Small DER Aggregation Example

Similar documents
DISTRIBUTED SOLAR+STORAGE PROBLEM STATEMENT. A.F.Mensah, Inc

Legal Considerations Related to Distributed Energy Resources

Mixed Generation Interconnection, Metering & Settlement

Presentation to the PJM NEMSTF Interconnection Issues. Interconnecting Solar Projects on the PSE&G Distribution System

Electric Storage Resources & Wholesale Electricity Markets

Solar Development in New Jersey, and PV Impacts on the Distribution System Carnegie Mellon Conference on the Electricity Industry - March 9, 2011

Grid Integrated Resources. Update to Energy/Ancillary Services. DERS March 2, 2018

Freeing The Grid Resource for better solar policy

Powering Your Home With The Sun. Introduction to Residential Solar Energy Systems [Your Name] ISEA Solar Ambassador

TILLAMOOK PEOPLE S UTILITY DISTRICT

PSE&G Solar 4 All Pilot Program. PSEG Vision Being a recognized leader for: People providing Safe reliable Economic and Greener Energy

Battery Interconnection Process

Topic Small Projects (< 100 kw) Large Projects (>100 kw)

EnSync Energy Systems. Transactional Energy Marketplace

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

SERVICE CLASSIFICATION "CEF" COMMUNITY ENERGY FACILITY

Commissioner Anne E. Hoskins iiesi Workshop Copenhagen, Denmark May, 2014

Wind Interconnection and Net-Metering in MA. Tim Roughan - National Grid Joe Feraci - NStar

MEMBER RELATIONS POLICY NO SUBJECT: INTERCONNECTION OF CUSTOMER GENERATION RESOURCES

Virginia Solar Pathways Project Training Session Module I: Electric Industry Background. US DOE Award No. DE-EE

Capacity Market Rules for Energy Storage Resources

Smart Grid Subcommittee Report

24. SOLAR INCENTIVE PROGRAM II

JEA Distributed Generation Policy Effective April 1, 2018

Information Packet Kissimmee Utility Authority Customer-Owned Renewable Generation Interconnection And Net Metering Program

Eric Johnson, Director, External Affairs, ISO New England

White River Electric Association, Inc. Net Metering Information & Service Requirements

Springfield Utility Board Net Metering Policy Adopted on February 13, 2008 (Resolution 08-1)

PG&E California Solar Initiative (CSI) & Net Energy Metering (NEM) Interconnection Webinar. March 26, 2009

Puget Sound Energy Overview

Please Refer to Attached Sample Form

ATTACHMENT 14 RESOLUTION NO. 5888(14) Supersedes Schedule NEM of Resolution No. 5592(09) Schedule NEM NET ENERGY METERING

µ-grids Integration to the Puerto Rico Electric System CCPR Puerto Rico Energy Sector Transformation Condado Plaza Hilton San Juan PR

Battery Interconnection Process

Microgrids A Regulatory Perspective

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Next Generation Solar Incentive Program

Interconnection Reform Update to New Jersey Board of Public Utilities IX/NEM Working Group

Solar Renewable Energy Certificate (SREC) Markets: Status and Trends

Xcel Energy Guidelines for Interconnection of Electric Energy Storage with the Electric Power Distribution System

Effects of Smart Grid Technology on the Bulk Power System

Interconnection and Net Metering Service in Ohio

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Eligible Renewable Generation (ERG) Application INSTRUCTIONS

Net Metering Policy Framework. July 2015

2018 Solar Home & Solar Share Home Program Manual

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

ILLINOIS SUPPLEMENTAL PV PROCUREMENT PROGRAM (ROUND 3) JANUARY 13, 2016

Montana-Dakota Utilities Co. A Division of MDU Resources Group, Inc. 400 N 4 th Street Bismarck, ND 58501

Distributed Generation

Douglas Electric Cooperative Roseburg, Oregon

Interconnection Process Simplification Webinar

Interconnection Process Simplification Webinar

Issue 23 draft for Nuvve

Creating A Greener Energy Future For the Commonwealth. Massachusetts RPS Solar Carve-Out: Overview & Program Basics.

Electrical District No. 3 SOLAR Q & A

SOUTH HADLEY ELECTRIC LIGHT DEPARTMENT Net Metering Policy As Amended 03/23/16 By the South Hadley Municipal Light Board

NEM Aggregation Tariff Overview

APPLICATION Net Energy Metering Interconnection For Solar And/Or Wind Electric Generating Facilities Of 30 Kilowatts Or Less

Essential Reliability Services Engineering the Changing Grid

40kW (and under) Solar/Inverter Installations Generation Interconnection Application to Minnesota Power

Distributed Energy Resources

HOW NET METERING OF ELECTRICITY WORKS

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Interconnecting with Ameren

Producing your own energy? Great Decision. ComEd.com/Interconnection. Let s connect you to our smart grid.

Basic Connection Services Application and Price Guide

Distributed Storage Systems

Dominion Energy Instructional Guide for Completing Virginia Form NMIN

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

SMART Program Specific Metering Wiring Diagrams. November 2018

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

DER101: Distributed Energy Resources basics. May 4, 2017

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

ENGINEERING SPECIFICATION

NET ENERGY METERING RIDER Rider NEM. Certain words, when used in this Rider NEM shall be understood to have the following meanings:

Demand Response - An End-to-End Approach from Markets to Consumers

S-PPC. Product Brief. Power Plant Controller Solutions for Energy Storage Systems

WEB ENABLE ONLINE DATA LOGGER AND REMOTE MONITORING FOR 66 KW ON GRID SOLAR PV SYSTEM

Energy Storage System Application Guidelines

Business Models and Compensation Framework for the Utility Transformation August 16, 2017

Contents. Solar Select TM Frequently Asked Questions

Inverter-based DER Ride Through and IEEE Standard 1547

Solar Microgrid Integrates Solar PV, Energy Storage, Smart Grid Functionality and Advanced Vehicle-to-Grid Capabilities

Electric Vehicles and the Power Grid. October 29, 2010 Biloxi, MS

Community Shared Solar Opportunities in Massachusetts Emma Krause Rooftop Solar Challenge Coordinator MA DOER

Implications of Alberta s Evolving Electricity Market for Solar

HydroGenerations PROGRAM HANDBOOK

Customers without access can fax comments and inquiries to , Attn: Gary Thompson, or submit through regular mail to:

Interconnection Process for Generation Systems

Enabling Smart Grid Interoperability: A System of Systems Approach via IEEE P2030 TM and IEEE 1547 TM

Version 1, June Energy Storage System Guide Version 1 / June 2018

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

Renewable Energy Integration: Wind, Solar and Energy Storage

Transcription:

Special MIC Meeting DER Small DER Aggregation Example April 10 th, 2017 Presented by: Drew Adams A.F.Mensah, Inc.

Outline Example Overview System Design Operations Backup Power Mode Description EDC ship Demarcation Line Interconnection Process Overview PJM Aggregation Considerations Future Considerations

EXAMPLE OVERVIEW Example Overview Site Overview Front of Generator Retail Load Retail Solar PV Net Energy ing FERC Jurisdiction Determination Non-FERC Jurisdictional ISA or WMPA? WMPA PJM Classification Resource Type Generation Resource Energy Only PJM Interconnection Application Attachment BB PJM Applications Frequency Regulation Market Energy Market Other Applications Backup Power (solar-storage)

SYSTEM DESIGN - FRONT OF METER GENERATOR Electric Distribution Grid EDC - GEN M2 EDC - LOAD M1 AC Electricity - Energized M4 Resiliency Main AC Electricity De - Energized DC Electricity - Energized Battery Inverter(s) M3 PJM Sub Solar Inverter(s) Battery Pack SREC M5 Solar Panels

SYSTEM DESIGN BACKUP POWER MODE Electric Distribution Grid EDC - GEN M2 EDC - LOAD M1 AC Electricity - Energized M4 Resiliency Main AC Electricity De - Energized DC Electricity - Energized Battery Inverter(s) M3 PJM Sub Solar Inverter(s) Battery Pack SREC M5 Solar Panels

METER DESCRIPTION M1 M2 M3 M4 M5 Description PJM Purpose EDC Purpose Cost New or Existing EDC Retail Load EDC Retail GEN Only GEN Only Resiliency Only Sub Solar (SREC) N/A Hourly Energy Confirmation Real Time Data; Hourly Energy Retail Settlement LOAD (NEM) Retail Settlement GEN N/A PJM Compliant EDC EDC Existing N N EDC GEN N/A Retail Resiliency GEN N/A N/A GEN GEN GEN GEN Solar New Y 1 Y New Y 1 Y 2 New N/A TBD Either N/A Y/N Comms Required 1 Compliant with proper internet connection and if meets PJM accuracy requirements 2 Real time secure data link to PJM SCADA Network

EDC OWNERSHIP DEMARCATION LINE OVERHEAD SERVICE UNDERGROUND SERVICE EDC ship Demarcation Line M2 M1 M2 M1 EDC Owned Line Customer Owned Line M1 M2 EDC LOAD (existing) EDC GEN (new)

INTERCONNECTION PROCESS (State Jurisdictional) PJM Interconnection Application Attachment BB Application FERC Jurisdiction Determination Wholesale Market Participation Agreement (WMPA) EDC - Dedicated Service Line Request Dedicated Service Line Application Engineering Site Survey ing & Installation Site Survey EDC Work Order Creation & Scheduling Cost Considerations EDC - State Level Interconnection Level 1 or 3 Interconnection Application Eligible Size: Up to 10 kw Application Fee: $500 / Site Equivalent to $50 / kw or $50,000 / MW Non-FERC Jurisdictional Individual WMPA per Site ~ PJM Combined Feasibility/Impact Study ~ PJM Facilities Study ~ PJM Construction Services Agreement EDC Cost + Contractor Cost to Install Administrative Exercise w/ Study Completed Above

PJM AGGREGATION CONSIDERATIONS Project Overview # of Generators 20 Battery Storage Systems Generator Size per Site 5 kw Aggregated Size 100 kw (0.1 MW) (20 x 5 kw) PJM Classification Generation Resource Energy Only Interconnection Aggregation Attachment BB Application WMPA PJM Model Points 20 separate applications 20 separate agreements 1 single point as aggregate Market Registration & Telemetry Aggregation PJM Telemetry Requirements Frequency Regulation Market Energy Market Capacity Market 1 Fleet (0.1 MW) 1 Market Resource (0.1 MW) 1 Market Resource 1 Market Resource (single pricing node) N/A

FUTURE CONSIDERATIONS Interconnection Process Project Design & Market Rules to Accommodate Behind the Resources Aggregated PJM Interconnection Application for Small DERs Mixed FERC and Non-FERC Projects As Aggregations ing Requirement Coordination Between PJM and EDC to Avoid Duplicate ing Data Sharing Between PJM, EDC, and GEN Aggregation Consistent Aggregation Rules Across All Markets Mix of GEN, DR, DER? Adding / Removing Resources to Existing Aggregation

Thank You! A.F.Mensah, Inc. 1 North Johnston Ave Suite 208 Hamilton, NJ 08609 Drew Adams drew.adams@afmensah.com

SYSTEM DESIGN -BEHIND THE METER GENERATOR Electric Distribution Grid EDC - GEN M2 EDC - LOAD M1 AC Electricity - Energized M4 Resiliency Main AC Electricity De - Energized DC Electricity - Energized Battery Inverter(s) Battery Pack M3 EDC / Sub SREC M5 Solar Inverter(s) Solar Panels

BEHIND THE METER GENERATOR GRID OUTAGE Electric Distribution Grid EDC - GEN M2 EDC - LOAD M1 AC Electricity - Energized M4 Resiliency Main AC Electricity De - Energized DC Electricity - Energized Battery Inverter(s) Battery Pack M3 EDC / Sub SREC M5 Solar Inverter(s) Solar Panels