OPERATION MANUAL. Me2-Series C LB CAPACITY C LB CAPACITY C LB CAPACITY

Similar documents
M REV. M SEPTEMBER 2013

TKL-25 OPERATION MANUAL

OPERATION MANUAL RA-35 & RA-45

M REV. E JUNE 2009 OPERATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44 & GPTLR-55

M REV. H JUNE 2015 OPERATION MANUAL MTB-25 & MTB-30

M REV. J APRIL 2012 OPERATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44 & GPTLR-55

PRODUCT DOCUMENTATION PARTS PORTAL

M REV. D AUGUST 2010 OPERATION MANUAL GPT-25, GPT-3, GPT-4, GPT-5, & GPTWR-3

M REV. C MARCH 2011 OPERATION MANUAL GPSLR-33 & GPSLR-44

INSTALLATION MANUAL RA-35 & RA-45 M REV. D SEPTEMBER 2017

M REV. A AUGUST 2008 OPERATION & MAINTENANCE MANUAL

M AUGUST 2018 MAXON

M REV. B JANUARY 2013 OPERATION & MAINTENANCE MANUAL

INSTRUCTIONS, C2 TORSION SPRING REPLACEMENT

INSTALLATION MANUAL DMD-22 & DMD-33

M APRIL 2012 INSTALLATION MANUAL DMD-22 & DMD-33

PRODUCT DOCUMENTATION PARTS PORTAL RAILIFT & DMD MAXON

GPT-25LM GPT-3LM GPT-4LM GPT-5LM

M REV. A APRIL 2008 INSTALLATION MANUAL

M REV. F AUGUST 2014 INSTALLATION MANUAL

M REV. C AUGUST 2008

M REV B SEPTEMBER 2017

M REV. L AUGUST 2012

INSTALLATION INSTRUCTIONS

TE-20 & INSTALLATION MANUAL M REV. F SEPTEMBER 2015

2017 MAXON LIFT CORP. M REV B NOVEMBER 2017

M SEPTEMBER 2017

M OCTOBER 2017 MAXON

INSTALLATION INSTRUCTIONS FOR WHEELCHAIR LIFT MODEL NO. WL7-vers. C WL7-vers. C-1K

M REV. D APRIL 2008 MAINTENANCE MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

INSTALLATION MANUAL TE-33, TE-33L & TEWR-33 M REV. K DECEMBER 2016

M REV. D APRIL 2008 INSTALLATION MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

M REV. D JANUARY 2003

M-90-1 REV. F SEPTEMBER 2010 INSTALLATION MANUAL RC-2B RC-3B RC-4B RC-5B RC-6B RC-6K

INSTRUCTIONS, NISSAN TITAN TRUCK INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

M REV. B AUGUST 2010 INSTALLATION MANUAL GPTWR-3

MAINTENANCE MANUAL RCM-1250C RCM-1250C AB RCM-1600C RCM-1600C AB Slauson Avenue Santa Fe Springs, CA (800)

M REV. G JANUARY 2003

MAINTENANCE MANUAL FOR WHEELCHAIR LIFT MODEL NO. WL7A

M REV. E APRIL 2011 MAINTENANCE MANUAL 2011 MAXON LIFT CORP.

M JULY 2017 GPTLR Liftgate www. maxonlift.com PRODUCTS, TUK-A-WAY GPTLR Maintenance Manual PRODUCT DOCUMENTATION PARTS PORTAL TUK-A-WAY GPTLR

M REV. B FEBRUARY 2016

RCM-1250 C RCM-1250 C AB RCM-1600 RCM-1600 C AB

M REV. A FEBURARY 2005 MAINTENANCE MANUAL GPTLR-25 & GPTLR-33

M REV. J JUNE 2014 MAINTENANCE MANUAL GPTLR-25, GPTLR-33, GPTLR-44, & GPTLR-55

M REV. M SEPTEMBER 2013

INSTRUCTION, GPT HAND PUMP KIT INSTALLATION GPT KIT P/N

M OCTOBER 2016

INSTRUCTIONS, FLASHING LIGHT INSTALLATION KIT

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTIONS (DROP PIN KIT FOR REPLACEMENT CABLE)

M JUNE 2008 MAINTENANCE MANUAL GPT-25, GPT-3, GPT-4 & GPT-5

INSTRUCTION, GPTLR POWER DOWN HAND PUMP KIT

INSTALLATION MANUAL M REV. G AUGUST 2016

INSTRUCTIONS, RAM DUAL REAR WHEEL TRUCKS INSTALLATION KIT (C2 LIFTGATES)

72-25(B & LM) 72-30(B & LM)

M APRIL 2000 INSTALLATION MANUAL MM Slauson Avenue. Santa Fe Springs, CA (800) LIFT CORP.

M REV. C AUGUST 2017

M REV. K SEPTEMBER Parts Manual Contains: Warranty Information Warnings Parts Ordering Information Exploded View Parts Breakdowns

M REV. J JULY 2008 MAINTENANCE MANUAL RC-2B RC-3B RC-4B RC-5B RC-6B RC-6K

INSTRUCTION, GPT HOSE RETROFIT KIT

M REV. B APRIL 2008 MAINTENANCE MANUAL GPT-25, GPT-3, GPT-4 & GPT-5

INSTRUCTION, DODGE TRUCKS INSTALLATION KIT (C2 LIFTGATES)

M REV. A DECEMBER 2016

Parts Manual Contains:

M REV. H OCTOBER 2005

M MARCH 2002 Parts Manual Contains:

INSTRUCTION, BMR STREET-SIDE CONTROL

M REV. D DECEMBER Parts Manual Contains: Warranty Information Warnings Parts Ordering Information Exploded View Parts Breakdowns

INSTRUCTION, CURRENT GPT HOSE RETROFIT KIT

INSTRUCTION, BMR AUXILIARY CONTROL

LIFT CORP. CUSTOMER SERVICE: (562) (800) FAX: (888) Slauson Ave. Santa Fe Springs, CA TECHNICAL SERVICE: (800)

INSTRUCTIONS, SLEEVED CABLE KITS BMRA (INCLUDES BMRA-CS) KIT P/N

M REV. F APR MAINTENANCE MANUAL GPT-3LM Slauson Avenue. Santa Fe Springs, CA (800)

INSTRUCTION, TE-33 DUAL STEP KIT

INSTRUCTION, GPT HAND PUMP KIT (BUCHER PUMP) INSTALLATION

OWNER'S / OPERATOR'S MANUAL. 650 Series 650 LB Capacity

INSTRUCTION, HALDEX PUMP LVS KIT P/N

SL15/20-6 AND SL15/20-10

ILM PARTS MANUAL. INTERLIFT, INC. a member of MBB

M REV. D MAR MAINTENANCE MANUAL 80-4 LM Slauson Avenue. Santa Fe Springs, CA (800)

Tailgates By THIEMAN WT20, 30 & 40 PLEASE READ AND UNDERSTAND THE CONTENTS OF THIS MANUAL BEFORE OPERATING THE EQUIPMENT. HIEMAN

MAXON - THE LEADER IN LIFTGATES

Maintenance and Lubrication

SL15/20-6 AND SL15/20-10 INSTALLATION INSTRUCTIONS

ALUMINUM CARGO CARRIER WITH FOLDING RAMP

Assembly & Operator s Manual

Maintenance and Lubrication

M REV. D APRIL 2010 BMR-44 PARTS MANUAL

General Guidelines. Instructions for Part # SDSH Safety. It is the user s responsibility to read and follow all instructions.

Slidelift. Operator`s handbook GPS 44 X1 GPS 55 X1. Lift CORP Slauson Avenue. Santa Fe Springs, CA (800)

Rail Gate AMERICA S FIRST NAME IN LIFTGATES. Rail Gate Series and 2000 lbs Capacity

INSTRUCTION, LVTS KIT, GPTLR KIT P/N

WARNING TABLE 3-1: DAILY SAFETY CHECK

Owner s Manual PTN 1250 lb. and 1600 lb. Capacity Rail Liftgate

Daily verifications : 1. Function and completeness of all operating and security equipment

INSTRUCTIONS, RA ROLLER REPLACEMENT

Owners & Installation Manual. READ INSTRUCTIONS - Failure to assemble cover properly will void warranty.

OPERATORS MANUAL AND SAFETY INSTRUCTIONS FOR STAR SAFETY WORK PLATFORMS

Transcription:

M-14-36 AUGUST 2015 OPERATION MANUAL Me2-Series C2 1300 LB CAPACITY C2 1500 LB CAPACITY C2 1600 LB CAPACITY LIFT CORP. To fi nd maintenance & parts information for your Me2 Liftgate, go to www.maxonlift.com. Click the PRODUCTS, Me2 & C2 buttons. Open the Maintenance Manual in the PRODUCT DOCUMENTATION window. MAXON Lift Corp. 2015 KEEP THIS MANUAL IN CAB OF VEHICLE Register your liftgate online at www.maxonlift.com/htm/services/reg.htm. For a free copy of other manuals that pertain to these liftgate models, please visit our website at www.maxonlift.com or contact customer service at (800) 227-4116.

TABLE OF CONTENTS WARNINGS... 4 LIFTGATE TERMINOLOGY... 5 DECALS... 6 FORKLIFT ADVISORY... 8 OPERATING INSTRUCTIONS... 9 ACTIVATING LIFTGATE... 9 UNFOLDING THE PLATFORM... 10 POSITIONING LOAD... 13 RAISING & UNLOADING PLATFORM... 14 UNLOADING VEHICLE... 15 POSITIONING LOAD... 15 LOWERING & UNLOADING PLATFORM... 16 STOWING PLATFORM... 17 TURNING OFF POWER... 20

WARNINGS! WARNING 1. Incorrect operation of this Liftgate can result in serious personal injury. Comply with WARNINGS and Liftgate operating instructions in this manual. Do not allow untrained persons to operate the Liftgate. If you need to replace an Operation Manual, additional copies are available from: MAXON Lift Corp. Customer Service 11921 Slauson Ave Santa Fe Springs, CA 90670 (800) 227-4116 2. Do not exceed rated load capacity of the C2 Liftgates which is 1300 lbs, 1500 lbs and 1,600 lbs. 3. Do not allow any part of your body to be placed under, within, or around any portion of the moving Liftgate or its mechanisms, or in a position that would trap them between the platform and the fl oor of truck body (or between platform and the ground) when Liftgate is operated. 4. Consider the safety and location of bystanders and location of nearby objects when operating the Liftgate. Stand to one side of platform while operating the Liftgate. Be certain that the area the Liftgate will move through during operation is clear of all obstacles. 5. Comply with all attached instruction decals and warning decals. 6. Keep decals clean and legible. If decals are illegible or missing, have them replaced. Get free replacement decals from Maxon. 7. Never drive a forklift on the Liftgate platform. 8. Do not move vehicle unless Liftgate is correctly stowed. 9. Correctly stow platform when not in use. Extended platforms could create a hazard for people and vehicles passing by. 10. A correctly installed Liftgate will operate smoothly and reasonably quiet. The only noticeable noise, during Liftgate operation, is from the power unit while the platform is being raised. Listen for scraping, grating and binding noises and have the problem corrected before continuing to operate the Liftgate. 11. Above all, USE GOOD COMMON SENSE when operating this Liftgate. 12. Never use a cell phone while operating the Liftgate. 4

LIFTGATE TERMINOLOGY PLATFORM LATCH CYLINDER COLUMN MAIN FRAME LIFTGATE CONTROL PLATFORM CHAIN COVER PLATFORM LATCH LIFT ARM FLIPOVER WITH RAMP (AS EQUIPPED) PLATFORM PARALLEL ARM TORSION SPRING & HINGE TUBE (AS EQUIPPED) C2 PICKUP LIFTGATE SHOWN FIG. 5-1 5

DECALS NOTE: Ensure there is no residue, dirt, or corrosion where decals are attached. If neccessary, clean surface before attaching decals. OIL CAUTION DECAL P/N 295317 CAPACITY DECAL P/N 220386-03 DECAL P/N 295597 CAPACITY DECAL P/N 220386 DECAL F DECAL H CAPACITY DECAL P/N 224751 DECAL J P/N 288215-01 DECAL E DECAL C DECAL A DECAL B DECAL D DECAL G P/N 288215-01 DECAL J P/N 288215-01 C2 PICKUP LIFTGATE SHOWN FIG. 6-1 6

WARNINGS, CAUTIONS & INSTRUCTIONS DECAL SHEET P/N 288215-01 FIG. 7-1 7

FORKLIFT ADVISORY! WARNING Keep forklift OFF of platform. FIG. 8-1 FIG. 8-2 8

OPERATING INSTRUCTIONS ACTIVATING LIFTGATE 1. Apply power to Liftgate by pushing power switch on the Liftgate control (FIG. 9-1). Amber POWER ON light is turned on when power is applied. AMBER LIGHT POWER SWITCH NOTE: Liftgate control allows a 90 second window of time to operate Liftgate after pushing the Liftgate activated switch 2 times. Each time the toggle switch is positioned to UP or DN position, the operating time is extend by 90 seconds. After 90 seconds without activity, the control will become deactivated. POWER ON SWITCH & INDICATOR LIGHT FIG. 9-1 2. Activate the Liftgate by pushing ACTIVATED switch 2 times in one second (FIG. 9-2). Red ACTIVATED light is turned on when Liftgate is activated. ACTIVATE LIFTGATE SWITCH RED LIGHT ACTIVATE LIFTGATE SWITCH & INDICATOR LIGHT FIG. 9-2 9

1. To pressurize the hydraulic system, hold the control switch UP for 1 second and release (FIG. 10-1). UNFOLDING THE PLATFORM CONTROL SWITCH UP FIG. 10-1 2. If necessary, remove lock from LH platform latch (FIG. 10-2). Release LH latch by pulling to the side until free of pin (FIG. 10-2). Then, rotate latch down. PIN LOCK LH LATCH UNLATCHING PLATFORM FROM LH COLUMN FIG. 10-2 10

! WARNING Never operate control switch or stand in the path of platform while unfolding the platform. 3. If necessary, remove lock from RH platform latch (FIG. 11-1). Standing to side of the RH column, hold top of platform with one hand. Use other hand to push RH platform latch to the side until free of platform pin (FIG. 11-1). Then, unfold platform (FIG. 11-1). LOCK RH LATCH PIN PLATFORM UNLATCHING & UNFOLDING PLATFORM (RH SIDE VIEW) FIG. 11-1 4. If platform is equipped with fl ipover, unfold fl ipover (FIG. 11-2). FLIPOVER PLATFORM UNFOLDING FLIPOVER FIG. 11-2 11

UNFOLDING THE PLATFORM - Continued 5. Use control switch to lower (DN) platform to the ground (FIG. 12-1). Release switch when platform reaches ground level. LOWERING PLATFORM TO THE GROUND FIG. 12-1 12

Place all loads as close as possible to the inboard edge of the platform with heaviest part toward the pickup bed as shown in FIG. 13-1. Move loads across the ramp (FIG. 13-1) to the platform, but never rest or raise loads solely on the fl ipover and ramp portion. LOADING VEHICLE POSITIONING LOAD! WARNING A load should never extend past the edges of the platform. Do not place unstable loads on platform, do not allow load to exceed lifting capacity of Liftgate, and do not ride on the platform. INBOARD EDGE LOADING PLATFORM AT GROUND LEVEL FIG. 13-1 13

RAISING & UNLOADING PLATFORM 1. Use switch to raise (UP) platform from ground level to bed height (FIG. 14-1). Release switch when platform reaches bed height. 2. Carefully move the load into vehicle (FIG. 14-1). RAISING LOADED PLATFORM TO BED HEIGHT FIG. 14-1 14

UNLOADING VEHICLE POSITIONING LOAD Pulling the load from vehicle to platform can result in a fall from platform and serious injury. When unloading vehicle, always push the load out on the platform. Unload the vehicle at bed level (FIG. 15-1) as follows. Push load out of the vehicle to correct position on the platform. Place all loads as close as possible to the inboard edge of the platform with heaviest part toward the vehicle body as shown in FIG. 15-1.! WARNING A load should never extend past the edges of the platform. Do not place unstable loads on platform, do not allow load to exceed lifting capacity of Liftgate, and do not ride on the platform.! WARNING INBOARD EDGE MOVING LOAD ON PLATFORM FIG. 15-1 15

LOWERING & UNLOADING PLATFORM! WARNING Before lowering platform, make sure area surrounding platform is clear of people and objects. 1. Use control switch to lower (DN) platform and load to the ground (FIG. 16-1). Release switch when platform reaches ground level. 2. Carefully move load off platform (FIG. 16-1) and then move it to a place where it will not become a hazard for people and other vehicles. If there is more to unload from vehicle, repeat the previous UNLOADING VEHICLE steps for each load. When unloading is fi nished, use STOWING PLATFORM procedure in this manual. UNLOADING PLATFORM AT GROUND LEVEL FIG. 16-1 16

STOWING PLATFORM 1. Use switch to raise (UP) platform from ground level to bed height (FIG. 17-1). Release switch when platform reaches bed height. RAISING PLATFORM TO BED HEIGHT FIG. 17-1 2. If platform is equipped with fl ipover, fold fl ipover (FIG. 17-2). PLATFORM FLIPOVER FOLDING FLIPOVER FIG. 17-2 3. Fold platform upright against the columns (FIG. 17-3). PLATFORM FOLDING PLATFORM FIG. 17-3 17

STOWING PLATFORM - Continued 4. Latch platform pin to RH column (FIG. 18-1). Repeat for LH column (FIG. 18-2). LATCH PIN LATCHING PLATFORM TO RH COLUMN FIG. 18-1 LATCH PIN LATCHING PLATFORM TO LH COLUMN FIG. 18-2 18

5. If necessary, lock latch to platform pin on the RH column or LH column (FIGS. 19-1 and 19-2). PIN LOCK PLATFORM LOCKED TO RH COLUMN FIG. 19-1 PIN LOCK PLATFORM LOCKED TO LH COLUMN FIG. 19-2 19

TURNING OFF POWER 1. Deactivate the Liftgate by pushing ACTIVATED switch 2 times in one second (FIG. 20-1). Red ACTIVATED light is off when Liftgate is deactivated. ACTIVATE LIFTGATE SWITCH RED LIGHT ACTIVATE LIFTGATE SWITCH & INDICATOR LIGHT FIG. 20-1 2. Turn off power to Liftgate by pushing power switch on the Liftgate control (FIG. 20-2). Amber POWER ON light is off when power switch is turned off. AMBER LIGHT POWER SWITCH POWER ON SWITCH & INDICATOR LIGHT FIG. 20-2 3. Liftgate is ready for transport. 20