Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

Similar documents
UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

SUBSIDY SCHEME FOR GRID CONNCTED AND OFF GRID SOLAR SYSTEMS AT IOCL PETROL PUMPS

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Joint Inspection Report

Net +Plus Connection Code

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Solar PV Projects PPA Model

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

DRAFT. Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING

Application for Net Export Rebate

Format - 16 GUIDELINES FOR ON-GRID SOLAR RTPV PROGRAMME (ON NET- METERING BASIS) FOR BESCOM OFFICERS

Net Metering Service. Customer Information Package

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016

JEA Distributed Generation Policy Effective April 1, 2018

RULES ENABLING THE NET- METERING PROGRAM FOR RENEWABLE ENERGY

Uttar Pradesh Electricity Regulatory Commission, Lucknow

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

RULE 21 GENERATING FACILITY INTERCONNECTION APPLICATION SMUD s Distribution System - (SMUD FORM 2655)

Umatilla Electric Cooperative Net Metering Rules

GOVERNMENT OF ANDHRA PRADESH ABSTRACT ****

GRID-INTERACTIVE SPV ROOFTOP PLANTS: AN OPTION FOR INDIA GROWING ENERGY DEMAND

Northeastern Rural Electric Membership Corporation Columbia City, Indiana

GRID CONNECTED 400kWp SOLAR ROOF TOP POWER PLANT NET METERING AT KARNATAKA STATE CRICKET ASSOCIATION M. CHINNASWAMY STADIUM, BENGALURU

White River Electric Association, Inc. Net Metering Information & Service Requirements

TILLAMOOK PEOPLE S UTILITY DISTRICT

Louisville Gas and Electric Company

Application for Operation of & Net Metering for Member-Owned Generation Name: Mailing Address: City: County: State: Zip Code: _

24. SOLAR INCENTIVE PROGRAM II

GUIDE FOR MICROGENERATION INTERCONNECTION TO CITY OF MEDICINE HAT ELECTRIC DISTRIBUTION SYSTEM

Renewable Net Metering Program Appendix ESD APX 001 1

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

INDEPENDENCE. Invest today. Reap benefits for a lifetime.

Instruction/Guidelines regarding rooftop solar PV Grid interactive systems and Net metering.

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Northeastern Rural Electric Membership Corporation Schedule DG-2 Columbia City, Indiana Page 1 of 5

Duke Energy Carolinas North Carolina Interconnection Request Checklist

ROOFTOP SOLAR POWER PLANTS FOR ACADEMIC CAMPUSES

The following are the clarifications to the queries raised by various participants during the pre- bid meeting held on at CTC Complex.

THE EMPIRE DISTRICT ELECTRIC COMPANY P.S.C. Mo. No. 5 Sec. 4 1st Revised Sheet No. 23

NET METER REQUEST FORM

DER Commissioning Guidelines Community Scale PV Generation Interconnected Using Xcel Energy s Minnesota Section 10 Tariff Version 1.

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Egyptian Solar PV Feed-in-Tariff Procedures for Small Scale Projects

Invest today. Reap benefits for a lifetime.

ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR ********

RAJASTHAN ELECTRICITY REGULATORY COMMISSION

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

magellan solar export control solutions Magellan Power Solar Gate

White Paper. P13008 Net-metering concept for Small Scale Embedded Generation in South Africa. prepared for

Connecting your home or small business generation

Panel Discussion on Accelerating Large Scale Deployment of Rooftop SPV in India

Residential PV-the City of Cape Town s experience Brian Jones Head: Green Energy/Electricity Services City of Cape Town South Africa

OFF GRID SOLAR PV SYSTEMS

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

MANIPUR GAZETTE E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY. No. 301 Imphal, Wednesday, January 7, 2015 (Pausa 17, 1936)

Certificate of Conformity self-generation unit

PUD ELECTRIC SYSTEM INTERCONNECTION

Ministry of New and Renewable Energy. Jawaharlal Nehru National Solar Mission (Off-grid and Decentralized Solar Applications)

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Order No : 1521/CT/2015 dated

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

REQUIREMENTS FOR PARALLEL OPERATION FOR CUSTOMERS WITH GENERATION NOT EXCEEDING 50 kw

TERMS AND CONDITIONS

Application for Commission Approval to Construct a Generating Station Pursuant to Public Utilities Article Section and

Distributed Generation Interconnection Policy

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

CITY OF SASKATOON ADMINISTRATIVE POLICY

MISSOURI SERVICE AREA

INTERCONNECTION for GENERATING FACILITIES Up to 20 MW

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

S T A F F R E P O R T

Aonghus Geraghty Chief Executive AG Energy Ireland

CHOCTAWHATCHEE ELECTRIC COOPERATIVE, INC RESIDENTIAL SERVICE--NET METERING RIDER

100kW GROUND MOUNTED SOLAR PHOTOVOLTIC POWER PLANT DETAILED PROJECT REPORT AERO SPACE MATERIALS PVT LTD

MICHIGAN ELECTRIC UTILITY

Noble County Rural Electric Membership Corporation

GOVERNMENT OF NCT OF DELHI

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

RULES FOR CUSTOMER INTERCONNECTION OF ELECTRIC GENERATING FACILITIES

Egyptian Solar PV Feed-in-Tariff Procedures for Small Scale Projects

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

Policy Bulletin No. 25 Net Metering. Public Utility District No. 1 of Klickitat County 1313 South Columbus Goldendale, WA 98620

Interconnection Process for Generation Systems

Origin Solar Presentation

SCHEDULE 84 CUSTOMER ENERGY PRODUCTION NET METERING SERVICE

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

Transcription:

Roof Top Solar Power Net Metering Solution Guidelines for implementation of Net Metering for Roof Top Solar Power System 1. Net Metering arrangement is permitted for 3 Phase connections only. The interconnection schematic is enclosed in Appendix A to these guidelines. 2. Consumers can avail Government of AP subsidy and MNRE subsidy, as applicable, in installation of solar power net metering solutions through NREDCAP. 3. Entire circuitry (Appendix A), including panels, inverter, bidirectional meters, cabling, manual switch, safety circuit breaker etc., should be installed by the vendor under a turnkey approach. 4. Mandatory safety precautions/features which have to be installed as part of SPV system are: i. Certified Inverter controlled relays which can trip on grid failure and thus prevent any solar power injection to Grid when there is no power in Grid. ii. Solar Circuit should be separately grounded/ earthed. iii. Additional switchgear/relay (sensing phase-angle shift) required as a second rung of safety. It shall be positioned between interconnection point and the bi-directional meter (Please refer Appendix A). Page 1 of 6

iv. Harmonics suppression/filtering feature in the inverter for local network s safety and for accurate measurement of energy. 5. A single bi-directional meter shall be installed for export and import. This bi-directional meter should have the following characteristics: i. Separate registers for Export and Import with MRI downloading facility. ii. kvar, kwh, kva measuring registers for Capacity above 1 KW. iii. AMI facility with RS232 (or higher) communication port. iv. Class 1 accuracy meters for PV systems up to 10 kw, 0.5 accuracy class meters for PV systems above 10 kw and 0.2 class accuracy meters for HT systems (56 kw and above). v. Meters should be BIS/ISI Certified. vi. CT functionality meters for PV systems above 50 kw. 6. Vendor executing turnkey solution should be a channel partner of MNRE. 7. If on inspection, at the time of release of permission to install a net metering solution or on any periodic inspection thereafter, non-iec/isi/bis certified equipment is found to be part of net metering solution on a consumer s premises, the vendor will be blacklisted and the same shall be notified to MNRE. 8. MNRE subsidy, Government of AP subsidy and any other subsidy relevant to Solar Panel based net metering solution which may be rolled out in future, should be front loaded on the consumer cost. Page 2 of 6

For example, for a solution costing Rs.100, if 30% MNRE and 20% GoAP subsidy is being availed, then the vendor should charge consumer only Rs.50 for installing the solution. Vendor should claim subsidy component from NREDCAP. 9. NREDCAP shall be the nodal agency for release of both MNRE and GoAP subsidy. 10. Net metering bills raised by DISCOM for the first 2 months since installation should be produced by the vendor for the release of subsidy. These bills should be countersigned by concerned DE Operations and District Manager of NREDCAP. Within 15 working days of receipt of such bills subsidy payments shall be cleared. 11. DISCOMs shall accord approvals on a first come first serve basis for Solar Net Metering till the Solar installed Capacity reaches 50% of the closest upstream DTR s rated capacity. After reaching this limit, the capacity of DTR shall be enhanced within next 45 working days to process remaining application from other consumers/spv source. 12. The nodal point of contact for solar net metering programme shall be the local Divisional Engineer (Operations). The consumer can download solar net metering rooftop application from official websites of APDISCOMs and submit the filled in application to the concerned Divisional Engineer/ Operation/ APDISCOM. 13. DISCOMs personnel shall conduct a feasibility analysis of the DTR within 15 working days of the receipt of completed Application Form. Page 3 of 6

14. Based upon feasibility study, approval shall be granted to the consumer for installation of SPV system. This approval shall contain maximum permissible capacity of the SPV system and shall be valid for a period of 6 (six) months from the date of approval. 15. The consumer shall install a SPV system (within permitted capacity limits) and request the DISCOM authorities for inspection within 6 months of receiving approval. 16. Upon receiving consumer s request, inspection of equipment, circuitry and meter shall be carried out under the supervision of nodal authority and the SPV system shall be synchronized (On successful outcome of evaluation) within 10 (ten) working days. 17. During the period of synchronization of the SPV with the gird, the DISCOM personnel shall inspect, calibrate and seal the bidirectional meters. DISCOM personnel reserve the right to inspect the entire plant routinely at any time and otherwise in accordance with Electricity Act 2003. 18. Guidelines on Billing and Payment: i. The consumer shall receive a net import/export bill indicating either net export to the grid or net import from the grid. ii. In case of net import bill, consumer shall settle the same as per existing norms. If it is a net export bill, then credit amount shall be carry forward to next month for adjustment against next month import bill. No interest will be payable on this credit forward amount. Net credit available in his account will be refunded Page 4 of 6

twice in a year based on June and December Month bills of each year. Net Credit amount payable will be deposited by DISCOM in consumer s bank account bearing a/c number provided by consumer at the stage of application, by June and December month end as the case may be. The amount payable for net export of energy will be based on pooled cost decided by APERC for that year. iii. iv. 2 months net bill should be submitted by vendors to NREDCAP to claim subsidy. DISCOMs shall effect suitable changes in the billing software to capture the impact of above guidelines. v. Consumer shall file application in the attached Format. Page 5 of 6

Appendix-A Note: 1) The schematic diagram shown is a model Solar net metering system. 2) Isolation transformer and solar energy meter are desirable, but not essential. Page 6 of 6