HRM Test Report Prepared for: Protective Structures, LLC DRAFT- 25 June 2013

Similar documents
PENTAGON PROTECTION USA

BLAST CAPACITY ASSESSMENT AND TESTING A-60 OFFSHORE FIRE DOOR

Explosive Energy Qualification and Equivalency Comparison in Impulsively Loaded Pressure Vessel

An Evaluation of the Effectiveness of Common Door Blast Shields

Abstract. 1 Description of the Problem

Instructional Objectives. Science of blasting. Blasting Objectives. Black Powder. Explosive materials. GE 5471 ROCK ENGINEERING CH 13 Blasting

How to Use the Look-up Chart

How to Use the Look-up Chart

How to Use the Look-up Chart

New Robotic Technologies for Inspecting Two Pole Electric Generators while the Rotor Remains in Place

2009 Insensitive Munitions and Energetic Materials Technology Symposium. Qualification Testing of the Insensitive TNT Replacement Explosive IMX-101

60/81mm HE Mortar IM Enhancement Program

DAVINCH Lite Chamber Design By Analysis and Full-Scale Testing CWD 2014 London, United Kingdom June 4-6, 2014

FOR COMPLETE INFORMATION AND DETAILS ON ALL BULLET/BLAST PROTECTION PRODUCTS WE OFFER PLEASE VISIT OR

Casspir Mine Protected Vehicle with Steel Wheels and VAMIDS

SUMMARY REPORT OF TESTING OF THE PROPELLANT TORCH SYSTEM

The AGM-114K-2A Missile Enhanced Lethality Design and Test

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Australian Explosives Industry and Safety Group (AEISG) Code of Practice Mobile Processing Units 4 th edition. Compliance Checklist.

BC Hydro Case Study: Battery Energy Storage in Field, British Columbia, Canada. IEEE PES Meeting July 2014

0 DISTANT RUNNER RESULTS

FAA FRANGIBILITY RESEARCH

Threat Awareness and Risk Mitigation

CRASH TEST REPORT FOR PERIMETER BARRIERS AND GATES TESTED TO SD-STD-02.01, REVISION A, MARCH Anti-Ram Bollards

CRASH TEST REPORT FOR PERIMETER BARRIERS AND GATES TESTED TO SD-STD-02.01, REVISION A, MARCH Anti-Ram Bollards

The Oxford High Density Tunnel (HDT)

NCHRP : Traffic Control Device Guidelines for Curves

JRS Dynamic Rollover Test Chevrolet Malibu

Model 134A24 Tourmaline ICP pressure bar, 1000 psi, 5 mv/psi, 0.2 microsecond rise. Installation and Operating Manual

JRS Dynamic Rollover Test Toyota Prius

Collecting In-theatre Vehicle Blast Data using Stand-alone On-board Data Acquisition Technology

Tactics. Terrorist. When broken down vehicles go boom! SENSITIVE BUT UNCLASSIFIED SENSITIVE BUT UNCLASSIFIED

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926)

Noise Emission Data of Danish Heavy Weapons

GAS DISCHARGE TUBES (GDTS)

Presentation Outline. # Title # Title

Innovating the future of disaster relief

Turbo Draft Flow Tests

FULL SCALE ARENA ASTM F 1642 TEST REPORT. Rendered to: Solar Gard

This copy is for personal use only - distribution prohibited.

JRS Dynamic Rollover Test Scion xb

Headlight Test and Rating Protocol (Version I)

History Dr. Richard Passamaneck- Inventor

Tanker Off-Load Test: 5,000 gallon Tanker with a 500 gpm Pump

Specifications for New Underground Mobile Mining Equipment Underground Mobile Equipment Major Hazard Standard

III. Substation Bus Configurations & Substation Design Recommendations

Flixborough petrochemical plant, 1974

Anniston Static Detonation Chamber Process Improvements

Standards & Regulations Guide. For manual attacks/ballistic/blast resistance

EXAMINATION OF NOZZLE INNER RADIUS AND PIPING FROM THE OUTER SURFACE

P O B J E D A-RUDET. BIHNEL 0 ms 4 m

Blast Pendulum Testing of Milliken Tegris Panels

GTCX35-XXXM-R05 Series

NHTSA OBLIQUE/SMALL OVERLAP MOVING BARRIER (OMDB)

B, C) 13, 2016 IMPORTANT UPDATE DATE TOPIC

A Guide to the Carriage. by Road of Detonators. with Blasting Explosive Substances

Joint Gun Effectiveness Model (JGEM) Navy Accredited Minor/Medium Caliber Operational Tool

KENTUCKY TRANSPORTATION CENTER

Technical Article. ISO26262: ams deploys unique technology to meet every new safety requirement. Roland Einspieler

Philippine IED Update

Companion II 8.3kV, 17.2kV and 23kV 12K - 40K Backup Fuses

LIGHT VEHICLE DRIVER ACCEPTANCE CLINICS PRELIMINARY RESULTS. Mike Lukuc NHTSA Research. May 21, 2012

Aging Systems Workshop Fuel Tank Safety- FINAL RULE

NFPA 286 STANDARD METHODS OF FIRE TESTS FOR EVALUATING CONTRIBUTION OF WALL AND CEILING INTERIOR FINISH TO ROOM FIRE GROWTH

: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

RED DIAMOND. Safety Improvements Project. Ohio Rail Development Commission. Project Narrative

Engineering Dept. Highways & Transportation Engineering

40mm Enhanced Blast Insensitive Explosive Munitions

Clay McClinton Rotating Equipment Reliability Analyst, Chevron. Dan Phillips Manager Global Field Services, Kop-Flex

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Arc Fault Circuit Breakers Implementation

TECHNICAL CHARACTERISTICS

The New 2017 National Electric Safety Code Overview and Significant Changes. Presented by. Mickey Gunter October 28, 2016

OHIO BRASS AIKEN, SC, USA

CERTIFIER MODEL 912 CERTIFIER 912 Brake Timing Test

Rural Water Supply Operations Seminar & Drill

A Dyno Nobel Overview. Our Company Our Products Our Technology Our Services Your Benefit

A preliminary experimental study

Breaker failure protection function block description

Overview of the Canada NDS and the Canada Truck NDS

Hazard Prevention Fires & Explosions. Buncefield, England, 2005

CRITICAL ISSUES DOWNTOWN CONTINGENCY PORTFOLIO

Work Environment Factors Mining Research in Sudbury Ontario

The Rebate Program can change without notice. CPS Energy reserved the right to discontinue the program at any time.

Particle Sensor Performance & Durability for OBD Applications & Beyond

CARBON MONOXIDE EMISSIONS AND EXPOSURES ON EXPRESS CRUISERS

VEHICLE / PEDESTRIAN COLLISIONS

LESSONS LEARNED WHILE MEASURING FUEL SYSTEM DIFFERENTIAL PRESSURE MARK HEATON AIR FORCE FLIGHT TEST CENTER EDWARDS AFB, CA 10 MAY 2011

Optima Distribution Class (PDV) and Riser Pole (PVR) Surge Arresters

Report No. D November 24, Live Fire Testing of Light Tactical Wheeled Vehicles was Effective for the Portions Completed

Apples Vs. Oranges : Comparing Safety Performance of Different Modes

Fluid Power Design Solutions Ltd. Threadless Low Pressure Connector

Toward New French IM General Purpose bombs

Fatigue in Winter Maintenance Operations

Intermediate weight at 155kg Peak continuous fields up to 3 T for 15mm pole face diameter at 8mm gap Any mounting orientation Fast cycle times

UNDERDOOR VIEWER VIPER UDV

Testing and Manufacturing Update. 4/6/2015 Kisa Brostrom, Kent Evans

ExxonMobil SYU LFC Interim Trucking Industrial Risk Analysis

P33T Series Redundant Safety Exhaust Valve ENGINEERING YOUR SUCCESS.

Safety Performance Indicators

Transcription:

HRM Test Report Prepared for: Protective Structures, LLC DRAFT- 25 June 2013 Scott Hardesty Dan Welsh shardesty@ara.com dwelsh@ara.com Mike Rictor mrictor@ara.com Applied Research Associates 7921 Shaffer Parkway Littleton, CO 80127 (303) 795-8106

Introduction: During the week of 6 10 May 2013, Applied Research Associates (ARA) conducted three blast exposures of various Hardened Resistant Module (HRM) or Blast Resistant Module (BRM) structures at the ARA operated Pecos Research and Testing Center (PRTC), located 18 miles southeast of Pecos, TX. The exposure charge was a nominal 9,000 lb of enhanced Ammonium Nitrate / Fuel Oil (ANFO) with an approximate TNT equivalence of 0.89. The charge was detonated in a vertically oriented metallic culvert with top initiation. The HRM stand-off distances were either 150 or 175 ft. Basic test layout showing relative HRM and charge locations 2

Test Preparation: Typical HRM off-loading, final positioning, and securing to support pilings 3

Test Preparation: BRM 2 as deployed 4

Test Preparation: Charge as viewed from incident BRM 2 transducer 5

Test Preparation: BRM 3 as viewed from charge 6

Test Preparation: BRM 3, incident transducer radial, and connex container as deployed 7

Instrumentation Matrix: The initial test on 07 May was fully instrumented with the following equipment. The test on 08 May utilized only the high-speed video and BRM 3 internal pressure. The test on 09 May was not instrumented. Blast Over-Pressure Three incident transducers mounted at 150, 175, and 200 ft. on a single radial BRM 1 2 x reflective, 2 x incident BRM 2 2 x reflective, 1 x incident, 1 x internal BRM 3 2 x reflective, 2 x incident, 1 x internal Shipping Connex 1 x internal All transducers recorded at 1.0 MHz on either MeDAQ or ARA MicroDAS data acquisition systems. The BRM reflective gauges were mounted on the horizontal midline of the structures at the 1/3 - Left and 2/3 - Right locations, with the incident gauges centered on the side walls. Frag poles were positioned in front of the reflected transducers to shield the gauges from direct impact by culvert fragments. High-Speed Digital Video Phantom 7.1 color overview of entire arena (4,700 frames per second)- Failed to trigger on 07 May test. Phantom 7.3 black and white detail view of BRM 3 and Connex (5,000 frames per second) BRM 3 Internal GOPRO camera (240 frames per second) monitoring human surrogate 8

Blast Pressure Results Summary for 07 May 2013 test: Location Max Pressure Total Impulse Positive Phase Duration Incident Radial (150 ft): 20.52 psi 177.6 psi-msec 31.3 msec Incident Radial (175 ft): 15.29 psi 133.5 psi-msec 29.6 msec Incident Radial (200 ft): 9.67 psi 124.3 psi-msec 35.3 msec BRM 1 Reflected Right: 46.62 psi 275.9 psi-msec 18.0 msec BRM 1 Incident Left: 18.58 psi 104.8 psi-msec 16.5 msec BRM 1 Incident Right: 24.24 psi 141.5 psi-msec 20.5 msec BRM 2 Reflected Left: 71.17 psi 315.2 psi-msec 15.4 msec BRM 3 Reflected Left: 78.55 psi 353.5 psi-msec 17.9 msec BRM 3 Reflected Right: 54.54 psi 338.2 psi-msec 18.5 msec BRM 3 Incident Left: 15.75 psi 117.6 psi-msec 25.5 msec BRM 3 Incident Right: 15.45 psi 134.4 psi-msec 19.7 msec BRM 2 Internal: 1.20 psi max BMR 3 Internal: 0.98 psi max Connex Internal: 9.57 psi max (prior to gauge becoming disconnected) 9

Blast Pressure Results: Incident Radial 10

Blast Pressure Results: BRM 1 Reflected and Incident Pressures 11

Blast Pressure Results: BRM 2 Reflected Pressure 12

Blast Pressure Results: BRM 3 Reflected Pressure 13

Blast Pressure Results: BRM 3 Incident Pressure 14

Blast Pressure Results: BRM and Connex Internal Pressures 15

High Speed Video Results: 07 MAY 2013 Phantom 7.3 Black and White BRM 3 16

High Speed Video Results: 07 MAY 2013 Phantom 7.3 Black and White BRM 3 17

High Speed Video Results: 07 MAY 2013 Internal GOPRO BRM 3 18

Post Test Assessment: 07 MAY 2013 BRM 1 19

Post Test Assessment: 07 MAY 2013 BRM 2 20

Post Test Assessment: 07 MAY 2013 BRM 3 21

Post Test Assessment: 07 MAY 2013 BRM 3 22

Post Test Assessment: 07 MAY 2013 BRM 3 23

Post Test Assessment: 07 MAY 2013 CONNEX 24