ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR

Similar documents
Case No.33/2010 AND. DUET India Infrastructure Pvt. Ltd., having its registered office at 815, ITT, Nehru Place, New Delhi

Before the. Case No. 106 of 2009

Case No. 109 of Coram. Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Distribution Co. Ltd.

Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

Guidelines for Solar Grid Power Projects

Wheeling charges, Banking charges & Cross Subsidy Surcharge for Solar Power Generators

Case No. 163 of In the matter of

Policy for Net-Metering based Renewable Energy Applications, Madhya Pradesh, DRAFT

GOVERNMENT OF NCT OF DELHI

Ministry of New and Renewable Energy (Jawaharlal Nehru National Solar Mission) Form B for Project Proposals for

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

KERALA STATE ELECTRICITY REGULATORY COMMISSION. NOTIFICATION Dated, Thiruvananthapuram 6 th August,2007

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

Solar PV Projects PPA Model

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its. Regulations, 2016 STATEMENT OF REASONS

Draft Solar Power Tariff - Ground Mounted Grid Connected and Solar Rooftop with Net Metering Regulations

Petition No. 1051, 1054 & 1055 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order :

Application for release of capital subsidy on installation of Grid Connected Solar Power Plant

Solar Energy Corporation of India Limited New Delhi Expression of Interest for Setting up of Solar PV Manufacturing Capacities in India

ASSAM ELECTRICITY REGULATORY COMMISSION

Policy & Regulatory Issues : Solar & Wind. Shri Rajinder Kumar Kaura CMD, Bergen Group India 21 st August 2014

CASE No. 35 of In the matter of

Panel Discussion on Accelerating Large Scale Deployment of Rooftop SPV in India

Case No. 77 of In the matter of

Orissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar , Orissa ** ** ** PUBLIC NOTICE

Nehru National Solar Mission, Phase II

25 th May Amal Sinha, CEO BSES Rajdhani Power Ltd.

SOLAR PV INTEGRATION: ISSUES & CHALLENGES with NET METERING

Frequently Asked Questions for Grid Connected Solar Rooftop Systems

24. SOLAR INCENTIVE PROGRAM II

Orissa Power Transmission Corporation Ltd. Janpath, Bhubaneswar , Orissa ** ** ** PUBLIC NOTICE

ROLE OF HAREDA IN NET METERING. By : P.C. Sharma Project Officer

Sun-Grid Electric Private Limited. Presented by:

BOOT/OPEX/Pay As You Use Model for Rooftop Solar Projects Workshop on Getting Started on Energy Management & Solar

Uttar Pradesh Electricity Regulatory Commission, Lucknow

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

Roof Top Solar Power Net Metering Solution. Guidelines for implementation of Net Metering for Roof Top Solar Power System

POWER DEVELOPMENT DEPARTMENT OF JAMMU AND KASHMIR JANIPUR, JAMMU TEL: FAX: PUBLIC NOTICE

Madhya Pradesh Policy for Rooftop Renewable Energy Projects, 2016

RENEWABLE ENERGY IN JORDAN What had to be done 8 Oct 2017

SUBSIDY SCHEME FOR GRID CONNCTED SOLAR ROOFTOP POJECT IN ASSAM UNDER THE 14 MW RESCO AND CAPEX MODEL

A CASE STUDY OF 15kW SOLAR INSTALATION

GRID-INTERACTIVE SPV ROOFTOP PLANTS: AN OPTION FOR INDIA GROWING ENERGY DEMAND

ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR *****************

Overview of S.L Competitive Energy Solutions for North Carolina

160 MW Solar-Wind Hybrid project with BESS at Ramgiri, Andhra Pradesh

Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Solar Rooftops in India

EXPRESSION OF INTEREST INVITING FROM

Considerations for Municipal Solar Projects. Ben Frevert Larsen Engineers November 16, 2016

Creating A Cleaner Energy Future For the Commonwealth. Growing Solar in MA. MMA Annual Meeting. Boston, 1/24/14

26 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects

In-House Paper on the implementation of Single Part Tariff in Power Distribution

Case No. 160 of In the matter of

Solar-Wind Specific Request for Proposals

Report No: BVQI/INDIA/6.49 rev. 01

BC Hydro writes in compliance with Exhibit A-4 to provide its Final Submission in respect of the Application (Exhibit B-1).

Case No. 164 of Coram. Shri. Anand B. Kulkarni, Chairperson

JEA Distributed Generation Policy Effective April 1, 2018

KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. Present : Sri. T. M. Manoharan, Chairman Sri. K. Vikraman Nair, Member OP 11/2016

TERMS AND CONDITIONS

Renewable Energy Integration: Wind, Solar and Energy Storage

Name and address of DISCOM with Logo. TARIFF NOTIFICATION The 22 rd March, 2018 RETAIL SUPPLY TARIFF EFFECTIVE FROM 1 st APRIL, 2018

Net +Plus Connection Code

PINANK ENERGY An ISO 9001: 2015 (QMS) Certified Company Channel Partner: Ministry of New and Renewable Energy, Govt of India

Contents. Solar Select TM Frequently Asked Questions

Agenda for Connectivity and Long Term (Open) Access of IPP Generation Projects in Odisha of Eastern Region

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

Renewable Regulatory Fund (RRF) Mechanism : -

ANNEXURE: TARIFF SCHEDULE

SSEFITAPP 2012_08_07 v2.1. FeeD-In TArIFF APPlICATIon ForM

MANIPUR GAZETTE E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY. No. 301 Imphal, Wednesday, January 7, 2015 (Pausa 17, 1936)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 17(2017)

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

Western Electricity Supply Company of Orissa Ltd., Burla, Sambalpur , Orissa

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

Feed in Tariffs. What is the feed-in tariff? Guaranteed for 25 years - by the UK Government. How do I claim the feed-in tariff?

Powering Your Home With The Sun. Introduction to Residential Solar Energy Systems [Your Name] ISEA Solar Ambassador

Consolidated Edison Company of New York, Inc.

ODISHA ELECTRICITY REGULATORY COMMISSION PLOT NO.4, CHUNOKOLI, SAILASHREE VIHAR, BHUBANESWAR ********

Net Metering implementation in Indian States for Rooftop Solar Deployment - State in Focus : Madhya Pradesh

TRANSMISSION CONNECTION CHARGING METHODOLOGY STATEMENT

(Liability of producers and importer for spent batteries and accumulators etc.)

Working Committee Report on Formulation of Regulatory Framework for Exploring Grid Connectivity of Solar Generators 1 MW & below capacity

Economics and Barriers to Solar Photovoltaic Applications in Barbados

RECOMMENDATION: It is recommended that the City Council, following a public hearing, adopt the attached resolution which:

Madhya Pradesh Policy for Decentralized Renewable EnergySystems,2016

ALZ Electrical Solar Consumer Guide

Analysis of Indian electricity distribution systems for integration of high shares of rooftop PV By Joerg Gaebler, IGEN Solar, GIZ India

ANNEXURE: TARIFF SCHEDULE

UK Power Networks Use of System Charging Methodology

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

2019 NYC Solar Installer Workshop: Solar and Storage. March 18, 2019

Electricity Demand Reduction Pilot BSRIA. Charlie Lewis, DECC 25 March 2014

Buy All Sell All Rider for Interconnection of Renewable Generation

Transcription:

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR 751012 ********** Present : Shri B K Das, Chairperson Shri K C Badu, Member Shri B K Mishra, Member In The Matter of: Petitions under Section 62 and 86(1) (e) of The Electricity Act, 2003 for Determination and Declaration of Tariff for Power Procurement by the Distribution licensee/gridco in State of Orissa from Grid Interactive Solar Photovoltaic Power Projects under Rooftop PV and Small Solar Generation Programmes (RPSSGP) announced by MNRE, GOI, on 16 th June, 2010. Case No. 58/2010 M/s Sahara India Power Corpn. Ltd.. Petitioner Case No. 60/2010 M/s Moser Baer Active Power Ltd. Petitioner Case No. 61/2010 M/s RSB Energy Pvt. Ltd. Petitioner Case No. 62/2010 M/s Alex Solar Pvt. Ltd. Petitioner Case No. 63/2010 M/s Alex Solar Pvt. Ltd. Petitioner Case No. 64/2010 M/s Abcus Holding Pvt. Ltd.. Petitioner 1

Case No. 68/2010 M/s MB Active Power Ltd. Petitioner Case No. 69 /2010 M/s Pan Time Finance Company Pvt. Ltd. Petitioner Case No. 70 /2010 M/s Shri Mahavir Ferro Alloys Pvt. Ltd., Petitioner GRIDCO & Ors.... Respondents Case No. 71 /2010 M/s Shri Mahavir Hi-Tech Chemicals Pvt. Ltd. Petitioner Case No. 72/2010 M/s Raajratan Energy Holdings Pvt. Ltd.. Petitioner Case No. 73/2010 M/s D.V. Traders Pvt. Ltd.. Petitioner Case No. 74/2010 M/s Legend Steels Pvt. Ltd.. Petitioner Case No. 75/2010 M/s Lakshya Suppliers Pvt. Ltd.. Petitioner Case No. 76/2010 M/s RSB Energy Pvt. Ltd.. Petitioner Case No. 77/2010 M/s Shanti Energy Projects Pvt. Ltd.. Petitioner 2

Case No. 79/2010 M/s e10 Six Solar India Pvt. Ltd.. Petitioner Case No. 80 / 2010 M/s Great Eastern Power Projects Pvt. Ltd.. Petitioner CEO, CESU & Ors... Respondents Case No. 82 / 2010 M/s Ananya Energy Pvt. Ltd.. Petitioner Case No. 83 / 2010 M/s Molisati Vinimay Pvt. Ltd.. Petitioner Case No. 84 / 2010 M/s S. N. Mahanty. Petitioner Case No. 85 / 2010 M/s OCL Iron & Steel Ltd.. Petitioner Case No. 86 / 2010 M/s Seashore Securities Ltd.. Petitioner Case No. 87 / 2010 M/s MGM Minerals Ltd.. Petitioner Case No. 88 / 2010 M/s IDEN Technologies Pvt. Ltd.. Petitioner Case No. 89 / 2010 M/s Pragati Electrocom Pvt. Ltd.. Petitioner 3

Case No. 90 / 2010 M/s Vaishali Agencies Pvt. Ltd.. Petitioner Case No. 91 / 2010 M/s Himco Finlease Pvt. Ltd.. Petitioner Case No. 92 / 2010 M/s Udhav Builder Pvt. Ltd.. Petitioner Case No. 93 / 2010 M/s VASA Pharmachem Pvt. Ltd.. Petitioner Case No. 94 / 2010 M/s Ananth Technologies Ltd.. Petitioner Case No. 95 / 2010 M/s Jay Iron & Steels Ltd.. Petitioner Case No. 96 / 2010 M/s Lingaraj Infrastructure Pvt. Ltd.. Petitioner Case No. 97 / 2010 M/s Max-Tech Oil & Gas Services (Pvt). Ltd.. Petitioner Case No. 98 / 2010 M/s Karthik Enterprises. Petitioner Case No. 99 / 2010 M/s Shiv-Vani Oil & Gas Exploration Services Ltd.. Petitioner 4

Case No. 100 / 2010 M/s Citygold Management Services Pvt.Ltd.. Petitioner Case No. 101 / 2010 M/s KTR Enterprises Pvt.Ltd.. Petitioner Case No. 102 / 2010 M/s Citygold Farming Pvt.Ltd.. Petitioner Case No. 103 / 2010 M/s Patnaik Minerals Pvt.Ltd.. Petitioner Case No. 104 / 2010 M/s Citygold Education Research Ltd.. Petitioner Case No. 105 / 2010 M/s Maa Bhagabati Solar Farms Pvt.Ltd.. Petitioner Date of Hearing: 07.07.2010 Date of Order: 09.07.2010 ORDER 1. A group of petitioners/developers have filed petitions for determination of tariff for the procurement of power by distribution licensee / GRIDCO in the State of Orissa from Solar PV Power Projects from 100 KW upto 2 MW under MNRE guidelines. As the prayers of all the petitioners are common in nature the petitions are taken together for analogous hearing. 2. During the hearing some Developers/petitioners in Case Nos.82 of 2010 to 105 of 2010 mentioned that they had filed their applications on 6 th July, 2010 and on the date of hearing itself, and requested to take up the matters during the present hearing. They prayed that due to fast approaching deadline fixed by IREDA their petitions may be disposed of with other similar petitions. GRIDCO and other respondents have no objection to take up their matters. The Commission, in the interest of the State, allowed the prayer of the developers/petitioners and heard along with other similar petitions. Some developers who had previously applied for tariff determination of their 3 MW and 5 MW Solar PV Power Plants also requested the Commission to 5

consider their case as 2 MW plant to avail the MNRE incentive. The Commission allowed the same. 3. Heard the petitioners and the respondents at length. 4. The background of the cases are as follows: Ministry of New and Renewable Energy (MNRE) in order to give a thrust to rooftop PV and other Small Solar Power Plants connected to distribution network at Voltage level below 33 KV has launched a programme called Rooftop PV and Small Solar Power Generation Programme (RPSSGP) to provide Generation Based Incentives(GBI). The key features of the programme are as under: The Project Proponents would be selected as per these guidelines for development of solar power projects to be connected to distribution network at voltage levels below 33 KV. The projects should be designed for completion before March 31, 2013. The local distribution utility in whose area the plant is located, would sign a Power Purchase Agreement (PPA) with the Project Proponent at a tariff determined by the appropriate State Electricity Regulatory Commission (SERC). 5. The MNRE has issued the final guidelines for installation of Rooftop PV and Small Solar Power Plants under Jawaharlal Nehru National Solar Mission (JNNSM) on 16.06.2010 based on GBI. Project schemes from States wherein tariff tenure for duration of 25 years with tariff structures on levellised basis has been determined by SERCs shall alone be considered to be eligible to participate in this programme (RPSSGP). The GBI shall be equal to the difference between the tariff determined by the Central Electricity Regulatory Commission (CERC) and the Base Rate which will be Rs.5.50 per KWh (for financial year 2010-11) which shall be escalated by 3% every year. The GBI shall be payable to the distribution utility for a period of 25 years from the date of commissioning of the project. IREDA has been designated as Programme Administrator by the MNRE for administering the generation based incentive programme for rooftop PV and other small solar power plants. It is proposed to develop solar capacity of 100 MW under these guidelines. This capacity addition has been divided into two categories and the projects connected at HT level of distribution network with installed capacity of 100 KW and upto 2 KW is now open for registration with IREDA. 6. The all application for registration with Project Administrator (IREDA) shall have to fulfill the following condition namely: (a) Issuance of relevant tariff from the concerned SERCs (in case of Orissa - OERC). (b) MoU with Utility (in case of Orissa GRIDCO). (c) (d) Pre-registration Certificates from State Competent Authority (in case of Orissa OREDA). Commitment Guarantee of requisite amount. 6

7. The time frame for the Programme Management by the Project Administrator (IREDA) has been specified as follows: i. Commencement of Registration by Programme Administrator (IREDA)- 15.07.2010. ii. Announcement of initial short-listing 16.08.2010. 8. All the project developers prayed before the Commission that the commencement of registration by Programme Administrator for installation of Rooftop PV and Small Solar Power Plants under JNNSM would start on 15.07.2010 by which time the eligibility criteria should have been fulfilled including levellised tariff for RPSSG Scheme with a tenure for a duration of 25 years. 9. During hearing M/s. Moser Baer, New Delhi submitted that the Solar power plant is a must run plant. While giving any scheduling instruction the principle of the must run plant should be kept in mind. The tariff from time to time may be revised but it should not be less than the solar energy purchase agreement initially agreed between the parties. They have applied to OREDA for Pre-registration certificate required for registering the project with the Programme Administrator (IREDA) and subsequently reporting progress on implementation of the project. 10. All the project developers submitted that their proposed power plants should be connected with nearest 33/11 KV sub-stations of DISCOMs and metering arrangement should be made at generating bus bar. They unanimously requested the Commission to direct the DISCOMs to bear the cost of interconnection arrangement from their generating bus bar. OPTCL prayed that Renewable Energy generator of 5 MW size should be connected to 33 KV side of Grid sub-station. 11. All the DISCOMs submitted that the connectivity cost upto DISCOM interconnection point should be borne by the Project Developers. The representative of Project Development Consultant urged the Commission that if OPTCL/DISCOMs failed to provide interconnection with their network in time then deemed generation Clause should be incorporated in the PPA. 12. Mr. R P Mohapatra representing some of the developers requested the Commission to direct GRIDCO to sign PPA with project developers quickly so that registration of the project could be made with IREDA on 15.07.2010 otherwise State would lose a big opportunity. Commission s Observations: 13. The Commission heard all the petitioners and the respondents including OREDA, GRIDCO, OPTCL, DISCOMs and SLDC. The Commission also very carefully perused the guidelines of the MNRE and the statutory provision under section 86(1)(e) of the Electricity Act, 2003 which mandates the Commission to promote cogeneration and generation of electricity from renewable sources of energy. Based on these inputs and statutory mandates the Commission decides to lay down the following for Power Plants coming up under Rooftop PV and Small Solar Power Generation Programme (RPSSGP) of MNRE. 14. Rooftop PV and Small Solar Power PV projects connected at HT level of distribution network with installed capacity of 100 kw and upto 2 MW would be eligible for 7

getting the preferential tariff determined by the Commission under this order. While issuing the order the Commission is purely guided by the Guidelines for Rooftop and Other Small Solar Power Plants issued by MNRE under Jawaharlal National Solar Mission and Draft Tariff Guidelines for Rooftop PV and other Small Solar Power Plants issued by CERC on 9 th June, 2010. 15. As per the above guidelines, IREDA has been designated as Programme Administrator by the Ministry of New and Renewable Energy. The power projects selected under this scheme shall be connected to HT level of distribution network at voltage levels below 33 KV i.e. at 11 KV in Orissa. The project size shall vary from 100 kw upto 2 MW. The MNRE Guidelines also state that the projects under this scheme shall be designed for completion before 31 st March, 2013. A PPA/MOU shall be signed between the local distribution utility in whose area the plant is located with the project proponent at a tariff by the concerned SERC. Further, MNRE shall consider the project schemes from states wherein levelised tariff has been determined for the full tenure of 25 years. The MNRE has designed scheme of Generation Based Incentive (GBI) which shall be payable to the distribution utility for power purchased from solar power projects selected under these guidelines. The GBI shall be equal to the difference between the tariff determined by the CERC and Base rate, which will be Rs.5.50 per kwh for (financial year 2010-11) and shall be escalated by 3% every year. Base Rate of Rs.5.50 per kwh to be considered for the purpose of computation of GBI, shall remain constant over duration of 25 years. Thus, GBI determined for a project (which is the difference of CERC determined tariff and Base Rate) shall remain constant for entire duration of 25 years. Base rate for projects to be commissioned for each subsequent year shall also be modified at escalation factor of 3% per annum and such escalated Base Rate shall remain constant over duration of 25 years. There shall be pre-registration by the project developers with the State Competent authority and registration with the Programme Administrator (i.e. IREDA). This registration process with IREDA shall commence from 15 th July, 2010. The developers under this scheme fulfilling four conditions viz. (a) issuance of relevant tariff order from concerned SERC (b) MOU with utility, (c) pre-registration certificate from State competent authority and (d) commitment guarantee of requisite amount shall be eligible for registration with IREDA. 16. The Govt. of Orissa has declared Orissa Renewable Energy Development Agency (OREDA) as the Nodal Agency (State Competent Authority) to pre-register the proposals from the prospective developers for holding Rooftop PV and other Small Solar Power Generation (RPSSGP) under Jawaharlal Nehru National Solar Mission. OREDA has issued an Expression of Interest inviting eligible independent power producers for pre-registration of solar power projects in the state of Orissa under the scheme. 17. In order to enable the project proponents to get registered with IREDA, the Commission hereby determines the following generic tariff for Rooftop PV and other Small Solar Power Plants to be commissioned in the State of Orissa under Jawaharlal Nehru National Solar Mission. 18. The following tariff parameters are being considered while determining the generic tariff: 8

(1) Financial Parameters (a) Capital Cost (b) Debt equity ratio (c) Loan and finance charges (d) Depreciation (e) Return on equity (f) Interest on Working Capital (g) Operation and maintenance expenses 19. Capacity Utilisation Factor (CUF) has been assumed at 18.5% which is the average of 18% recommended by Draft CERC guideline and 19% recommended by the study carried out by WISE taking into consideration the state specific parameters. Capital cost has been taken as Rs.17 cr. per MW which is very close to what is assumed in the draft tariff guidelines for rooftop PV and other Small Solar Power Plants dtd.09 th June, 2010. Debt-equity ratio is assumed at 70:30 which is as per CERC Draft Guidelines. Interest on loan is assumed at 12.5% considering the recent base rate of 7.5% specified by State Bank of India. Loan repayment period is considered as 10 years. Differential depreciation of 7% is allowed during 1 st ten years of the tariff period and remaining depreciation shall be spread over the balance useful life of the project from 11 th year onwards. Pre-tax return on equity of 19% per annum for 1 st ten years and 24% per annum from 11 th year onwards has been assumed. Interest on working capital has been taken at 12% considering base rate of 7.5% of SBI. O & M expenses have been assumed at Rs.11 lakhs per MW with 5.72% escalation per annum. Levellised tariff is computed over useful life and will be applicable for 25 years. Table-1 No Technical Parameters Value Unit 1 Capacity Utilization Factor 18.50% % 2 Annual Gross Generation 16.21 Lakh kwhs 3 Life of Plant and Machinery / Project Life 25 Years No Financial Parameters Value Unit 1 Cost of Rooftop Solar PV Project 1700 Rs Lacs 2 Debt 1190.00 Lacs 3 Equity 510.00 Lacs 4 Interest Rate on Term Loan 12.50% % 5 Repayment Period 10 Years Depreciation (Straight Line Method,Company Law) - for first 10 years 7.00% % 6 7 O&M cost 11.00 Rs. Lakhs 8 O&M Cost Escalation 5.72% % 9 Return on Equity - pretax (1-10 years) 19.00% % 10 Return on Equity - pretax (11-25 years) 24.00% % 11 Interest on working capital 12.00% % 12 Levellised Tariff for 25 years 18.52 Rs./kWh 9

20. Based on the above financial and operational parameters the levellised tariff works out to Rs.18.52 per kwh. This tariff is comparable with the one given by TNERC at Rs.18.45 per kwh and MERC Draft Order at Rs.18.41 per kwh for FY 2010-11. 21. The Commission recognizes the need to encourage the roof-top and small SPV projects in order to fulfill the Renewable Purchase Obligation (RPO) as laid down in OERC (Renewable Purchase Obligation & its Compliance) Regulations, 2010 and also the national target specified under Jawaharlal Nehru National Solar Mission. Accordingly, the Commission directs GRIDCO (the State Nodal Agency to procure power) to procure energy from solar power projects which shall come up under the present scheme of MNRE. The Commission further directs as under: 22. Following the MNRE guidelines, GRIDCO, the State Nodal Agency for power procurement shall sign a Power Purchase Agreement (PPA)/ MOU with the project proponent at a tariff determined by this Commission and presented in Table-1 above on or before 12 th July, 2010. It is further provided that the benchmark capital cost for Rooftop PV and Other Small Solar Power Projects may be reviewed annually by the Commission in line with Tariff Guidelines and its amendments, if any, published by CERC. 23. GRIDCO shall receive Generation Based Incentive (GBI) for power purchased from solar power projects selected under these Guidelines. 24. The GBI shall be equal to the difference between the tariff determined by the CERC and the Base Rate, which will be Rs.5.50 per kwh (for FY 2010-11), which shall be escalated by 3% every year. 25. The GBI shall remain constant for entire duration of 25 years. Base Rate for projects to be commissioned during each subsequent year shall also be modified at escalation factor of 3% per annum and such escalation base rate shall remain constant over duration of 25 years. The GBI shall be disbursed as per IREDA guidelines. 26. The project developer shall submit a letter from the concerned distribution utility in whose area the plant shall be set up confirming technical feasibility of connecting plant to the distribution transformers/substation. 27. The metering point for energy accounting shall be at HT side of generating transformer of RPSSGP. The RPSSGP shall be connected normally to the 11 KV bus of the nearest 33/11 KV bus of DISCOM s substation. With the consent of DISCOM in the specific cases the RPSSGP may also be connected to the nearest 11 KV line through LILO arrangement. The necessary interconnecting line shall be constructed by DISCOM and the cost of such interconnection shall be reimbursed by the project proponent to the DISCOM. The billing meter will be jointly read by the project proponent, GRIDCO and DISCOMs for proper energy accounting and billing by the project proponent to GRIDCO at OERC determined rate and GRIDCO to DISCOM at approved BSP rate. Technical requirements for these Solar Power Plants shall be as specified in the Guidelines of CERC for Rooftop and other Small Solar Power Plants and as amended from time to time. 28. Rebate: For payment of bills of the Rooftop PV and Other Small Solar Power Projects through letter of credit or by cash within two working days (except holidays 10

under N.I. Act), a rebate of 2% shall be allowed. Where payments are made other than through letter of credit within a period of one month of presentation of bills by the generating company, a rebate of 1% shall be allowed. 29. Late Payment Surcharge: In case the payment of any bill for charges payable under these Guidelines is delayed beyond a period of 60 days from the date of billing, a late payment surcharge at the rate of 1.25% per month shall be levied by the generating company. 30. Sharing of CDM benefits: The proceeds of the carbon credit from approved CDM Project shall be shared between the project developers and GRIDCO in the following manner. (a) 100% of the gross proceeds on account of CDM benefit to be retained by the developer in first year after the date of commercial operation. (b) In the second year, the share of GRIDCO shall be 10% which shall be progressively increased by 10% every year till it reaches 50%, where after the proceeds shall be shared in equal proportion by generating company and GRIDCO. 31. Subsidy or incentive by the Central/State Government: The Commission shall take into consideration any incentive or subsidy offered by the Central or State Government, including accelerated depreciation benefit if availed by the project developers. Any developer availing accelerated depreciation, the same shall be internalized in the tariff and accordingly the tariff per kwh shall be reduced to the extent of Rs.3.13 per kwh. This means the effective tariff for developers availing accelerated depreciation shall be Rs.18.52 minus Rs.3.13 which equals to Rs.15.39 per kwh on a levellised basis. 32. In view of the urgency for registration of the Rooftop PV and Small Solar Generation Programmes with the Programme Administrator (IREDA) in time, Commission directs to implement the programme under following timelines: (a) Issuance of relevant tariff order as per this order. (b) MoU with GRIDCO on or before 12.07.2010 (c) Pre-registration Certificates from OREDA on or before 14.07.2010. (d) Commitment Guarantee of requisite amount with IREDA by project proponent positively by 15.07.10. 33. Accordingly, the matters are disposed of by this common order. (B.K. Misra) (K.C. Badu) (B.K. Das) Member Member Chairperson 11