Owner's Manual: 8000 BRUTE SERIES LIVE FLOOR CONVEYING SYSTEMS

Similar documents
MODEL HD-BTC. Installation, Operation & Repair Parts Information REV041416

Pneumatic Cylinder 14 Bore X 22 Stroke Part No. R (Formerly P )

Model CP420/CP425. Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual

Model GP Triplex Ceramic Plunger Pump Operating Instructions/ Manual

MODEL 5120 Tire Repair Station

Pneumatic Cylinder 14 Bore X 21 Stroke Part No. P Replaces Part No. P

INSTRUCTIONS PARTS LIST This manual contains important warnings and information. READ AND RETAIN FOR REFERENCE

MODEL EF Full Circle Tire Spreader

8700 Series 8900 Series Rolling Air Jacks

Operation & Service Manual

Extreme Duty Grapple (Rock, Skeleton, Scrap & Tine) Operation and Maintenance Manual

Model BP6150. Triplex Ceramic Plunger Pump Operating Instructions/ Manual

Model GX Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

INSTALLATION INSTRUCTIONS

MODEL G300 Brake Bleeder

MODEL G300 BRAKE BLEEDER

Air Control Kit INSTRUCTIONS-PARTS LIST. Table of Contents HIGH VOLUME. 250 psi (1.7 MPa, 17.2 bar) Maximum Air Inlet Pressure

P SERIES PUMPS. 18mm Versions Nickle-Aluminum Bronze Models: P , P , P , P , P , P , P

HYDRAULIC POWER PACK

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

Premium Supply. Direct Push. Models PCK-3530-DP PCK DP PCK-530-DP. Operator s Manual and Installation Instructions

IMPORTANT OPERATING CONDITIONS. Failure to comply with any of these conditions invalidates the warranty. STANDARD CONFIGURATIONS

OPERATING INSTRUCTIONS AND PARTS MANUAL

MULTIPOSITION AIR CYLINDER

MEX (55) QRO (442) Web Controls

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

4200 & 6200 Owner s Manual & Parts Book

Operating Manual High Viscosity Dispense Valve Item #

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

PARTS LIST. Guardian A- Series. Material Pumps

Getz Equipment Innovators 450 lb Portable / Wheeled Unit Dry Chemical Fill System Part No: 3G0061/3G0063

LUBRICATOR GUN INSTRUCTIONS-PARTS LIST. 10,000 psi (700 bar) Maximum Delivery Pressure. Detachable-type

Pump/Manifold Kits. Instructions F ENG. To convert E-Flo 4-Ball Piston Pumps to a different size lower. For professional use only.

15H882 Slider Bearing Kit

Under Axle Jack Max. Capacity: 25 Tons

Air Control Kits INSTRUCTIONS-PARTS LIST. Table of Contents HIGH VOLUME. 250 psi (1.7 MPa, 17.2 bar) Maximum Air Inlet Pressure

USER MANUAL. NEMA 48C Flange Mounted, Enclosed, Clutch Brake. FMCBE Model 500 FORM NO. L A (i)

CONTENTS. VIKING PUMP, INC. A Unit of IDEX Corporation Cedar Falls, IA USA SECTION TSM 710.1

Old Proportioning Pumps

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

Model GP5128. Triplex Ceramic Plunger Pump Operating Instructions / Manual

CRUSTBUSTER OWNER / OPERATOR MANUAL

Model GXR Series. Consumer Pump. Triplex Plunger Pump Operating Instructions/ Repair Instructions Manual

Model. Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual SP100W/SP351W

Pressure Roller with 24-inch Fixed Extension - For application of architectural paints and coatings -

Operation and Safety Manual

Spray Nozzle Adapters

Extreme Duty Grapple (Rock, Skeleton, Scrap & Tine) Operation and Maintenance Manual

Models P420A-3100 & P420A-5100

OWNER/OPERATOR MANUAL. Airmotor effective dia. in. 2.5

Heavy Duty Bottle Jacks

6200 Series. Specifications. Fluid End Power End Models 6211, 6212, 6221, & 6222 Models 6241 & 6242 Part Material Part Material Part Material

Operating Instructions & Parts Manual. Air/Manual Hydraulic Bottle Jacks

INSTRUCTIONS AND SERVICE MANUAL WITH PARTS LIST

Models GP5132, GP5136, GP5142 & GP5145. Triplex Ceramic Plunger Pump Operating Instructions / Manual

HM860 FLOWMETER OPERATOR S MANUAL DO NOT USE OR OPERATE THIS EQUIPMENT UNTIL THIS MANUAL HAS BEEN READ AND THOROUGHLY UNDERSTOOD

INSTALLATION INSTRUCTIONS AND OWNER S MANUAL

CDS-JOHN BLUE COMPANY

450 & Slant Top Owner s Manual & Parts Book

Owner s Manual & Safety Instructions

Operating Instructions and Parts Manual AHR-50 Auto Rewind Hose Reel

CRD610 Automatic Fitting Inserter

AEROMOTIVE Part # L 4V Fuel Rails INSTALLATION INSTRUCTIONS

MODELS 94100, 94300, and BARE REEL SERIES A OWNER/OPERATOR MANUAL

Installation and Service Manual Hydraulic Cab Tilt System

Model , Series A 9 in. (23 cm) roller frame with 45 angle and 12 in. reach 1/2 in. (13 mm) nap roller cover

MODEL 7400 STRUT SPRING COMPRESSOR

MODEL 5500 Tire Repair Station

Model GP5128HS. Hydraulic Drive Pump. Triplex Ceramic Plunger Pump Operating Instructions / Manual

HIGH PRESSURE CONTROL VALVE PISTON BALANCED

INSTALLATION INSTRUCTIONS

Telescopic Transmission Jacks

AS-57FMH Flush Mount Kit AS-57EBDBP

MODEL 7600 STRUT SPRING COMPRESSOR

CDS-JOHN BLUE COMPANY

OWNER S MANUAL Z SERIES TRACKS. Rev. 355_05

Series CP200. Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual. For Models: CP218 CP219 CP220 CP230

ASSEMBLY / OPERATION INSTRUCTIONS. Low Profile Motorcycle Dolly

J. & M. Mfg. Co., Inc. 284 Railroad Street - P.O. Box 547 Fort Recovery, OH Ph: (419) Fax: (419)

Power Train. Chapter 5

Operating Instructions & Parts Manual

UNIVERSAL CUSTOMIZABLE MUD FLAP INSTALLATION INSTRUCTIONS

SHEYENNE TELE-BOOM OWNERS MANUAL OPERATOR INSTRUCTIONS PARTS BOOK

JOHN DEERE 9970 COTTON PICKERS

TECHNICAL SERVICE MANUAL

LEWIS WINDROWER OWNER / OPERATOR MANUAL

APCO CRF-100A RUBBER FLAPPER SWING CHECK VALVES

Full View Flow Indicator

OWNER S MANUAL. LOEGERING th Street SE Casselton, ND USA Fax:

Hydraulic Transmission Jack, Telescopic

RAM 1500, 2019 CLASSIC & 2010-ON 2500/3500 INSTALLATION INSTRUCTIONS

Low Profile Service Jack Jack Stand Combo

48" and 52" Hyflo Fans Installation and Operators Instruction Manual

Premium Supply. Tilt Deck. Models PCK-TD PCK-PTD. Operator s Manual and Installation Instructions

INSTALLATION INSTRUCTIONS, PARTS LIST AND CONFIGURATION GUIDE FOR THE CARBONATOR. Large Model No

Premium Supply. Tilt Deck. Models PCK-TD PCK-PTD CTD-310-K. Operator s Manual and Installation Instructions

High Lift Transmission Jack

Installation Instructions

INSTALLATION INSTRUCTIONS

Air Actuated Hydraulic Bottle Jacks

Transcription:

Owner's Manual: 8000 BRUTE SERIES LIVE FLOOR CONVEYING SYSTEMS West Coast USA 6605 Ammunition Road P.O. Box 505 Tillamook, OR 97141 Ph. 800-542-5526 Ph. 503-842-8886 Fax: 503-842-4866 Central USA 8276 Hwy. 16 North Poteet, TX 78065 Ph. 877-425-5261 Ph. 830-742-8441 Fax: 830-742-8682 Web: www.hallcoind.com Email: info@hallcoind.com East Coast USA 480 Millrun Rd. Salisbury, NC 28144 Ph. 800-230-0190 Ph. 704-636-4122 Fax: 704-636-1644

-FOR YOUR SAFETY- Read Carefully Before Operating Floor This floor contains moving components and carries large loads which are capable of causing injury or death, if the following precautions are not followed carefully: Lock out or isolate the power source from floor while performing installation, inspections, cleaning, or maintenance. Keep all body parts clear of the floor mechanisms while the floor is operating. DO NOT operate floor while a person is on the floor. DO NOT stand at the opening of the container while the floor is unloading or in the way of the unloading doors which may be pushed by the moving load. Use caution when opening container doors even when floor is not operating. The load may have shifted against the door in transit causing the door to open rapidly when unlatched. DO NOT operate the floor in the unloading direction with the unloading door(s) closed. DO NOT shift the load material against the forward wall with the floor. The installing activity must provide a means for the operator to visually monitor the load when shifting it forward. This floor is capable of causing serious damage to the box structure and may pose a safety hazard, if the load is shifted against the rear or forward box structure. DO NOT operate floor above the maximum operating pressure specified in this manual. Observe Hallco safety sticker instructions. TABLE OF CONTENTS SAFETY...2 SAFETY & OPERATIONAL DECALS...3 HOW THEY WORK...4 FLOOR COMPONENTS... 5-6 SPECIFICATIONS...7 THEORETICAL UNLOAD TIMES...7 HYDRAULIC REQUIREMENTS... 8-9 OPERATING THE FLOOR...10-11 TROUBLESHOOTING...12 CLEANING...13 INSPECTIONS...13 REPAIRS...13-23 External Plumbing...14 Hydraulic Module Overhaul...15-19 Switching Rod Stops...20 Switching Valve Overhaul...21-22 Control Valve Overhaul...23 WARRANTY...24 2

TM SAFETY & OPERATIONAL DECALS Prior to operating the LIVE FLOOR system check that the safety and operational decals are installed on the container. Refer to Figure 1 (this page). FRONT MOUNT SAFETY AND OPERATIONAL DECAL PLACEMENT GUIDE #99-4400 #99-4806 #99-4807 #99-4808 1 2 3 4 Qty 3 Qty 3 Qty 2 Qty 2 #99-4399 5 Qty 1 #99-4398 1 7 6 4 3 2 Qty 1 #99-4401 Rear decals must be visible with the doors completely open! 7 4 5 6 Qty 1 1 Place Hallco logo decal on rear door. #99-4809 8 1 9 Qty 1 1 #99-4821 9 2 3 4 Qty 1 TM Copyright 2010 -Figure 1- Safety & Operational Decal Placement Guide 3 Doc # 99-5521-A

HOW THEY WORK 1. All Slats Move Together Moving the Load With Them. 2. One-Third of the Slats Retract. Two-Thirds Hold the Load. 3. Next One-Third of the Slats Retract. Two-Thirds Hold the Load. 4. Last One-Third of the Slats Retract. Two-Thirds Hold the Load. Cycle Repeats... -Figure 2- How They Work 4

FLOOR COMPONENTS Closely packed Bearing Chrome Shaft Switching Rod Shaft Clamp Hydraulic Module Guard and Support Structure Slat Several Slats Hidden, Front & Rear Cross Drives and Walls Cutaway Rear Hold Down Block Bearing Cutaway Isometric View Rear Trigger Cross Drive Side Wall & Several Slats Hidden Wiper Block Slope Sheet Deck Bolt Slat Spacer Nut Insert Continuous Bearing Sub-deck Front Hold Down Block Control Valve -Figure 3- Floor Components Sub-deck 5

Mounting Plate Part Number: 49-5282 8200 Series "BRUTE TM " Hydraulic Module 81-3223 1-14 Locknut Qty: 4 51-5313, Mounting Plate Gusset PN Varies Front Cross Drive Qty: 1 PN Varies Center Cross Drive Qty: 1 PN Varies Rear Cross Drive Qty: 1 81-5411 1/2-13 x 1-3/4 Flange Bolt Qty: 4 Per Slat 81-5702 R Washer, Nordlock, 1/2 x.13 thick Qty: 4 Per Slat 51-2803 Switching Rod Assy 81-3987 1-14 x 5-1/2 Bolt Qty: 4 51-4730 Front Trigger Qty: 1 51-4731 Rear Trigger Qty: 1 Slat Spacer (Based on Slat Profile) Qty: 1 Per Slat 81-5494, 1/2-13 Flanged Nut Insert Qty: 4 Per Slat 39-4093-9 9' [3 m] Long Continuous Bearing Qty: Varies with Floor Length -Figure 4- Drive Unit--Exploded View Loosely Assembled: 51-3397 Clamp Assy 51-3429 Clamp Spacer 81-5497 5/8-18 x 2 Flange Bolt 81-5697 Washer, Nordlock, 5/8 x.13 thick R 81-4111, 1-1/8 lock washer Qty: 3 81-4110, 1-1/8-12 x 2 bolt Qty: 3 PN Varies Side Trim (Based on Slat Profile) Qty: Depends on Floor Length PN Varies Wiper Block (Shape Based on Slat Profile) Qty: 1 PN Varies Slat (Many Different Profiles - See Deck Selection Guide) Qty: Depends on Floor Width PN Varies Std Bearing (Part Number Depends on Cross Member Size) Qty: Approximately 36 Per Foot [305mm] of deck length. 6

SPECIFICATIONS Hydraulic Module: 8200 (Two-Way) Maximum Hydraulic Pressure: 3000 psi [207 Bar] Maximum Hydraulic Flow Rate: 30 gal/min [114 l/min] Floor Stroke: 8 inches [203 mm] Hydraulic Module Shaft Diameter: 2 inch [51 mm] Hydraulic Module Cylinder Diameter: 4.1/2 inches [114 mm] Load Capacity: 40 Ton [36 Tonne] THEORETICAL UNLOAD TIMES Oil Flow (GPM [LPM]) -Table 1- Theoretical Minimum Unload Times 45 ft. [14 m] Container Cycle Time (seconds) Convey Speed* (ft./min. [m/min.]) Unloading Time* (minutes) 15 [57] 11.9 3.4 [1.02] 13.4 16 [61] 11.2 3.6 [1.09] 12.6 17 [64] 10.5 3.8 [1.16] 11.8 18 [68] 9.9 4.0 [1.23] 11.2 19 [72] 9.4 4.3 [1.30] 10.6 20 [76] 8.9 4.5 [1.36] 10.1 21 [79] 8.5 4.7 [1.43] 9.6 22 [83] 8.1 4.9 [1.50] 9.1 23 [87] 7.8 5.1 [1.57] 8.7 24 [91] 7.4 5.4 [1.64] 8.4 25 [95] 7.1 5.6 [1.71] 8.0 26 [98] 6.9 5.8 [1.77] 7.7 27 [102] 6.6 6.0 [1.84] 7.4 28 [106] 6.4 6.3 [1.91] 7.2 29 [110] 6.2 6.5 [1.98] 6.9 30 [114] 6.0 6.7 [2.05] 6.7 *Convey speeds and unload times shown are at 100% efficiency and do not account for such things as load slippage. Actual convey speeds and unload times vary by load type. 7

HYDRAULIC SYSTEM REQUIREMENTS Hydraulic Pump: Hydraulic Reservoir: Hydraulic Oil: Relief Valve: Filler Cap: Hydraulic Plumbing: Quick Connects: Filter: Pressure Gage: This floor is rated to 3000 psi [207 Bar] operating pressure. Installing a pump which provides lower output pressure may result in poor operation. Maximum flow rate is 30 gallons [114 liters] per minute. 30 gallons [114 liters] minimum capacity. The hydraulic reservoir must have facilities to mount the relief valve and a return line filter. Both of these items must dump the oil into the reservoir below the low level line. Hallco suggests a down draft be installed in the reservoir on the return line to limit the turbulence. The pump supply oil should be taken from 1 to 2 [25 to 51 mm] above the bottom of the reservoir. This outlet should be screened or baffled to prevent whirlpool. The whirlpool could introduce air into the system. A sight gauge or other means of visually checking oil level should be installed. Select a petroleum or mineral base anti-wear (AW) hydraulic fluid in ISO viscosity grade 46 or 68. Most synthetic and vegetable based biodegradable hydraulic fluids are also compatible provided the moisture content in the fluid is kept below 1%. Hydraulic fluid temperatures must always be kept below 200 F (93 C). The relief valve must be external, relieved directly to tank, and set at 3000 psi [207 Bar] maximum. The relief valve must be able to handle the maximum system flow rate. Filler cap must have a fill filter and a breather cap (sized greater than the system flow rate) unless breather cap is already provided separately. 1 [25 mm] size hydraulic hoses are recommended for the supply and return lines which connect to the switching valve ports labeled P for pressure and T for tank/return. See Figure 8 (page 14). Mating quick connects must be of the same type and must be rated above the maximum system flow. A 25 micron (or finer) filter rated above the maximum flow rate of the system must be installed on the return line. A good filter is essential to assure clean oil for a long system life. For units where quick connects are frequently connected and disconnected (where contaminants may be introduced) a pressure line filter is recommended between the quick connect and the hydraulic module. 0 to 5000 PSI [0 to 350 Bar] range, glycerin filled. 8

Filler Cap Breather Return Line Filter Tank Relief Valve Quick Connects Pressure Gauge Pump -Figure 5- Example Hydraulic Supply System 9

OPERATING THE FLOOR The hydraulic module which drives the deck slats can be configured for one-way and two-way operation. The one-way module is designed to move the load material in one direction only. The one-way module is controlled by a two-position valve, neutral and unload positions. The two-way module can move material in loading or the unloading directions. It is controlled by a three position valve (unload, neutral, load). Refer to Figure 6 (this page). Two-way operation is standard. Contact Hallco, if you need information about one-way configuration. When unloading material, or when shifting the load material in the unloading direction, make sure the exit door is fully open. When shifting the material in the load direction, be sure you have a visual means of monitoring the position of the load. The load must not be shifted against the forward wall. If the load is conveyed against the wall structure by the floor, it will more than likely cause structural damage to the box and put the operator and/or bystanders at a safety risk. NORMAL OPERATION IN UNLOAD MODE (One-Way & Two-Way Modules): 1. All deck slats move together towards the exit door. 2. First slat set (cross drive 1) moves away from the exit door. 3. Second slat set (cross drive 2) moves away from the exit door. 4. Third slat set (cross drive 3) moves away from the exit door. Cycle repeats. NORMAL OPERATION IN LOAD MODE (Two-Way Modules): 1. All deck slats move together away from the exit door. 2. Third slat set (cross drive 3) moves towards the exit door. 3. Second slat set (cross drive 2) moves towards the exit door. 4. First slat set (cross drive 1) moves towards the exit door. Cycle repeats. UNLOAD MODE: Pull the handle all the way out. NEUTRAL: Push the handle in until it hits the valve body. LOAD MODE (Two-Way): Turn the handle forward and push it all the way in. -Figure 6- Control Valve Positions 10

Front Wall 1 2 3 1 2 3 -Figure 7- Cross Drives and Shafts VERT IMPORTANT!!! Mounting, Clamp and Deck Bolts MUST be re-torqued several times during the first few months of operation. If this is not done bolts will loosen and cause damage! 11

TROUBLESHOOTING Experience has shown that most problems originate with the hydraulic supply system. If your floor is not functioning properly, first check for visible interference/damage of the floor structure or mechanisms, then check the hydraulic supply system. Problem: Floor does not operate or operates slowly First Check: (A) PTO. Is it fully engaged? (B) OIL. Is the oil reservoir full? (C) QUICK CONNECTS. Are they fully connected? Are they a matched set? (D) PUMP. Is the pump operating? Does it deliver the specified flow rate and pressure? (E) RELIEF VALVE. Is it set high enough (within specified limit)? (F) PLUMBING. Is the entire system plumbed correctly? If the problem persists Disconnect the pressure line from the hydraulic module. Attach a hydraulic pressure gage to the pressure line. Start up the hydraulic system (typically by engaging the PTO) and activate pressure to the pressure line. If the pressure gage shows sufficient pressure being supplied to the hydraulic module, then the hydraulic supply system is OK. If there is insufficient pressure being supplied to the hydraulic module, then the hydraulic supply system may need servicing. Common hydraulic supply system problems are defective pump and defective relief valve. If the pump ONLY becomes hot, that is a clue to a bad pump. Another clue to a bad pump is having to rev up the engine to get enough pressure to operate the floor. If the relief valve ONLY becomes hot, that is a clue that the relief valve is defective or has debris holding it partially open. If the hydraulic supply system checks out OK, but the floor still does not operate Check the setting of the switching rod stops. See page 20, Setting the Switching Rod Stops. Problem: Floor operates correctly except that the slats do not sequence properly. Adjacent slats (cross drives) move together when they should move one set at a time. Likely Cause:A poppet may have debris in the poppet seat, have a damaged poppet seat, or the poppet may not be seated correctly. To resolve this issue remove the poppet in question. Inspect the poppet seat for damage and debris. Remove any debris. Small amounts of debris can be flushed out by re-installing the poppet cap only (without the poppet valve and spring) and running the system, then re-install the poppet, spring, and cap. A leaky poppet seat can often be corrected with the poppet seating tool listed on page 15. Place the coned end of the tool into the poppet seat and tap the other end of the tool firmly with a hammer. If the problem is in unload mode: A poppet in the base manifold may be malfunctioning. Check the poppet between the shafts of the cross drives which move together. I.e. if cross drives 2 and 3 move forward together, remove the poppet between shafts 2 and 3 in the base manifold. Refer to page 11. If the problem is in load mode: A poppet in the head manifold may be malfunctioning. Check the poppet between the shafts of the cross drives which move together. I.e. if cross drives 2 and 3 move rearward together, remove the poppet between shafts 2 and 3 in the head manifold. Refer to page 11. If the above solutions do not bring the floor to correct operation Contact Hallco to talk with a technical representative and/or to make service arrangements. 12

CLEANING The floor must be cleaned regularly to prevent buildup of material which could cause the floor to operate inefficiently or bind. Areas affected may include, but are not limited to, between the deck slats, between the deck slats and sub-deck, between the deck slats and the forward wall, and between the deck and the exit door. The operator/owner should establish a cleaning cycle appropriate to the type of loads which are carried. The life of the floor will be maximized by regular cleaning. INSPECTIONS Inspect your floor regularly in order to monitor wear of your floor and to prevent further damage, if damage has already occurred. The following are some highlighted areas to inspect: Bolts: Decking: Bearings: Hydraulic Plumbing: Floor Structure: Hydraulic Module: Sloped Sheet & Wiper: The deck bolts, clamp bolts and mounting bolts connecting the deck slats to the cross drives and the cross drives to the drive unit and the drive unit to the container must be kept tight at all times! Loose bolts will damage your system. The bolts must be checked after the first 5 to 10 loads. Torque the deck bolts to 80 ft-lbs [108 N-m] (lubricate flange and threads). Torque the clamp bolts to 215 ft-lb [290 N-m] (lubricate flange and threads). Torque the mounting bolts to 800 ft-lbs [1080 N-m]. (See Installation Manuals). The deck and clamp bolts have two piece R Nord-Lock washers to prevent them from loosening yet allow re-torquing. Inspect for wear or damage. Inspect for wear or damage. Inspect the hydraulic system for leaks and abrasion wear. Maintain reservoir minimum/ maximum levels. Inspect floor structure including hydraulic module mount and framework, hydraulic shafts, shaft-to-cross drive connections, cross drives, and sub-deck for damage and wear. Inspect the hydraulic module for leaks, loose mounting bolts, loose manifold bolts, worn wipers and seals, and pitted/worn/damaged shafts. Make sure the sloped sheet is in good condition and that the wiper attached to the sloped sheet is keeping the gap between the forward wall and the end of the decking clear of material which could cause the floor to bind. REPAIRS Refer to the installation manual for repairs which extend beyond the scope of this owner s manual. Do not reinstall defective components into your floor system. Contact Hallco for replacement components. EXTERNAL PLUMBING Refer to Figure 8 (page 14) for plumbing details. Note that some hose lengths vary based on the floor width. 13 Doc # 99-5504-A

-Figure 8- Standard 8000 BRUTE Plumbing (Two-Way Operation) 3/4" Adj. Male O-Ring x 3/4" Male JIC 90_ #85-3369 Fitting, 3/4" Male Pipe 90_ x Male JIC 90_ #85-2953 3/4" Male Pipe x 3/4" Female Pipe Swivel #85-2661 3/4" Adj. Male O-Ring x 3/4" Male JIC #85-3371 3/4" Adj. Male O-Ring x 3/4" Male JIC 90_ #85-3369 Return, 3/4" Female Pipe Pressure, 3/4" Male JIC Base Poppets Hose, 3/4" x 33" (STD) OR 45" (Long) Long, 3/4" Male Pipe x 3/4 FJIC Swivel 90 86-5340 OR 86-5491 _ Hose, 3/4" x 26" (STD) OR 38" (Long) Long, 3/4" Male Pipe x 3/4 FJIC Swivel 90 86-5341 OR 86-5490 _ 2x Fitting, 3/4" Male O-Ring x 3/4" Female Pipe Swivel #85-3952 2x Fitting, 3/4" Male Pipe x 3/4" Female Pipe Swivel 90_ #85-2662 2x Fitting, 3/4" Adj. Male O-Ring x 3/4" Female Pipe Swivel 90_ #85-3953 Hose, 3/4" x 44" (STD) OR 56" (Long) Long, 3/4" Male Pipe x 3/4 FJIC Swivel 86-5338 OR 86-2985 Hose, 3/4" x 16" Long, 3/4" FJIC Swivel x 3/4 FJIC Swivel 90_ 86-5337 Hose, 3/4" x 16" Long, 3/4" Male Pipe x 3/4 FJIC Swivel 86-5339 Head Poppets 3/4" Adj. Male O-Ring x 3/4" Male JIC #85-3371 14

HYDRAULIC MODULE OVERHAUL -Table 2- Recommended Tools for Hydraulic Module Overhaul & Repairs Part Number Description 93-5525 Head Manifold Installation Tool 8000 BRUTE Series 56-3713 Poppet Seating Tool 3000, 6000, 8000 Series 85-2972 Pressure Gauge 0-5000 PSI 93-4311 Rod Seal Insertion Tool 93-5527 Tie Bolt Installation Tool, 7/8 Tie Bolts 8000 BRUTE Series Some hydraulic module repairs can be done with the hydraulic module in place. Other repairs and complete overhauls may require removing the hydraulic module. Hydraulic modules may be shipped to Hallco for overhaul. Hallco recommends including the switching valve for testing. Removing the Hydraulic Module Refer to Figure 4 (page 6). Detach the hydraulic hoses from the hydraulic module & catch the hydraulic fluid drips in a drip pan (temporary port plugs recommended). Remove the switching rod. Loosen the shaft clamps and remove the shaft end bolts. Support the weight of the hydraulic module. Remove the hydraulic module mounting bolts. Remove the hydraulic module by sliding it forward. Drain the hydraulic fluid from the hydraulic module before disassembling or shipping it. Disassembling the Hydraulic Module Refer to Figure 9 (page 17), and Table 3 (page 18). Hallco recommends tagging or organizing the components as they are disassembled in such a way that they can be installed in their original positions. This will also help with inspecting for damage and wear (for example: score marks on a barrel ID may correlate with piston and seal damage as well). Remove the switching valve (refer to Switching Valve Overhaul, page 21). Remove the switching valve mounting manifold. Remove the tie bolts. Remove the base manifold. Remove the barrels. Remove the piston nuts and pistons. Note: The piston nuts were installed with 600 ft-lbs [810 N-m] of torque. The shafts will need to be held securely to keep them from rotating. Be careful not to damage the shaft chrome in the sealing areas. Shafts of hydraulic modules rebuilt in place are kept from rotating by the cross drive clamps. Remove the shafts from the head manifold. Do not pull the externally exposed end of the shafts through the head manifold as roughness in the shafts could damage it. Remove the seals from the head manifold, base manifolds, and pistons. Poppet assemblies may be removed at any point. 15

Reassembling the Hydraulic Module Hallco recommends replacing all hydraulic module seals when overhauling a hydraulic module. Prior to reassembly inspect the components for wear and damage. Do not reassemble defective components. Replace the seals (lubricate with hydraulic fluid) in the head and base manifolds and on the pistons as shown in Figures 9 (page 17) & 11 (page 19). Use the shaft seal insertion tool listed in the recommended tools list, Table 2 (page 15), to insert the shafts seals. Install the poppet assemblies. Install seals on the head manifold, base manifold, and pistons. Assemble the shafts in the head manifold. Insert the piston end of the shafts into the head manifold. Insert the pistons (with seals) into the cylinder barrels. Install the cylinder barrels with pistons inserted. Note orientation of pistons. Secure the pistons with the 1-1/4 NF stover nuts. Lightly lubricate the threads and torque the nuts to 600 ftlbs [810 N-m]. Install the base manifold. Install the tie bolts and corresponding lock nuts. Make sure the tie bolts thread into the head manifold at least 1 [25 mm]. Snug up the lock nuts in the criss-cross pattern shown in Figure 10 (page 18). Tighten the ties bolts in the criss-cross pattern to 100 ft-lbs [136 N-m], then to 200 ft-lbs [271 N-m]. Install the switching valve mounting manifold (with seal). Torque the mounting bolts to 55 ft-lbs [75 N-m]. Install the switching valve (with seals). Torque the mounting bolts to 30 ft-lbs [41 N-m]. Installing the Hydraulic Module Install the hydraulic module into position in the reverse order of the way it was removed. Secure it in position with the mounting bolts and lock nuts. Snug up the lock nuts. Torque the hydraulic module mounting bolts to 800 ft-lbs [1080 N-m]. R Torque the shaft clamp bolts with Nord-Lock washers to 215 ft-lbs [290 N-m] (Lubricate flange and threads). Torque the shaft end bolts to 800 ft-lbs [1080 N-m]. Install the switching rod assembly. Note: the switching rod stops may require adjustment when the floor is ready to be operated. Refer to page 20. Re-connect the hydraulic plumbing. 16

Bolt, 1/2"NC x 6-1/2" #81-5624 (Qty 2) Fitting #85-3369 Valve Mounting Manifold #54-4112 5/8" Collar #51-2800 Switching Valve #56-3964 3/8" Washer #81-4497 5/16" NC x 1/2" Bolt #81-2507 Fitting #85-2686 Fitting #85-4755 Fitting #85-2953 Fitting #85-3371 Fitting #85-2901 Fitting #85-2661 Pressure Relief Valve Assy #56-4837 Nut, Nylon Insert, 7/8" NC #81-3218 (Qty 8) Switching Rod Assy #51-2803 3/8" NC x 4-1/2" Bolt #81-2537 (Qty 4) Lock Washer #81-2650 (Qty 4) Fitting #85-3371 8200 Head Manifold #54-4113 *Shaft Wipers *Shaft Seals *Shaft Wear Rings Fitting #85-3369 Center Shaft #55-3983 Left Side Shaft #55-3982 Piston Seals (Qty 3) Right Side Shaft #55-3984 Fitting #85-3371 8200 4.5" Piston #57-3587 (Qty 3) *Piston Wear Rings (Qty 3) 1-1/4" NF Stover Nut #81-3773 (Qty 3) Cylinders (Qty 3) #53-5291 *Cylinder O-Ring (Qty 6) *Cylinder O-Ring Parbak (Qty 6) Fitting #85-3369 8200 Base Manifold #54-4114 **Poppet Valve Assy (Qty 4) * Seals, Wipers, and O-Rings Included in Brute 8000 Seal Kit #50-3715 Tie Bolt - 7/8" Dia. (Qty 8) #58-5185 -Figure 9-8000 BRUTE Series Hydraulic Module--Exploded View O-Ring, 1-1/4" OD (Qty 2) O-Ring, 1" OD **Poppet Valve Assy Poppet Valve #56-3980 Poppet Spring #56-2714 Poppet Cap #85-3472 17

-Table 3- Parts List 8000 BRUTE Series Hydraulic Modules Qty P/N Description 2 81-5624 Bolt, 1/2 NC x 6-1/2 4 81-3987 Bolt, 1-14 NF x 5-1/2, GR-8 4 81-2537 Bolt, 3/8 NC x 4-1/2 1 81-2507 Bolt, 5/16 NC x 1/2 1 51-2800 Collar, 5/8 Long 3 53-5291 Cylinder, 8000 Series (8 Stroke) 1 85-2661 Fitting, 3/4 Adj. Male O-Ring x 3/4 Female Swivel Pipe 4 85-3369 Fitting, 3/4 Adj. Male O-Ring x 3/4 Male JIC 90 Degrees 3 85-3371 Fitting, 3/4 Adj. Male O-Ring x 3/4 Male JIC, Straight 1 85-4755 Fitting, 3/4 Male O-Ring x 3/4 Male Pipe 1 85-2953 Fitting, 3/4 Male Pipe x 3/4 Male JIC 90 Degrees 1 85-2901 Fitting, Pipe Nipple, 3/4 x 3 1 85-2686 Fitting, Tee, 3/4 Female Pipe 8 81-3218 Lock Nut, Nylon Insert, 7/8 NC 4 81-3223 Lock Nut, Stover, 1 NF 3 81-3773 Lock Nut, Stover, 1-1/4 NF 4 81-2650 Lock Washer, 3/8 1 54-4114 Manifold, Base, 8000 Series 1 54-4113 Manifold, Head, 8000 Series 1 54-4112 Manifold, Valve Mounting, 8000 Series 3 57-3587 Piston, 4.5 Diameter, 8000 Series 4 85-3472 Poppet Cap, 3000, 6000, 8000 Series 4 56-2714 Poppet Spring 4 56-3980 Poppet Valve, 8000 Series 1 56-4837 Relief Valve Assembly 1 50-3715 Seal Kit, 8000 Series 1 55-3983 Shaft, Center 1 55-3982 Shaft, Left Side 1 55-3984 Shaft, Right Side 1 51-2803 Switching Rod Assembly 1 56-3964 Switching Valve 8 58-5185 Tie Bolt, 7/8 Diameter (8 Stroke Unit) 1 81-4497 Washer, 3/8 USS 7 1 4 6 5 3 2 8 Tie Bolts Anchor Bolts -Figure 10- Manifold Torque Pattern 18

Cylinder Shaft Shaft Wiper Shaft Seal Shaft Wear Ring Head Manifold Barrel Seal Backup Barrel Seal (O-Ring) Piston Seal Piston Wear Ring Barrel Seal (O-Ring) Barrel Seal Backup Base Manifold -Figure 11- Seal Installation 19

SETTING THE SWITCHING ROD STOPS 1. Release and move stops A and B away from the front and rear triggers. 2. Move the switching rod forward toward the switching valve until it stops. 3. Apply hydraulic pressure (load or unload mode) until the shafts are fully extended rearward away from the switching valve, then shut off pressure. 4. Move the switching rod away from the switching valve until it stops. Move and set stop A firmly against the front trigger. 5. Apply hydraulic pressure until the shafts are fully retracted forward towards the switching valve, then shut off pressure. 6. Move the switching rod forward toward the switching valve until it stops. Move and set stop B firmly against the rear trigger. 7. Mark the positions of stops A and B on the switching rod. 8. Apply hydraulic pressure to the cylinders until the triggers are free from the stops by at least 3/8. Shut off the pressure. Move stop A 3/8 [10 mm] toward the front trigger and tighten firmly. Move stop B 3/8 [10 mm] toward the rear trigger and tighten firmly. Switching Valve 5/8" Spacer Collar Front Trigger Stop "A" Stop "B" Rear Trigger -Figure 12- Switching Rod Stops 20

SWITCHING VALVE OVERHAUL The switching valve can be overhauled to correct seal leakage only not bypass. If any of the major components require replacement, the entire valve will need to be replaced. If bypass is suspected because of overheating of the switching valve during operation, send the switching valve to Hallco for testing or replace entirely. Refer to Figure 9 (page 17) and 13 (page 22). Removing the Switching Valve Disconnect the switching rod mechanism. Remove the switching valve stop bolt, washer and collar. Remove the switching valve mount bolts. Disassembling the Switching Valve Remove the cap screws which attach the end caps to the valve body. Slide the end caps away from the valve body. Remove the pilot rod and the spool. Remove the o-rings and shaft wipers. Inspecting the Switching Valve Components Inspect the spool, pilot rod, spool bore, and pilot rod bores for scoring and burrs. Inspect all the remaining seal areas. The seal areas must be smooth and free of scoring and burrs. Inspect the fasteners and threaded holes for good thread engagement. Reassembly of the Switching Valve Hallco recommends replacing all the switching valve seals when overhauling the switching valve. Lubricate the shaft wipers and o-rings with hydraulic fluid and install them in the end caps. Lubricate the valve spool and pilot rod with hydraulic fluid and insert the spool into the valve body and the pilot rod into the spool. Center them on the valve body. Place the o-rings which go between one of the end caps and the body in their respective seal grooves and slide on the end cap. Note the location of the alignment pin. Repeat for the other end cap. Install the cap screws which hold the forward end cap on, snug them up, then torque them to 30 ft-lbs [41 N- m]. Use two of the same size cap screws to hold the rear end cap snug until it is ready to be installed on the hydraulic module. Installing the Switching Valve Install the switching valve onto the hydraulic module. Note that port P goes below port T, and the 1/4 NPT Plug is on the underside of the switching valve. Torque the mount bolts to 30 ft-lbs [41 N-m]. Reinstall the switching valve stop bolt, washer and collar. Reattach the switching rod mechanism making sure to include the switching rod stops (collars, rubber bumpers, washers). 21

*O-Ring Pair, Size 2-214 # 50-2847 Rear End Cap Valve Body Pilot Rod (Qty 5) *O-Ring, Size 2-117 (Qty 2) *O-Ring, Size 2-136 (Qty 4) Cap Screw 3/8" NC x 2.1/2" # 81-2529 Valve Spool *Indicates Contents of Switching Valve Seal Kit # 50-2709 Forward End Cap (Qty 2) *O-Ring, Size 2-210 (Qty 2) *Shaft Wiper 1/4" NPT Plug # 85-3489 -Figure 13- Switching Valve--Exploded View 22

CONTROL VALVE OVERHAUL The control valve can be overhauled to correct external leakage only. If the valve has excessive internal bypass, it will need to be replaced entirely. Refer to Figure 14 (this page). Disassembling the Control Valve Remove the cap screw and lock washer which attach the valve handle to the spool. Note: If the spool turns so that the screw cannot be removed, hold the end of the spool at the opposite end beyond the retaining ring with locking pliers or similar. Do not grip the area which slides in the valve body. Remove the spool by sliding it toward the retaining ring side. Note that the retaining ring does not have to be removed. Remove the two o-rings from the valve body. Reassembling the Control Valve Prior to reassembly inspect all components for wear and damage. Do not reinstall defective components. Replace the two o-rings in the valve body with new o-rings. Lubricate the o-rings with hydraulic fluid before installing them. Install the retaining ring on the spool, if it was removed. Lubricate the spool with hydraulic fluid and insert it into the valve body. Attach the valve handle with the cap screw and lock washer. Retaining Ring # 81-3031 Valve Spool Valve Body Valve Handle # 56-3943 3/8" Lock Washer # 81-2650 Valve Assembly # 56-3632 O-Ring Pair, Size 2-214 # 50-2847 Hex Head Cap Screw, 3/8"NF x 3/4" # 81-3255 -Figure 14- Standard Control Valve, Two-Way--Exploded View 23

WARRANTY Hallco Industries, Inc. ( Hallco or Company ) warrants to the original product purchaser ( Customer ) each of the Hallco LIVE FLOORS or its other floor systems manufactured and sold by it or any of its authorized distributors, when properly assembled and installed, to be free from defects in material and workmanship. This warranty expressly excludes deck seal, when used. Company s obligation to Customer under this warranty is limited to repairing or replacing, as herein provided, and at its sole option, any part or parts of the system which within twelve (12) months after delivery to Customer shall be found, upon examination by Company, to be defective, provided that such part or parts shall be returned, with insurance and shipping costs at Customer s expense, to Company s factory at 6605 Ammunition Road, Tillamook, Oregon 97141. Company must be notified in writing of any claim under this warranty within 30 days of any claimed lack of conformity of the product. WARRANTY SERVICE OPTIONS. For service under this warranty, Customer must notify Company in writing to obtain a Returned Material Authorization Number (RMAN). When requesting your written RMAN, specify in writing the part in question by part number & applicable purchase order number. Customers in countries other than the United States should contact Company s authorized representative in such country, when applicable. WARRANTY EXCLUSIONS. Representatives of Company are not authorized to modify this warranty in any way. It is the Customer's responsibility to regularly examine the product to determine the need for normal service or replacement. This warranty does not cover the following: - Products that have been modified, altered, neglected or poorly maintained, misused, abused or involved in accidents or natural disasters, or repaired other than by Company in accordance with these warranty procedures; - Damage occurring during shipment of the product. (Such claims must be presented directly to the freight company). - Damage to the product resulting from improper maintenance or repair, the use or installation of parts and or accessories not manufactured by Company, or which are not compatible with the system, or failure to follow product warnings and usage instructions. - Normal wear and tear. - Any product for which Customer does not follow the warranty procedures stated above. WARRANTY LIMITATIONS. THIS WARRANTY IS MADE EXPRESSLY IN LIEU OF ANY OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY IMPLIED WARRANTY OF MERCHANT ABILITY OR FITNESS FOR ANY P ARTICULAR PURPOSE, AND OF ANY OTHER OBLIGATION OR LIABILITY ON THE PART OF THE MANUFACTURER. In no event shall Company be liable for any loss, inconvenience or damage, whether direct, incidental, consequential or otherwise, except for the repair or replacement obligation as set forth herein. Some states or countries do not allow limitation on how long an implied warranty lasts and some do not allow exclusions or limitations of incidental or consequential damages, so the above limitations or exclusions may not apply to you. This warranty will be interpreted pursuant to the laws of the United States and the State of Oregon. HALLCO INDUSTRIES, INC. - P.O. BOX 505 - TILLAMOOK, OREGON 97141 PHONE (800) 542-5526 - FAX (503) 842-4866 24