PRODUCT INSTALLATION GUIDE

Similar documents
PRODUCT INSTALLATION GUIDE

INSTALLATION / MAINTENANCE

Page 1. File: Motolight caliper one-piece Date: 8/14/2006

3-5 Hours Professional installation recommended

= Experienced

3-5 Hours Professional installation recommended

I N S T A L L A T I O N G U I D E

Dodge Cummins Positive Air Shutoff

Ford 7.3L Powerstroke Positive Air Shutoff

3.5-4 GENERIC POSITIVE AIR SHUTOFF

and Original Series Pickup Lift Mounting Instructions Fleetside Chevy & GMC Trucks Fleetside 4-door Chevy & GMC Trucks T-100

Dodge Cummins Positive Air Shutoff

Dodge Cummins Positive Air Shutoff

Slope Detector IV Installation Instructions

Dodge Cummins Positive Air Shutoff

I N S T A L L A T I O N G U I D E. Chevrolet Silverado / GMC Sierra - Ext Cab * A (Diesel Only)

Dodge Cummins Positive Air Shutoff

Race Sport Lighting RSUKIT LED UNDERBODY KIT INSTALLATION GUIDE

3-5 Hours Professional installation recommended

3-5 Hours Professional installation recommended

Dodge Cummins Positive Air Shutoff

Technical Installation Manual

CANOPY WIRING PATCH KIT INSTALLATION INSTRUCTIONS Holden Colorado RG

2-3 Hours Professional installation recommended

2-3 Hours Professional installation recommended

LOOKOUT LED LIGHT BAR INSTALLATION MANUAL 7900 SERIES

GEN 3 LED LIGHT BAR INSTALLATION MANUAL Model 7840-A 44"

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

3-5 Hours Professional installation recommended

Trail Rocker Installation

AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

and Original Series Pickup Lift Mounting Instructions T-150-T T-150 PART#5177 T-150-T

Double-check to ensure that all of the parts are included in your shipment. Please immediately contact 3dCarbon if you are missing any part.

I N S T A L L A T I O N G U I D E

INSTRUCTION, TRAIL CHARGER KIT P/N

Page 1. File: Motolight caliper one-piece Harley Date: 8/15/2006

I N S T A L L A T I O N G U I D E. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

Ford 6.7L Powerstroke Positive Air Shutoff

2-3 Hours Professional installation recommended

= Experienced

INSTALLATION INSTRUCTIONS TRAILER HITCH MAIN HARNESS KIT

POWERED RUNNING BOARDS INSTALLATION MANUAL

Splicing Procedures 4. 2 Insert the new wire between the parted strands. If more than one wire is being spliced, wrap them in opposite directions. Use

Nero 6600H/6601H. Installation Guide. Commercial Vehicle Productivity and Security. Antenna Configuration

Ford 6.7L Installation of the Guardian Safety System

GM 6.6L (LLY, LZB, LMM) Duramax Positive Air Shutoff 2.5 CAC TUBES

AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

3-5 Hours Professional installation recommended

GENUINE PARTS INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL. Middle. Def tank. Standard. Middle. Standard. Def tank WARNING. Level of Difficulty CAUTION. Parts List.

Important: Please read these instructions carefully and completely before starting the installation. TITAN Fuel Tanks INSTALLATION INSTRUCTIONS

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

RoadRelay 4. Installation Guide

WOT Box Installation Instructions VW / Audi

and Original Series Pickup Lift Mounting Instructions Fullsize Nissan Titan Trucks present T-420 BOLT-ON GUSSET PART#5257

INSTALLATION GUIDE. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

INSTALLATION MANUAL SPECTRUM BRAKE CONTROL

I N S T A L L A T I O N G U I D E. Ram 1500 Crew Cab A Ram 2500/3500 Crew Cab A

I N S T A L L A T I O N G U I D E. AMP RESEARCH TECH SUPPORT (Press 2) Monday - Friday, 6:00 AM - 5:00 PM PST

2015 Mustang Lightbar (All Models) CDC#

SELF DRILL SCREWS FILLER STRIP

GM 6.6L (LML) Duramax Positive Air Shutoff 2.5 CAC TUBES

Applicable to the Following Part Numbers. Notes and Maintenance. Torque Specifications. Metric SAE. Use above torque setting unless otherwise noted

I N S T A L L A T I O N G U I D E

3-5 Hours Professional installation recommended

I N S T A L L A T I O N G U I D E. Ford Transit - Single Sided A (All slider and barn door models)

Custom Dynamics Spyder Stingerz Installation Instructions

INFINITY-3 STROBE LED BAR INSTALLATION MANUAL 7700 SERIES

3-5 Hours Professional installation recommended

INFINITY-1 HALOGEN LIGHT BAR INSTALLATION MANUAL 7000 SERIES

Ram 1500 Crew Cab A Ram 2500/3500 Crew Cab A

Installation Guide. Blackhawk G4 and G5 hardware variants, for passenger vehicles, vans and light trucks

I N S T A L L A T I O N G U I D E

JEEP JK4 STEP SLIDER INSTALLATION BD-SS-100-JK4

Sprinter Van A

Track Rocker Installation Instructions

Fitting Instructions: Street Triple from VIN and Street Triple R from VIN A

LEDneon flex. Features & Benefits DOT-FREE ILLUMINATION

ONBOARD AIR SYSTEM FOR ALL VEHICLES APPLICATIONS

and Original Series Pickup Lift Mounting Instructions Fullsize Chevy & GMC Trucks: 1500 & 2500 LD HD & 3500HD BOLT-ON GUSSET

R-SE JK 4 DOOR Step Slider Install Instructions. *If any parts listed are missing or damages please call prior to install.

TJ YJ LJ STEP SLIDER INSTALLATION

LGT-306L / LB Club Car Precedent LED Light Bar Bumper Kit Installation Instructions

Two panel Sequential LED Taillight kit installation guide

CHEVY CAMARO Four panel Sequential LED Taillight kit installation guide

Toyota Tacoma Double Cab up A Toyota Tacoma Access Cab* up A. 3-5 Hours INSTALLATION GUIDE INSTALLATION TIME SKILL LEVEL

Conflicts Note: Toyota Tacoma 2015 LED Bed Lights Preparation. Part Number: Accessory Code: BU1000

IMPORTANT. Tools Needed: (depending upon vehicle) Phillips Screwdriver. Drill & Bit Set. Wire Stripper/ Crimp Tool

Installation Instructions

Assembly instructions Original parking distance control system, Volkswagen

channel damage the internal components and the weight may break the internal wiring or flexible strip.

JEEP JK4 STEP SLIDER INSTALLATION BD-SS-100-JK4

CouplerTec Electronic Rustproofing For All Vehicles

LiteDOT Installation Document

3 in 1 TRAIL CHARGER with LOCKOUT

High Idle Kit Dodge Cummins (24 valve) Dodge Cummins (with APPS on motor) PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION

Installation Instructions PowerBoard Automatic Retracting Running Board

GENUINE PARTS INSTALLATION INSTRUCTIONS

PFadvantage MF 6850/6855; Ideal 9080/9090

PN DODGE CORONET Two panel Sequential LED Taillight kit installation guide. Kit Contents:

Transcription:

PRODUCT INSTALLATION GUIDE MODEL: PRODUCT CODE: PRODUCT DESCRIPTION: 4COMM 4COMMSFK CouplerTec Commercial Heavy Duty Electronic Rustproofing System 12V / 24V Four Capacitive Couplers KIT CONTENTS: ITEM QTY Couplertec Module 1 Capacitive Coupler 4 Capacitive Coupler Covers 4 Alcohol Cleaning Pad 4 Fuse Holder with Ring Terminal 1 Blade Fuse (2Amp) 1 Heat-Shrink Ring Terminal 3 Crimp Heat-Shrink Connector 9 Hex Head Self Tapping Screw 12 PRODUCT TO BE SUPPLIED BY THE INSTALLER. For installation of the CouplerTec System you will need to supply the following: PRODUCT REQUIRED 1. 4mm Double Insulated Auto Cable 2. Cable Ties 3. Split Loom 4. Neutral Cure Silicone TOOLS REQUIRED: 1. Power Drill 2. 6 mm Drill Bit 3. 8mm Socket (5/16") 4. Side Cutter 5. Wire Stripper 6. Crimping Tool 7. Heat Gun or Gas Torch PLEASE READ THE FOLLOWING FITTING INSTRUCTIONS CAREFULLY BEFORE PROCEEDING TO INSTALL THE COUPLERTEC ELECTRONIC RUSTPROOFING SYSTEM. For technical support please contact us from 7 AM to 4 PM CET on business days (Monday to Friday) by phone 00 386 40 80 33 40 or send us an e-mail to info@couplertec.si. 1

Step 1: Select a site to locate the Couplertec Module The module should be mounted on the same side as the vehicles main/start battery. The module can be mounted either horizontally or vertically. Try and locate the module in a site that will not interfere with normal vehicle repair or maintenance, and preferably a site where the two LED indicators will be visible. IMPORTANT INFORMATION: DO NOT connect the Module to Auxiliary Batteries! Step 2: Selecting sites to locate the Capacitive Couplers The Capacitive Coupler sites should be evenly located over the vehicle/machine with a minimum distance of 1.5m between Capacitive Coupler sites. Locate the Capacitive Couplers as high as possible on the body of the Vehicle /Machine in positions where they will not be subjected to any possible damage. The Capacitive Coupler site must be: A painted metal surface which is part of the vehicles main structure e.g. Cab, Chassis or Body Flat (no contoured surfaces or indentations) Large enough to accommodate the entire surface area of the Capacitive Coupler Free of holes Free of joins in the metal work Free of spot welds, welding slag/spikes Well painted with no scratches (if in doubt, lightly sand and apply two coats of quick dry enamel paint to the area). (FIGURE: 1): Example diagram of a truck installation Modul Capacitive coupler Earth 2

Step 3: Fitting the CouplerTec Module Drill two 6mm holes in each of the modules two base wings. (refer figure: 2) (FIGURE: 2) Holes for fitting Base Wing Affix the module to the vehicle/ machine using the Hex Head Self Tapping Screws. (before affixing, ensure that there is nothing behind the location that can be damaged by the self tapping screws). Base Wing Holes for fitting Step 4: Connecting the Module to the battery/batteries Connect the pre-wired half of the fuse holder (the ring terminal) to the positive (+) battery terminal. For 24V set-up refer to figure 4 to determine the correct (+) battery terminal. (FIGURE: 3): 12V BATTERY SET-UP Fuse Holder Module Route the RED wire from the Module to the fuse holder, cut to length and crimp to the other half of the fuse holder using a crimp heat-shrink connector. Use a heat gun to seal the heat-shrink connector. 12V Ground IMPORTANT INFORMATION: DO NOT insert the fuse at this stage! Route the BLACK wire from the Module to the negative (-) battery terminal and cut to length, crimp on a Ring Terminal. Use a heat gun to seal the heat-shrink on the ring terminal connection. (FIGURE: 4): 24V BATTERY SET-UP Fuse Holder Module Connect the ring terminal to the negative (-) battery terminal. (for 24V set-up refer to figure 4 to determine the correct (-) battery terminal) 12V 12V Ground IMPORTANT INFORMATION: Be sure to avoid positioning wires too close to hot or moving parts that may melt or pinch the wires. Protect all wiring with split loom. Ensure that all wiring cannot be damaged or torn off in normal working environments. Secure all wiring firmly with cable ties or equivalent alternative. 3

Step 5: Routing the BLUE Capacitive Coupler wires The BLUE Capacitive Coupler Wires should be routed towards the Capacitive Coupler sites at the FRONT of the vehicle/machine. (refer to figure: 5) Route each BLUE wire from the Module towards the selected Capacitive Coupler site and cut to length, or extend if necessary using 4mm Auto wire. Connect the BLUE wire (or extended wire) to the Capacitive Coupler wire using the supplied crimp heat-shrink connector. After crimping the connection, use a heat gun to seal the heat-shrink connection. Step 6: Fit Capacitive Coupler and Capacitive Coupler Covers Refer to Page 7 for fitting instructions. Step 7: Routing the GREEN / YELLOW Earth wire The GREEN/YELLOW wire MUST be routed in the same direction as the BLUE wires. Find an existing screw/bolt at the very FRONT extremity of the vehicle/machine to earth the wire. Route the GREEN/YELLOW wire to the selected location, extend the wire if necessary using 4mm auto cable, crimp on a heat-shrink ring terminal and then seal the crimp connection using a heat gun. Terminate the wire under the existing screw/bolt ensuring a good earth. (refer to figure: 5) (FIGURE: 5): Example diagram for a Truck installation - BLUE wires running to the FRONT Capacitive Coupler locations. Modul Capacitive coupler Earth IMPORTANT INFORMATION: Be sure to avoid positioning wires too close to hot or moving parts that may melt or pinch the wires. Protect all wiring with split loom. Ensure that all wiring cannot be damaged or torn off in normal working environments. Secure all wiring firmly with cable ties or equivalent alternative. 4

Step 8: Routing the WHITE Capacitive Coupler wires The WHITE Capacitive Coupler Wires should be routed towards the Capacitive Coupler sites at the REAR of the vehicle/machine. (refer to figure: 5) Route each WHITE wire from the Module towards the selected Capacitive Coupler site and cut to length, or extend if necessary using 4mm Auto wire. Connect the WHITE wire (or extended wire) to the Capacitive Coupler wire using the supplied crimp heat-shrink connector. After crimping the connection, use a heat gun to seal the heat-shrink connection. Step 9: Fit Capacitive Couplers and Capacitive Coupler Covers Refer: Fitting instructions (p7). Step 10: Routing the GREEN Earth wire The GREEN wire MUST be routed in the same direction as the WHITE wires. Find an existing screw/bolt at the very REAR extremity of the vehicle/machine to earth the wire. (refer to figure: 5) Route the GREEN wire to the selected location, extend the wire if necessary using 4mm auto cable, crimp on a heat-shrink ring terminal and then seal the crimp connection using a heat gun. Terminate the wire under the existing screw/bolt ensuring a good earth. (FIGURE: 6): Example diagram for a Truck installation - WHITE wires running to the REAR Capacitive Coupler locations. Modul Capacitive coupler Earth IMPORTANT INFORMATION: Be sure to avoid positioning wires too close to hot or moving parts that may melt or pinch the wires. Protect all wiring with split loom. Ensure that all wiring cannot be damaged or torn off in normal working environments. Secure all wiring firmly with cable ties or equivalent alternative. Step 11: Check Installation Check all wiring connections to ensure that they are secure and sealed correctly. Ensure that the Capacitive Couplers are all affixed to the body/chassis of the vehicle. Step 12: Insert the Fuse 5

Insert the fuse into the fuse holder and observe the modules LED's to confirm Normal Operation Mode (refer Modes of operation). 6

Modes of operation The Module has three modes of operation, which are: 1. Start-up Mode When the system is started using a 12V Power Supply: The modules Green LED will illuminate for 30 seconds whilst the system configures itself. When the system is started using a 24V Power Supply: The Green LED on the module will illuminate for 10 seconds, this will be followed by the Red LED illuminating for 30 seconds whilst the system configures itself. 2. Normal Operation Mode The modules Green LED will flash continuously confirming that the system is functioning correctly. 3. Fault Mode The modules Red LED will flash upon the detection of a fault. The fault indicators are: - Red LED flashing continuously: This indicates that the module has detected a Dead Short on Channel A - White Capacitive Coupler wiring. In this instance Channel A will be shut down, but Channel B will continue to function. - Red LED flashing continuously with the Green LED constantly illuminated: This indicates that the module has detected a Dead Short on Channel B - Blue Capacitive Coupler wiring. In this instance Channel B will be shut down, but Channel A will continue to function. - Red & Green LEDs flashing together 10 times every 30 seconds: This indicates Low, meaning that the vehicles battery level has dropped below the minimum input requirement and that the module has shut itself down to protect the battery. (FIGURE: 7): GREEN LED RED LED 7

Fitting the Capacitive Coupler Thoroughly clean the site where the Capacitive Coupler is to be located using the alcohol cleaning pad. Remove any oil, wax or dirt. For extremely dirty sites, use white spirits or similar with a rag to clean the site, followed by the use of the alcohol cleaning pad. Before affixing the Capacitive Coupler, ensure that all joins between the module and Capacitive Coupler have been completed. Once the site is clean and dry peel off the backing paper from the back of the Capacitive Coupler ready to secure (don t touch the adhesive surface). The Capacitive Coupler must be affixed in an upright position with the wire facing downwards (refer figure 8), firmly press the Capacitive Coupler onto the prepared site making sure that there are no bubbles under the Capacitive Coupler. The Capacitive Coupler must be 100% in contact with the painted metal surface. IMPORTANT INFORMATION: DO NOT install the Capacitive Coupler in an upside down position. Always install the Capacitive Coupler with the wire facing towards the ground. If you are locating Capacitive Couplers on the underside of the vehicles body or chassis rails, or other areas that may potentially be exposed to water, then you must;completely dome over the entire Capacitive Coupler including the wire with a Neutral Cure Silicone Sealant ensuring that the edges of the Capacitive Coupler are sealed to the paintwork. Fitting the Capacitive Coupler (FIGURE: 8) Ground Turn the Capacitive Coupler Cover upside down (refer Figure: 9). Completely fill the inside of the Capacitive Coupler Cover with a Neutral Cure Silicone. (FIGURE: 9) Screw Holes Fill with Neutral Cure Silicone Hole for Coupler Wire Turn the Capacitive Coupler Cover upright and push the cover over the Capacitive Coupler ensuring that the wire runs through the hole in the cover. Press down firmly until the Cover is flush with the painted surface. Run a bead of silicon around the border of the Capacitive Coupler Cover to completely waterproof. Use the Hex Head Self Tapping Screws to secure the Capacitive Coupler Cover to the body of the vehicle. WARNING: Do NOT use the screws in areas where the screws will pentrate to the outside of the vehicle. Ensure that there is nothing behind the location that can be damaged by the self-tapping screws which will used to secure the cover to the vehicle. 8