A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

New Federal Regulations for Internal Combustion Engines. Doug Parce

Federal Engine Regulations NSPS JJJJ/NESHAP ZZZZ

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

RICE NESHAP Frequently Asked Questions (FAQ)

Permit Holder. Permitted Equipment

RICE MACT / NSPS Update: How to Make Sense of this Difficult Issue

RICE NESHAP Implementation. Ray Lukkarinen, P.E. Stanley Consultants, Inc.

Air Permitting: Municipal Facilities with Emergency Generators

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

RICE NESHAP Finalized Rule Summary Spark Ignited Engines

Regulation No. 3 Changes For Internal Combustion Engines. Christine Hoefler November 14, 2012

U.S. EPA and State Perspectives on Clean Air Act Rules for Stationary/Emergency Engines

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

Electrical Power Generator Use and Procurement Guidance

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

Area Source NESHAPS and Air Permits

RICE NESHAP Finalized Rule Summary Diesel Compression Ignited Engines

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

Permit Holder. Permitted Equipment

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

RICE MACT 40 CFR 63, Subpart ZZZZ. SI Source Requirements 7/18/2013

Regulatory Impacts of Biogas-fired Internal Combustion Engines

August CFR Part 63 Subpart ZZZZ review

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

RICE NESHAP RECORD KEEPING Stationary Engines

Applicable Requirements - NSPS Subpart JJJJ

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Minutes of November 14, Littleton/Englewood IT

Example Notification of Compliance Status Report a

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

STATEMENT OF BASIS Boise Cascade Wood Products, LLC Thorsby Engineered Wood Products Thorsby, Chilton County, Alabama Facility/Permit No.

Workshop B. Managing Engine Compliance Best Practices for a RICE/ICE Compliance Plan. Tuesday, March 22, :45 a.m. to 11 a.m.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

How to Comply with EPA Regulations for Stationary Reciprocating Internal Combustion Engines ( RICE ) Roy Crystal, EPA Region 1 (New England)

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

A Tool for Specifying Diesel Genset Replacements Steve Stassel, Gray Stassel Engineering

Oxidation Catalyst System to satisfy RICE NESHAP (40 CFR Part 63, Subpart ZZZZ) Requirements

Regulatory and Permitting Requirements of Stationary Generators In Delaware

SECTION.1400 NITROGEN OXIDES

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

2018 Diesel & Gas Turbine Sourcing Guide

MAJOR SOURCE OPERATING PERMIT THIRD TITLE V RENEWAL DRAFT

This rule applies to any internal combustion engine rated at 25 brake horsepower or greater.

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

COMPLIANCE ASSISTANCE BULLETIN March Agricultural Internal Combustion Engines

State of New Jersey. Department of Environmental Protection Division of Air Quality

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

AUTHORITY TO CONSTRUCT

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

Bureau of Air Quality Technical Support Document General Permit GP-5 January 31, 2013

NACT 271 Stationary Reciprocating Engines

Facility Name: Chevron Products Company Doraville Terminal City: Doraville County: DeKalb AIRS #: Application #: 40411

RULE 4702 INTERNAL COMBUSTION ENGINES PHASE 2 (Adopted August 21, 2003; Amended June 16, 2005; Amended April 20, 2006; Amended January 18, 2007)

Well Pad Operations. Pennsylvania s GP-5A for Sources at Unconventional Natural Gas Well Sites

EPA Tier 4 and the Electric Power Industry

Air Individual Permit Permit Limits to Avoid NSR

OPERATING PERMIT. Bill Barrett Corporation Bailey Compressor Station

EPA Regulations and Their Affect on Rural Alaska Powerplants Steve Stassel, Gray Stassel Engineering

IAPH Tool Box for Port Clean Air Programs

Printed: April 13, 2016 Page 1 of 35

Metro and you, building together.

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY. Tim Cresswell Tier 4 Product Definition Manager Electric Power Division

City of Fort Worth s Natural Gas Air Quality Study Follow-up on Report Recommendations. August 16, 2011

Presented by: Richard M. Cestone, PE, CHMM Senior Project Engineer Remington & Vernick Engineers For New Jersey Water Environment Association

Appendix K. Final DOC Conditions

General Plan Approval and General Operating Permit BAQ-GPA/GP-5 and Proposed Exemption 38. Citizens Advisory Council Meeting March 19, 2013

STATEMENT OF BASIS. University of Arkansas for Medical Sciences (UAMS) 4301 West Markham St. Little Rock, Arkansas 72205

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Appendix K. DOC Conditions

WRITTEN STATEMENT OF THE MANUFACTURERS OF EMISSION CONTROLS ASSOCIATION ON THE U.S

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

Retrofit Crankcase Ventilation for Diesel Engines

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

Board Administration and Regulatory Coordination Unit. Division 3. Air Resources Board

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

TECHNICAL REVIEW DOCUMENT For OPERATING PERMIT 09OPGA339. Bill Barrett Corporation Bailey Compressor Station Garfield County Source ID

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

Workshop JJ. Permitting Back Up/Emergency Generators Surviving the EPA s New Rules and Regulatory Maze

DEP7007CC Compliance Certification

REGULATIONS OF THE DEPARTMENT OF PROCUREMENT SERVICES FOR CLEAN DIESEL CONTRACTING

PERMIT TO INSTALL. Table of Contents

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Co dba Xcel Energy

Transcription:

Internal Combustion Engines Air Updates 2010 Stationary Source or Non-road Engine? o Regulated stationary source: 1. At point of use for > 12 months or full operating season (3-12 months) Point of use is considered to be where the engine is in operation or continuously connected (not in storage) and ready to activate. For example, an emergency engine connected to the grid and available to provide electricity at any time. It does not include engines in storage, waiting to be deployed for use, and not connected or available to serve as backup power. If an engine is replaced at a point of use with another engine, you consider both engines when calculating consecutive time period. For example, an engine connected to a tub grinder is in place for six months and is replaced with a different engine for another eight months. Because an engine has been at the same point of use for 14 months, the second engine is treated as a stationary source. 2. Not used to propel a motor vehicle 3. Not a non-road engine as defined in 40 CFR 1068.30 Non-road engines are self-propelled or serve a dual purpose by both propelling itself and performing another function (such as garden tractors, off-highway mobile cranes and bulldozers). Used in or on a piece of equipment that is intended to be propelled while performing its function (such as lawnmowers and string trimmers). By itself or in or on a piece of equipment, it is portable or transportable, meaning designed to be and capable of being carried or moved from one location to another (wheels, skids, carrying handles, dolly, trailer, or platform). Must be moved to remain non-road (remember point of use ) Does not include temporary stationary sources, e.g., asphalt plants, concrete batch plants, etc. 1 of 11

Non-road engines attached to & are integral part of temporary stationary source are considered stationary. Permitting o Stationary Engines We do not permit or report emissions from non-road engines. o Construction Permits Might be units that need a permit that didn t obtain at the time of installation Based on when the unit is installed and potential emissions Diesel Engines June 6, 1972 December 14, 1993 o 50 lb/24-hours NO x o 67 HP engine After December 15, 1993 o 40 tons/year NO x o 295 HP engine After May 29, 1995 o Consider Net Emissions Increase Gasoline Engines June 6, 1972 June 4, 1988 o 50 lb/24-hours NO x o 190 HP engine June 5, 1988 - December 14, 1993 o 100 tons/year CO o 52 HP engine After December 15, 1993 o 50 tons/year CO o 26 HP engine After May 29, 1995 o Consider Net Emissions Increase Natural Gas Engines June 6, 1972 December 14, 1993 o 50 lb/24-hours NO x o 94 HP engine After December 15, 1993 o 40 tons/year NO x o 413 HP engine After May 29, 1995 o Consider Net Emissions Increase 2 of 11

May want to take limits in construction permit 500 hr/year may reduce requirements Hours of operation or fuel usage o May reduce or eliminate modeling required Emergency or Limited Use limit your use to only operate in emergency situations with some testing or limited use o Lesser NSPS & NESHAP requirements o Operating Permits If you only need permit due to emissions from an emergency generator for power backup No permit needed Provide report if operate >500 hours in 12 months Engines no longer qualify as an insignificant activity All are affected sources under NESHAP (& maybe NSPS) even if you have no requirements under the rules National Emission Standards for Hazardous Air Pollutants (NESHAP) o Stationary sources o 40 CFR Part 63 Subpart ZZZZ for Reciprocating Internal Combustion Engines 63.6580 o What you need to know to determine applicability and compliance Major or area source of HAP New or existing source Manufacture date of engine Installation date of engine Startup date of engine Fuel combusted: diesel, natural gas, dual fuel, landfill/digester gas Brake horsepower site rating Displacement in liters/cylinder o 3 significant actions, each include regulations for different types of engines Original: June 15, 2004 (Correction: June 26, 2006) Revision: January 18, 2008 Revision: March 3, 2010 3 of 11

Engine Type & Applicable Rules Existing and > 500hp Existing and < 500 hp Major source Yes (2004 rule) 1 Compression Ignition (2010 rule) 4 Compression Ignition (2010 rule) Area source Compression Ignition (2010 rule) 3 New/reconstructed and > 500hp Yes (2004 rule) 1 2, 3 Yes (2008 rule) New/reconstructed and < 500 hp Yes (2008 rule) 2 1 For the 2004 rule, new or reconstructed means that construction or reconstruction of the RICE commenced on or after December 19, 2002. Otherwise, it is existing. 2 For the 2008 rule, new or reconstructed means that construction or reconstruction of the RICE commenced on or after June 12, 2006. Otherwise, it is existing. 3 Horsepower designations do not apply to area sources. 4 Non-emergency CI engines with a site rating >500 HP o Rules for existing spark ignition to be final in August 2010 No requirements until then Existing major < 500 HP & existing area sources 4SLB 2SLB 4SRB Landfill/Digester Gas o No requirements under NESHAP or NSPS Subparts IIII or JJJJ Existing residential, commercial, & institutional at area sources Existing limited use >500 HP at major source Existing emergency >500 HP at major source Existing spark ignition 4SLB >500 HP at major source Existing spark ignition 2SLB >500 HP at major source Existing landfill digester gas >500 HP at major source New reconstructed or constructed on or after 6/12/06 and before 1/1/08 that is non-emergency spark ignition > 250 HP at major source 4 of 11

o No requirements under NESHAP, subject to NSPS (as applicable) New or reconstructed area sources New or reconstructed major sources < 500 HP Limited Use Emergency Non-emergency compression ignition Spark ignition < 250 HP Spark ignition 2SLB Spark ignition 4SRB Landfill/Digester Gas o Limited requirements under NESHAP, subject to NSPS (as applicable) Must submit NESHAP initial notification New reconstructed or constructed > 500 HP at major source o Emergency o Limited Use Limited monitoring, recordkeeping, and reporting Landfill/digester gas that is new reconstructed or constructed > 500 HP at major source Install non-resettable hour meter New or reconstructed and manufactured after 1/1/08 that is emergency spark ignition 4SLB > 250 HP at major source o Existing compression ignition area sources Subject to 3/3/10 rules <300 HP, emergency, and black start Work practice standards o Change oil, inspect air cleaner & hoses periodically Emergency non-resettable hour meter No initial notification or compliance status notification required Non-emergency engines > 300 HP Subject to numerical emission standards for carbon monoxide. o 49 ppmvd @ 15% O 2 for CO or 70% reduction of CO. o May need control equipment to meet limits. o Initial testing required Install a closed crankcase ventilation system or an open crankcase filtration emission control system. 5 of 11

With a displacement of less than 30 liters per cylinder subject to fuel requirements. Non-emergency engines > 500 HP o 23 ppmvd @ 15% O 2 for CO or 70% reduction CO. o Utilizing oxidation catalyst required to follow operating limitations, monitor the pressure drop across the catalyst, and maintain the catalyst inlet temperature. o Initial testing and every 8,760 hours of operation or every three years. o Limited use engines initial testing and every 8,760 hours or every five years. Initial notification required by 8/31/10 Compliance status notification required by 7/2/13 All engines have startup requirements Minimize idling at startup to less than 30 minutes. Compliance Date = 5/3/13 o Existing compression ignition at major sources Subject to 3/3/10 rules <100 HP, emergency, and black start Work practice standards o Change oil, inspect air cleaner & hoses periodically Emergency non-resettable hour meter No initial notification or compliance status notification required Non-emergency engines > 100 HP Subject to numerical emission standards for carbon monoxide or formaldehyde. o 230 ppmvd @ 15% O 2 CO o May need control equipment to meet limits. o Initial testing required Non-emergency engines > 300 HP o 49 ppmvd @ 15% O 2 CO or 70% reduction of CO o Install a closed crankcase ventilation system or an open crankcase filtration emission control system. o With a displacement of less than 30 liters per cylinder subject to fuel requirements. Ultra Low Sulfur Diesel Fuel with sulfur content of 15 ppm maximum 6 of 11

Non-emergency engines > 500 HP o 23 ppmvd @ 15% O 2 CO or 70% reduction of formaldehyde o Utilizing oxidation catalyst required to follow operating limitations, monitor the pressure drop across the catalyst, and maintain the catalyst inlet temperature. o Initial testing and every 8,760 hours of operation or every three years. o Limited use engines - initial testing and every 8,760 hours or every five years. Initial notification required by 8/31/10 Compliance status notification required by 7/2/13 All engines have startup requirements Minimize idling at startup to less than 30 minutes. Compliance Date = 5/3/13 o New or reconstructed spark ignition at major source manufactured after 1/1/08 that is non-emergency spark ignition 4SLB > 250 and < 500 HP Subject to 1/18/08 rules may be subject to NSPS Subject to numerical emission standards for formaldehyde (14 ppmvd @ 15% O 2 ) or carbon monoxide (93% reduction) Operating limitations if using catalyst Initial testing required. Compliance Date = 1/18/08 or upon startup Initial Notification due 7/16/08 or 120 days after startup o Existing and new or reconstructed spark ignition 4SRB at major source >500 HP Subject to 6/15/04 rules, may be subject to NSPS Subject to numerical emission standards for formaldehyde (76% reduction or 350 ppbvd @ 15% O 2 ). Operating limitations using non-selective catalytic reduction. Conduct initial testing and semiannual testing. Compliance Date = 6/15/07 (existing) & 8/16/04 or upon startup (new) Initial Notification due 12/13/04 or 120 days after startup Compliance Status Notification due 8/14/07 (existing) or 10/15/04 or 60 days after compliance date (new) o New or reconstructed compression ignition, 4SLB, and 2SLB >500 HP at major source Subject to 6/15/04 rules, may be subject to NSPS 7 of 11

Subject to numerical emission standards for formaldehyde or carbon monoxide CI formaldehyde (580 ppbvd @ 15% O 2 ) or CO (70% reduction) 2SLB formaldehyde (12 ppmvd @ 15% O 2 ) or CO (58% reduction) 4SLB formaldehyde (14 ppmvd @ 15% O 2 ) or CO (93% reduction) Operating limitations if using catalyst Conduct initial testing and semiannual testing. Compliance Date = 8/16/04 or upon startup Initial Notification due 12/13/04 or 120 days after startup Compliance Status Notification due 10/15/04 or 60 days after compliance date New Source Performance Standards (NSPS) o Stationary sources o What you need to know to determine applicability and compliance Manufacture date of engine Order date of engine Fuel combusted: diesel, natural gas, dual fuel, landfill/digester gas Brake horsepower site rating or KW site rating Displacement in liters/cylinder Certified and labeled per 40 CFR Part 89, 94, or 1039 Fire pump engine? Certified per National Fire Protection Association (NFPA)? Testing conducted on that unit or similar unit? o 40 CFR Part 60 Subpart IIII for Compression Ignition Internal Combustion Engines 60.4200 Final 7/11/06 Proposed amendments 6/8/10 Applicability Engine ordered after 7/11/05 and o Non-fire pump manufactured after 4/1/06 or o Certified NFPA fire pump engine manufactured after 7/1/06 Engine modified or reconstructed after 7/11/05 Emission standards dependant on model year and engine size or displacement in liters/cylinder for NO x, NMHC, CO, & PM Non-emergency: Pre-2007 model year and 2007 and later 8 of 11

Emergency: Pre-2007 model year; 2007 and later; fire pumps; and all > 30 Testing for engines < 30 liters/cylinder Pre-2007 model year o Certified per 40 CFR 80 or 94, performance test of similar unit, or manufacturer data, or control device manufacturer data demonstrating compliance with emission standards OR o Conduct performance test to demonstrate compliance 2007 and later model year o Must be certified Testing for engines > 30 liters/cylinder All model years o Conduct performance test and o Establish operating parameters for continuous monitoring and submit petition to EPA for approval o Conduct annual performance tests Fuel Standards 10/1/07 Low Sulfur Diesel 500 ppm 10/1/10 Displacement <30 liters/cylinder Ultra Low Sulfur Diesel - 15 ppm Emergency Engines Install non-resettable hour meter Keep records Using diesel particulate filter Install backpressure monitor Initial Notification only non-emergency date of construction (installation on site) within 30 days >3,000 HP or; Displacement >10 liters/cylinder or; Pre-2007 model year >175 HP and not certified. o 40 CFR Part 60 Subpart JJJJ for Spark Ignition Internal Combustion Engines 60.4230 Final 1/18/08 Proposed amendments 6/8/10 Applicability Engine modified or reconstructed after 6/12/06 Engine ordered after 6/12/06 and o Engine (except lean burn) > 500 HP manufactured after 7/1/07 9 of 11

o Lean burn > 500 HP and <1,350 HP manufactured after 1/1/08 o Engine < 500 HP manufactured after 7/1/08 o Emergency > 25 HP manufactured after 1/1/09 o Temporary engines certified as non-road engine at stationary source for < 1 year exempt from NSPS Emissions standards vary depending on engine type, fuel, engine HP, and manufacture date NO x, CO, & VOC Installation requirements must meet emission standards > 500 HP (not lean burn) installed after 7/1/09 Lean burn > 500 HP and < 1,350 HP installed after 1/1/10 < 500 HP installed after 7/1/10 Emergency > 25 HP installed after 1/1/11 Gasoline engines - sulfur standards of 30 ppm per gallon average and maximum of 80 ppm per gallon Following engines must be certified: All < 25 HP Gasoline > 25 HP LPG rich burn > 25 HP Others may be certified by manufacturer to comply with standards Certified Engines Must be labeled Must keep maintenance records, operate according to manufacturer s instructions, and keep record from manufacturer that engine meets standards If not required to be certified can purchase certified engine to comply with standards keep records If certified engine is not operated according to manufacturer s instructions o Considered not certified o Maintenance plan and records o Initial performance test for engines > 100 HP o Periodic testing for engines > 500 HP Non-Certified Engines Must keep maintenance records, operate according to maintenance plan, and keep record from that engine meets standards Initial performance test for engines > 25 HP Periodic testing for engines > 500 HP Emergency Engines Must install non-resettable hour meter 10 of 11

o > 500 HP built on or after 7/1/10 and doesn t meet standards for non-emergency engines o > 130 HP and < 500 HP built on or after 1/1/11 and doesn t meet standards for non-emergency engines o <130 HP built on or after 7/1/08 and doesn t meet standards for non-emergency engines Keep records of hours operated o No limit for emergency situations o <100 hours per year maintenance and testing o <50 hours for non-emergency (can t sell to grid), but has to be included in 100 hour limit Initial notification for non-certified engines > 500 HP - date of construction (installation on site) within 30 days 11 of 11