SM6. instructions for use. SM cubicle. MV distribution factory built assemblies at your service. Anglais

Similar documents
SM6. instructions for use. GAM cubicle (1250A) MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. IMB cubicle without earthing switch. MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. DMVL cubicle. MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. QMB cubicles. MV distribution factory built assemblies at your service. Anglais

Information for the modified document

SM6. instructions for use. DMV S cubicle. MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. IMCandQMCcubicles. MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. DM1 S cubicle. MV distribution factory built assemblies at your service. Anglais

SM6. instructions for use. DMV A---DMV D cubicle (1250A range) MV distribution factory built assemblies at your service. Anglais

Medium Voltage Distribution FBX. Assembling a 1250A busbar Instructions.

MCset kv Medium voltage equipment

circuit breaker instructions for use SF draw --- out circuit---breakers in F400 MV distribution circuit breaker Anglais at your service

circuit-- breaker instructions for use SF1 fixed or in SM6 circuit --- breaker MV distribution circuit breaker at your service Anglais

MCset 4-24 kv Withdrawable SF6 circuit breaker

Medium voltage NEX switchgear Withdrawable circuit breaker. Quite simply efficient

0MV vacuum circuit breaker. 0Evolis 24 kv. 0User 0Manual. Creation Printed on 2008/07/17

NEX - 24 kv Withdrawable Circuit Breaker

GHA. Gas-Insulated Switchgear. Gas-Insulated Switchgear. Switchgear extension and replacement of a panel

MCset 17.5 kv. Civil engineering guide April Medium Voltage Distribution

CBGS-0. Medium voltage distribution

PIX. Operation - Replacement of Fuses Replacement of Voltage Transformers Technical manual. Medium Voltage Distribution

The Key Link for all your Distributions Needs. A Comprehensive Range for All Your Needs

CGMCOSMOS. Reliable innovation. Personal solutions. Fully gas insulated modular and compact (RMU)system.

Secondary Distribution Switchgear FBX. SF6 Gas-insulated switchboards. Instructions Operation - Maintenance

Medium Voltage Distribution PIX kv. Additional equipment Instructions.

circuit breakers instructions for use SF2 fixed MV distribution circuit breaker at your service Anglais

Secondary Distribution Switchgear FBX. SF6 Gas-insulated switchboards CB function. Instructions Installation - Commissioning Operating - Maintenance

AIR INSULATED METAL ENCLOSED SWITCHGEAR AND CONTROLGEAR

I B D Q I B D Q O I B D Q O

CPG.1 Gas insulated, single busbar cubicle range Up to 27 kv / 2000 A / 31.5 ka Up to 38 kv / 2000 A / 31.5 ka IEEE Standards

Evolis offer Merlin Gerin

The vacuum circuit breaker for commercial buildings, industrial plants and utilities

PIX-H Metal-clad switchgear up to 17.5kV

abb SafeLink SF 6 Insulated Ring Main Unit Installation and Operating Instructions Switchgear Division Auckland, New Zealand SLMIO ver 2.

SFset with VIP 400/410 built-in control unit Medium Voltage Circuit Breaker

ormaset-m PREFABRICATED METALLIC TRANSFORMER SUBSTATION

Medium Voltage Distribution PIX. Air Insulated Switchgear up to 24 kv PARS TABLEAU

B kv Gas-insulated Substations

SYSclad switchboard equipped with draw out type vacuum circuit breaker closed dooroperationoperation. SYSclad 12 17,5kV A.

For your safety! Foreword

Low-voltage switchgear MNS Light W. Installation, handling and operation. ABB LV Systems

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1.

PIX High. Installation Operation Maintenance Technical Manual No. AGS Edition 01/2009. Medium Voltage Distribution

CGMCOSMOS Fully gas-insulated modular and compact (RMU) system Up to 24 kv

Galaxy 300 Battery Breaker Kit G3HTBKIT1

Galaxy VM. Battery Breaker Box Installation 09/

ormaset-m Prefabricated metallic transformer substation

Medium Voltage Distribution Maintenance Guide I 2013 Premset. 15 kv compact modular vacuum switchgear with Shielded Solid Insulation System

SD, SE, SDE, SCO series Multipole switchgear for rail vehicles: Disconnecting switches, Earthing Switches, Disconnector with Earthing Switches,

Electrical network protection VIP30, VIP35. User s manual 12/2008

SFset with VIP 400/410 built-in control unit Medium Voltage Circuit Breaker

CPG.0 Single busbar gas-insulated cubicles

Cloud-connected solution for utility-scale renewable power

ACROBAT SWING STAND MODEL

Schneider Electric PV Skid. Optimized solar power conversion system tailored to enhance any North American PV power plant

UniSec Operation and maintenance manual

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

cpg.0 GIS-type medium-voltage switchgear with full insulation in SF 6 gas, up to 40.5 kv in accordance with IEC Standards

DISTRIBUTION SOLUTIONS. GSec Gas-insulated switching and isolating apparatus

Medium voltage products UniSec DY800 New 24 kv air-insulated medium voltage switchgear to e-distribuzione specifications

Key features. DESIGNS: - Conservator type - Hermetically sealed

Galaxy VX Battery Breaker Trip Board (GVXBBTB) and Battery Breaker Capacitor Board (GVXBBCB)

CGMCOSMOS-2LV. MEDIUM-VOLTAGE SF 6 GAS-INSULATED RING MAIN UNIT UP TO 12 kv LIB

Galaxy Receiving and Unpacking 09/

Cloud-connected solution for utility-scale renewable power

UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions

EVlink Parking EVF1 - EVW1

PIX High. Medium-voltage switchgear. Air-insulated switchgear kv ( 50 ka) Assembly - Operation - Maintenance Technical Manual

NXPLUS C Single busbar. Maintenance-free for lifetime

CGM.3 System. Medium Voltage SF 6 gas-insulated cubicles up to 38 kv according to IEEE and CSA standards

Galaxy VM. Modular Battery Cabinets Installation GVMMODBCW, GVMMODBCN 09/

SOUTH AFRICAN NATIONAL STANDARD

MESG 12 / 17.5 / 24 / 36 KV

High voltage products PASS M0S 252 kv Innovative solution for transmission substation up to 252 kv

XL Distribution enclosures WORKSHOP SPECIFICATIONS

Vacuum Circuit-Breakers, Type HVX kv, of cassette design, cassette with motor drive

STAND MODEL FOR MACH M2

Air-insulated switchgear UniGear type ZS1

Contents. Overview. Safety Instructions. Before Installation. Installation. Operation. Maintenance. Replacement Parts. System Specifications 8 01

GHA. Medium-voltage switchgear. Gas-insulated switchgear 40.5 kv ( 40 ka) for single and double busbar panels. Assembly Instructions

Cable arrangement 15 Preparation for cable installation. 15 Installation of the cables 16 Finishing of the cable installation. 17 Examples.

Steve Summers Region Sales Manager

24 kv. A brief summary of the. range

Simple and smart power factor correction

Metal Clad Switchgears

SF6 Load Break Switch 2017 FIL3 - S. Indoor Medium Voltage LBS With or without fuse 12kV- 24kV FIL3 D FIL3. 24KV SF6 Load Break Switch

Medium Voltage Distribution Catalogue Flusarc Make the most of your energy

MARTINDALE INSTRUCTIONS ELITE FUSE FINDER KIT ELECTRIC. Trusted by professionals. 4.4 Storage Conditions

B kv T&D GAS INSULATED SWITCHGEAR

cgm.3 system Fully SF6 gas insulated medium voltage switchgear up to 40.5 kv in accordance with IEC Standards

Type Operating Instructions. Bedienungsanleitung Manuel utilisateur

Galaxy VM. Classic Battery Cabinet Installation GVMCBCWUE, GVMCBC2WUE, GVMCBC2WUF, GVMCBC3WUF 07/2017.

All rights reserved. Neither this catalogue nor any part of it may be copied using any method or for any purposes. Most studies are legally protected.

24 k B788 ELEKTROTECHNISCHE WERKE FRITZ DRIESCHER & SÖHNE GMBH

DT-6C MEDIUM VOLTAGE SWITCHGEAR COMPACT RING MAIN UNIT. User Manual: DT-6C / DT-6+ C

TABLE OF CONTENTS FOREWORD...3 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS REQUIREMENTS...

DR-6C MEDIUM VOLTAGE SWITCHGEAR COMPACT RING MAIN UNIT. User Manual: DR-6C / DR-6+ C THE SPECIALIST IN MEDIUM VOLTAGE SWITCHGEAR

Compact NR630. NR100F to NR630F

e 2 ALPHA -2S Medium Voltage Double Busbar Switchgear K Catalogue EN

NEXT STEP B) SAFETY :

Transcription:

SM6 Anglais MV distribution factory built assemblies at your service instructions for use SM cubicle

foreword... 3 symbols and conventions... 3 as per iso 3864---2... contact the Schneider Electric service unit for diagnosis and advice 3 4 distribution rules... safety rules... 4 4 general description... 5 SM : disconnector cubicle... 5 handling instructions... 7 identifying the device... 7 list and number of bags and accessories... weight... 7 7 overall dimensions... handling using slings... 8 8 handling by forks... storage... 8 9 installation and operation recommendation... 11 installation instructions... 13 preparing the cubiclesprior to assembling the switchboard... fitting the end plate... 13 13 assembling the switchboard... fastening to the ground... 15 15 installing in the substation... fitting the busbar afterinstalling the cubicles... 16 16 reassembling the cubicle... fitting the earth busbar... 17 17 connecting MV cables... 18 start up instructions... 21 checking prior to switching on... operating the device with power off... 21 21 energising the HV incoming cables... voltage presence... 21 22 checking phase concordance... 22 cable test intervention... 22 operating instructions... 25 operations and visualisationof the status of the SM cubicle... padlocking... 25 26 keylocking... operating safety... 26 26 maintenance instructions... 27 preventive maintenance, cleaning instructions and power---up... 27 replacing a voltage indicator pack... table of anomalies/solutions... 28 28 spare parts... options... 28 28 recovery of SF6 gas at end of life... 29 7896687EN revision : 01 1

2 7896687EN revision : 01

foreword symbols and conventions Caution: you will find all the symbols below throughout the document, indicating the hazard levels depending on the different types of situation. DANGER as per iso 3864---2 DANGER: failure to follow this instruction will result in death or serious injury. WARNING as per iso 3864---2 WARNING: failure to follow this instruction may result in death or serious injury. CAUTION as per iso 3864---2 CAUTION: failure to follow this instruction may result in injuries. This alert signal can also be used to indicate practices that could damage the SM6 unit. INFORMATION-ADVICE We draw your attention to this specific point. 7896687EN revision : 01 3

contact the Schneider Electric service unit for diagnosis and advice Call your sales representative who willputyouincontactwith the closest SCHNEIDER ELECTRIC group service centre. You can log on to: www.schneider-- electric.com distribution rules The aim of this publication is to enable the SM6 unit to be installed correctly. This document is not a commercial document. It is a strictly technical document drawn up by Schneider Electric. safety rules CAUTION WARNING All the operations described below must be performed in compliance with applicable safety standards, under the responsibility of a competent authority. Thecontractormustbecertified and authorised to manipulate and perform work on the SM6 unit. CAUTION Only undertake the work after having read and understood all the explanations given in this document. If you have any difficulty complying with these rules, please contact Schneider Electric. 4 7896687EN revision : 01

general description SM : disconnector cubicle 1 : monitoring compartment 2 : busbar compartment 3 : control compartment 4 : switchgear compartment: disconnector and earthing switch 5 : cable connection compartment A : busbar connecting pad B : voltage presence indicator C : lower field deflector and cable connection D : capacitive divider E : cable connection inspection ports F : front panel 2 A 4 C D 5 1 B 3 F E 7896687EN revision : 01 5

6 7896687EN revision : 01

handling instructions identifying the device A D2 D3 B D1 C A : rating plate (option) B : characteristics and description C :firmplate serial number D1: riveted on the control cover D2: stuck behind the monitoring cover D3: stuck on the frame column list and number of bags and accessories H switchboard packing list (optional according to switchboard composition) --- operating lever --- 2 end plates --- 1 bag of end plate bolts S4: 3729744 --- positioning bracket H cubicle packing list 1 bag of busbar distribution blocks >12kV S2: 3729742 or 1 bag of busbar fasteners <12kV S6: 3729746 1 bag of bottom plate fasteners S3: 3729741 1 bag of inter---cubicle connections S1: 3729745 1 earth busbar 3 bottom plates 1busbar 3cablebushings 3 flange supports + flanges weight H SM : 120kg Do not handle the cubicle using the control front plate. 7896687EN revision : 01 7

overall dimensions 47 20 1600 1630 375 870 940 handling using slings L 60 MAXI L = 920 mm mini. handling by forks 8 7896687EN revision : 01

storage 7896687EN revision : 01 9

70 C --- 40 C 10 7896687EN revision : 01

installation and operation recommendation switchgear ageing withstandinanmv substation depends on 3 main factors H The need for proper implementation of connections: the new cold slip --- on and retractable technologies offer ease of installation, thereby promoting withstand over time. Their design enables operation in polluted environments with harsh atmospheres. H Theinfluenceoftherelative humidity factor: installation of heating resistors is essential in climates with high relative humidity and large temperature differences. H Ventilation control: the grids must be sized according to power loss in the substation. These grids must only be placed near the transformer, so as to prevent air circulating on the MV switchboard. operation We strongly recommend that you carry out at regular intervals (at least roughly every 2 years) afew operating cycles on the switching devices. Outside normal operating conditions (between -- 5 C and 40 C, absence of dust, corrosive gas, etc.), we recommend that you contact our Groupe Schneider Electric service centre in order to examine the measures to be taken to ensure proper installation operation. Our service centre is at your disposal at all times: H To conduct an installation diagnosis. H To suggest the appropriate maintenance operations. H To offer you maintenance contracts. H To suggest adaptations. 7896687EN revision : 01 11

12 7896687EN revision : 01

installation instructions preparing the cubicles priortoassembling the switchboard Delivery state: Earthing switch in closed position :bolt+washer : bolt+washer+nylstop nut A D C B Remove the front panel A, then pallet B. Remove the cover from the monitoring compartment C and the eye bolts D. E F Remove part E. (4bolts) Remove part F. (cubicle without LV box). fitting the end plate prèparation (only if the cubicle is at the end of the switchboard) bag of S4 bolts: 3730427 (HM 6x12 bolts only). Mount 10 cage nuts on the cubicle. (see assembly overleaf). 7896687EN revision : 01 13

1 2 1 insert the cage nut from outside the cubicle in the specially provided rectangular hole. 2 topple the cage nut inside the cubicle. 3 4 3 push the cage nut in the direction of the arrow so as to place the upper part of the cage behind the plate. 4 nut correctly placed. fitting the end plate Instructions are given for the left hand side of the switchboard. Thesameappliesfortherighthand side. :screw+washer : screw+washer+nylstop nut Position the end plate. Place the screws onthecagenuts. Mount the screws with the nylstop nuts. Mounting direction of the screw and nylstop nut. (nut inside the cubicle) Fixer la 2 ème tôle d extrémité suivantlemêmeprincipe. (pas d équerre de positionnement) 14 7896687EN revision : 01

assembling the switchboard bag of bolts S1: 3729745 (HM6x16 bolts only) : screw+washers+nut M K L upper view K L Fix the cubicles together. (the additional screws are for mounting the earth collector) Bolt mounting direction. K : left---hand cubicle L : right---hand cubicle M : to join the 2 cubicles. Screw HM6x60 to tighten moderately. Tightening torque : 6 Nm. fastening to the ground (bolts to be provided by the contractor depending on the installation layout) 840 50 740 50 12,3x12,3 15 345 375 15 7896687EN revision : 01 15

installing in the substation 100 mm* 100 mm* SM SM 20 mm 20 mm installing the switchboard to the right of the wall* (mini dimension to ensure proper operation of device.) installing the switchboard to the left of the wall. fitting the busbar after installing the cubicles in their final position bag of accessories S2: 3729742 or S6: 3729746 tools: 1 torque wrench (10 to 50 Nm) 11/4---3/8reducer1x6mm socket sleeve 1 6 mm hexagon male socket or 1 hexagon female socket Busbar connection Tightning torque: 28 Nm. Version < 12 kv S6: 3729746 mounting without field distribution block. Version > 12 kv S2: 3729742 correct position of field distribution block. Incorrect position, risk of damage. 16 7896687EN revision : 01

reassembling the cubicle F E Reassemble part F of the roof. (nuts inside the cubicle) Reassemble part E. G Reassemble cover G of the monitoring compartment aligning it according to marking. fitting the earth busbar the earth busbars are connected together. (HM8 x 35 screws) 2waysofearthing the substation frames. 7896687EN revision : 01 17

connecting MV cables Install the cable straps. H bag of bolts S3: 3729741 HM 6x16 screws. Remaining bolts are intended for flanging the cables. Install the cable bushing. L1 Connect the cable on phase L1. The bolts remain fixed in place. Use a torque wrench and a 19 mm socket to immobilize the cable. Tightening torque: 50 Nm. 1 2 Fix the bottom plate and then flange the cable.(hm 8x50 screws) Mount the bottom plate 2 at the back of the cubicle. 18 7896687EN revision : 01

K K AV Position K openings as shown. H Mount L2 and L3 phases following the same instructions as for L1 phase. 2 ways of connecting the cable earthing braids and the toroids. (the bolts remain fixed in place) 7896687EN revision : 01 19

20 7896687EN revision : 01

start up instructions checking prior to switching on H leave nothing in the connection compartment H check on all phases that the field deflector lid is properly closed Reassemble the front panel. operating the device with power off refertothechapter: operating instructions Carry out a few operations on the disconnector and earthing switch. energising the HV incoming cables The devices must be in the open position. (see: operating instructions). 7896687EN revision : 01 21

voltage presence When the cables are energised, the lamps of the voltage presence indicator must come on. checking phase concordance L1 L2 L3 L1 L2 L3 Phases are concordant, the lamp does not come on. Phases are not concordant, the lamp comes on. cable test intervention Phase detection or current injection for fault tracking. H close the earthing switch. H open the front panel. H place the earthing pad. B L1 A A Secure the vice A against the earthing rod and connect the earthing device to the 3 shafts of the lugs of cables B. A bottom view of the securing of vice A. Correct mounting. 22 7896687EN revision : 01

Must not be assembled as shown. Earthing switch reopening for access to conductors. 7896687EN revision : 01 23

24 7896687EN revision : 01

operating instructions operations and visualisation of the status of the SM cubicle Position the lever as shown for downwards opening operations. Position the lever as shown for upwards closing operations. Opening the earthing switch. Closing the disconnector. Opening the disconnector. Closing the earthing switch. 7896687EN revision : 01 25

padlocking Padlock the switch in the open or closed position by 1, 2 or 3 padlocks (diameter = 8 mm). keylocking Refer to the keylocking installation and operation manual n 7896785. operating safety The front panel can only be withdrawn or fitted when the earthing switch is closed. 26 7896687EN revision : 01

maintenance instructions preventive maintenance, cleaning instructions and power --- up If necessary: contact the Schneider Electric group service centre. We strongly recommend that you carry out at regular intervals (at least roughly every 2 years) afew operating cycles on the switching devices. CAUTION Never lubricate the disconnector operating mechanism. If necessary: contact the Schneider Electric group service centre. In normal operating conditions (temperature between --- 5 C and40 C) no special maintenance is required. CAUTION Never use solvents and alcohol. We recommend that you inspect each compartment (cable, fuse, busbar)* at regular intervals according to environmental conditions. If the insulating parts are dusty, that you remove the dust using a dry cloth. example : In harsher conditions (aggressive atmosphere, dust, temperature less than --- 5 C or greater than 40 C) consult the nearest Schneider Electric service centre. 7896687EN revision : 01 27

replacing a voltage indicator pack Manually extract the voltage indicator: the switchboard may be on. table of anomalies/solutions the voltage presence indicator does not come on the front panel does not open or cannot be fitted check that the earthing switch the earthing switch cannot be not operated the earthing switch cannot be operated check that the incoming cables are energised check the lamp box check that the disconnector is closed check that the disconnector is closed check that the disconnector is open check that the earthing switch is open spare parts H voltagepresenceindicator (for other interventions, consult us: seegroupeschneiderelectric services) options (consult us) H H H H keylocking auxiliary contacts heating element phase concordance unit 28 7896687EN revision : 01

recovery of SF6 gas at end of life for disconnector cubicle The SF6 must be removed before any dismantling operation can be carried out in compliance with the procedures described in IEC--61634 and according to the following instructions. The gas must be treated in compliance with IEC--60480. H volume of gas to be recovered: 35 litres H internal gauge pressure: 40 kp A NB : SF6 gas recycling at the end of circuit-- breaker life, refer to its instruction for use. Remove the cover (A) from the control cabinet. control cover access B Remove the control cover (B). Remove the 3 screws retaining the operating mechanism. Cut the wiring to remove the operating mechanism. Drill 2 holes in the filler valve safety cap 4 mm, centreline 20 mm, max. depth 4 mm 7896687EN revision : 01 29

CAUTION pump the gas for at least 15 minutes. C Using a spanner wrench, remove the safety cap from the valve. Connect the special pumping equipment (C). 30 7896687EN revision : 01

7896687EN revision : 01 31

32 7896687EN revision : 01

group Schneider Electric service centers are there for: engineering and technical assistance start-up training preventive and corrective maintenance adaptation work spare parts Call your sales representative who will put you in touch with your nearest group Schneider Electric service centers. Schneider Electric Industries SAS 89, boulevard Franklin Roosevelt F--- 92500 Rueil--- Malmaison (France) Tel:+33(0)141298500 http://www.schneider--- electric.com 7896687EN revision : 01 As standards, specifications and designs change from time to time, please ask for confirmation of the information given in this publication. Conception, rédaction: Service Documentation Technique T&D Edition du : 20/07/2007