TURBOCHARGER L INSTALLATION GUIDE

Similar documents
05-08 GT. Hellion Power Systems Mustang Kit Instructions

03-04 Mach 1. Hellion Power Systems Mach 1 Kit Instructions

4. Remove (4) 10mm and (1) 7mm bolt that holds fascia at front corners, on each side

2017+ L5P Duramax 3 ½ Down Pipe & EGR Fix Kit

3 October 2016 PN# V Dodge Twin Turbo Kit (I-00274) ½ D o d g e 2 4 v I S B

Installation Instructions

IAG Air / Oil Separator (AOS) For STi

99-04 GT. Hellion Power Systems Mustang GT Kit Instructions

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

INSTALL MANUAL D o d g e 1 2 v 6 B T A PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION.

SLP Camaro ZL1 STAGE 3 (650 HP)

4 December 2017 PN# , , Dodge 6.7L Rumble B SXE (I-00400) 1. BD Rumble B SXE. D o d g e 6. 7 L H P C R Installation Instructions

Wrenches: ⅞, 8mm, 10mm, 13mm, 19mm P. allen, Other: Electrical Tape

Step 6: Remove and save the MAP sensor for later use. Step 7: Remove the passenger side intercooler pipe and the EGR intake manifold.

IAG Street Series Air / Oil Separator (AOS) For WRX & WRX STI

Shotgun Single Barrel HPFP install guide

Included parts: 1 - BorgWarner SX-E Turbocharger 1 - SX-E 90-Degree Compressor Outlet Elbow 1 - HSM Cast Exhaust Manifold 1 - HSM Downpipe

03-04 Cobra. Hellion Power Systems Mustang Cobra Kit Instructions

CHALLENGER TWIN TURBO SYSTEM INSTALLATION INSTRUCTIONS

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Shotgun Double Barrel HPFP install guide

BD 6.7L Super B Special Turbo Kit For L Dodge -- I n s t a l l a t i o n I n s t r u c t i o n s -- PN#

Installation Instructions

Ford 6.0L. Part #: Part #: BD GASKET PART# will be needed for this installation.

2016+ NISSAN TITAN XD

IAG Competition Series Air / Oil Separator (AOS) For 2017 STI

Parts List See cover Page

BD TrackMaster S D o d g e H P C R Installation Instructions

IAG Street Series Air / Oil Separator (AOS) For WRX & WRX STI

Procharger Stage II Intercooled Supercharger System (11-14 GT)

IAG Street Series Air / Oil Separator (AOS) For WRX & WRX STI

96-04 tt. Hellion Power Systems Mustang Twin Turbo Kit Instructions

Performance Inlet Manifold

Installation Instructions

8 Zip Tie Zip Tie 1 Union Fitting 1 ½ ½ Union Reducer Fitting Union 1 5/8 ½ (For Plastic Intake Manifold Vehicles)

Single Barrel Shotgun HPFP Install Guide

Tools Required. Metric Wrench Set Screwdriver Set Metric Socket Set Pliers Heavy duty hydraulic Jack and Car Stands Box knife or similar Hacksaw WD40

SLP Camaro ZL1 STAGE 2 (625 HP)

JBR MAZDASPEED

Installation Manual v1.0: MST Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

V1 Truck Manifold Turbo Kit for F-body

Phone Fax

IAG Street Series Air / Oil Separator (AOS) For WRX

2015+ SUBARU STI FRONT-MOUNT INTERCOOLER PARTS LIST AND INSTALLATION GUIDE INSTALL DIFFICULTY DISCLAIMER CAUTION INSTALL PROCEDURE TOOLS NEEDED

Includes: 1. High Flow Turbo Up-Pipe 1. J-Hook Block Off / Coolant Reroute 1. Coolant Hose 1. EGR Valve Block Off Plate 2. Hose Clamps 4.

2006 Honda Civic SI Supercharger Kit Installation Instruction Kit #

XDP Complete EGR Race Track Kit w/up-pipe. Item Number: XD144

IAG Street Series Air / Oil Separator (AOS) For 2017 WRX

Included parts: 1 - New Bosch CP3 Pump 1 - HSM Pulley 1 - Serpentine Belt 1 - Pump Bracket/ Hardware STEP 1

TURBO KIT INSTRUCTIONS

* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION

MAZDASPEED3 Intercooler Instructions

IAG Street Series Air / Oil Separator (AOS) For WRX

2015 Corvette Supercharger System Instructions

Ford 6.0L Regulated Return Kit

Installation Manual v1.0: Aurora Plus Turbo Kit ( ) 5.9L Dodge. Please read all instructions before installation.

SHELBY GT500

Always use fuel with a minimum octane rating of 93 (R+M)/2. (Equivalent to 98 RON).

#TL T EA888 GEN 3 FUELING SYSTEM/ INSTALLATION INSTRUCTIONS

OIL COOLER KIT CHEVY CAMARO 2.0T PARTS LIST AND INSTALLATION GUIDE INSTALL DIFFICULTY DISCLAIMER CAUTION TOOLS NEEDED NOTE INSTALL PROCEDURE

All cores due 30 days after invoice date - no credit after 60 days.

IAG Competition Series Air / Oil Separator (AOS) For WRX

Includes: 1. J-hook Block Off / Coolant Reroute 1. Coolant Hose 1. Turbocharger Up Pipe Block Off Disc 2. Hose clamps

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

FULL LENGTH HEADERS/ CATTED HEAD PIPES

Ford Racing Performance Improvement Intake Manifold (96-04 GT) Time Necessary: Approximately 4 hours

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi Document# Support:

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

INSTALLATION INSTRUCTIONS AOS-R (Air Oil Separator-Return) Turbo Subaru and STi

Scion FR-S ZN6. GTX2867R Gen2 (Internal Wastegate) Installation Instructions GPP P/N #

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D E92 335is (N54 engine) with BMW M-Technic bumper and with stock oil cooler

Instant Chat off the main page of Or simply call our tech team at

EXHAUST SYSTEM AND INTAKE MANIFOLD

INSTALLATION INSTRUCTIONS AIR/OIL SEPARATOR KIT

Mercedes E63/CLS AMG Carbon Turbo Intake System Instructions

7 th Gen. Celica GTS Turbo Kit Installation Guide This kit has not been CARB approved and is intended for racing / offroad purposes only.

Owner smanual. Banks Monster-Ram Intake and Grid Heater Delete Kit. For Racing Only Ram 6.7L Pickup Trucks. with Installation Instructions

FREE $15 Gift Card for every $100 spent on Ship To Home orders. Find Out How

JK V8 HEMI BUILDER KIT Overview

Corvette Stage X Twin Turbo Installation. Please read the entire instructions as we ve made many changes.

INSTALLATION INSTRUCTIONS CATCH CAN KIT

EXHAUST SYSTEM AND INTAKE MANIFOLD

Disconnect negative battery cable and remove coolant bottle cap.

MTF Power Package Warranty Guidelines & Installation Instructions

1501 Industrial Way N., Toms River, NJ Fax: PACKING LIST

INSTALLATION INSTRUCTIONS BILLET FUEL RAIL KIT

ADJUSTMENTS Mazda MX-3. Fig. 1: Identifying Engine Code & Number Courtesy of MAZDA MOTORS CORP. VALVE CLEARANCE ADJUSTMENT

Revised 10/23/2015 Page 2 of 10

Keeping You Cool Under Pressure

Ford 6.7 EGR Delete Kit

1988 Ford F-350 PICKUP

Charger, Magnum, 300C 5.7L & 6.1L Supercharger Installation Manual

Edelbrock E-Force Supercharger Part #1538: Dodge 1500 Truck 5.7L V8 HEMI

TiAL R770 & S605. Installation notes. TIAL Sport!! TiALsport.com!! Revision 2

Includes: 1. Silicone Hose 2. EGR Block Off Plates 1. Exhaust Block Off Plate 2. Hose Clamps 1. Spacer/Washer 8. Bolts 2. Nuts

INSTALLATION GUIDE. CTS MBQ Front Subframe Bushing Kit CTS-MQB-BOSS Mufford Crescent, Unit #309 Langley, British Columbia V2Y 2V9

TABLE OF CONTENTS PARTS LIST

L Intake Manifold Part #

OIL COOLER KIT INSTALLATION INSTRUCTIONS PART NUMBER D

BBK Intake Manifold Kit ( L) - Installation Instructions

Transcription:

1

TURBOCHARGER INSTALLATION GUIDE TABLE OF CONTENTS Chapter Page 1 Intake and Cooling System Preparation 04 2 Intake Plenum and Manifold 08 3 Turbocharger Lubrication 11 4 Fuel Injectors 13 5 Re-installing the lower intake manifold 14 6 Ventilation Hose Assembly 15 7 Heater Hoses 17 8 Turbo Air Filter preparation 18 9 Turbo Oil Drain 19 10 Removing the factory exhaust 22 11 Installing the Wastegate and Turbo Piping 24 12 Adding the flanges to the Turbo 27 13 Installing the Turbocharger to the Exhaust Piping 28 14 Intercooler Manual Transmission 31 15 Intercooler Automatic Transmission 34 16 Coolant Reservoir 37 17 Power Steering 38 18 Power Steering Reservoir 39 19 Charge Pipe 41 20 Attaching the Wastegate to the Downpipe 42 21 Purge the Cooling System 43 22 Re-install the Intake Plenum 44 23 Install Upper Charge Pipe 46 24 Programming 47 25 Completion 49 2

VEHICLE APPLICATIONS 2012 2018 JEEP JK WRANGLER & UNLIMITED ALL TRIM LEVELS INCLUDED INFO AND REQUIREMENTS ĥĥ ĥĥ ĥĥ ĥĥ ĥĥ ĥĥ ĥĥ ĥĥ Prodigy Performance warrants all products against defects in materials or workmanship for 1 year from date of purchase. No warranty is provided or extended regarding vehicle or its components. This is a high performance modification designed to dramatically increase the engine output. Results may vary. Operate vehicle responsibly. Designed and sold for Off-road use only. Minimum 2 suspension lift is required. If vehicle is already equipped with a computer flash device it must be completely returned to its stock configuration. High quality top-tier fuel with a minimum octane rating of 91 must be used at all times. If ANY fuel is used other than the minimum 91 octane severe engine damage will result. Read ALL instructions prior to beginning the installation. Verify inventory packing list contents prior to beginning installation. This will ensure a smooth installation process and minimize aggravation. Professional installation is recommended. Failure to install the components correctly can result in severe damage to the vehicle and potentially personal injury. If at any time you are unsure about a step in this installation, please do not take any chances or make any assumptions. Call Prodigy Performance Toll Free at 1-855 TURBO JEEP. INSTALLATION TIME ĥ 12 Hours 3

STEP 1 INTAKE AND COOLING SYSTEM PREPARATION In this step we will be removing the factory intake system from the vehicle and preparing the cooling system. DISCONNECT NEGATIVE BATTERY TERMINAL BEFORE BEGINNING THE INSTALL PROCESS! a. Remove entire factory air intake system including lower box portion under air filter. b. Remove intake air temperature sensor for later use. c. Remove lower front shield. d. Drain coolant at petcock on passenger lower side of radiator and save in clean container for later use. 4

STEP 1 INTAKE AND COOLING SYSTEM PREPARATION e. Remove aluminum coolant pipe assembly from passenger side of engine. 5

STEP 1 INTAKE AND COOLING SYSTEM PREPARATION f. Using the box end of a wrench, gently rotate the coolant fitting upwards towards alternator as shown. g. Remove lower radiator hose from radiator. Slide clamp back as shown and use as a guide to shorten hose length. h. Using a long blade cut the hose then reinstall hose back on radiator. It will now have a new orientation and allow more room between engine and cooling fan assy. 6

STEP 1 INTAKE AND COOLING SYSTEM PREPARATION i. Slide abrasive sheath forward to protect it from components it comes in contact with at lower portion. 7

STEP 2 INTAKE PLENUM AND INTAKE MANIFOLD In this step we will be removing the intake plenum and intake manifold from the vehicle. Note: Fuel liquid and vapor will be present during this step. Take necessary precautions and clean up immediately if spill occurs. a. Remove nuts from brackets on both sides and bolts down center of manifold. b. Disconnect electrical connectors from sensors and throttle body. c. Disconnect hoses from plenum. d. Remove intake plenum. 8

STEP 2 INTAKE PLENUM AND INTAKE MANIFOLD e. Remove 8 bolts and disconnect electrical connectors to fuel injectors. f. Loosen vehicle fuel cap to relieve pressure in fuel tank. g. Remove safety tab on fuel supply connection. h. Carefully remove wire harness hold downs. i. Remove lower intake manifold. 9

STEP 2 INTAKE PLENUM AND INTAKE MANIFOLD j. Remove and discard heater hose connections at heater core. Slide back clamps and use a razor knife to slit the hose open. Peel hose away from pipes being careful not damage heater core aluminum. 10

STEP 3 TURBOCHARGER LUBRICATION In this step we will be installing a T fitting between the oil pressure sensor and the engine. This will provide lubrication to the turbocharger. a. Route cooling hose behind fuel line as shown. b. Disconnect 2 electrical connectors and remove oil pressure sensor. c. Apply Teflon tape to extension on both sides and insert into T-fitting as shown. d. Install extension and T-fitting where oil pressure switch was removed and tighten. 11

STEP 3 TURBOCHARGER LUBRICATION e. Install and tighten oil pressure sensor to T-fitting as shown. f. Apply Teflon tape to supplied #4 fitting, install and tighten. g. Route supplied oil feed line, attach and tighten as shown. h. Reconnect electrical connectors to sensors. 12

STEP 4 FUEL INJECTORS In this step we will be installing the precision matched higher flow rate injectors. a. Turn manifold upside down to drain any remaining fuel. Clean up fuel spill immediately to avoid fire hazard. b. Remove o-rings seals from manifold assy. to avoid contact with fuel, as they will change shape and no longer be usable. c. remove the torx bolts that secure the fuel rails to the intake manifold. d. remove the fuel rail from the manifold. e. Remove the injectors form the manifold or fuel rail as some may stick in the rail during removal. f. Lubricate injector orings and install in manifold. g. Carefully reattach fuel rail to injectors and manifold. h. Tighten fuel injector rail torx fasteners. i. Reinstall oring seals on both top and bottom of intake manifold. 13

STEP 5 RE-INSTALL THE LOWER INTAKE MANIFOLD In this step we will be reinstalling lower intake manifold to the engine. a. Clean mating areas with rag to ensure a good seal for the o-rings. c. Reinstall fuel feed line and safety lock. b. Carefully reinstall manifold using caution not to disturb orings. 14

STEP 6 RE-ROUTING OF PCV LINES In this step we will be... a. A. Remove the factory PCV lines shown. This shows their orientation in the vehicle. b. B. Remove the 3 hose ends as shown here. c. C. These are the original parts we will be using. Discard the other components. d. D. Attach the hose end to the tube as shown 15

STEP 6 RE-ROUTING OF PCV LINES In this step we will be... e. Attach the supplied pre-assembled hose as shown. f. F. Attach to the supplied air filter hose as shown. This will connect to the fitting on the air filter. 16

STEP 7 HEATER HOSES in this step we will be installing the heater hoses. The driver side heater hose goes to straight to the fitting near the alternator. The passenger side hose uses a T-fitting and goes to the hose under the manifold and around to the hose on front lower portion of engine. a. Remove clamp from hose end near lower intake manifold. b. Install hose with supplied clamp on bottom leg of heater hose assy. c. Install supplied heater hose to fitting near alternator and attach to driver side heater core tube. d. Attach supplied 55 hose to factory hose near lower radiator hose using supplied hose mender and clamps. e. Route the 55 hose up and around passenger side of engine. This hose will be attached to T-fitting later and will need to be carefully re-routed at areas near exhaust pipes. 17

STEP 8 TURBOCHARGER AIR FILTER in this step we will be making room for the tubrbocharger and the air filter. The filter will be installed and changed for regular maintenance. a. Access the air box support. Remove the front bolt near the power steering resorvoir. A portion of the air box support will be carefully trimmed and removed as shown in the pictures below. 18

STEP 9 TURBO OIL DRAIN In this step we will be preparing the oil pan for a turbo oil drain. a. Drain the engine oil from the vehicle and tighten the drain plug. b. Remove the oil pan bolts. c. Remove oil pan from the engine. Note: The oil pan is attached with sealant and will need to be pried off for removal. d. Clean oil residue from oil pan. Note: A wire wheel works well. e. Using a hole saw, drill a 7/8 hole as shown. Clean any burrs so surface is flat. Note: Do not drill directly under the pan bolt holes as it will cause the fitting to interfere with bolt installation. 19

STEP 9 TURBO OIL DRAIN f. Apply sealant between the nylon washer and the pan surfaces.(both sides) g. Attach oil drain fitting as shown with washers and sealant on both sides between washers and oil pan. h. Secure fitting to oil pan. Clean residue with dry rag. j. Apply sealant to oil pan surface going around inside of bolt holes. i. Clean engine oil pan mating surface with razor blade. 20

STEP 9 TURBO OIL DRAIN k. Reinstall oil pan to vehicle. 21

STEP 10 REMOVE THE FACTORY EXHAUST In this step we will be removing the factory exhaust. a. Remove exhaust hanger. b. Remove fasteners from right and left sides. c. Locate 4 oxygen sensor connectors and disconnect. d. The cat equipped pipes are a wedged flange design. Remove the top 2 bolts and just loosen the lower 2. e. Remove left and right cat equipped pipes. Note: carefully twist and wiggle, they will come out! 22

STEP 10 REMOVE THE FACTORY EXHAUST f. Ok, here is the fun part. Remove the Y pipe from the vehicle by loosening the 15mm clamp nut and getting some help from your friends. These are usually a bit stuck. Use some rust penetrant, twist and pull. You ll get it. 23

STEP 11 INSTALLING THE WASTEGATE AND TURBO PIPING In this step we are going to install the wastegate and turbo piping. All the exhaust must go to the turbocharger and then back out to the factory exhaust under the driver s seat. Note: DO NOT TIGHTEN EXHAUST UNTIL ALL PARTS ARE CONNECTED. The pipes are CNC bent and welded in large jig fixtures for consistency. a. Install wastegate to turbo feed pipe using V-band clamp but do not tighten all the way. It will need to be rotated as it meets the downpipe later. b. Install this pipe from underneath c. Attach passenger pipe to engine and turbo feed pipe. d. Install crossover pipe to driver side and turbo feed pipe. 24

STEP 11 INSTALLING THE WASTEGATE AND TURBO PIPING e. Position flanges so they do not interfere with suspension articulation. f. Install catalytic converter equipped extension pipe to factory exhaust under driver s seat g. Loosen 2 bolts under alternator. The downpipe brackets will attach here. h. Remove coolant reservoir 25

STEP 11 INSTALLING THE WASTEGATE AND TURBO PIPING i. Trim cooling fan shroud as shown. j. Install downpipe and attach to bracket and extension pipe but do not tighten. k. Position flange so it does not interfere with driveshaft articulation. 26

STEP 12 ADDING THE FLANGES TO THE TURBO In this step we are going to add the flanges to the turbo and rotate for proper orientation. The turbo charger is made of three sections. The Center, the Turbine housing (black side) and the Compressor housing (silver side). a. Using the supplied components, attach the flanges to the turbo center section. The smaller one is the oil feed and the larger is the oil drain. b. If necessary loosen the housings bolts and rotate to achieve the desired orientation. The rectangular turbo flange should be flat, the oil feed will feed directly from the top and the compressor discharge opening will also be straight up. c. Attach the oil drain hose to the turbocharger at this time. 27

STEP 13 INSTALLING THE TURBOCHARGER TO THE EXHAUST PIPING In this step we will be installing the turbocharger to the exhaust piping, adjusting and tightening all exhaust pipes. a. Feed the drain hose down as you lower the turbocharger on the flange. b. Using a long extension snug the turbocharger to the flange but do not tighten completely c. Carefully route and attach the oil feed line to the top of the turbocharger. This stainless steel braided line is coated to protect the surrounding components from abrasion. d. Take the time to route the heater hose away from all exhaust and come up the passenger side as shown. e. Attach downpipe to turbocharger using V-band clamp. 28

STEP 13 INSTALLING THE TURBOCHARGER TO THE EXHAUST PIPING f. Tighten exhaust bolts at engine cylinder heads (both sides). h. Tighten the downpipe to the catalytic converter equipped extension housing i. Tighten factory exhaust clamp. g. Tighten turbocharger to flange. Make sure air filter does not contact surrounding plastic when tight. j. Tighten all ball flanges making sure their orientation does not interfere or contact any components. 29

STEP 13 INSTALLING THE TURBOCHARGER TO THE EXHAUST PIPING k. Attach oil drain hose to oil pan. Make sure you hold base of fitting so it does not rotate while tightening. 30

STEP 14 INTERCOOLER MANUAL TRANSMISSION EQUIPPED ONLY Note: Proceed to step 5 if equipped with automatic transmission In this step we will clearance the core support and install the intercooler. a. Loosen bolts that attach compressor housing to turbocharger (this will allow the compressor housing to rotate). c. Remove air diverters and discard. We found this type of tool works well. b. Route wire harness near p/s reservoir up for increased clearance. 31

STEP 14 INTERCOOLER MANUAL TRANSMISSION EQUIPPED ONLY d. Clearance core support on both passenger and driver side for silicone hoses as shown. This tool works great! 32

STEP 14 INTERCOOLER MANUAL TRANSMISSION EQUIPPED ONLY e. Align the two tabs at the top of the intercooler, to the available factory hardware on your Jeep. f. Install and attach silicone hose on passenger side with clamps to intercooler but do not tighten g. Rotate compressor housing down and connect to silicone hose on passenger side with supplied clamps (inlet of intercooler) h. Tighten silicone hose at compressor housing and inlet side of intercooler 33

STEP 15 INTERCOOLER AUTOMATIC TRANSMISSION EQUIPPED ONLY In this step we will clearance the core support, install the intercooler and transmission cooler. a. Loosen bolts that attach compressor housing to turbocharger (this will allow the compressor housing to rotate). b. Route wire harness near p/s reservoir up for increased clearance. d. Remove air diverters and discard. e. Remove factory transmission cooler and disconnect pipes under driver side headlamp. c. Remove the factory transmission cooler and feed pipe assembly. 34

STEP 15 INTERCOOLER AUTOMATIC TRANSMISSION EQUIPPED ONLY In this step we will clearance the core support, install the intercooler and transmission cooler. f. Clearance core support on both passenger and driver side for silicone hoses as shown. This tool works great! 35

STEP 15 INTERCOOLER AUTOMATIC TRANSMISSION EQUIPPED ONLY g. Install supplied trans cooler as shown. Be sure to put foam spacer between trans cooler and a/c condenser to avoid abrasion under driver headlamp. h. Route hoses to existing transmission feed tubes and secure with clamps i. Align the two tabs at the top of the intercooler, to the available factory hardware on your Jeep. j. Install and attach silicone hose on passenger side with clamps to intercooler but do not tighten m. Tighten silicone hose clamps at compressor housing and inlet side of intercooler n. Install modified p/s bracket to reservoir o. Tighten compressor housing bolts k. Rotate compressor housing down and connect to silicone hose on passenger side with supplied clamps (inlet of intercooler) 36

STEP 16 COOLANT RESERVOIR In this step we will install a new coolant reservoir A. Remove the Fan Assembly B. Install the reservoir with bracket as shown C. Reinstall Fan Assembly 37

STEP 17 POWER STEERING In this step we will be replacing the high pressure power steering hose from the pump to the gear box. This is done to provide adequate clearance for the intercooler charge pipe on the driver side. a. Remove power steering high pressure hose from P/S pump to gear box. b. Install provided power steering adapter fittings in both the gear box and the p/s pump. c. Install provided high pressure power steering hose in the same location as old hose was removed. 38

STEP 18 POWER STEERING RESERVOIR In this step we will be modifying the power steering reservoir to make room for the front mounted intercooler. a. Remove the bracket that holds the power steering reservoir to the radiator core support. b. Modify bracket as shown in illustrations using diagonal cutting pliers. B. Modified bracket B. Modified bracket 39

STEP 18 POWER STEERING RESERVOIR c. Attached modified bracket to mounting stud in front of original location as shown. d. Modify reservoir using diagonal cutting pliers as shown. e. Do not attach reservoir to bracket at this time. This will give you room to route intercooler hose. 40

STEP 19 CHARGE PIPE In this step we will install the charge pipe and vacuum hoses a. Install shorter 2.5-2.5 90 degree silicone hose to driver side of intercooler b. Gently manipulate a/c line to allow room for charge pipe c. Install blowoff valve on charge pipe. Make sure you install rubber seal between pipe and base of BOV! d. Install longer 2.5-2.5 90 degree silicone hose between charge pipe and outlet side of intercooler. e. Install 2.5 3 90 degree silicone hose to charge pipe and throttle body f. Install supplied vacuum hose assembly to blowoff valve, intake manifold, wastegate and purge control valve per diagram. (Route away from any direct contact with heat source) Use zip ties where necessary. (add pic of diagram here) 41

STEP 20 ATTACHING THE WASTEGATE TO THE DOWNPIPE In this step we will be attaching the wastegate to the downpipe and installing the wastegate sensing line. a. Attach the wastegate to the downpipe using the supplied clamp. b. Install wastegate vacuum hose assembly as show in diagram. Purge Valve 10.5 15 1.75 Int ake manifold 25 14 Bl ow off valve Wasteg ate 42

STEP 21 PURGE THE TRAPPED AIR AND FILL THE COOLING SYSTEM In this step we are going to purge the trapped air and fill the cooling system. a. Remove the air bleed fitting on the thermostat housing. c. Top off cooling system and put radiator cap back on. b. Fill cooling system until coolant runs from fitting and then close quickly. 43

STEP 22 REINSTALL THE INTAKE PLENUM In this step we are going to reinstall the intake plenum, charge pipe and tidy things up a. Attach all o-rings on the lower intake manifold. b. Attach intake plenum. c. Reattach brackets. d. Remove factory map sensor. 44

STEP 22 REINSTALL THE INTAKE PLENUM e. Install supplied 3bar map sensor using provided harness adaptor. f. MAP Sensor adaptor 45

STEP 23 INSTALL THE UPPER CHARGE PIPE a. Install throttle body silicone and intake air temperature sensor in pre-punched hole on underside of hose going to throttle body b. Re-install the O2 sensors On driver side the white sensor is in the front position and the black sensor goes behind the cat converter On the passenger side the black sensor is in the front position and the white sensor goes behind the cat converter MAKE SURE THEY ARE IN THE PROPER POSTIONS! Use the 32 O2 extensions included with your kit Route the passenger side over the top of the transmission and the driver side along the frame rail Use zip ties to secure as necessary. 46

STEP 24 INSTALL PROGRAMMING In this step you will be updating the lntune to the latest Prodigy Tune, installing a new tune to the engine computer and programming the vehicle to work with the turbo system You will also be able to use the tool to calibrate tire size, gear ratio etc IMPORTaNT!! be careful NOT TO disturb VEHIcLE during THE FLaSHING PROcESS. IF THE cable IS disconnected, VEHIcLE S battery VOLTaGE drops TOO LOW. IF key cycle IS NOT FOLLOWEd ENGINE computer WILL crash and REQUIRE REPLacEMENT and PROGRaMMING. PROdIGY PERFORMaNcE IS NOT RESPONSIbLE FOR PcM FaILURE during WRITING PROcESS... Reconnect negative battery terminal. B. Turn of all electrical accessories. (radio, a/c, blower, lights. etc) C. Plug Diablo unit into the OBD2 connector at bottom of driver s dashboard D. Follow the prompts on the screen to load Prodigy Tune to the Vehicle. 47

STEP 24 INSTALL PROGRAMMING 1) In some cases, the tool may report that your vehicle needs a calibration update Should this be necessary, simply unplug the tool from the vehicle and plug it into your PC using the supplied USB connection. If the tool does not prompt you to that the vehicle needs a calibration update then proceed with loading the Prodigy Tune to your vehicle. The Calibration Update steps are not necessary for your particular vehicle. 2) The tool will be found under windows file explorer, just like you would find a jump drive, camera or any other device you would connect to your PC via USB. 3) Under the "i3" drive - go to updater 4) Select whether you're using a Mac or Windows PC 5) Select ignitioninstaller.cmd Run the program after it downloads Agree to the Terms and the program will be installed on your desktop 8) Open the ignition updater program. 9) The program will automatically load the calibration update for your vehicle. Once the update is installed, the Diablo device will display Calibration updated has been loaded 10) Disconnect the Diablo device from your PC and plug it in your vehicle via the OBD2 connection. 11) Follow the prompts to install the calibration update to the vehicle. 48

STEP 25 COMPLETION 1) Carefully follow the prompts to load the Prodigy Tune to your vehicle. Do not make mistakes during key cycles prompts. When the tool says key in off position, simply move key to OFF and THEN confirm by pressing the button on the display. When the tool says key in on position, simply move key to ON and THEN confirm by pressing the button on the display. 2) The programming is now complete.e are now going to review steps 1-23 to ensure all directions have been followed a. Check all fittings. b. Check all hoses. c. Cycle key from off to on 3 times. d. Check for fuel leaks. e. Start vehicle and run for 10 seconds. f. Check again for leaks (Fuel, Coolant, Oil, etc.). g. Idle vehicle until cooling fans come on, top off cooling system and install radiator cap. h. Test drive vehicle under light acceleration for one mile and verify installation success. i. Allow 50 miles of light to moderate driving before engaging vehicle in wide open throttle. j. No abnormal noises, vibrations, sensations should be present. k. Contact Prodigy Performance at 855-TURBOJEEP with any questions or concerns after analyzing first.. 49