) 180 post (2 cutouts) 90 post (2 cutouts) post feet 3-way post (3 cutouts) 4-way post (4 cutouts) foot screws mounting bracket screws jumper cable 22" full foot half foot #12-24x½" Phillips #3 flat head #8x½" self-tapping Phillips #2 flange head rail connectors receptacle cover plate voice/data plate power feed voice/data adapter kit Tools required Phillips screwdriver Power drill with Phillips #2 and #3 bits Page 2

Component quantities by configuration The table below can be used to verify the quantities of each component provided with your order. The minimum number of rails is shown for each configuration. Additional rails may be added to any of the configurations. Use the additional rail(s) column to calculate the number of added components per additional rail. Bullpen configurations are configured as a 90degree plus an additional rail with a 90degree post instead of a 180degree. Be sure to read the important notes under the table for further details related to the configurations. linear 90 3-way 4-way additional rail(s) configuration linear example: added rail item quantity rail 1 2 3 4 1 per added rail rail cover 1 2 3 4 1 per added rail end post 2 2 3 4 180 post 1 per added rail (rail added in-line) 90 post 1 3-way post 1 4-way post 1 full or half foot* 2 3 4 5 1 per added rail foot screws 8 12 16 20 4 per added rail mounting bracket 2 4 6 8 2 per added rail mounting bracket screws 6 12 18 24 6 per added rail rail connectors 4 8 12 16 4 per added rail post cap 2 3 4 5 1 per added rail receptacle voice/data plate 2 (single run) 4 (double run) 1 (single run) 2 (double run) 4 (single run) 8 (double run) 2 (single run) 4 (double run) 6 (single run) 12 (double run) 3 (single run) 6 (double run) 8 (single run) 16 (double run) 4 (single run) 8 (double run) 2 or 4 per added rail (match adjacent rail) 1 or 2 per added rail (match adjacent rail) voice/data adapter kit 1 2 3 4 1 per added rail jumper cable 1 2 3 1 per added rail power feed 1 1 1 1 Notes *The half foot is used when the unit will be positioned against a wall. Otherwise, the full foot is used. Power outlets and voice/data ports can be on one side of the rail (single run) or both sides (double run). Cover plates are installed when electrical receptacles or voice/data plates are not used. Page 3

The following procedures are for a single rail two-post unit. These basic procedures apply to any Railway configuration. Contact Customer Service if you have any questions at: 800.833.3746 Step 1: attach feet to base of posts Use four Phillips flat head screws per foot. Install the full foot or half foot perpendicular to the direction of the rail. Use the half foot when the posts will be positioned 4" or less from the wall or baseboard. full foot #12-24x½" half foot wall half foot 4" or less Step 2: hook mounting brackets to posts Stand the post assemblies upright, with the cutouts facing each other. Position the posts rail width apart. Hook the mounting brackets to the bottom of the cutouts. mounting bracket position rail width apart Page 4

Step 3: attach rail to posts Place the rail onto the mounting brackets. Secure the rails to the post using the rail connectors, as shown below. Fasten each mounting bracket to the post and rail using three #8 self-tapping Phillips flange head screws. Screw the bracket to the post with a screw through the hole in the tab. Screw the bracket to the rail with two screws through the bottom flange. 1 place rail on mounting brackets 2 secure rail with rail connectors #8x½" top of connector 3 fasten mounting brackets to post and rail Step 4: remove rail assembly side cover(s) Lift the side cover from the rail and pull it out. If this is a double-run Railway (power outlets on both sides of rail), remove the side cover from both sides. rail assembly side cover rail Page 5

Step 5: install receptacles Insert the electrical receptacles into the power block. Then secure each receptacle into the power block connectors by pushing the receptacles away from middle of the rail assembly toward the posts. IMPORTANT: Check that the receptacles are securely connected to the power block by sliding them back and forth. power block insert receptacles secure receptacles into power block connectors Step 6: connect power feed to power block Remove the plastic cover from the base of the end post. Route the power feed up through the post and into the rail assembly. Insert the connector on the power feed into the power block. Coil the remaining power feed for safety. IMPORTANT: Check that the power feed is securely connected to the power block. NOTE: The power feed may be connected to the building s power through the floor, wall, or ceiling. plastic cover connect securely power feed Page 6

Step 7: connect power blocks with jumper cable(s) if necessary One or more jumper cables are used to connect power blocks in two or more rail assemblies. Skip this step if your unit has only one rail assembly. Run the jumper cable through the openings in the rail ends and post. Insert the connectors on the jumper cable onto the power block in each rail assembly. With 3-way configurations, two jumper cables are used. With 4-way configurations, three jumper cables are used. Each end of the power block can accommodate two jumper cable connections. Refer to the illustrations at the bottom of the page to see how the jumper cables are routed for 3-way and 4-way configurations. IMPORTANT: Check that each end of the jumper cable is securely connected to the power block. jumper cable power block accommodates two jumper cable connections 3-way routing 4-way routing jumper cables jumper cables power feed power feed Page 7

Step 8: route voice and/or data wires Skip this step if voice/data wires will not be used with the unit. If routing through the base of an end post, remove the plastic cover at the base of the post. Route the wires up through the post and out the slotted opening above the rail. Route the wires across the top of the rail assembly and down through the center opening. The wires may be routed in other appropriate ways depending on installation type and installer preference, as long as the voice/data jacks exit the center of the rail assembly, as shown. voice/data wires Step 9: reinstall rail assembly side cover(s) Reverse the procedure described in step 4. Pull the jacks out through the center hole in the side cover before securing the cover in place. jacks rail assembly side cover rail Page 8

Step 10: install voice/data plate(s) Skip this step if voice/data wires will not be used with the unit; instead, install a cover plate over the opening (see step 11). Using the appropriate adapters in the voice/data adapter kit, attach the jacks to the voice/data plate. Insert the voice/data plate into the center opening of the side cover and push it securely in place. voice/data plate voice/data adapter kit push plate into side cover Step 11: install cover plate(s) if necessary Install cover plates into any unused openings in the side covers. In the example shown, the Railway is single run, with power on only one side of the rail assembly. The three openings on the other side of the rail assembly should be covered. Push the cover plates into the side cover until they snap into place. push plates into side cover Page 9

Step 12: install top data cover Snap the top data cover onto the top of the rail assembly to conceal any wiring on the top of the rail and to provide a finished appearance. Step 13: install post caps Place post caps on the top of each end post as shown. post caps Page 10

Connection to building power Step 14: connect power feed to building power (licensed electrician required) The connection to building power may be made through the floor, wall, or ceiling. A tag attached to the power feed shows the required wiring. Check that there is power to all receptacles. The licensed electrician should correct any problems. Page 11

evolution of motion Railway data and power solution Please contact Customer Service with any questions or comments at 800.833.3746 or visit our website at esiergo.com LIMITED WARRANTY ESI warrants this product to be free from defects in manufacturing for a period of 15 years on structural parts and 7 years on electrical parts from the date of original purchase. This warranty extends only to the original purchaser, and does not apply if the product has been damaged or fails to function properly as a result of misuse, abuse, modification, alteration, or improper cleaning or maintenance. This warranty does not apply to damage in shipment caused by carriers, damage caused during installation, normal wear and tear, or excessive use (meaning consistent use in excess of an eight hour shift). ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ARE LIMITED IN DURATION TO ONE YEAR FROM THE DATE OF ORIGINAL RETAIL PURCHASE. ESI s sole obligation under this warranty or any implied warranty, and the purchaser s sole remedy, is limited to the repair or replacement, at ESI s option, of the product or any defective part. Costs (such as installation, labor fees or express shipping) incurred due to replacement of products are not covered under warranty. IN NO EVENT SHALL FELLOWES, ITS AFFILIATES, SUBSIDIARIES, RELATED ENTITIES OR THEIR RESPECTIVE OFFICERS, DIRECTORS, OR EMPLOYEES, BE LIABLE FOR INCIDENTAL, CONSEQUENTIAL, PUNITIVE, EXEMPLARY, OR SPECIAL DAMAGES. To make a warranty claim, contact ESI at 800-833-3746 or customerservice@esiergo.com. You must provide proof of purchase, such as the original purchase order number. The duration, terms and conditions of this warranty are valid worldwide, except where different limitations, restrictions or conditions may be required by local law. 2018 Fellowes, Inc. PR Rev B 06/2018