Regulation for Installing

Similar documents
MATERIAL FOR FIBRE OPTIC LINES. General C-bracket HSU trunnion type, forged, for aluminium based OPGW conductors...

Townsend Bearings. Rosta Tensioner Devices. Revision 1

OPTOFIT CATALOGUE. FITTINGS FOR METALFREE (ADSS CABLES) and METAL ARMOURED (OPGW & OPPW) AERIAL CABLES WITH INTEGRATED OPTICAL FIBRES.

SUSPENSION 04 CLAMPS

OPERATIONS MANUAL LEVER CHAIN HOIST

Spring Cable Reels EXEL

Crane. Bridge. Crane Control. Crane. Force, breakaway. hook device. hook device. Friction-type pressure gripping lifters. Below. hook device.

Conductor: plain wire, fine stranding as per VDE 0295 class 6 from 50 mm² fine stranding according to VDE 0295 class 5

Section 5: Parts Replacement

CS Fiber Optic Splice Case. Instruction

Star Swivel-Arm Hoist Installation and Operating Instructions

Accessories. Introduction. Cable Hangers LINE PRODUCTS TRANSMISSION

YOUR SPECIALIST AROUND CABLE AND WIRE. Catalog

For advanced drive technology CLAMPEX. Shaft-hub-connection. KTR Precision joints CLAMPEX

APPLICATION NOTE. Mounting instructions for EasyPIM 750 and EasyPACK750 Modules with screw clamps

Operator s Manual. 2010, 2015, 2020, 2025 Material Lifts

Engineering Data Tensioner Arms idler Sprocket Sets Idler Roller Pulley Sets

Guide units. For toolmaking, fixture manufacturing and machine engineering

WARNING. Electric Recovery Winch. General Safety Precautions

Installation Instructions Table of Contents

How it s done Fitting instructions for replacing brakes

OWNERS GUIDE 12V / 24V DC ELECTRIC WINCH. 12,000lb (6124kg) TWO SPEED VERY IMPORTANT

OPERATING INSTRUCTIONS (Translation) Hoisting crane

EARTH WIRE FITTINGS 08

ENERGY. TECWATER EMV-FC S1BC4N8-F 0,6/1 kv. Screened Cable for Water Application

COME.UP DV-15. Instruction manual.

LIFT TRUCK SERIES: G35S-2 G40S-2 G45S-2 G40SC-2 G45SC-2 G50SC-2. November 15, 2000 CODE 3150 LT3150-L0 SUBJECT: NEW DRIVE AXLE

INSTRUCTIONS FOR USE CAUTIONS AND WARNINGS

Conveyor Belt Maintenance

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

Load Cell for Manually Operated Presses Model 8451

Tension and Compression Load Cell Model 8435

I. General Safety Precautions

RIG-I-FLEX 140 SERIES CURTAIN TRACKS

sa B-CABLES nv PROTOLON(ST) NTSCGEWOEU Medium Voltage Flexible Cables for Use In Water sa B-CABLES nv ENERGY

INSTALLATION INSTRUCTIONS HAND OPERATED MODELS 140 AND 140-R BI-PART OPERATION

Brake Shoe: Service and Repair Removal Procedure

SERVICE GUIDE For WARN PULLZALL 120Vac P/N &

Product Range Modules ROSTA Tensioner Devices

PROTOLON(FL)-LWL (N)TSFLCGEWOEU 3,6/6 kv: medium voltage flat reeling cable with fibre-optics

Spring hangers, spring supports

BENCH GRINDER MODEL NO. OZBG150WA

sa B-CABLES nv PROTOLON(ST) NTSCGEWOEU.../3E Medium Voltage Flexible Cables for Use in Water with Copper Core Shield sa B-CABLES nv ENERGY

PROTOLON (SB) PROTOLON (SB) with Copper Core Shield Flexible Cables for Trailing Operation

General page 3-8. Mounting instructions page Couplings DN6 page Couplings DN7 page Couplings DN8 page 27 34

TEKNISK RIKTLINJE TR05-10E

CRANE, CONVEYOR, LIFT & REELING CABLES

AU DU PONT DE LUTTRE BRUSSELS BELGIUM PHONE: FAX: OPERATING MANUAL. Electric Fully Automatic Floor Saw FS 1218 EX

Product Information Overspeed governor GB 260

PRECISMECA - MONTAN Gesellschaft für Fördertechnik mbh. Documentation Operating Instructions. Rollers

Assembly and Service Instructions for Telescopic Steel Covers

TubeTrace Tubing Bundles

CONVEYOR BELTING INSTALLATION, OPERATION AND MAINTENANCE MANUAL

STRINGING EQUIPMENT CATALOGUE

CORDAFLEX(SMK) (N)SHTÖU Tough Rubber-Sheathed Reeling Cables

Global data. Electrical parameters

400 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS

TRANSMISSIONS. Mechanical Power Transmission

Recommended Brake Assembly/Disassembly Procedure

Instruction Manual. LG-100 Series Pointer-type Liquid Level Gauge

Butterfly Valve Type 58 (PDCPD)

Prusa i3 Printer Assembly Guide

PROPELLER SHAFTS 16-1 PROPELLER SHAFTS CONTENTS

COYOTE ENTERPRISES, INC. 9/10 BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

I. Safety Requirement WARNING. ATV/UTV Winch

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

SPRING DRIVEN CABLE REELING DRUMS

Changes in direction.! Using pulleys with belts

3 Axles and brakes. 3.1 Function and construction of the axles Construction Function

Re-Energy.ca - Solar Electricity - Build Your Own Solar Car

SECTION 17 SUSPENSION CONTENTS FRONT SUSPENSION REAR SUSPENSION MAINTENANCE SERVICES

TECHNICAL INFORMATION. Dipl.-Ing. (FH) Christian Niklis. Stationary Lance Earthing Device

Energy Supply Systems

ROSTA Tensioner Devices

Operation and Maintenance Instructions

Fishing Bumper Sub. Manual D450

Installation Service INSTRUCTIONS

Operating Instructions Ball Valves

BEAM CLAMP INSTRUCTION MANUAL

Lincoln Hoist. Web Hoist Operating Manual. Lincoln Hoist

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

PRB b-E. Spring Cable Reels. Stock&Go

JFETIGER RUNNING MANUAL. Downloaded From JFETC.COM Thu, 20 Sep :15: JFETIGER. * valid at time of download * JANUARY 2015

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

HYDRAULICS. TX420 & & lower. Hydraulic Tandem Pump Removal. 4. Remove the LH side panel (Fig. 0388).

OPTOFLEX G62,5/125: rubber cables with fiber optic

INSTRUCTIONS Ç CAUTION. S&C Power Fuses Types SMD-1A, SMD-2B, SMD-2C, and SMD-3. For Field Assembly and Installation NOTE INSTRUCTION SHEET

Adjustable Speaker Mount GRAVIS 8

Adjustable Speaker Mount GRAVIS 12

Amphenol. eries SJT. Series SJT. VG 96912, Series 1 PAN JN 1003

For advanced drive technology CLAMPEX. Shaft-Hub-Connection. KTR Precision Joints CLAMPEX

Transformer Bushing Type EKTO

Operating Instructions. TM Girder Clamps

Operating & Installation Manual

Instructions for Use Plain Trolley ULK Geared Trolley UHK

ELEVATOR BELT & BELT SPLICE INSTALLATION GUIDE

B Precision Ground Plates and Flat Bars. E Ground Precision Components. G Elastomer-Bars, -Sheets, -Sections

A Quick reference guide to the installation of Uniflex. Oldham Seals Group. Uniflex installation Guide

Self-Recovery Winch WARNING. General Safety Precautions

INSTALLATION INSTRUCTIONS SERVICE MANUAL

Transcription:

Regulation for Installing Phase Conductors and Earth Wires, as well as OPGW/OPPC (PCEWOP) made from aluminium, aluminium alloy, steel, aluminium clad steel, HACIN and combinations of these materials with and without surface treatment Lumpi-Berndorf Draht-und Seilwerk GmbH Version 08/2017

1. General points The generally applicable accident prevention and safety regulations of the relevant country apply to the handling and installation of Lumpi-Berndorf PCEWOP, as well as, in general terms, the installation regulations in accordance with DIN 48 207 and EN 50182, Annex E, supplemented by the points of this regulation, which take precedence. It should be noted that, in principle, PCEWOP are only intended for one-off assembly. Disassembly and renewed assembly should generally be avoided, as should moving the PCEWOP back and forth. Rewinding the PCEWOP onto other cable drums must be avoided as a matter of principle. In exceptional cases, rewinding may take place following prior consultation with and/or in the presence of Lumpi-Berndorf. PCEWOP must be installed under conditions that are as clean as possible. Surface-treated PCEWOP with hydrophilic properties require special care to prevent contamination and damage. The contact between the assembly personnel and the PCEWOP must be restricted as far as possible. Where such contact cannot be avoided, new, clean gloves must be used. This regulation provides general information and notes for the storage, handling and installation of Lumpi-Berndorf PCEWOP. These procedures and notes are intended as guidelines, as each installation is unique and is influenced by the local conditions and the existing requirements and customer wishes. Other information, such as minimum separation distances, sage and regulation tables and specific PCEWOP data does not constitute the object of this regulation. Items of installation equipment not mentioned in the present regulation are not approved for use with Lumpi-Berndorf PCEWOP. The use of such devices without the express consent of Lumpi-Berndorf Draht- und Seilwerk GmbH takes place at the customer's risk. 1.1 Function Lumpi-Berndorf PCEWOP are used to transfer electrical energy/data and/or provide a protective function in the event of lightning strikes and short-circuit currents. In order to do justice to the high requirements of the PCEWOP, the utmost care and professional handling by trained personnel is required during transport, loading and unloading, stringing and assembly. erstellt:dha 08/2017 Seite 2 von 7

2. Specification 2.1 Storage and transport 2.1.1 Transport The PCEWOP drums may only be transported with the drum axle in a horizontal position. The PCEWOP drums must be secured on the loading bed to prevent movement. It is prohibited to tip or throw the PCEWOP drums from the means of transport. The PCEWOP drums must therefore be unloaded using suitable lifting equipment. The PCEWOP drums may be moved a short distance ( 10 m) on the ground, only in the opposite direction to that in which the PCEWOP unrolls (see roll direction arrow). 2.1.2 Storage The lagging may not be removed until shortly before installation. A visual inspection of this cover makes it easy to determine any transport damage. The PCEWOP drums must be stored in an upright position (horizontal axle) and on suitable squared timbers. In order to prevent damage caused by moisture, the drum must not touch the ground during storage. The storage temperature should not fall below -30 C and not exceed 80 C. Suitable measures must be taken to protect the PCEWOP drums from external influences. In environments that attack metals and wood, the PCEWOP drums must be stored in warehouses. 2.2 Preparations 2.2.1 Preparatory works Before installation starts, it must be guaranteed that the PCEWOP cannot be damaged by brief contact at any time. Obstacles must be removed or appropriate protective equipment must be used. It must be ensured that the PCEWOP parameters, along with this installation regulation, are brought to the attention of all of the assembly personnel. 2.2.2 PCEWOP drums PCEWOP may be delivered on steel or wooden drums. In the event that wooden drums are used, the nuts on the draw bolts and the axle plate fixing bolts must be tightened before moving the drums at the storage location and before starting the stringing work. The U-hooks that are used to secure the inner end of the PCEWOP must be loosened to the point that the PCEWOP end can be moved freely. In the case of steel drums, the inner end of the PCEWOP must be loosened. The lagging boards must be removed using suitable tools, without damaging the PCEWOP. erstellt:dha 08/2017 Seite 3 von 7

2.2.3 Deflection pulleys (wheels) The pulley diameter must equate to at least 30 x the conductor diameter. With supporting masts and an angle of deflection <15, the pulley diameter can be decreased to 25 x the conductor diameter. The minimum jaw width must equate to 1.5 x the conductor diameter. The pulleys must have bearings that enable them to move freely and the running surface must be clean, undamaged and free from scoring and notches. Only uncoated light metal pulleys or light metal pulleys with a hard and smooth plastic coating may be used. Smooth plastic coatings must be provided for surface-treated conductors. The conductor must run into the roller centrally and must not slip from the jaw flange into the middle so as to avoid damage and torque forces. Where necessary, the deflection pulley should be suspended at a height/at an angle using suitable equipment. For pulling up the conductor, the pulleys must not have any copper particles or other materials that attack the metals used. If no fitting lengths are used, a pressed connector must be deployed to ensure that the conductor can pass through without damage. In general, only single pulleys are permitted. Tandem pulley suspension gear is only permitted if the conductor is not deflected by more than 5 per pulley. 2.2.4 Cable brake The diameter of the brake drum must be at least 30 x d (d = PCEWOP diameter). The brake must have a hydraulic or mechanical fine adjustment device. The running grooves must be clean, undamaged and free from scoring and notches. Smooth, hard plastic coatings of the running grooves must be provided for surfacetreated PCEWOP. Braking of the Lumpi-Berndorf PCEWOP in the drum stand must be carried out so as to prevent overtravel. An PCEWOP may not be deflect by more than 5 without suitable pulleys (see Point 2.2.3). As a result, it is necessary to position the drum stand in line with the brake. The separation distance between the drum stand and the brake should be at least 5 m, but ideally 8 m or more. erstellt:dha 08/2017 Seite 4 von 7

The PCEWOP must be pulled into the brake in line with the figures below, depending on the lay direction of the outer layer. PCEWOP with right-hand lay PCEWOP with left-hand lay In the case of hollow conductors, in connection with high installation tensile stresses, the brake drum grooves must be adapted to the cable diameter. This is to prevent the hollow conductor becoming permanently deformed in the area of the brake drum cable wrap. The PCEWOP manufacturer must always be contacted if higher installation tensile forces than those listed in point 2.2.5 are to be expected. 2.2.5 Installation tensile force The installation tensile force of Lumpi-Berndorf PCEWOP must not exceed 20% of the calculated breaking load in accordance with the data sheet. In the case of OPGW/OPPC and hollow conductors, the installation tensile force must not exceed 16% of the calculated breaking load in accordance with the data sheet. A cable brake with adjustable tensile force limitation and automatic shut-down must be used for installing the PCEWOP. For OPGW/OPPC and hollow conductors, the installation tensile force must be documented without breaks over the entire length. 2.2.6 Installation speed The maximum speed is 4,000 m/h. 2.2.7 Earthing The contractor must ensure that the equipment is earthed in accordance with the regulations. 2.3 Installation 2.3.1 Installation The pull rope (front cable) must be non-twisting; braided cables are preferably used. A rotating shackle must be mounted between the PCEWOP and all the front cables, so that any torsional stress is not transferred to the cable, even under tensile load. The PCEWOP must always be pulled off the drum from above and in the direction of erstellt:dha 08/2017 Seite 5 von 7

travel with the cable brake. At angled towers, the PCEWOP may be pulled through without being cut if the following conditions are observed: Installation without grinding by means of appropriate pulley arrangement Suitable positioning of the deflection pulleys in order to prevent the PCEWOP moving upwards in the pulley jaw Compliance with the minimum bending radii The PCEWOP must run straight into the feed roller (first deflection pulley). Suitable pulling grips and/or other appropriate PCEWOP pulling fittings must be mounted on the PCEWOP. The pulleys should generally be secured so that the PCEWOP do not rise up at the jaw flange. In general, the information set out in EN 50182, Annex E must be observed. We wish to point out that the feed roller guide of the cable brake is not suitable for deflecting PCEWOP. The Lumpi-Berndorf PCEWOP are tied off in an appropriate manner so as to ensure grip and friction between the individual wire layers. If the PCEWOP is cut in the course of installation, or the tie is removed for other reasons, it must be ensured that the individual wire layers remain securely connected with one another and that no movement of the individual wire layers relative to one another occurs. The protective caps applied to the ends of the OPGW/OPPC in the factory seal the cable. They prevent water penetrating into the stainless steel loose tubes. These protective caps may not be removed until the fibres are spliced. This means that stringing and introduction of the OPGW/OPPC into the joint boxes takes place with the protective caps fitted. Particular care must be taken to ensure that the protective caps are not damaged by pulling grips. However, if it is vital that the protective caps be removed for stringing, new caps must be applied once again in a professional manner after pulling. It should be noted that the ends of the loose tubes are fully sealed. Protective caps are available from Lumpi-Berndorf Draht- und Seilwerk GmbH. In order to remove the caps, the whole end of the OPGW/OPPC (approx. 10 cm) must be sawn off. Here the end of the OPGW/OPPC that is released must be tied off in a suitable manner, otherwise the cable could spring open. 2.3.2 Installation temperature The minimum installation temperature is -20 C. For OPGW/OPPC, the minimum installation temperature is -10 C. If the outside temperature is lower, stringing is not permitted and must therefore be ceased. erstellt:dha 08/2017 Seite 6 von 7

2.4. Travel on PCEWOP In order to fit warning spheres, reflectors, spacers or similar, cable wagons may travel on new, undamaged PCEWOP provided that the following conditions are met: The cable wagon must be fitted with plastic rollers or with plastic-coated metal rollers, the diameter of which must be at least 200 mm (4 rollers per PCEWOP) The vertical load on the PCEWOP per carrier roller must not be greater than 1500 N During travel on the PCEWOP, the PCEWOP tensile force must not exceed 30% of the calculated breaking load of the PCEWOP. The breaking load for the type of PCEWOP can be found in the relevant data sheet. Moreover, the regulations of the network operator in question apply to travel on PCEWOP. 2.5. Assembling fittings The assembly instructions issued by the fittings manufacturer must be observed. Colour-coated surfaces may be cleaned mechanically with suitable brushes. In doing so, care must be taken not to damage the wires. The brushes must not incorporate any materials that attack the metals used (e.g. copper, brass). If follow-up treatment of cleaned and/or damaged areas of coating is required, suitable colourants may be purchased in small containers (touch-up paint). The follow-up treatment involves applying the paint by hand. 2.6. Stretching cables With any stressing of PCEWOP, attention must be paid to the necessary tower stability. 50% of the calculated breaking load (RTS) is applied constantly for 1 hour as tensile load. The changes in the length of the PCEWOP that occur during this process must be documented, as well as the forces applied. After stretching, the force on the PCEWOP must not be relieved so as to fall below 10% of the RTS. 2.7. Securing the PCEWOP to the tower Lumpi-Berndorf PCEWOP should be anchored in the standard manner. Hollow conductors require special handling in the process of fixing them to the tower. All fittings must be agreed between the fittings manufacturer and the customer. 3. Applicability of warranty conditions Compliance with these installation instructions constitutes a prerequisite for provision of warranty services from Lumpi-Berndorf Draht- und Seilwerk GmbH in accordancewith the agreed warranty conditions. erstellt:dha 08/2017 Seite 7 von 7