XEROX WORKCENTRE 4150

Similar documents
XEROX PHASER 3635 MFP

TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS OKIDATA B710/720/730 SERIES TONER CARTRIDGE

ML-3712 MLT-D205 TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS XEROX PHASER 3320 TONER CARTRIDGE

THE ML-3471 TONER CARTRIDGE

HP ENTERPRISE 600 M651/M680 SERIES TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

1320 TO P2015 TONER CARTRIDGE CONVERSION INSTRUCTIONS

IMAGECLASS MF7200 SERIES (EP105) TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

KONICA MINOLTA MAGICOLOR

MINOLTA MAGICOLOR 5430/5440/5450 CARTRIDGE REMANUFACTURING INSTRUCTIONS

TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS LASERJET P1505 SERIES TONER CARTRIDGE

Technical Document. Panafax UF-890 (actually revisiting the Panafax UF-550)

LEXMARK C780 CARTRIDGE REMANUFACTURING INSTRUCTIONS LEXMARK C780 TONER CARTRIDGE

HP LASERJET

HP 5500 COLOR LASER PRINTER W/TONER CARTRIDGES

Sharp AR-160 OPC Cartridges DOC-0270

Conversion Kit for HP1200 Cartridge

TPE CC1997CRS HP M252/MFP M277 X TONER HOPPER 60GRMS FILL(WITH SEAL) OEM HP M252/MFP M277 (CF400A-CF403A

INSTALLATION INSTRUCTIONS REPAIR SEAL KIT PowerSurvivor 40E

DRUM UNIT REMANUFACTURING INSTRUCTIONS

DELL C 5100 TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

Installation Manual TWM Performance Short Shifter 2008 Mitsubishi Lancer

Installation Manual TWM Performance Short Shifter Subaru STi 2008+

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

2003 CR-V - A/T Shift Cable Replacement-Print Preview

Installation instructions for Alpha Racing Quickshifter/Blipper for a pre-2014 S1000RR

3.2 DRIVE TORQUE HUB. Roll, Leak and Brake Testing SECTION 3 - CHASSIS & TURNTABLE. 3-2 JLG Lift

5 Removal and replacement

Oreck Magnesium Series Service Manual. The Oreck Manufacturing Company

Maintenance Information

Southwest Windpower Instruction Sheet AIR-X Circuit Replacement Kit

Installation Manual TWM Performance Short Shifter Subaru Forester up to 2005

Maintenance Information

Short-throw Shifter Installation Guide

Model EL8500 Series. Bagless Upright. Assembly/Disassembly Guide 1

Maintenance Information

Maintenance Information

Product Description. Product Numbers. Warning/Caution Notations. Required Tools. Wiring. Prerequisites

Primus Wind Power. AIR Circuit Replacement Instructions

SAFETY THIS PRODUCT IS FOR OFFROAD USE ONLY. ALL LIABILITY FOR INSTALLATION AND USE RESTS WITH THE OWNER.

Blue Jay Rodless Cylinder BC MS. Track Repair Manual 1996 & 2012 THE EASTMAN EASTMAN. All End Caps Black for Models

Installation Manual TWM Performance Short Shifter Cobalt SS/SC, SS/TC, HHR SS, Ion Redline and Saab 9-3

KJ09168BK Renegade 1.5 Lift Kit

THIS GUIDE IS INTENDED FOR DEALERS AND SOLAR COMFORT TECHNICIANS ONLY AND IS NOT MEANT OR INTENDED TO BE REPRODUCED OR DISTRIBUTED TO THE CONSUMER

Laser BILLET Main Grille

Installation Manual TWM Performance Short Shift Kit Stage 1 and Stage 2 MazdaSpeed 6

Upper Class Grille Main grille INSERT - #54127 / #54131 / #54133 / #51127 / #51131 / 51133

Maintenance Adjustments

Service Handbook High-Pressure Washer Pump

TORCH Main Grille Main grille INSERT - # / # Chevrolet Silverado

Polaris 9300 Series Robotic Cleaner

EDGE The Laser Printer Tech Quarterly from Liberty Parts Team Summer 2014

Power Steering Rack Leak from Right Side: Overhaul Procedure

Installation Instructions

Detroit Speed, Inc. Electric Headlight Door Kit Corvette P/N: &

Dispenser Parts Part Description Replacement SKU

Rollstar Shade Installation Instructions

Detroit Speed, Inc. Electric Headlight Door Kit Corvette P/N: &

Maintenance Instructions. World Leader in Modular Torque Limiters. JSE AEA Extruder Clutch

DRIVE AXLE Volvo 960 DESCRIPTION & OPERATION AXLE IDENTIFICATION DRIVE AXLES Volvo Differentials & Axle Shafts

Tooling Assistance Center

Top Down Rollstar Shade Installation Instructions

Merkur Scorpio Odometer Repair Instructions

Electric motor testing

SUT-250-S (These instructions are used for SUT-250-SCLC also)

Please try our way first.

LIMITED SLIP DIFFERENTIAL INSTALLATION

Push Start Ignition (05-10 All) Installation

SECTION 4 - FUEL SYSTEMS AND CARBURETION

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM

Operation and care of the Visual Optics Fiber Scopes

SERVICE INSTRUCTIONS,HOOVER - BAGLESS CLEANERS

AmTryke Adult Recumbent Model JT2000 #50-FC-2000

Installation Instructions 7024

Installation Manual TWM Performance Short Shifter Nissan 350Z, 370Z Infiniti G35, G37

Installation Manual TWM Performance Short throw shifter 2001 and up Hyundai Accent

Moddit. How to Install an OS Giken Differential into a

In an effort to do a comprehensive 67,500 mile service article, this is what we found:

Supply Valve Replacement

Current Range Rover Sport STRUT Collection Installation Manual

GruvenParts.com BRASS GM Power Folding Mirror Gear Replacement Instructions. Updated 8/25/2017 Additional Pictures / Tips Posted!

CorkSport ort Mazda 3 Adjustable Shifter Mazdaspeed 3, Mazda 3 6-speed and Mazda3 SkyActiv 6-speed

Creation Date Last Mod Date Model Year Drawings Estimated Time. 5/22/2009 6/15/2009 S120/S90/E min.

Fuser Replacement LJ 1160/1320/P2015

Tru-Billet Climate Control Knob Installation Instructions

Electrically Held to Mechanically Latched Contactor

PIKE DUAL AIR PICTORIAL INSTRUCTIONS. INSTRUCTIONS FOR INSTALLING ENDURO FORK SEALS AND CHANGING SEMI-BATH OIL in RockShox PIKE Dual Air Forks

REVi RX-8 Intake. RX-8 REVi Intake System I PN Installation Instructions. Tools Required:

CorkSport Mazdaspeed 3 ECU Relocation Box Mazdaspeed 3

Trackstar Motorized Folding Shade Installation Instructions

EDGEMERE DUAL CONTROL WIDESPREAD LAVATORY FAUCET INSTALLATION INSTRUCTIONS

LIFT TRUCK SERIES: G35S-2 G40S-2 G45S-2 G40SC-2 G45SC-2 G50SC-2. November 15, 2000 CODE 3150 LT3150-L0 SUBJECT: NEW DRIVE AXLE

AmTryke Adult Recumbent Model HP1000 #50-HC-1000

Periodic Maintenance 7-1

TOYOTA RAV4/HV INTERIOR LIGHT KIT Preparation

MANUFACTURING CO. THE FIRST NAME IN QUALITY COUPLINGS. Installation, Inspection, Operation & Maintenance Guide. Model 880 Coupling IMPORTANT

Remove Air Cleaner Cover and. Filter

Integrated Engineering MK7/MQB Cold Air Intake Install Guide IEINCI2 & IEINCI8

INSTALLATION INSTRUCTIONS PATIENCE

Motion System Components Diagram. Note: #2 Mirror Cover and X-Axis Motor Cover have been removed for visibility. Maintenance.

Transcription:

XEROX WORKCENTRE 4150 TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS 013R00623 DRUM UNIT

REMANUFACTURING THE XEROX WORKCENTRE 4150 DRUM UNIT By Enrique E. Estura, Daniel Reyes, and the Technical Staff at UniNet Introduced to the market in September 2008, the Xerox WorkCentre 4150 is a machine that operates with a fax motor capable of printing 45 ppm at 1200 DPI. This machine has a separate toner and drum unit for printing cycles of 20,000 and 55,000 pages respectively. The remanufacturing instructions for the toner cartridge are dealt with in a separate article written by Mike Josiah. The following remanufacturing steps relate to the OEM part number 013R00623 which, contrary to what happens with the toner cartridge, is a multi-region device chipped to that effect. Both the toner and drum unit use RF chips that require replacement each cycle. The xerographic system used in this model is known as dual components which necessarily implies conjunction of toner and carrier to perform the image development. The drum unit, which is of immediate concern, is where the machine s xerographic system centers image creation and its development all carried out in a rather complex module which require sub systems approach for disassembly, cleaning, and component replacement. To work with this drum unit all that is needed are the basic tools found in any remanufacturing shop for laser toner cartridges including a toner vacuum cleaner. There is a striking similarity in equipment between the Xerox WorkCentre 4150 and the Samsung SCX-6555. However, there are also extreme differences in the programming and functionality, which impedes interchangeability of toner and drum units including chips. To say that this drum unit is easy to remanufacture would be an understatement of the task involved mainly due to the numerous details to take into account for the work to be successful. We have created this instruction not only for disassembling sub-components in a precise order, but to also attend to each without leaving room for doubts when putting everything back as it was. Due to the fact that insertion and retrieval of this unit from the machine is performed perpendicularly we will refer to the part that goes in first as front and back for the part put into the machine last. The drum unit is divided into an image section and a development section, and as such we will proceed to disassemble and remanufacture. Once the work is completed on each will be put them together again leaving it ready for use.

REQUIRED TOOLS 1. Philips head screwdriver 2. Small common screwdriver 3. Needle nose pliers 4. Toner approved vacuum 5. Cleaning brush 1/2 REQUIRED SUPPLIES 1. Dedicated developer carrier (338 grams) 2. New OPC drum 3. New wiper blade 4. New PCR roller 5. Replacement RF chip for drum unit 013R00623 6. Conductive grease 7. Q-tips 8. Lubricant powder INITIAL DISASSEMBLY 1. Remove the four Phillips screws from the back cover, and with the needle-nose pliers, remove the plastic coupling from the developer mixer shaft.

2. Remove the two screws holding the front of the cover and undo the plastic tab. 3. With the small screwdriver, pry the cover open and remove it from the unit. Be aware that a certain amount of toner might fall out of the orifice where the helicoid shaft turns. Be prepared to vacuum this area immediately.

4. Now proceed to remove the four Phillips screws from the inside plate with contacts. 5. Removing the mentioned plate gives access to the Erasing Lamp electrical connections (red and black wires respectively) ending at the white connector. Open the connector.

6. Return to the opposite cover, and with the small screwdriver, pry the back cover to remove it from the unit. 7. With the above steps, the cartridge halves can now be separated into OPC and developing sections.

8. Begin working with the OPC section removing the OPC drive coupling, prying with the screwdriver at three separate points until it comes out completely. Note that the shaft end has a flat section to match with the coupling. 9. Remove the intermediary gear, and finally the helical shaft gear.

10. Remove the helical shaft slowly and clean any residual toner with the vacuum cleaner if need be while extracting it. REMOVAL OF THE PCR ASSEMBLY 11. Proceed next to remove the PCR assembly held by four Phillips screws. Take out the first one located in the back as shown, then the one up front and finally one on each side.

12. Pull out one end of the assembly and slide it out of position. 13. To remove the PCR, press it toward the gear to loosen the other end, and take it out from the assembly.

14. Thoroughly vacuum the foam roller and any debris accumulated beneath the roller, using for this purpose a narrow cleaning brush. The brush will help to loosen any debris that is difficult to vacuum from the small waste bin. 15. Clean the PCR roller with a soft cloth and install gear side first, and then the other end. Apply a very small amount of conductive grease on the shaft.

OPC DRUM UNIT DISASSEMBLY 16. Slightly push the shaft from the end where it connects to the metal grounding ring. This will create enough protrusion in the other end to grasp it, to take the metal bushing and the cross pin from the shaft. Be very careful not to lose these components. 17. Slide the shaft out and lift the OPC from where it rests.

18. On the contact side undo part of the strip out of the upper plastic post and leave it at an angle as shown. 19. Push the erasing lamp from the socket and take it out completely as shown.

20. Remove both screws securing the wiper blade, lift the front end, and slide the blade out of position. 21. Vacuum the waste bin completely including the inside of the tube where the helical shaft turns.

ASSEMBLY 22. Insert the proper end of the wiper blade in the support and then the other end. Tighten up with the two screws. 23. Insert the erasing lamp and firmly push the metal ground contact against the plastic post.

24. Take the OPC and visually align the slot in the hub with the slot in the molding where the cross pin rests. Insert the OPC shaft until reaching the hole in the shaft. Mount the cross pin before pushing the shaft all the way in. 25. Now slide the bronze bushing in and push the shaft further in until the other end touches the OPC metal grounding ring.

26. Insert and slide the helical shaft in its place until the shaft appears on the other end. Fit the drive gear, the intermediary, and finally the OPC gear. 27. Mount the PCR assembly pointing the rounded shaft end first and then the rest of the assembly in place. Secure the ends with proper screws first, and then the laterals.

28. Leave the OPC section for a moment and start working on the developer section. Remove the four screws belonging to the magnetic roller protection. 29. Displace the sliding cover enough to allow removal of the entire protection.

30. Rotate the magnetic roller in the opposite direction to its normal position to allow concentration of the carrier in a collecting point and to vacuum it. Slide the tip of the hose to take the entire carrier from the surface and rotating the magnetic roller until all of it is lifted. Be careful not to damage the surface of the magnetic roller. Continue cleaning of the mixer until all material is cleaned off. 31. Only in case of replacement consider taking the doctor blade out, otherwise perform cleaning without removal. The sealing that it is used with the doctor blade requires careful worktop put it right. Measuring the distance between the doctor blade working edge and the magnetic roller surface gives 0.80 mm gap that must be observed when installing the blade.

32. Once the cleaning process is done load the new carrier with even quantities inside the mixer cavity. 33. Install the magnetic roller protection aligning first all tabs and once all are locked, seat the opposite side to allow closing and securing with the screws.

34. Now take the image section and match the mounting holes with the corresponding couplers, and with one section next to the other proceed to close one against the other until the magnetic roller seats practically against the OPC. 35. Fit the inside contact plate and secure with the four screws.

36. Now install the external front end with the two screws and mount the plastic coupling for the mixer. 37. Install the back end.

38. Install a new RF chip for use in the Xerox WorkCentre 4150. BASIC REPETITIVE DEFECTS PCR roller: 44.00 mm OPC drum: 94.25 mm Magnetic roller: 78.54 mm