EVLA Front-End CDR. EVLA Front-End Budget

Similar documents
4- The Work Breakdown Structure and costs 4.1 WBS 4.2 COSTS

EVT A Memo 34. ig^la MONITOR AND CONTROL SYSTEM Monitor and Control Points. George Peck

Cryogenic Improvements for the ATLAS Energy Upgrade

Draft Working List to be done at CERN for ATLAS Central Solenoid. Originated, Dec. 4, 2001 Revised, Dec.5, 2001 Akira Yamamoto (KEK)

COUNCIL ACTION FORM SUBJECT: POWER PLANT FUEL CONVERSION BID NO. 1 TURBINE CONTROL SYSTEM CONTRACT COMPLETION

Stormwater Utility Agency Mission Agency Overview

Adopted Requested Executive Position Title CG-RG FTEs Amount FTEs Amount FTEs Amount

From: Tito R. Nagrampa Jr, P.E. Approved by: /s/ General Manager Juan M. Ulloa, P.E. Engineering Supervisor

Temescal FC-1800 Electron Beam Evaporator System Refurbished by TES

Exhibit R-2, RDT&E Budget Item Justification

Camera Electronics Systems

1291BL Series Technical Specification Single Axis Position and Rate Table System

TECHNICAL INFORMATION

Parking Utility Agency Overview

TECHNICAL INFORMATION

UNCLASSIFIED BUDGET ITEM JUSTIFICATION (EXHIBIT P-40) P-1 LINE ITEM NOMENCLATURE: C-12

Too Good to Throw Away Implementation Strategy

1291BL Series Technical Specification Single-Axis Rate and Positioning Table System

WEIGHTS FOR FTE FUNDING FORMULA INIT FY13

CRITICAL DESIGN REVIEW. University of South Florida Society of Aeronautics and Rocketry

Adopted Requested Executive Position Title CG-RG FTEs Amount FTEs Amount FTEs Amount

Metro Transit Function: Public Works & Transportation

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

CSU Annual Library Statistics

FLEET AND EQUIPMENT SERVICES

TECHNICAL INFORMATION F25 AS LT3 12/2011 / B 1

Adopted Requested Executive Position Title CG-RG FTEs Amount FTEs Amount FTEs Amount

Exhibit R-2, RDT&E Budget Item Justification

TECHNICAL INFORMATION HXL 8015 S 11/2011 / 730-C 1

Magnet, Support and Infrastructure. Whit Seay November 7, 2014


Continuing Research and Development of Linac and Final Doublet Girder Movers

Turlock Irrigation District

Ronnie van Eeden. Senior Mining Engineer. Overview

Parking Utility Function: Public Works & Transportation

Cryocooler with Cold Compressor for Deep Space Applications

The Problems We Deal With. From a Fleet Management Perspective.

Thermo Scientific Cryo and CryoPlus Quick Reference Guide for Racks and Frames

2015 Annual Report From The Director of the Weights and Measures Dept. To The Wayne County Board of Supervisors And N.Y.S. WEIGHTS and MEASURES DEPT.

Electrical Ground Support Equipment Schedule and Cost. EGSE Schedule and Cost

Solar Powered Golf Cart

Los Angeles County Metropolitan Transportation Authority. Paid Parking Pilot Program Parking Management

District Technology Purchase and Replacement Plan for the 4-year Levy Cycle,

Rocketry, the student way

AGENDA REPORT. Craig Crowder, Fleet Manager %-

FLEET SERVICES OVERVIEW and ACCOMPLISHMENTS Public Works Commission August 10, 2017

Denver Volunteer Fire Department. Insurance Services Office Rating: 5-9E. Number of Volunteers on Roster: 15

PRELIMINARY DESIGN REVIEW. LFEV-ESCM-2014 February 13, 2014

TECHNICAL INFORMATION HXL8018S-K 11/2012 / 733-B 1

Appendix A: System Codes

Sustainable Transportation At Stony Brook University Friday, September 21, 2012 SUNY Sustainability Conference Syracuse Center of Excellence

Traffic Engineering Function: Public Works & Transportation

Mobile Radiation Shield

Intelligent Interface Adaptor Fuse & Distribution Unit Electric Step Controller

TECHNICAL INFORMATION

POWERCON CORPORATION

GLAST Large Area Telescope: Cost/Schedule Review June 30, 2005 AntiCoincidence Detector (ACD) Subsystem WBS: 4.1.6

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ALWAYS follow all Webasto installation and repair instructions and observe all warning instructions.

Wiring Diagram 7 Amp 2 Step (7642MC) Ignition Box - No Booster ENGINE BLOCK LOWER LIMIT ARMING WIRE ORANGE GREEN BLACK DISTRIBUTOR LOOM (PRE-MADE)

Engine Division Training Center

Internal Trading. University of Edinburgh policy on how trading of goods and services between schools or support services should be transacted.

Sanitation Services Proposed FY11 Budget. Council Briefing

DES MOINES AIRPORT AUTHORITY BOARD SUMMARY OF REGULAR MEETING Des Moines International Airport Board Room May 13, 2014

Angelo State University Energy Savings Program October 30, 2014

POTTSGROVE SCHOOL DISTRICT 1301 KAUFFMAN ROAD POTTSTOWN, PENNSYLVANIA

Mechanical Integrity (MI)

2011 Saskatoon Transit Services Annual Report

Switchgear Skid, C1192

Sanitation Services Proposed FY11 Budget. Council Briefing

CITY OF HEATH, TEXAS ANNUAL OPERATING BUDGET FISCAL YEAR

CLASSIFICATION: UNCLASSIFIED. DATE May 2009 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SUBMARINE TACTICAL WARFARE SYSTEM

Correlator rack internal mechanical and electrical specs B. Carlson

Inventory of Best Practices for Learning Support Centers in Higher Education

Mars Surface Mobility Proposal

Campus Summary. Page 1 of 6

GENERAL GOVERNMENT ~ Municipal Buildings

Great Brands! Values. Authenticity. Purpose. Copyright 2010 Johnson Controls, Inc.

Introduction. Pre-Lab

NORWAY Industrial Participation. 25 January 2007

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

Matt Morgan Assistant Superintendent of Support Services. Kristine Johnston Director of Purchasing. Date: May 2, 2014

ANNEX AGRI/12 PLANT PRODUCTION ANNEX AGRI / 12 A - SEED REQUIREMENT AND ALLOCATION Proposed Allocation Unit Total

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

Overview of Micro-Miniature Stirling Cryocoolers for High Temperature Applications

Pos of value more than Rs.5 lakhs for materials ordered on single tender basis

Provision of Proprietary Software Licences and Maintenance from Innovyze Inc. for Hydraulic Modelling and Asset Management

Department of Legislative Services

Formation Flying Experiments on the Orion-Emerald Mission. Introduction

Stationary Bike Generator System

Taxi Cab Safety Bylaw

Thermo Scientific TSX Series Ultra-Low Freezers

Critical Upgrade to University Police Department Computer Systems

Chain Guides for Roller Chains as per DIN 8187

ATTACHMENT A - STATEMENT OF WORK INVITATION TO BID FOR CHILLER INSPECTION SERVICES ITB NO.: DMS-13/14-035

Saab Avitronics THE CHALLENGES OF DEVELOPING A COMINT DF AND MONITORING ANTENNA FOR THE HIGH PRESSURE ENVIRONMENT OF SUBMARINE OPERATIONS

ATHLETICS AUSTRALIA FACILITIES & EQUIPMENT COMMITTEE RECOMMENDED PROCEDURES FOR OPERATING AND MAINTAINING ATHLETIC FACILITIES

600 A CURRENT LEADS WITH DRY AND COMPACT WARM TERMINALS

Transcription:

EVLA Front-End CDR EVLA Front-End Budget 24 April 26 1

EVLA Front-End Budget Overview 1) Budget Overview 2) Annual M&S Cost Estimates 3) Annual Manpower Cost Estimates 4) Annual Machining Estimates 5) FE Costs 24 April 26 2

Budget Overview WBS broken down by Receiver Band, Monitor & Control and Cryogenics FE Estimates include M&S, FE/Cryo Group manpower loading & Machining effort Management / System Engineering Catch-All Budget HFSS ($45K) & Miscellaneous ($7K) Software, Lab PC s and Laptops for Site Maintenance ($68K) Test Equipment, including Rx Test Racks & Repair/Calibration ($115K) Caltech QPAM & KaDCM Design & Prototype Contract ($12K) Wafers - Raytheon MMIC Amps ($55K) & NG Cryo-3 ($7K) Feed Heater & Moisture Control ($178K) Student Salaries ($85K) Conference, Training & Business Travel LNA staff effort at CDL (4.8 FTE) EVLA Staff effort not directed towards any specific Receiver task Additional LNA costs included in Receiver Band M&S estimates Feeds have their own budget Manpower loading estimates includes: EVLA funded positions Contributed Effort (NRAO Operations Budget) 24 April 26 3

Annual FE M&S Budget Estimates by Rx Band ($K) Task 22 23 24 25 26 27 28 29 21 211 212 L 3. 1.7 3.4 9.6 318.7 186.5 153.3 57.7 42.7 44.7 83.3 S 2.2 1.4 1.4 53.1 213.5 184.7 42.7 42.7 541.7 C 1.8 76.3 15.2 172.8 111.4 31.1 23.3 15.5 11.6 63. X.4 5.9 21.6 329.8 13. 595.7 Ku 1.8 1.8 39. 236.1 36.7 594.5 K 2.7 143.2 125.2 53.2 17.5 62.5 9.5 13. 445.4 Ka 164.1 26.1 6.7 299.1 211.7 118.8 46.6 33.2 17.5 923.3 Q 3.8 12.5 52.6 37.2 74.1 31.8 19.6 15. 8. 254.7 6.8 222.8 314.2 33.3 917.9 651. 649.7 774.5 791.6 129.5 4788.6 24 April 26 4

Annual FE M&S Budget Cryogenic Estimates ($K) Task 22 23 24 25 26 27 28 29 21 211 212 Vacuun Sys 3.4 23.5 46.8 21. 36.2 15.2 146.1 Compressors 6.5 34.8 122. 44.5 14.2 8. 5.5 26.8 2. 282.3 CTI 35 s 47. 54.3 566.8 14. 14. 7. 73.1 Cryo 56.9 112.6 735.6 79.5 64.4 15. 2.7 26.8 2. 1131.5 24 April 26 5

Annual FE M&S Budget Miscellaneous Estimates ($K) Task 22 23 24 25 26 27 28 29 21 211 212 Man / Sys Eng 5.3 167. 126.8 18.7 138.8 85.8 115. 76. 46.5 4. 99.9 Card Cage 2. 11.2 2.1 69.2 176.9 4.1 78.3 4.1 437.9 F317 Mod 5.6 19. 31. 21.7 21.7 1.9 19.9 F- Rack 19. 74.4 44.1 44.1 45.1 226.7 M&C 2. 11.2 44.7 162.6 252. 15.9 145.1 51. 774.5 24 April 26 6

FE M&S Budget Estimates by Task ($K) 12 1 8 6 4 2 24 April 26 7 F-Racks Man / Sys Eng L-Band S-Band C-Band X-Band Ku-Band K-Band Ka-Band Q-Band Vacuum Sys Compressors Refrigerators Card Cages F317 Modules

24 April 26 8 Annual FE Manpower Estimates By Task (Man-Months) 155.5 5.5 28. 28. 3. 28.8 14.6 11.4 7.2 Cryo 188.8 6.9 7. 14.2 19.3 17. 17.9 23.8 37.8 24.5 9.4 11. M/SE 13.1 6.5 6.5 1.7 12.9 13.2 21.1 2.4 11.8 M&C 43. 4.8 4.8 4.8 4.8 5.9 4.4 5.4 6.8 1.4 Q 38.9 32. 212 134.1 16.1 16.1 16.1 16.1 19.2 1.8 21.9 13.6 4.5 Ka 115.7 7.5 16.6 116.8 14.8 138.6 158.3 146.4 119.8 78.8 34.2 53.4 7.4 7.5 7.5 7.6 7.6 5.2 5.1 5.9 K 89. 12.5 16.3 15.5 15.1 13.2 7.7 2.2 5.3 1.4 Ku 77.8 32..1.1.1.1 5.7 4.8.4.7 1.8 X 16.7 12.8 12.9 12.9 13.4 14.8 1.4 14.5 11.4 3.6 C 8.8 13. 13. 13.1 13.1 9.1 11.2 8..3 S 118.5 6 15.4 15.5 15.5 15.5 19.2 12.9 7.4 6.4 4.7 L 211 21 29 28 27 26 25 24 23 22 Task

Task L-Band S-Band C-Band X-Band Ku-Band K-Band Ka-Band Q-Band Cryogenics Miscellaneous Man / Sys Eng Front-End Manpower Estimates By Staff Effort (Man-Months) Engineering 44.5 32.6 42.1 28.7 36.2 17.5 46.8 23.2 2.3 1. 391.9 Technical 74. 48.2 64.6 49.1 52.8 35.9 87.3 19.8 82.8 88.9 63.4 Cryogenic 155.5 155.5 118.5 8.8 16.7 77.8 89. 53.4 134.1 43. 155.5 13.1 188.8 115.7 24 April 26 9

24 April 26 1 Annual FE Manpower Budget Estimates ($K) 737.3 25.5 128.3 128.3 14.5 133.2 72.9 59.9 48.8 Cryo 1326.5 44. 44.3 11.3 157.3 145.7 146.7 179.7 228.4 135.8 66.8 76.6 M/SE 469.2 26.5 26.5 45.6 54.6 56.4 9.2 11.7 67.8 M&C 274.7 29.9 29.9 29.9 29.9 39.7 3.4 34.1 42.6 8.2 Q 183.2 183.2 212 795.9 91.3 91.3 91.3 91.3 116.3 73.1 124.5 88.7 28.3 Ka 527.3 32.2 485.5 57.7 622.9 648.5 731.7 571.6 541.2 446.5 148.7 286.5 38. 38.6 38.6 39.6 39.6 3.2 27.6 34.3 K 488.4 59.6 94.5 89.3 82.6 66.1 34.8 16.1 34.3 1.6 Ku 471.3 183.2.6.6.6 45.2 39.7 3.4 4.1 1.6 X 617.6 72.5 73.1 73.1 76.1 75.3 67.2 8.8 72.1 27.4 C 419.2 77.4 61.7 61.7 61.7 46.2 59. 5.3 1.8 S 647.2 7.5 71.2 71.2 71.2 13.4 77.5 59.4 59.9 36. L 211 21 29 28 27 26 25 24 23 22 Task

FE Manpower Budget Estimates by Task ($K) 15 125 1 75 5 25 L S C X Ku K Ka Q Cryo M&C M/SE 24 April 26 11

24 April 26 12 Annual Machining Manpower Estimates by Task (Man-Months) Cryo 33.3 6. 6. 6. 6. 6. 1.4 1.4.4 Q 15.2 15..2 212 9.6 1.9 1.9 1.9 1.9 1.3.7 M&C 79.8 6. 14. 14. 14. 14. 3. 13.4 1.4 Ka 359. 15.2 51.8 44.8 46.7 67.7 44.7 28.4 36. 8. 4.6 1. 1. 1. 1..4 K 6.3 14.4 14.4 14.4 14.4 2.4.2 Ku 46.7 15. 15. 1.7 X 53.3.2.2.2 12.4 12.4 12.4 12.4 3.1 C 43.6.2 1. 1. 1. 1. 3.1 S 27.8.2.2.2 6.3 6.3 6.3 6.3 2. L 211 21 29 28 27 26 25 24 23 22 Task

24 April 26 13 Annual Machining Budget Estimates by Task ($K) Cryo 135.6 24.4 24.4 24.4 24.4 24.4 5.7 5.7 1.6 Q 61.9 61.1.8 212 39.1 7.7 7.7 7.7 7.7 5.3 2.8 M&C 324.9 24.4 57. 57. 57. 57. 12.2 54.6 5.7 Ka 1461.9 61.9 21.9 182.4 19.2 275.7 182. 115.6 146.6 32.6 18.7 4. 4. 4. 4.1 1.6 K 245.5 58.6 58.6 58.6 58.6 9.8.8 Ku 19.2 61.1 61.1 6.9 X 217..8.8.8 5.5 5.5 5.5 5.5 12.6 C 177.5.8 4.7 4.7 4.7 4.7 12.6 S 113.2.8.8.8 25.6 25.6 25.6 25.6 8.1 L 211 21 29 28 27 26 25 24 23 22 Task

Machining Budget Estimates by Task ($K) 4 3 2 1 L S C X Ku K Ka Q Cryo M&C 24 April 26 14

Front-End Budget Estimates by Task ($K) Task M&S Manpower Machining L-Band 83.3 647.2 113.2 1,59.7 S-Band 541.7 419.2 177.5 1,138.4 C-Band 63. 617.6 217. 1,437.6 X-Band 595.7 471.3 19.2 1,257.2 Ku-Band 594.5 488.4 245.5 1,328.4 K-Band 445.4 286.5 18.7 75.6 Ka-Band 923.3 795.9 324.9 2,44.1 Q-Band 254.7 274.7 135.6 665. Cryogenics 1,131.5 737.3 1,868.8 Miscellaneous 774.5 469.2 39.1 1,282.8 Man / Sys Eng 99.9 1326.5 1,466.4 7,685.5 6,533.8 1,461.7 15,681. 24 April 26 15

Front-End Budget Estimates by Task ($K) 2,5 2, 1,5 1, 5 L S C X Ku K Ka Q Cryo Misc M/SE 24 April 26 16

Front-End Unit Cost Estimates ($K) Including (Cryo, Misc & S.E. Costs) / 24 Task M&S Manpower Machining L-Band 39.8 32.1 3.9 75.8 S-Band 3.1 24.5 6.1 6.7 C-Band 32.2 31.1 7.4 7.7 X-Band 32. 26.3 6.5 64.8 Ku-Band 31.9 26.8 8.4 67.1 K-Band 26.9 2.1.8 47.8 Ka-Band 42.9 37.1 11. 91. Q-Band 2.6 19.7 4.7 45. Per Antenna 256.4 217.8 48.7 522.9 24 April 26 17

Unit Cost Per Receiver ($K) 1 9 8 7 6 5 4 3 2 1 L S C X Ku K Ka Q 24 April 26 18

Questions? 24 April 26 19