Ayeyarwady Integrated River basin Management Project (AIRBM)

Similar documents
Ayeyarwady Integrated River Basin Management (AIRBM) Project. Procurement Plan

Ayeyarwady Integrated River Basin Management (AIRBM) Project. Procurement Plan

Nairobi Metropolitan Services Improvement Project (NaMSIP) Summary Procurement Plan

Federal Road Development Project 2011 Procurement Plan.

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Glendale Water & Power Smart Grid Project

Procurement Plan. I. General

First NEP Implementation Workshop, Thingaha Hotel, NayPyiTaw Myanmar.

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

FOR IMMEDIATE RELEASE

Date Event or Holiday :Sun, 2:Mon North Orchard Delong Preschool North Orchard Delong Preschool

Off-Grid Renewable Energy Program in Myanmar. Pradeep Tharakan, PhD Senior Energy Specialist (Climate Change) Asian Development Bank

Status of Road Transport and Transit Facilitations in Myanmar Thet Zaw Win Director Department of Highways

Procurement Plan ECSEE APL3 - Republic of Macedonia Project. Procurement Method [**] Scope [***] Bid Docs sent. Total cost. G & Supervision ICB

Ministério de Minas e Energia. Minister Eduardo Braga. Brazil - Texas Chamber of Commerce - BRATECC May/2015

M onthly arket. Jan Table of Contents. Monthly Highlights

FOR IMMEDIATE RELEASE

Bank of Japan. Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, October 25, All items

Capital Project Tracking Report

Implementation Status & Results Report China GEF Large City Congestion and Carbon Reduction Project (P127036)

Energy Performance Information Request Timeline

Research and Statistics Department FOR RELEASE 8:50 A.M. Thursday, July 26, All items

Procurement Plan for TRP Additional Financing, July 06, 2009 Loan amount: 36,800,000 Loan currency: EUR

LIST OF OPEN TRAINING TRAINING PLANNER 2016/2017 Course location: Lagos, Abuja, Port Harcourt.

FOR IMMEDIATE RELEASE

Appendix E Water Supply Modeling

November 2018 Customer Switching Report for the Electricity and Gas Retail Markets

STAFF REPORT ACTION REQUIRED

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

Horseshoe Bay Terminal Open House

Research and Statistics Department FOR RELEASE 8:50 A.M. Tuesday, December 25, 2018

FOR IMMEDIATE RELEASE

Total Production by Month (Acre Feet)

DVD Backup Technical Information Web Site Gregg Maroney, Web Master Service Magazines

FOR IMMEDIATE RELEASE

Up and Down Months of the Stock Market

December. Next release: 13 February Oct/Sep Nov/Oct Dec/Nov Janu19 January Febru13 February 2018 Oct/Sep Nov/Oct Dec/Nov 2017

Draft Results and Open House

FOR IMMEDIATE RELEASE

PROCUREMENT SCHEDULE FOR EQUIPMENTS AND MATERIALS REQUIRED FOR CoE - BASIC, ADVANCE MODULES & UPGRADATION IN 28 I.T.Is ( Proposals) 2010 May

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

Action Requested From AMWG

Bulk Storage Containers

RESIDENTIAL WASTE HAULING ASSESSMENT SERVICES. January 10, 2011 Presentation to Arvada City Council

FOR IMMEDIATE RELEASE

Implementation Status & Results Bosnia and Herzegovina ROAD INFRASTRUCTURE AND SAFETY PROJECT (P100792)

Employees' Provident Fund Organisation, India Ministry of Labour & Employment, Government of India

January William W. Winpisinger Education and Technology Center. Sunday Monday Tue sday Wednesday Thursday Friday Saturday

STAFF REPORT ACTION REQUIRED

Year to Date Summary. Average and Median Sale Prices

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Energy Conservation Efforts

Hospitality & Tourism Management January 2015 Calendar Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3

Electric Vehicle Program

Inventory Levels - All Prices. Inventory Levels - By Price Range

Units of Instruction MISD Pacing Guide Days Date Range Test Date

Wheat Marketing Situation

GAZIFÈRE INC. Prime Rate Forecasting Process 2017 Rate Case

ANCR CRU Statistics February 2007 to December 2007

Research and Statistics Department FOR RELEASE 8:50 A.M. Tuesday, February 24, All items. Monthly change. Index

TECHNICAL SERVICE BULLETIN

November. Next release: 19 January Sep/AugOct/Sep Nov/Oct Dec 14 December Janu 19 January 2018 Sep/AugOct/Sep Nov/Oct 2017

January During JANUARY. Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 Dec Feb 2011

2016 UC Solar Research Symposium

Macroeconomic Outlook. Presented by Dr. Bruce A. Scherr Chairman of the Board Chief Executive Officer Emeritus

Solomon Islands Government. Statistical Bulletin: 11/2011. HONIARA CONSUMER PRICE INDEX (June 2011)

Prcurement of. Guidelines (PPA/BG) review (Yes/No) of contract signing RFQM PPR 2008 NO 1 Sept 09 (18 Nov 09) date of Bid opening

November 2017 Customer Switching Report for the Electricity and Gas Retail Markets

PUBLIC UTILITIES COMMISSION

TRANSPACIFIC CUSTOMER ADVISORY Implementation of New BAF Formula Effective January 01, 2019

The Peoples Gas Light and Coke Company

Sprinkler System Waiver Application Packet

Regulatory Status and Road Map for Wind Energy in Namibia

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Status Report on Bridges and Roads Repair/Renovations

LAX Specific Plan Amendment Study. CONCEPT DEVELOPMENT Public Meeting Series #5 August 23 & 26, 2006

Ameren Missouri. AMENDED Renewable Energy Standard Compliance Report Prepared in Compliance with 4 CSR

Appendix E Hydrology, Erosion and Sediment Transport Studies

Advancing our Fleet. Blue Springs School District. Bill Cowling Assistant Superintendent Blue Springs Schools

Massachusetts Electric Company and Nantucket Electric Company, Docket No. D.T.E

Factory activity accelerated further in our region this month, posting its highest composite reading since 2011, said Wilkerson.

RESTRUCTURING PAPER ON A. PROPOSED PROJECT RESTRUCTURING OF MUMBAI URBAN TRANSPORT PROJECT 2A Loan No IN June 29, 2010 TO THE REPUBLIC OF INDIA

Myanmar: Towards Universal Access to Electricity by Yangon, January 30, 2015

Automotive Gas Oil (Diesel) Price Watch

Public Disclosure Copy

Docket No. DE Dated: 05/04/2015 Attachment CJG-1 Page 1

IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA TEL: IMT PART NUMBER

M A N I T O B A ) Order No. 42/14 ) THE PUBLIC UTILITIES BOARD ACT ) April 23, 2014

Digitized for FRASER Federal Reserve Bank of St. Louis. Per cent. P Total reported (000) ^D-)>oCL

MEDIA PACK 2019 MAGAZINE WINDOWS DOORS CONSERVATORIES GLASS FABRICATORS DISTRIBUTORS INSTALLERS. October 2018 Issue

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

Algebra II Pacing Guide

TORONTO TRANSIT COMMISSION REPORT NO.

Peninsula Corridor Electrification Project (PCEP)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD ( W)

National Household Kerosene Price Watch

Alternatives to an Open Competitive Commercial Collection Program Presented by Robert Craggs RAM/SWANA Conference

Liquefied Petroleum Gas (Cooking Gas) Price Watch

Transcription:

Public Disclosure Authorized Public Disclosure Authorized I. GENERAL Ayeyarwady Integrated River basin Management Project (AIRBM) Procurement Plan 1. Project information a. Country/Borrower: Myanmar b. Project Implementing Agency: Ministry of Transport (Directorate for Water Resources and Improvement of River Systems) 2. Bank s approval of the procurement Plan a. Original Plan: October 24, 2014 b. Revised Plan September 7, 2015 c. Revised Plan: November 11, 2015 d. Revised Plan: February 26, 2016 e. Revised Plan: August 4, 2016 107491 Public Disclosure Authorized II. 3. of General Procurement Notice: a. : 18 February 2015 4. Period covered by this procurement plan: a. August 2015-December 2016 GOODS AND WORKS AND NON-CONSULTING SERVICES 1. Prior Threshold: Procurement Decisions subject to Prior by the Bank as stated in Appendix 1 to the Guidelines for Procurement. The prior review thresholds are as shown below unless otherwise stated for specific contracts. Procurement Procurement Threshold (USD) Prior Threshold Public Disclosure Authorized 1. ICB (Goods) Above 500,000 All contracts 2. Shopping (Goods) Below $500,000 >$200,000 3. ICB (Works) Above $500,000 All contracts 4. Shopping (Works) Below $500,000 >$200,000 5. Force Account - All contracts 6. Direct ing - >$5,000 1

Procurement Packages with s and Time Schedule WORKS: 1 2 3 4 5 6 7 Component 1 CW 1.1-1 CW 1.1-2 CW 1.1-3 CW1.2 Procurement CW1.3 PMU Building Car Park Direct CW 2.1 CW 3.1 CW3.1-5 Pre-Q (yes /no) Bid-Opening PMU Building ICB No Prior (O) Mar-16 (R) Nov -16 Demolition of DWIR Shopping No Post Dec - 15 Works completed Building Renovation of DWIR Shopping No Prior (O) Nov-15 Works completed Building (R) Jan - 16 Municipal Water Shopping No Post July-16 Supply Connection and Tank for Renovated PMU Building No Post June-16 Awarded to Shwe La Win Company Meeting Room Upgrade, DMH Yangon Office DWIR Sub-Project North Mandalay DWIR Micro-Project in Bagan and Pakokku shopping no Post (O) March-16 ICB No Prior (O) Mar-15 (R) Nov- 16 Force Account No Prior Feb. - 16 It has been divided into 5sub-components. Works commenced NON-CONSULTING SERVICES: 1 2 3 4 5 6 7 8 Procurement Pre-Q (yes/ no) Domestic Preference (yes/no) (Prior/ Bid- Opening S 2.1 Non-Consultancy Services: Flow surveys and rating reviews S3.1 Non-Consultancy Services: Hydrographic Survey Stretch 1 S3.2 Installation of Aids to Navigation Force Account Force Account Force Account No No Prior July-16 Report to be submitted No No Prior Sept-16 Report to be submitted No No Prior July-16 Report to be submitted 2

GOODS: 1 2 3 4 5 6 7 8 Component 1 G1.4.2 G1.4.3 DWIR Office Equipment ( Yangon Office) DWIR Office Furniture (Yangon Office) Procurement Pre-Q (yes /no) Domestic Preference (yes/no) Bid Opening date Shopping No No Post (O) Nov-15 (R) Feb - 16 Shopping No No Post (O) Nov-15 (R) Feb 16 G1.9 Vehicles Shopping No No Prior (O)May 16 (R)Aug-16 Goods Delivered 3 mini-buses and one pick-up G1.6 Accounting Software shopping No No post (O) May 16 (R) Jun -16 G1.7 Fibber cable Installation and Transmission for data Network for PMU and DWIR Office Direct ing No No post (O) March-16 G1.8 Office Upgrade/Maintena nce : WiFi Installation at DWIR G1.5 Relief Model of Ayeyarwady Basin G2.1.1 DMH Office Equipment (NPT + Yangon Office) G2.1.4 DMH Office Furniture (NPT Office + Yangon Office) G2.1 Fibber cable Installation and Transmission for data Network for DMH Office in NPT G2.2 ADCP Flow meters and associated equipment Shopping No No Post (O) May-16 Direct ing This service is provided only by the Government Office Ministry of Post and Telecommunication (Completed) Completed No No Post June-16 Mr. LwinKo Hein Architect, L.S. B.Arch., Dip. in Architecture (Y.T.U) Shopping No No Prior (First ) Jan. - 2016 Shopping No No Post (O) Nov-15 (R) Feb - 16 Shopping No No Prior (O) Feb. 16 Completed Goods Delivered shopping No No Post Aug.-16 To provide additional equipment for fast-track survey work. G2.1.3 Generators shopping No No Post July-16 2 generators one for PMU, one for DMH G3.1.1 Speed Boats shopping No No Prior March - 16 2 Speed Boats, 3 engines and 2 trailers Planned to be re-tendered G3.2 Topo-Hydrographic survey equipment, satellite images and maps, including installation of equipment and training in surveying G3.3 Supply and Delivery of Aids to Navigation shopping No No prior Aug-16 ICB No No prior Nov-16 G3.4 Multifunctional and Buoy Handling vessel ICB No No prior Nov-16 3

SELECTION OF CONSULTANTS 1. Prior Threshold: Selection decisions subject to Prior as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants. The prior review thresholds are as shown below unless otherwise stated for specific contracts. Selection Value Threshold (USD) Prior Threshold (US$) 1. QCBS/QBS (Firms) Above 500,000 All contracts 2. CQS Below 500,000 Above 100,000 3. Single Source (Firms) - Above 10,000-4. Individual Consultants (IC) - First contract; all legal and fiduciary positions; and long term advisory positions 5. Single Source (IC) - Above 10,000 2. Short list comprising entirely of national consultants: No short lists of consultants for services are expected to comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. However, if a need arises during the project implementation and if it is warranted, short lists of consultants for services estimated to cost less than $50,000 equivalent per contract may be composed entirely of national consultants. 3. All TORs for consulting services, whether subject to post review or prior review, shall be subject to Bank review and no-objection unless otherwise noted in the procurement plan. 4

CONSULTANCY SERVICES: 1 2 3 4 5 6 Selection Component 1 1 COMPONENT 1 DIRECTOR IC-Sole 2 3 4- a 4- b 5 6 7 8.a INTERNATIONAL PROJECT COORDINATION TO PROJECT DIRECTOR INTERNATIONAL PROCUREMENT NATIONAL PROCUREMENT OFFICER 1 NATIONAL PROCUREMENT OFFICER2 INTERNATIONAL FINANCIAL MANGEMENT NATIONAL PROJECT ACCOUNTANT INTERNATIONAL SAFEGUARDS NATIONAL ENVIRONMENTAL OFFICER Source Proposals Submission Prior May-15 Full Time ( signed) IC Prior (O) July-15 2 Year Estimated 6 Months Per Year IC Prior July-15 2 Year - 5 Months per year ( signed) IC Prior (O) Jul-15 (R) Feb. -16 2 Year Full Time ( signed) IC Prior (O) March -16 IC Prior July-15 2 Year - 5 Months per Year ( signed) IC Post (O) Jul-15 (R) Feb 16 signed IC Prior July-15 2 Year Estimated input 5 Months Per Year( signed) IC Post (O) Jul-15 (R) Feb. -16 ( signed) 8.b 9 10 11.a 11.b NATIONAL SOCIAL OFFICER IC Post Feb. -16 ( signed) COMPONENT 1 INTERNATIONAL IC Prior July-15 2 Year - 5 Months Per Year( signed) COMMUNICATION OFFICER FOR PMU DIRECTOR OFFICE STAKEHOLDER COMMUNICATION OFFICER 1 FOR COMPONENT 1 STAKEHOLDER COMMUNICATION OFFICER 2 FOR COMPONENT 1 IC Post (O)April- 16 IC Post (O)April 16 (R)July-16 IC Post (O)April 16 (R)July-16 ( Signed) 12 HIC INTERNATIONAL CONSULTANT IC-Single Source Prior July-15 Awarded to Adri Verway(Service completed) 15 National Financial Officer IC Prior (O) April 16 (R)July-16 18 Project Director Executive IC Post (O) Nov-15 (R) Mar- 16 Assistant 20 National IT Network Specialist IC Post (O) Nov-15 Full-Time 5

1 2 3 4 5 6 21 Design and Construction Supervision of DWIR Building Selection Proposals Submission CQS Prior (O) Jan-16 (R) June -16 Proposal received C1.1.12 AG Secretariat support officer IC Post Mar - 16 ( signed) C1.1.13 NWRC Secretariat support officer IC Post (O)March-16 (R) Aug-16 C1.1-14 HIC/GIS & Data Base Specialist IC Post (O) Nov-15 (R) July 16 C1.1-15 HIC/NWRC Technical Coordinator IC Post (O) Nov-15 C1.1-16 HIC Executive Assistant IC Post (O) Nov-15 C1.2.1. a C1.2.1. b C1.2.1. c Institutional and Development Planning - Team Leader and Institutional Specialist Institutional and Development Planning - Management Specialist Institutional and Development Planning - Governance Specialist IC Post (O) Mar- 16 IC Post (O) Mar- 16 IC Post (O) Mar- 16 C1.9.a Project Officer 1 for Component 1 IC Post (O) Mar 16 (R) May -16 C1.9.b Project Officer 2 for Component 1 IC Post (O) Mar 16 (R) May - 16 C1.10 HIC Junior Researchers (8 People) IC Post (O) Jan-15 (R) Jun - 16 C1.11-a HIC GIS Specialist IC Post (O) May-16 C1.11-b HIC Water Resource Engineer IC Post (O) May-16 C1.11-c HIC Resource Economist IC Post (O) May-16 C1.11-d HIC Environmental Scientist IC Post (O) May-16 C1.12 SOB Package 2: Groundwater and CQS Prior (O) May-16 data management C1.13 SOB Package 3: Sediments & geomorphology CQS Prior (O) May-16 C1.14 SOB Package 4: : Biodiversity & CQS Prior May-16 Fisheries C1.15 SOB Package 5: Sectoral CQS Prior (O) May-16 development and macroeconomics C1.16 SOB Package 6: 3D Mapping and local consultations CQS Prior (O) May-16 C1.17 Ayeyawady Master Plan and DSS QCBS Prior March-17 C1.18 PMU Website Developer IC Post July -16 55 working days input in 12 months 50 working days input in 12 months 50 working days input in 12 months 1 Year Full Time( signed) 1 Year Full Time ( signed) 6

1 2 3 4 5 6 Selection Proposals Submission C2.1-10 COMPONENT 2 INTERNATIONAL IC Prior July-15 2 Year Estimated 5 Months Per completed Year ( signed) C2.1 Project Officer IC Post July - 16 possibility of extension C2.2 DMH System Integrator QCBS Prior (O) June 2016 Evaluation of EOIs completed, RfP is expected to be finalized soon. C2.3 DMH International Institutional and Regulatory Consultant C2.4 DMH National Institutional and Regulatory Consultant IC Post July 2016 IC Post July 2016 C3.4-11 COMPONENT 3 INTERNATIONAL IC Prior July-15 Completed C3.4.1 Project Officer for IC Post (O) Mar 16 C3.6 Engineering design, Capacity Building and Construction Supervision for Sub Project1 C3.3 ESIA/SEA/EMP Supervision for Subproject 1 and Stretch 1 SSS CQS Prior (O) Feb. 16(R) July- 16 Prior (O) Nov-15 (R) Sep 16 2 Year Estimated 5 Months Per Year- 1 Year Full Time ( Signed) Royal Haskoning C3.9 Design of Navigation Aids Upgrade Program IC Post Mar- 16 signed Completed contracts Signed contracts 7