Similar documents
CITY OF PALM DALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Please Refer to Attached Sample Form

Please Refer to Attached Sample Form

Application for Service Residential Subdivision / Development

Contact Person for questions and approval letters: Alain Blunier

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019.

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

TEMPORARY SERVICE TABLE OF CONTENTS PUD SERVICE TERRITORY AND CONTACTS CHAPTER ONE - INTRODUCTION CHAPTER TWO - TEMPORARY OVERHEAD SERVICE

traversing them. Speed dips may be installed in lieu of speed humps where the 85 th percentile speed on a street is at least 36 mph.

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota

September 9, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E., Room 1A Washington, DC 20426

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

Please Read Carefully

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments

P.S.C. No. 9 - Electricity Consolidated Edison Company First Revised Leaf No. 244 of New York, Inc. Superseding Original Leaf No.

All Toyota Dealer Principals, Service Managers, Parts Managers

201 S. Anaheim Blvd. Page No Anaheim, CA RULE NO. 2 DESCRIPTION OF SERVICE

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

ACTION TRANSMITTAL No

STATE CORPORATION COMMISSION DIVISION OF PUBLIC UTILITY REGULATION. May 22, 2018

REMOVE II VANPOOL VOUCHER INCENTIVE PROGRAM

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018

Consolidated Edison Company of New York, Inc.

Director of Building and Deputy Chief Building Official. 1. North York Community Council approve the request for sign variance at 515 Drewry Avenue.

New York City Department of Transportation. Notice of Adoption

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

ITEM 13 - NOTICE May 20, 2009

ELECTRIC SERVICE RATES UPDATED NOVEMBER 2016

STREET LIGHT POLICY PURPOSE GENERAL CRITERIA & INFORMATION

POLICY AND PROCEDURE FOR SPEED HUMP INSTALLATION. Effective Date: July 10, 2013

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

COUNTY OF ROCKLAND Department of General Services Purchasing Division

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

Monroe County Municipal Waste Hauler Permit Application CALENDAR YEAR 2019

Construction Staging Area 4 Avenue Road

Lexus has completed the remedy preparations and will begin mailing the remedy owner letter for Safety Recall ELF.

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Residential Application for New Electric Service

PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

CITY OF PLACENTIA RESIDENTIAL PERMIT PARKING PROCEDURES AND GUIDELINES 2017

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

M.P.S.C. No. 2 Electric Ninth Revised Sheet No. 50 (Rate Case) Cancels Eighth Revised Sheet No. 50

Panola-Harrison Electric Cooperative, Inc. Louisiana Tariff Effective: March 3, 2004

,ILLS CITY OF BEVERLY HILLS TRAFFIC AND PARKING COMMISSION. July 12, 2018 TO: Traffic and Parking Commission FROM: Transportation Staff SUBJECT:

Energy Forum: Demand Side Management & May 6, 2010

Turnpike Mitigation Program Application

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED SEPTEMBER 12, 2016

ORDINANCE NO

MOBILEHOME PARK CONVERSION PROGRAM APPLICATION

TAUSSIG. Public Finance Public Private Partnerships Urban Economics. Newport Beach Riverside San Francisco Dallas ASSOCIATES, INC.

SANDAG Vanpool Program Guidelines as of February 2018

THE PUBLIC SERVICE COMMISSION OF WYOMING

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

RESIDENTIAL NEW CONSTRUCTION PACKET CITY OF VERO BEACH UTILITIES. Important Notice to Builders/Contractors/Developers From Electrical Engineering

Turnpike Mitigation Program Application

This page is intentionally left blank.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

BC Hydro Undergrounding for 100 Avenue Widening Between King George Boulevard and 140 Street

MEMORANDUM TERESA MCCLISH, DIRECTOR OF COMMUNITY DEVELOPMENT

Public Access Electric Vehicle Charging Station Rebate Program Agreement

RLY AGENDA REPORT. Meeting Date: January 22, 2018 Item Number: E 9 To: From:

I b *A 1 I F IRPORT COMMISSIONERS REPORT TO THE QARD. "" 119,rte.1111.r;

CITY OF VALLEJO. DEPARTMENT OF PUBLIC WORKS Engineering Division

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

City Transfer Stations: Loading Services and Fees

ELECTRIC SERVICE RATE SCHEDULES. Effective November 1, 2017

Dropped Crossing Service

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

July 24, Project IR

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Thank you for your time and attention to this matter. Please feel free to contact me if you have any questions regarding the filing.

IID. Customer Project Development Services. Customer Project Application. A century of service.

Purple Line Extension. Rodeo Station AUR MOA October 24, 2017

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Street Address. City-Village-Township

REVISION NO.: 7 EFFECTIVE: 07/07/16

Agenda Cover Memorandum

Included in this Stakeholder Information Package:

1

CITY OF SAN GABRIEL ALL-NIGHT PARKING APPLICATION

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

PETROLEUM TRADERS CORPORATION RIGGINS, INC.

Traffic Signals and Streetlights

SERVICE CLASSIFICATION NO. 4

#04017A: Special Policy - Tail Lamps/Stop Lamps - (Aug 6, 2004)

All territory within the incorporated limits of the City and land owned or leased by the City.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2018 Ascension Hot Air Balloon Festival Food Vendor Information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

TOWN OF SAN ANSELMO Staff Report May 1, 2017

Re: California Independent System Operator Corporation

REQUEST FOR PROPOSALS FIRE HYDRANT MAINTENANCE SERVICES

Transcription:

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION LINES ------------------------------------------------------------------------------- WHAT: The Anaheim Public Utilities Board (Public Utilities Board) will hold a public hearing concerning the formation of Underground District No. 66-Beach (District) to underground existing overhead facilities (including, power and communication lines) in your neighborhood in accordance with Chapter 17.24 of the Anaheim Municipal Code (Chapter 17.24). The public hearing is an opportunity for you to speak on and learn more about the proposed District. The Public Utilities Board will ascertain whether the creation of the District will further the public health, safety and welfare by promoting one or more of the purposes set forth in Section 17.24.020 of Chapter 17.24. In addition, the Public Utilities Board will also consider a recommendation that the City Council take action on the formation of the District at a future City Council meeting. WHEN: Date: October 25, 2017 Time: 5:00 PM WHERE: Gordon Hoyt Conference Room 2nd Floor Anaheim West Tower 201 S. Anaheim Boulevard, Anaheim, CA 92805 ABOUT UNDERGROUNDING POWER AND COMMUNICATION LINES: On July 25, 2017, the City Council approved the current five-year plan for Anaheim Public Utilities to replace existing overhead power and communication lines with new underground lines. The program is in its twenty-seventh year, and more than one hundred twenty-eight (128) circuit miles of overhead power lines have been replaced with new underground systems. Projects are added annually based on whether undergrounding will avoid or eliminate a heavy concentration of overhead electrical facilities, whether the street or right-of-way is extensively used by the general public and carries a heavy volume of pedestrian or vehicular traffic, or whether the street or rightof-way adjoins a civic area or public recreation area or an area of unusual scenic interest to the general public. Also, the selection criteria include the geographical diversity of projects, coordination with other City projects such as street widening, electric system reliability improvements, available funds, and aesthetic improvements. BENEFIT OF UNDERGROUNDING: Neighborhood beautification - Undergrounding power and communication lines adds aesthetic appeal to the neighborhood by eliminating heavy concentrations of power poles and lines along the District s streets. Additionally, the removal of power poles contributes to the overall visibility improvements along the street where the undergrounding takes place. State-of-the-art equipment - Placing the power and communication lines underground also gives Anaheim Public Utilities an opportunity to replace older equipment with stateof-the art electrical cables and switches, which in turn improves reliability of electric service to the area residents and businesses. WHAT YOU SHOULD KNOW ABOUT CONSTRUCTION:

The project will complete the conversion of all existing overhead power lines, street light systems, telephone, internet and cable television (CATV) lines and associated facilities to underground utilities along Beach Boulevard, from south of Ball Road to north of Lincoln Avenue, as shown and demarcated on the attached Exhibit A. Properties where the electric service, telephone, internet and/or CATV service(s) are connected from streets within the District will be either converted from overhead to underground or reconnected from the rear or side alley. Service(s) at properties where the utilities intend to convert existing overhead to underground services will be provided, with underground service conduits and cables installed from the Public Right-of-Way to the respective utility's service entrance. Typically, the utilities will replace up to 200 feet of service at the utilities expense. The overhead to underground service work described above requires the legal property owner(s) to sign a Right-of-Entry document, authorizing the work to be performed on premises where conversion from overhead to underground service connections will take place. This will be provided to the individual property owners during the design phase of the project. Existing street light fixtures on utility poles will be replaced with new LED street light poles. While the end-result of undergrounding is a positive one, the conversion process may create short-term inconveniences including temporary planned outages that will be communicated 48-hours in advance. Please contact Anaheim Public Utilities to discuss special circumstances or needs. Undergrounding power and communication lines does mean that during construction, heavy equipment will be present digging, and temporary road closures will occur in your area. However, the contractor is required to minimize these inconveniences by closely planning and coordinating the work, completing it as quickly as possible, and with minimal disruption to the residences and businesses in the area. Construction hours are typically between 7:30 a.m. and 4:30 p.m. on Monday through Friday. Some work may be scheduled after hours to minimize impact to traffic flow or to customers, or to meet permitting and other requirements. We appreciate your cooperation during this time and are committed to working closely with you to minimize any inconvenience. PROPOSED UNDERGROUNDING DISTRICT: District No. 66 Beach Blvd. between south of Ball Rd. and north of Lincoln Ave. District boundaries shown on the attached map. PROPOSED DISTRICT SCHEDULE: Public Hearing: October 25, 2017 City Council Meeting: December 5, 2017 Construction Start: December 2018 Construction Complete: September 2020 Note: The proposed schedule is tentative and intended to illustrate the time estimates to complete the project.

WHOM TO CONTACT: If you have any questions about the program, please call or e-mail Timothy Bass at (714) 765-4287 or tbass2@anaheim.net.

Jennifer Ward Project Manager Transmission Project Management January 20, 2017 Timothy Bass City of Anaheim 201 S. Anaheim Blvd Anaheim, CA 92805 Subject: Request for Engineering Advance Project Location: Beach Blvd, South of Lincoln Ave to North of Ball Rd, City of Anaheim Project ID #1317 Dear Mr. Bass: Southern California Edison Company ( SCE ) requires an engineering advance in the amount of $40,000 to proceed with the following activities: designing a relocation plan for SCE s Distribution and Telecommunication facilities affected by your project, preparing a cost estimate for the proposed relocation plan, and related activities (hereinafter, Design and Estimation ). You agree to pay to SCE the actual costs incurred in the course of Design and Estimation, recognizing that the actual costs may differ from the amount above. If this project is cancelled, SCE will calculate the actual costs SCE has incurred through the date of cancellation and provide you with a final invoice. If the actual costs exceed the amount of the engineering advance, you agree to pay SCE the difference. If the actual costs are less than the engineering advance, SCE will deduct the actual costs from the engineering advance, and will refund the difference to you. If the project is not cancelled, any unused funds from the engineering advance will be applied to the total actual cost of the project. Please issue your payment in the above-described amount payable to Southern California Edison, and forward it to the Accounts Receivable address indicated on the enclosed Invoice, or follow the instructions on the Invoice for making a wire or ACH payment. Please return a countersigned copy of this letter agreement to my office at the following address: 1444 E McFadden Ave, 2 nd Flr, Bldg D, Santa Ana, CA 92705 I will be managing your project; therefore, if I may be of assistance to you, please do not hesitate to telephone me at 714-973-5418. Please notify me immediately if the project is delayed, cancelled, or if there are changes in building plans, work schedules or completion dates. 1444 E McFadden Ave, 2 nd Flr, Bldg D Santa Ana, CA 92705 714-973-5418 Revision Date: Jennifer.Ward@sce.com Page 1 December 2013

Jennifer Ward Project Manager Transmission Project Management Sincerely, Jennifer Ward Project Manager Transmission Project Management I have read and understood the above letter agreement, and acknowledge and agree to the terms herein as an authorized representative of the City of Anaheim. By: Applicant Signature Print Name Date: Title: Enclosure cc: Eric C Wang David Barrett Project File 1444 E McFadden Ave, 2 nd Flr, Bldg D Santa Ana, CA 92705 714-973-5418 Revision Date: Jennifer.Ward@sce.com Page 2 December 2013

City of Anaheim PUBLIC UTILITIES DEPARTMENT December 5, 2017 Ms. Jennifer Ward, Project Manager Transmission Project Management Southern California Edison 1444 E. McFadden Ave., 2 nd Floor Building D Santa Ana, California 92705 Subject: Planned Rule 20B Underground Conversion of Southern California Edison s (SCE) Overhead Electric Distribution Facilities on Beach Blvd. within Anaheim City Limits Dear Ms. Ward: This confirms City of Anaheim s plans to underground SCE s 12,000 Volt overhead electric distribution facilities on Beach Blvd., within Anaheim s city limits from South of Ball to North of Lincoln. The planned undergrounding will be under California Public Utilities Commission s Rule 20B and is delineated within the boundaries shown on the attached map. The City is scheduled to conducted a public hearing for the formation of an underground conversion district on Beach Blvd. (District No. 66) at the October 25, 2017 Public Utilities Board (Board) meeting. Pending the results of the public hearing and subsequent recommendation by the Board, a request for City Council authorization is scheduled for December 2017. The City of Anaheim Public Utilities Department will coordinate with SCE to develop joint undergrounding plans for all agencies with overhead facilities present on the utility poles along Beach Blvd. Based on the attached Request for Engineering Advance, Anaheim will provide $40,000 to SCE for the estimated costs for preliminary engineering and design, with an adjustment for the actual costs when the construction plans are finalized. When the construction plans are complete and bids received for the work, a reimbursement agreement for SCE undergrounding shall be finalized. The reimbursement agreement and construction bid award are subject to approval by the Anaheim City Council. If you have any questions or require further information, please contact Tim Bass at tbass2@anaheim.net or 714-765-4287. Sincerely, 201 S. Anaheim Blvd. Suite #1101 Anaheim, CA 92805 Tel: (714) 765-5173 www.anaheim.net Dukku Lee Public Utilities General Manager

Planned Rule 20B Underground Conversion of Southern California Edison s (SCE) Overhead Electric Distribution Facilities on Beach Blvd. within Anaheim City Limits December 5, 2017 Page 2 of 2 Attachment: 1. Underground District No. 66 Map 2. SCE Request for Engineering Advance for Beach Boulevard Undergrounding, Project ID #1317

Proposed Underground District No. 66 - Beach Public Hearing October 25, 2017

Crescent Knott Lincoln SCE Transmission to remain Beach Magnolia SCE Distribution to be removed Ball

Beach Blvd. Undergrounding 1.5 Circuit Miles Cost : $10.5M - Anaheim $4-6M - SCE line Construction: May 2019 Feb 2021

Planned Area Improvements Beach Blvd. Specific Plan Enhanced Electric Reliability Increased Capacity LED Streetlights

LED Street Lights Upgrades on Beach Blvd. Before After

Proposed Underground District No. 66 -Beach